FY 1998 PLHD Awards
| State |
Project Description |
Total Award |
"Earmarked" Portion |
Discretionary Portion |
| Alaska | Walden Point Road near Metlakatla IR on the Annette Islands Reserve near Ketchikan in Southeast Alaska - Relocation of the Metlakatla Indian Community's water line and electrical power plant, and design | $1,200,000 | | $1,200,000 |
| Arizona | Claypool-Jakes Corner Highway, State Routes 88 & 188, Wheatfields Area - Hicks Wash, Phase II, Tonto NF, Gila County - 2.5 miles of grading and drainage, and 6.7 miles of paving | $5,800,000 | | $5,800,000 |
| California | Auburn-Foresthill Road (FH 124, FAS Y133, Co.Rd. G0088), Placer County - Reconstruction of approximately 6.7 miles of existing roadway (Phase 3 of 3) | $3,400,000 | | $3,400,000 |
| D.C. | E Street N.W., through President's Park, 15th St. to 18th St. - Reconstruct and reopen two lanes of westbound E St. NW as a surface street including bicycle and pedestrian elements between 15th & 17th Streets | $500,000 | | $500,000 |
| Idaho | Mesa Falls Scenic Byway (FH-62) from SH-47 east of Ashton to US-20, in the Targhee NF, Fremont County - Reconstruction of 15.8 miles of roadway | $4,000,000 | | $4,000,000 |
| Michigan | Forest Hwy 8 (Bamfield Road) from AuSable River west 3.2 miles to FH 5 (Curtisville Road), in Huron NF, Alcona County - Reconstruction of 3.2 miles of roadway including asphalt surfacing and shoulders | $500,000 | | $500,000 |
| Nevada | Pahrump Valley Road, State Route 160, from 19.5 to 2.2 miles south of the Nye County line (final of five segments), Clark County - Construct new 36' divided 2-lane EB roadway and overlay existing 2-lane for WB traffic | $10,000,000 | | $10,000,000 |
| New Mexico | NM 537, from mp 37.9, 17.8 miles south of US 64, north for 2.1 miles, in Jicarilla Apache IR, Arriba County - Reconstruction | $525,000 | | $525,000 |
| Utah | State Route 35 (Forest Highway 5, Wolf Creek Pass Road), from mp 2.4 to 18.0, Unitah NF, Wasatch County - Pave the previously graded road | $3,000,000 | | $3,000,000 |
| Vermont | Forest Hwy 3 from Town Hwy 2 to Hapgood Pond Entrance, 2.61 km, Peru, Bennington County - Pavement base repairs, replacement of existing drainage crossings, resurfacing with 25 mm overlay | $100,000 | | $100,000 |
| TOTALS | 10 Projects | $29,025,000 | $0 | $29,025,000 |
|