|
|
FY 2000 PLHD Awards
| State |
Project Description |
Total Award |
"Earmarked" Portion ** |
Discretionary Portion |
| Alaska | Chugach National Forest, Bird Creek road widening and public safety project - Road and parking lot improvements at Chugach State Park Bird Creek fishery | $871,000 | $871,000 | |
| Alaska | Katmai National Park, Lake Camp access, Bristol Bay Borough - Construction of boat ramp, 2 docks, parking lot, picnic shelters, restrooms, interpretive exhibits, and other amenities | $958,100 | $958,100 | |
| Alaska | Kenai Fjords National Park, Exit Glacier Road, Kenai Peninsula Borough - Rehabilitation and paving of 1.5 miles of roadway and loop parking area | $958,100 | $958,100 | |
| Alaska | Donlin Creek Access Road near Village of Crooked Creek - Preliminary engineering and environmental coordination for construction of approximately 15 miles of roadway between Crooked Creek and Donlin Creek | $435,500 | $435,500 | |
| Alaska | Skyline Drive from West Hill Road to East Hill Road (MP 4.83 to 8.02), in Homer, Kenai Peninsula - Rehabilitate, and resurface approximately 3 miles of roadway and construct trail connection and landscaping | $435,500 | $435,500 | |
| Arizona / Nevada | US-93 Hoover Dam Bypass (Phoenix-Las Vegas Highway) in the Lake Mead NRA, Mohave County, AZ and Clark County, NV - Preliminary engineering, right-of-way acquisition and utility relocation | $6,000,000 | | $6,000,000 |
| Arizona | Diamond Bar Road (Mohave County Route 261) near the Hualapai IR in Mohave County - Reconstruction of 14 miles of roadway | $1,000,000 | | $1,000,000 |
| California | Doyle Drive (US Hwy 101) in the Presidio of San Francisco NP in the Golden Gate NRA in City and County of San Francisco - Environmental and preliminary engineering for reconstruction of 1.1 mile of roadway (This request is for additional funding necessary to complete environmental studies) | $1,600,000 | | $1,600,000 |
| California | Juan Bautista de Anza National Historic Trail in Imperial, San Diego, Riverside, Los Angeles, Ventura, Santa Barbara, San Luis Obispo, Monterey, San Benito, Santa Clara, San Mateo, San Francisco, Alameda, and Contra Costa Counties - Installation of historic trail markers along 900 miles of road | $200,000 | | $200,000 |
| Colorado | U.S. 50, U.S. 285 and SH 291 at the Arkansas Headwaters Recreation Area in BLM lands in Fremont and Chaffee Counties - Resurfacing of 19 miles of U.S. 50, guardrail replacement, and access and safety improvements at four recreation site entrances | $4,225,000 | | $4,225,000 |
| District of Columbia | E Street, NW, from 15th Street through President's Park to vicinity of 18th Street, National Capital Parks - Central - Rehabilitation and reopening of westbound E Street | $1,500,000 | | $1,500,000 |
| District of Columbia | Independence Ave. from Kutz Bridge (17th Street) to 14th Street, and Maine Ave. from Independence Ave to 14th Street - Roadway rehabilitation | $1,500,000 | | $1,500,000 |
| Florida | Timucuan Ecological and Historic Preserve, Duval County - Bicycle touring path | $871,000 | $871,000 | |
| Hawaii | State Route 270 (Kawaihae Road) at intersection with Spencer Beach Road at the Pu'ukohola Heiau National Historic Site, Island of Hawaii, Hawaii County - Intersection improvements | $1,127,383 | $1,127,383 | |
| Hawaii | State Route 270 (Kawaihae Road) at intersection with Park Maintenance Road at the Pu'ukohola Heiau National Historic Site, Island of Hawaii, Hawaii County - Intersection improvements | $614,617 | $614,617 | |
| Hawaii | Kealia Pond NWR Entrance Road at Mokulele Highway intersection, Kihei, Island of Maui, Maui County - Rehabilitation of roadway, intersection improvements, and resurfacing parking lot | $958,100 | $958,100 | |
| Hawaii | Keanakolu Road at the Hakalau Forest NWR, Island of Hawaii, Hawaii County - Roadway rehabilitation | $348,400 | $348,400 | |
| Idaho / Wyoming | Teton Pass Trail, Stage 2, between Victor, ID and Wilson, WY, Teton County, Idaho, and Teton County, Wyoming in the Bridger-Teton and Targhee NFs - Design and construction of non-motorized trail segments | $1,300,000 | | $1,300,000 |
| Idaho | US-89 from West Forest Boundary to Bishoff Canyon, in Caribou NF, Bear Lake County - Roadway reconstruction | $1,742,000 | $1,742,000 | |
| Kentucky | Daniel Boone Parkway from MP 37.6 to MP 39.0, Leslie County - Widening of roadway, center barrier wall, and rural ITS measures | $1,742,000 | $1,742,000 | |
| Louisiana | Highway 117 from US-171 to Louisiana Highway 6, Vernon and Natchitoches Parishes - Feasibility study for upgrading 2-lane facility to 4-lane | $435,500 | $435,500 | |
| Michigan | FH-8 (County Road H-40) from Mackinac County line east 17.5 miles through the Hiawatha NF to Fibre, Chippewa County - Roadway rehabilitation and resurfacing | $400,000 | | $400,000 |
| Mississippi | Bear Garden Road at the Yazoo NWR, Washington County - Roadway rehabilitation and site improvements | $320,000 | | $320,000 |
| Montana | Big Mountain Road (Montana Secondary Route 487) from East Lakeshore to Big Mountain Ski Resort, Flathead County - Design and right-of-way acquisition for roadway realignment | $4,267,900 | $4,267,900 | |
| Montana | Montana Secondary Route 323 from Ekalaka to Alzada, Carter County - Environmental study and design for southern 46.9 miles of Highway 323 | $1,916,200 | $1,916,200 | |
| Montana | Lemhi Pass Road (Trail Creek Road) from Highway 324 to Bar TT Ranch west of Clark Canyon Dam, Beaverhead County - Roadway widening, drainage, and gravel surfacing | $1,742,000 | $1,742,000 | |
| Montana | North Fork Road (MT Secondary 486) from Canyon Creek 9.2 miles north to Camas Creek, near Columbia Falls, Flathead County - Roadway rehabilitation and resurfacing [The FHWA Administrator approved transferring the $2,090,400 funds for this project to the Big Mountain Road project] | | | |
| Nebraska | Boyer Chute NWR access roads (County Roads P-51, 51 & 34) from Douglas County Line north 5 miles to Boyer Chute NWR - Roadway reconstruction | $1,306,500 | $1,306,500 | |
| New Jersey | Delaware Water Gap National Recreation Area, Warren and Sussex Counties - Design and reconstruction of 3 roadways (North Old Mine Road, South Old Mine Road, Route 113), including bridge rehabilitation | $2,961,400 | $2,961,400 | |
| New Mexico | NM-537 from MP 42.60 north for 13 miles to US-64, on the Jicarilla Apache IR, Rio Arriba County - Roadway reconstruction | $2,680,000 | | $2,680,000 |
| New Mexico | New Mexico Route 4 (Jemez Pueblo Bypass) on the Jemez Pueblo Indian Reservation, Sandoval County - Location study, preliminary engineering and design of bypass around Walatowa | $435,500 | $435,500 | |
| Oregon | Historic Columbia River Highway, MP 41.8 to 42.8, Starvation Creek to Viento segment, Hood River County - Construction of non-motorized trail | $435,500 | $435,500 | |
| Oregon | US-26 (John Day Highway), from MP 190.6 to 200.0, Austin Junction to Baker County line, in Malheur NF, Grant and Baker Counties - Roadway reconstruction | $5,661,500 | $5,661,500 | |
| Rhode Island | Blackstone River Valley Bikeway, Segment 7, from the Manville section of Lincoln to Davison Street in Woonsocket, in the Blackstone River Valley National Heritage Corridor, Providence County - Design and construction of Segment 7 (3 miles) of the bikeway, including two small bridges | $1,742,000 | $1,742,000 | |
| Utah | State Route 248 Access to 2002 Olympic Venues, from SR-224 in Park City northeast to US-40, near Wasatch and Uintah NFs, Summit County - Roadway reconstruction | $3,222,700 | $3,222,700 | |
| Utah | Soldier Hollow Access (US-40, Tate Lane, and US-189) to the 2002 Winter Olympics cross-country skiing and biathlon venues, near Uintah NF, near Heber City, Wasatch County - Roadway reconstruction | $2,613,000 | $2,613,000 | |
| Virginia | Access road from US-60 (Warwick Blvd.) over the Warwick River to Fort Eustis, City of Newport News - Completion of engineering and construction of 3-lane access road and bridge, and intersection improvements at US-60 | $1,000,000 | | $1,000,000 |
| Virginia | Chincoteague National Wildlife Refuge, Accomack County - Design and planning for education and interpretive visitor center, initial site preparation, bike and pedestrian trails, parking lots, road realignment and upgrade, building demolition, utilities | $871,000 | $871,000 | |
| Washington | Middle Fork Snoqualmie River Road (Forest Highway 29), Snoqualmie Valley (Forest Service), King County - Roadway reconstruction, including roadway and bridge widening, drainage improvements, and paving | $1,742,000 | $1,742,000 | |
| West Virginia | New River Gorge National River, Pave and Realign Cunard Road, Fayette County - Roadway realignment and paving | $836,160 | $836,160 | |
| West Virginia | Harpers Ferry National Historical Park Shoreline Drive and other road improvements, Jefferson County - Design and construction of roadway rehabilitation, parking area reconstruction and amenities | $2,090,400 | $2,090,400 | |
| Wyoming | Wamsutter Railroad Overpass at Broadway Street adjacent to BLM lands, Sweetwater County - Design of railroad grade separation | $400,000 | | $400,000 |
| TOTALS | 41 Projects | $65,465,960 | $43,340,960 | $22,125,000 |
** This funding was designated by Congress in the FY 2000 DOT Appropriations Act (Public Law 106-69) conference report (House Report 106-355).
|
Contact
Aron Reif
Federal Lands Highway 202-366-9489 E-mail Aron
|