Relationships Between Asset Management and Travel Demand:
|
| MDOT's Road Quality Forecasting System (RQFS) | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
QFS is a forecasting tool that predicts future performance of a pavement network under a variety of investment scenarios, allowing users to compare the relative merits of various strategic alternatives. RQFS inputs include the following:
Alternative strategies are developed based on the available resources and typically include a mix of fixes. Although RQFS does not select projects, users can identify the most cost-effective overall network strategy, then identify specific projects to achieve that strategy. |
Some of the above measures are obtained using Michigan's Road Quality Forecasting System (RQFS), a pavement management tool that draws on current pavement age, condition data, and investment strategies to forecast future conditions. For example, Exhibit 4-2 provides a sample RQFS output based on a hypothetical investment scenario. The exhibit shows current and future RSL. The tool is also used to identify a cost-effective "mix of fixes" for pavement preservation. MDOT also maintains a similar program, the Bridge Quality Forecasting System (BQFS), for prioritizing bridge projects.
Over time, MDOT staff have continued to improve and refine their TAM capabilities and tools such that today, the staff's recommendations for system preservation activities are generally accepted by the state Transportation Commission, although the Commission may still exercise its discretion to alter resource allocation commitments. The analytical rigor of the state DOT's recommendations include the following:
Exhibit 4-2: Example RQFS output based on a hypothetical investment scenario (Description)

Capacity-related projects in Michigan are prioritized by the Project Planning Division at the statewide level. Each proposed project undergoes an evaluation that is objective "to the extent possible." Analysts take a benefit-cost approach that draws on existing sources of data from the CMS and other sources to produce a score for each proposed project.
As noted above, Michigan law stipulates that 90 percent of all state transportation funds be devoted to preservation. Of the remaining 10 percent available for system expansion and other uses, most are dedicated to Congressionally-earmarked projects. As a result, the state Transportation Commission has not recently exercised its authority to decide allocation of resources to capacity-related projects.
| MDOT's MAPSCORE |
|---|
|
MAPSCORE is a decision-support software tool used by MDOT staff to provide input to professionals regarding the relative merits of various transportation projects. Since MDOT relies on its regional offices to a large extent for identification and prioritization of projects, MAPSCORE provides staff with an objective tool for verifying regional input and for providing feedback on the project prioritization process. MAPSCORE uses a variety of input measures to produce a single evaluative measure for each project. Input measures include the following, each converted to a value ranging from 1-100 and weighted according to the percentages indicated:
|
Michigan tracks current measures of travel demand through annual traffic counts along its trunkline highway system. As noted above, these counts are maintained in the TMS. Specifically, these data include raw vehicle counts, classifications by vehicle type (e.g., small and large truck counts), intersection counts, speeds, travel time delays, and special studies.
MDOT currently produces a statewide travel demand model and, like many states, is in the process of refining and improving the model's capabilities and uses. In addition, there are 12 MPOs in Michigan, each of which produces its own regional travel demand forecasts (7 of which are maintained by MDOT staff on behalf of some of the state's smaller MPOs). Input data for the statewide model include the MPO models themselves, traffic counts from the primary highway network, and projected growth rates in population. Model outputs include projected traffic flows, estimated travel speeds, travel paths, commodity flows, and VMTs. The travel demand model is used to estimate future congestion (i.e., volume-to-capacity ratios), VMT, level of service (LOS), and future highway user-tax revenues. In addition, the output data are co-located with other data (e.g., location, roadside features, and pavement condition of highway segments or links) and are accessible by all internal DOT customers for their own independent analyses. MDOT also has a truck model used to analyze current and project future truck movements throughout the state. The Transportation Planning Division uses these data as inputs for validation of the statewide travel demand model. Like many state DOTs, MDOT is in the process of refining and improving the model's capabilities and uses. Although not all aspects and data that compose the modeling process are captured specifically in the CMS, all model outputs are made available through the TMS.
| MDOT's Integrated Call for Projects |
|---|
|
In order to ensure that district-recommended reconstruction and rehabilitation (preservation) projects can be evaluated commensurably at a statewide level, MDOT requires that district managers submit their annual project lists together with detailed information about the projects, their costs, their geometry, their impacts, and other features. Following are specific considerations that are required elements of each districts submittal to the annual Call for Projects:
Once compiled, the data gathered through the Call for Projects provide statewide staff with yet another tool for evaluating the relative costs and benefits of projects across all districts. Together with input from RQFS and MAPSCORE, asset managers can draw on the Call for Projects documentation as a reference point for developing statewide prioritization of preservation projects. In addition, decision makers can use information from the Call for Projects for further analysis of a particular project with unclear or inadequate justification. |
Following are documented ways in which travel demand data are used by MDOT to support asset management processes or where asset management processes are used to address future travel demand issues.
As with most other states, MDOT uses estimates of future equivalent single-axle loadings (ESALs) during initial pavement design. While this process generally ensures that pavement standards are sufficient to sustain future traffic volumes and truck weights, the volume of traffic actually realized can differ from that predicted during the design phase, potentially leading to accelerated rates of pavement deterioration.
To account for this and other deterioration drivers, MDOT models deterioration of pavement on a segment-by-segment basis by fitting curves to observed pavement condition data over a period of at least three years (i.e., at least three data points are required to create a deterioration model for a given segment). These segment-specific curves are then used to predict future pavement deterioration on each individual stretch of roadway. While this pavement deterioration modeling process does not make explicit use of current travel demand measures for each segment, the process of using segment-specific models (based on segment-specific historical data) does yield an implicit measure of the impact of auto and truck demand on pavement deterioration.
Travel demand measures are built into the decision-making process for preservation projects by way of the MAPSCORE project evaluation process. In addition to other project evaluation criteria (see callout box), MAPSCORE considers the travel demand related measures of project cost per VMT and return on investment (ROI). The first measure focuses on cost per mile of travel on rehabilitated facilities, while the second incorporates measures of user benefits (travel time reductions) that scale as travel demand increases. Using this process, MAPSCORE helps to ensure objective and consistent project selection across each MDOT district.
MDOT uses the results of the statewide travel demand and truck models as well as output from the local MPO models to help identify capacity needs. Using output from these models combined with other related measures (e.g., LOS, trade, population, employment), MDOT has identified several prioritized "corridors of highest significance" requiring major capacity improvements. MDOT's "corridors of highest significance" are discussed in detail in Chapter 5.
As with other states included in this study, MDOT also uses travel demand forecasts to help evaluate the cost-effectiveness (benefit-cost analysis) of major investment projects and their alternatives.
MDOT maintains crash data used to identify the locations of "problem areas" on its network. Analysis of these data are then used to help target the location of safety-improving investments. In practice, the implementation of safety-improving investments is frequently coordinated with other required investment activities (e.g., preservation, expansion). In addition, MDOT uses its historical crash rate data combined with traffic count data to pre-position emergency response equipment, particularly during periods of high traffic demand or inclement weather.
As already noted, the Michigan legislature has mandated that the state devote 90 percent of transportation resources to preservation, maintenance, safety, and operations of existing facilities. In general, the remaining 10 percent of funds are available for capacity enhancement, but often must be applied to specific, Congressionally mandated projects. This situation naturally constrains MDOT's ability to "optimize" the allocation of funds between these two investment options.
MDOT's performance targets, like its TAM program, are preservation-focused. In contrast, the agency's strategic goals and objectives (as identified in MDOT's long-range transportation plan) do include travel demand and travel demand management-related goals such as mobility and land use coordination. Long-range goals and objectives are discussed further in the next chapter.
Like MDOT, UDOT operates in a somewhat decentralized fashion. Project recommendations are made at the headquarters or central office through tactical and strategic asset management practices. These recommendations form the 10-year Preservation Plan and are incorporated into UDOT's SLRP. The two plans are then used by leaders within each of the department's four regions to produce the STIP that looks at four years of committed projects and a further two years of concept development projects. Also like Michigan, this allocation is informed by quality data and decision-support tools that have earned UDOT strong credibility with its politically appointed Transportation Commission, upper management, and state legislature. Exhibit 4-3 presents UDOT's organizational structure.
Exhibit 4-3: UDOT's organizational structure (Description)
Full-size PDF

Asset management principles have been adopted by UDOT's Systems Planning and Programming group, which includes the Systems Data and Pavement Management, Planning, Program Financing, and Statistics/Data divisions. Staff in these divisions collectively carry out the collection of system inventory and condition data, technical support for MPO models, project-specific traffic modeling, monitoring of system performance relative to performance standards, optimization of investment scenarios, and recommendation of resource allocation. Programming of preservation projects is based largely on the data and recommendations produced by the Systems Planning and Programming staff, but project selection occurs at the regional level.
In Utah, the Systems Planning and Programming group is the "champion" of asset management, and its success is evidenced by the credibility that their products enjoy with decision makers.
As with the other participant states, asset management at UDOT tends to be preservation oriented. The following are descriptions of the key components of UDOT's existing asset management program.
UDOT's policy is to address all preservation needs for existing infrastructure before committing funds to expansion projects. Given the limited availability of state funds and the common challenges of preserving an aging highway system, UDOT has had limited ability to fund expansion projects in the recent past. As in Michigan , this has resulted in the deferral of capacity-related projects. However, the strength and credibility of the asset management program's analyses have yielded increases in available funding for expansion projects, with positive impacts to the state's highway users.
UDOT has established its "final four" strategic goals, which are to "take care of what we have," "make the system work better," "improve safety," and "improve capacity." The TAM program addresses each of these goals through a variety of objectives, which include those listed below. UDOT has a policy that defines a hierarchy of how funds are allocated between three of the four strategic goals. Funds are allocated to: first, "take care of what we have;" second, "make the system work better;" and third, "improve capacity;" while dedicating funds to "improve safety." This prioritized ordering of these goals reflects the state's current emphasis on system preservation (the first goal) versus the travel demand-related goal of capacity improvements (the last goal).
As with each of the other study states, Utah employs pavement management, bridge management, and maintenance management systems for the ongoing maintenance of highway and highway-related infrastructure. Each of these systems is supported by databases housing inventories of the state's highway related assets including pavement, bridges, signs, guard rails, and other facilities. UDOT has integrated these tools into a comprehensive asset management system (AMS).
UDOT has developed an AMS within the commercially available software package called dTIMS CT. The AMS uses data and models from the other tactical management systems and houses data similar to MDOT's TMS, including asset information data such as inventory, conditions, and crashes, and travel demand data such as AADT and travel forecasts. Data related to TAM are collected similarly in Utah as in other states; each management system (bridge, pavement, safety, and maintenance) has its own source.
UDOT then performs a strategic analysis, including cross-asset analysis and optimization across the asset groups. Currently, UDOT has implemented pavements, bridges, safety, mobility, and maintenance analyses into the dTIMS CT AMS.
Utah has completed the implementation of the decision-support software tool dTIMS-CT, which analyzes alternative infrastructure preservation and maintenance investment scenarios and produces "optimal" resource-allocation strategies. Although initially focused on pavement preservation alone, dTIMS CT has been implemented to allow for a more complete analysis of all project types, including pavements, bridges, safety, maintenance, and capacity projects. The goal of the AMS is to allow analysts to produce "apples-to-apples" measures of the benefits of all projects relative to UDOT's goals and objectives.
In recent years, the results of scenario analyses produced with the help of dTIMS CT are typically adopted as a baseline for consideration by decision-making bodies (including the four geographic divisions and the statewide Commission). UDOT maintains a high level of credibility with the state legislature and with transportation decision-making bodies because of its ability to present, with the help of dTIMS CT, the consequences of changes in levels and mixes of investments in preservation.
UDOT's toolkit for presenting information related to preservation needs includes a 10-year Preservation Plan as well as output from the dTIMS CT AMS.
| UDOT's dTIMS CT Asset Management System Software |
|---|
|
UDOT purchased the dTIMS CT software initially to serve as a pavement management tool, but has retained Deighton Associates Limited, the software developer, to assist with implementation of a more comprehensive, "enterprise-wide" Asset Management System (AMS). A key feature of UDOT's enterprise-wide effort was the implementation of an AMS that could consider and optimize investment strategies for one or more "asset groups." Examples of asset groups are pavements, structures (e.g., bridges), safety, and maintenance; most state DOTs have developed or are developing similar management systems. UDOT has expanded that list, however, to include mobility as an asset. While deterioration for pavements and bridges follow predictable patterns that can be represented as curves, UDOT has suggested developing a similar curve that tracks and predicts the deterioration of mobility over time based on current congestion data and travel demand forecasts.
UDOT's AMS within dTIMS CT has been configured by UDOT and Deighton to have the following capabilities:
Conceptually, UDOT's AMS functionality includes the ability to produce investment strategies within and across asset groups, including investment strategies related to both preservation and expansion of physical networks. The relationships built into the asset management database are illustrated above. |
UDOT's asset management strategy consists of four different levels of asset management analysis that are integrated to produce a consistent set of recommendations:
In time, UDOT desires to have all of the 10-Year Rehabilitation and Preservation projects and STIP projects come from the SLRP.
Utah faces a constraint similar to Michigan for capacity-related projects, in that additional state resources have been dedicated to Utah State Legislature-earmarked projects. As a result, decision makers have not been faced with tradeoff decisions related to travel capacity projects and programs. Nonetheless, UDOT has expanded the dTIMS CT AMS capability to include consideration of capacity projects, which will allow for cross-asset allocation of resources among preservation, maintenance, and expansion investments.
In the absence of a dTIMS CT decision-support tool to prioritize capacity projects, UDOT's Project Planning and Programming Division is responsible for recommending capacity-related projects among the four UDOT regions based on travel demand. Prioritization is based primarily on historic population growth trends from the State Budget Office and the list of prioritized projects as identified by the regions.
Similar to Michigan, the concept of transportation asset management extends beyond UDOT and is currently practiced by a variety of local and county agencies around the state. Less structured than in Michigan, asset management at the local level within Utah is autonomous from other towns and counties and is also less influenced by UDOT's own TAM program. Here communities desiring asset management can reach out to the Utah Local Technical Assistance Program (LTAP) Center. This center was established to:
The Center is working with communities desiring asset management to collect data on the configuration, condition, and performance of locally owned roadway infrastructure and then help the locality develop its own re-investment programs using LTAP's own decision support software. As with Michigan , this broader application of asset management principles within the state ensures that a greater proportion of roadway assets are governed by such principles (i.e., more than the roughly 10 percent of center-line miles maintained by UDOT).
| UDOT and MDOT asset management at the local level |
|---|
|
All states participating in this study are focused on developing asset management practices for application at the statewide level to state-owned assets. Yet, with the exception of North Carolina, state DOTs own fewer than 10% of highway centerline-miles. The majority of the remaining facilities are owned and managed by counties and municipalities. In both Utah and Michigan, asset management principles are being promoted at these local levels. In Michigan, the legislature established an Asset Management Council, independent from MDOT, which is responsible for coordinating asset management activities with all 617 highway-owning agencies across the state, including counties, cities, townships, and villages. The Council distributes technical guidance and supports pavement condition data collection and analysis using the RoadSoft software program. In Utah, FHWA's Local Technical Assistance Program (LTAP) was established at Utah State University in 1988. LTAP transfers technologies and technical guidance from FHWA, UDOT, and universities to local agencies through workshops, a lending library of various informational products, newsletters, and special projects. One special project developed an asset management tool for local agencies. The tool comprised basic inventory, condition, and forecasting components that local agencies could use to monitor and predict needs, including needs for maintenance of signs, signals, pavements, and other assets. |
Utah tracks current measures of travel demand through traffic counts throughout the state highway system. These counts are reported as AADT and by vehicle type ("classification counts"). Volume estimates are derived from 48-hour counts and summarized monthly and annually for each state route. Data are collected annually for the entire network.
UDOT currently does not produce a statewide travel demand model; however, there are four MPOs in Utah, each of which produces a regional travel demand model. UDOT provides technical assistance to three of these MPOs. Input data for the models include traffic counts from the primary highway network and projected growth rates in population. UDOT does have a statewide traffic forecasting tool that draws on 10 years of AADT records to estimate future levels of traffic along the state highway network. All of these activities take place within the Planning Division. These future levels of AADT are loaded into the dTIMS CT AMS for use in the analysis of the various assets considered within the AMS.
Following are documented ways in which travel demand data are used by UDOT to support asset management processes or where asset management processes are used address future travel demand issues.
UDOT does not use measures of travel demand to predict future deterioration rates of highway infrastructure. Rather, UDOT follows the common practice of using estimates of future ESALs during initial pavement design for a new or rehabilitated facility. The dTIMS CT model will then assume that the deterioration of that pavement will reflect the average deterioration rate for that pavement type and thickness, with no consideration of the potential acceleration (deceleration) of pavement wear due to higher (lower) than expected traffic volumes.
As with the other participant states, UDOT also conducts annual condition inspections of pavement throughout its network. These annual inspections provide an alternate means of capturing the impacts of accelerated (decelerated) pavement wear due to high (low) traffic volumes.
UDOT prioritizes preservation projects (e.g., pavements and bridges) based on their benefits and costs using the dTIMS CT optimization, decision-support software tool. dTIMS CT estimates user benefits for preservation projects (including bridges, pavements, and maintenance) by incorporating travel demand measures (e.g., VMT) as a factor in the project evaluation score, similar conceptually to the MAPSCORE program in Michigan . Outputs that the system produces can include any of the following:
Regions use these recommended prioritization lists as starting points for determining the projects in which they would prefer to invest.
Capacity expansion in Utah is constrained by a combination of the UDOT policy that preservation needs be addressed first and a lack of available funds to address all preservation needs. However, the prioritization process for capacity is based on the statewide travel demand model and MPO models, which identify areas of high congestion.
In the absence of a more sophisticated dTIMS CT model to prioritize capacity projects, UDOT's Project Planning and Programming Division is responsible for recommending capacity-related projects among the four UDOT regions and does so based on forecast travel demand (from local MPOs) and from the output of a preliminary analysis within dTIMS CT. Final prioritization is based primarily on historic population growth trends from the State Budget Office and the list of prioritized projects as identified by the regions.
Utah does not currently use travel demand measures to help identify areas for safety investment.
Once again, UDOT policy is that all preservation needs be met before allocating funds to capacity enhancement. This and the state's funding constraints prevent UDOT from addressing most capacity needs. At the same time, UDOT's "final four" strategic goals are:
Together, these constraints and prioritized goals effectively pre-determine the investment tradeoffs for preservation versus capacity improvements. Despite these constraints, UDOT is moving ahead to expand the dTIMS CT-implemented mobility models to conduct more sophisticated analytical tradeoff analyses between preservation and capacity improvements.
UDOT has established performance measures that align with the four strategic goals listed above (preservation, operations, safety, and congestion). The agency has not yet, however, defined standards for the congestion performance measure (travel times between various intersections along Interstates 15 and 80 in the Salt Lake City area) because of difficulty in establishing baseline travel times. Performance is reported annually.
Exhibit 4-4 presents MDOT's organizational structure.
Exhibit 4-4: Caltrans' organizational structure (Description)
Full-size PDF

Caltrans does not currently have staff dedicated wholly to "asset management." The organization's leadership, however, is establishing organizational and transportation system performance measures that ultimately will spread throughout Caltrans and help to shape the way that the state invests in infrastructure. In addition, there are several asset management-related activities ongoing within various segments of the organization. First, the Transportation Systems Information division collects and maintains inventory data for Caltrans highways. Also, staff within Maintenance and Operations utilize pavement, bridge, and maintenance management systems, which are used to help prioritize projects within each of those areas.
Capacity projects and preservation projects in California are developed and programmed separately. Capacity projects are identified and developed by staff in the Planning and Modal Programs group, and these projects ultimately, with input from Districts, are programmed into the STIP. Preservation, maintenance, and operations projects and programs, on the other hand, are identified by staff in the Maintenance and Operations group and ultimately are programmed into the State Highway Operations Preservation Program (SHOPP).
Despite the absence of an official asset management program, Caltrans staff were eager to participate in the study with the objective of learning more about asset management practices and how the state can benefit from the experiences of other states. The following describes those management processes utilized by Caltrans that most closely match the roles, responsibilities, and principles of TAM.
Caltrans recently began developing high-level organization-wide goals and performance measures, including measures that apply to Caltrans organizationally and others that apply to the performance of the transportation system. This program enjoys the support of upper management and ultimately aims to provide common goals, objectives, and measures for use across the organization. Key organization-wide goals include:
Here mobility is the only goal relating directly to travel demand concerns.
Caltrans also publishes a 10-year SHOPP Plan, which identifies all system preservation needs for the upcoming 10-year period. Project selection for the 2005 ten-year SHOPP Plan was guided by the following goals (closely related to the agency wide goals as stated above):
Note that the above strategic goals and objectives, even those specifically addressed by the SHOPP plan, are aimed at both preservation- and capacity-oriented needs. In addition, the DOT-wide objectives have not yet been applied to or refined by asset managers or other divisions within Caltrans for whom the objectives are intended.
California's current asset management activities are focused on the traditional suite of management systems for assets, including bridge, pavement, and maintenance management systems. These systems are used to house and manage transportation system data. In addition, these tools include features that allow users to analyze various investment scenarios to better understand the impacts of allocating resources. For example, Caltrans uses PONTIS as a tentative baseline estimate of bridge needs, but the software does not capture some risks well (e.g., seismic and scouring problems). Consequently, analysts combine PONTIS results with other information to develop estimates and allocation recommendations manually. As another example, the pavement management system produces similar results as PONTIS, but also encounters a similar shortcoming - the investment scenario recommended by the system serves as a baseline, but is subject to substantial revisions by analysts based on other information.
| Caltrans' Integrated Transportation Management System (ITMS) |
|---|
|
Caltrans has been developing and refining its Intermodal Transportation Management System (ITMS) over the past several years. ITMS is a macro-economic tool designed to provide comprehensive analysis of and coordination of planning for a broad range of transportation projects spanning all modes, accessible to planners from all twelve Caltrans Districts and other planning agencies. Completing the ITMS involved the establishment of multimodal performance measures across modes in five key areas: mobility, financial, safety, economic development, and the environment. In addition, Caltrans developed demand and cost data for passenger and freight movements (all modes) for the base year, and for 10-, 20-, and 30-year horizons. Ultimately, this led to the provision of a computer and database architecture capable of integrating data analysis, forecasting, and GIS capabilities. ITMS includes the major functions of asset management; specifically, it recognizes performance measures, provides planners at several levels the ability to coordinate project planning by using common data, develops consistent information, and performs credible analyses that support better decision making. |
Asset inventory, condition and performance data are collected by several distinct Caltrans divisions:
The recommendations of the SHOPP (preservation plan) are generally approved by the State Transportation Commission because SHOPP's preservation-oriented projects and built-in prioritization process have input from both district engineers and statewide asset managers. Within this plan, the prioritization of preservation funds between pavement, bridges, and maintenance is determined by a combination of historic funding allocations to each of these uses and upper management decisions based on the input of regional engineering staff and headquarters staff responsible for each asset class (i.e., there are no decision support tools to support this process). In addition, the 10-year SHOPP Plan, which projects future preservation needs, offers decision makers a "preview" of future SHOPPs.
Caltrans does not actively utilize any decision-support tools beyond traditional management systems for assets, but is working to re-implement its Intermodal Transportation Management System (ITMS) tool (see callout box).
There is no rigorous analytical decision-support process for capacity-related projects at the statewide level in California, the reason being that 75 percent of available STIP (i.e., capacity improvement) funds are allocated to independent regional transportation planning agencies (RTPAs) as defined under state statute. Consequently, those agencies, which include MPOs, conduct their own investment prioritization analyses with minimal input from headquarters staff. This decentralized approach, in which each region is free to use its own methods to prioritize projects, leads to varying levels of sophistication with regard to project selection. The 25 percent of available STIP funds that are allocated to interregional projects, as part of the Interregional TIP (ITIP), meanwhile, are distributed based on an allocation formula to projects that are consistent with priorities described in the statewide Interregional Transportation System Plan (ITSP).
Overall, decision makers have few "levers" to pull with regard to the allocation of expansion project funding in California due to the formula allocation of resources programmed into the STIP. Decision makers can, however, impact the total allocation to the STIP. In fact, recently, the STIP allocation were temporarily suspended as a consequence of the state's recent funding problems. If funding is restored, the total funding levels will be at the discretion of lawmakers, with allocation again relying on the STIP formulas.
Given its high rate of growth and diverse needs, California has felt resource constraints more acutely than other states. For example, whereas other states program expansion projects and some preservation projects as part of a STIP, California transportation agencies develop two distinct programs, one for expansion-related projects (STIP) and another for highway preservation- and operations-related projects (SHOPP). In recent years, funding for the STIP has been committed to other non-transportation needs of the state. In this regard, Caltrans staff agreed that the state has become "preservation-focused," despite the growing travel demand.
| Statewide travel demand models |
|---|
|
Statewide travel demand models are a "recent phenomenon," with the most advanced models emerging in the last 10 years. The participating four states are at varying stages of model development, reflecting the fact that across the nation many states have yet to develop any models, others are considering investment in a model, and still others have developed sophisticated models that consider all modes of passenger and freight travel, drawing on numerous sources of data. Statewide travel demand models help DOTs to think more strategically about where future capacity investments will provide the highest long-term payoff. Benefits include:
|
The Division of Traffic Operations' System Management Planning group conducts an annual screen-line survey (traffic count). This survey gathers sample counts of traffic volumes, including trucks, at numerous points of the state highway network, reported annually as AADT. In addition, the Motor Vehicle Stock, Travel, and Fuel Forecast (MVSTAFF) estimates current and future projected numbers of registered vehicles, VMTs, and fuel consumption.
The TSI's Office of Travel Forecasting and Analysis produces and manages the statewide travel demand model, which projects VMT and volume-to-capacity ratios on the intercity state highway network based on a decennial household travel survey. Modes included in the model, which projects travel from 2000 to 2025, include air, rail (Amtrak), intercity bus, and highway. This information is provided as requested by MPOs and RTPAs as an input to their regional travel demand models. Travel demand forecasts are also often produced by TSI on smaller scales to support project-specific analyses. The Office also produces an annual MVSTAFF report, which estimates current and future projected numbers of registered vehicles, VMTs, and fuel consumption (forecasts are based on current and projected socioeconomic attributes such as population, income, fuel price, interest rates, and assumptions regarding fuel economy).
In the past, TSI has relied on screen-line truck counts to model truck flows on the intercity network. Staff indicated that these data are not reliable and that the division is currently undertaking a study to construct a truck model
Following are documented ways in which travel demand data are used by Caltrans to support asset management processes or where asset management processes are used to address future travel demand issues.
Caltrans does not currently use measures of travel demand to predict asset deterioration. As with the other states, however, ESAL projections are used in pavement design.
Capacity improvements in California fall under the STIP and are funded according to a formula-based allocation process. Formulas stipulate the following:
Funds allocated to the counties (which account for three-quarters of all STIP funds) are distributed based on two weighted criteria: population, which is weighed 75 percent, and state highway mileage, which is weighed 25 percent. Given this formula, the selection of capacity investments is made primarily at the regional level, with little consideration of statewide travel demand issues.
Safety investments made through the SHOPP in California are based on a traffic safety index score. This score does not explicitly include a measure of travel demand. In addition, California also utilizes the practice of pre-positioning emergency response crews on high-volume highway segments during peak-period travel as a means of accelerating accident response and traffic flow restoration.
STIP and SHOPP resources are allocated under distinct processes and are driven by eligibility of funding under various state and federal programs. As a result, there is no tradeoff analysis between investment alternatives within these two programs. For example, since SHOPP needs exceed available federal and state resources, all state and federal funds that are legally eligible for SHOPP programs are allocated to SHOPP. On the other hand, some federal (e.g., TE) and state (e.g., California Proposition 42 and Public Transportation Account spillover funds) are only eligible for STIP projects. In recent years, however, resources have been re-allocated from the STIP to meet California 's non-transportation financial needs.
Caltrans has developed organizational and system performance measures to guide its operations and decisions related to transportation infrastructure and service provision. Organizational performance measures have been coupled with targets for improvement. Targets have not yet been set, however, for system performance measures (e.g., travel demand and congestion-related measures).
NCDOT is responsible for operating and maintaining over 75 percent of North Carolina's roadway miles, a far larger share of statewide highway miles than any of the other study participants. (Note: The other state DOTs maintain roughly 10 percent of their state's total center-line miles.) State law also requires that 90 percent of North Carolina residents have access to a four-lane, divided highway within five miles of their homes. Furthermore, recent and projected population growth rates in North Carolina are among the fastest in the nation. These characteristics make NCDOT a unique organization in that it must simultaneously address system preservation and capacity needs for an unusually large infrastructure network.
NCDOT's Transportation Planning Branch is responsible for a statewide long-range strategic plan, technical support for MPO models, and programming of capacity-related projects. Although districts and MPOs identify projects for capacity expansion, planning staff are also responsible for coordinating the process and providing technical assistance as projects move from identification to the programming stage. Next, projects are selected by the state Transportation Board in a programming process that involves resource negotiation among members, subject to financial constraints and legal requirements, and results in a STIP.
The long-range strategic plan was initiated by NCDOT leadership and has retained the support of upper management. Although carried out by the Planning Branch, the long-range plan involved numerous divisions of NCDOT, defined strategic goals and objectives, identified the various investment needs of the transportation system, and suggested courses for meeting the needs of the system (e.g., moving from capacity expansion toward preservation).
The Operations Branch includes an Asset Management staff that oversees bridge, pavement, equipment, roadside, and other maintenance units. Where the Transportation Planning Branch identifies capacity needs, the Operations Branch identifies system maintenance, preservation, and operations needs. Funding of maintenance, preservation, and operations needs occurs independently of the TIP process and comes directly from the state legislature.
Due to a legislative requirement to build out a pre-defined intrastate highway system, North Carolina has dedicated substantial funds to system expansion - significantly more than other states that participated in this study. Although the long-range plan suggests addressing more preservation needs, the high rate of population growth and policy considerations will continue to emphasize system expansion. The decision-making processes and programs that provide resources for capacity expansion, however, are balanced by realization of maintenance, operations, and preservation needs within the Asset Management division, as a result of data-driven analysis and relatively strong linkages among staff in asset management, planning, and other functional areas.
As noted earlier, NCDOT is responsible for more than 168,000 lane-miles statewide or more than three-quarters of the state's total center line miles and more than 17,000 bridges. Given the state legislation's requirement for ongoing build out of an extensive intrastate system combined with a program to pave dirt roads and the expansion of local roads by the state's developers, the number of road miles under NCDOT maintenance is expanding by more than 400 miles each year. Ongoing maintenance and preservation of this extended roadway network places significant demands on the state's budget and NCDOT's resources. Within this constrained environment, asset management processes have evolved as the optimal method for sustaining the existing roadway network.
NCDOT is in the final stages of completing a multi-year process of developing performance measures and performance standards for each of the activity areas encompassed by the state's asset management program. These activities include maintenance, pavement, bridges, traffic/ITS, roadside, and construction. For each of these activity areas, NCDOT's TAM program has identified multiple asset specific performance measures, with over 100 difference performance measures and related performance targets identified in all. In accordance with the TAM program's emphasis on preservation, the selected performance measures are dominated by measures relating to system preservation, with relatively few measures relating to travel demand-related concerns. For example, the bridge unit includes measures such as "percentage of bridges exceeding the National Average" deficiency rating and "percentage of overhead sign structures rated 'good.'" The traffic/ITS unit includes several preservation related measures (e.g., "linear feet of pavement markings visible at night"), but also includes the indirect travel demand measure "incident clearance times." Only a small number of measures relate either directly or indirectly to travel demand issues. This is to be expected as travel demand is not a current focus of NCDOT's asset management program.
Both the statewide long-range plan and the asset management program enjoy support at high levels of NCDOT. This high-level support and the identification of common goals and objectives at all levels of management is crucial to the long-term success of any asset management program.
As with each of the other study states, North Carolina employs pavement management, bridge management, and maintenance management systems for the ongoing maintenance of highway infrastructure.
NCDOT's TAM program, organizationally a part of the Bureau of Operations, has numerous data collection and management responsibilities. Much of this data is available to other DOT users and some data (e.g., pavement condition) are available to the general public as well.
Data maintained by NCDOT's TAM program include:
Like California, North Carolina 's project selections occur primarily at a decentralized level, with the majority of analysis for project prioritization occurring inside of MPOs and regional planning agencies (RPAs). Further analysis occurs at NCDOT Regions before final resource negotiations among the statewide programmers. The decision-making process for inclusion in the STIP occurs at the MPO and district levels before analysis at the statewide level and ultimately the opinion of the Board of Transportation.
NCDOT does not require a standard procedure for analyzing and prioritizing travel demand-related needs within each region, in part because the goals of each region differ (e.g., mobility versus safety versus economic development). Much of the funding for preservation projects in North Carolina is derived from an annual legislative appropriation.
Capacity investments in North Carolina are a reflection of the state's legal requirements and the funds available that are specifically programmable only for new capacity. The processes used to identify which network components will receive resources first, however, are not currently based on explicit measures of travel demand or economic analyses, but rather on a scoring formula. The state allocates 25 percent of funds equally across all districts, 25 percent based on the number of intrastate system miles left to complete, and the remaining 50 percent based on district population (thereby implicitly considering travel demand).
NCDOT will soon unveil a new benefit-cost analysis tool that will inform the decisions of the Transportation Board's programming of capacity expansion projects. As in Utah, the tool is not intended to remove the resource allocation decision from human decision makers, but rather to provide Board members with additional, higher-quality, objective information that speaks to the varying performance goals of districts (e.g., mobility, economic development, and safety).
NCDOT's Bureau of Planning tracks current measures of travel demand through annual traffic counts along its primary highway network, semi-annual traffic counts along its secondary network, and counts within MPOs every two to three years. Traffic counts are recorded manually in a map book, which is one of NCDOT's highest-use products. Project-specific counts are also performed; these special counts include vehicle-type classifications, turning movements, and peak versus non-peak flows.
NCDOT currently does not produce a statewide travel demand model but does provide technical support to the regional models for small- and mid-size MPOs (there are 11 total MPOs in North Carolina ). Travel demand forecasting capabilities are also used to support cost-effectiveness analyses for major investment projects.
Following are documented ways in which travel demand data are used by NCDOT to support asset management processes or where asset management processes are used to address future travel demand issues.
NCDOT does not currently use measures of travel demand to predict asset deterioration. As in other states, however, ESAL projections are used in pavement design.
Transportation investment prioritization occurs within each district in North Carolina , but ultimate authority to allocate resources resides with the state's Transportation Board. Resource allocation among divisions by the Board does not explicitly consider travel demand measures.
Capacity investments in North Carolina are a reflection of the state's legal requirements and the funds available that are specifically programmable only for new capacity. The processes used to identify which network components will receive resources first, however, are not currently based on explicit measures of travel demand or economic analyses, but rather on a scoring formula. The state allocates 25 percent of funds equally across all districts, 25 percent based on the number of intrastate system miles left to complete, and the remaining 50 percent based on district population (thereby implicitly considering travel demand).
Travel demand measures are not explicitly considered in decision-making processes for safety projects. However, each NCDOT region has a unique goal relative to transportation investment (e.g., congestion relief, economic development, and safety enhancement). The mix of projects selected by a district reflects its interests-meaning that some districts may identify more safety-related improvements than others.
Allocation of resources between preservation, capacity, and other needs in North Carolina is subject to legal requirements, as in other states; however, state law actually requires that certain funds be dedicated to expansion of the highway network. Management and preservation needs, on the other hand, are addressed through annual legislative appropriations based on historical trends and the needs identified by NCDOT staff.
Within this environment, NCDOT will soon unveil a new benefit-cost analysis tool that will provide decision makers on the Transportation Board with a complete picture of the benefits of all potential projects, including preservation- and capacity-oriented projects. This tool is expected to make use of VMTs or other travel demand-related measures to scale the size of investment-related travel time savings and other traveler-oriented benefits.
NCDOT uses performance measures in a variety of areas. For example, the traditional asset management functions (bridge, pavement, roadside, operations, etc.) each are in the process of refining numerous performance measures that ultimately will be used to guide investment within each particular area. Broader performance measures are discussed in the statewide long-range transportation plan, including those related to travel demand management and congestion and efficiency. However, no targets are used as part of a process to help identify specific investment needs.
Linkages between TAM and travel demand vary from state to state, but largely remain formative. Travel demand data are occasionally used explicitly to inform TAM analyses (e.g., determining benefits of preservation projects based on VMT), but are mostly considered implicitly (e.g., using population growth in decision-support tools to determine resource allocation). Specifically, this review observed the following:
The TAM programs for each of the four participant states remain primarily focused on system maintenance and preservation. This focus reflects the history of each program's development (developing from a kernel of pavement and bridge management systems) and the particular investment needs, legislative requirements, and "color of money" limitations within each state. Moreover, most agencies tend to focus on the short- to medium-term investment needs, but place less emphasis on long-term objectives (e.g., mitigating congestion). This emphasis is reflected in their TAM program goals and objectives, which are also primarily focused on maintenance and preservation.
A key process currently used by agencies (either within or outside of their existing TAM programs) to consider and address long-term issues driven by ongoing growth in travel demand is the SLRP. The next chapter considers the current SLRPs of the four participant states, with emphasis on what these documents reveal about each state's plans to address the consequences ongoing travel demand growth. In addition, the chapter also considers how states are preparing long-term budgets to meet all transportation investment needs.