PBES Innovative Projects
Main Street over Metro North Railroad |
| Location | Tuckahoe |
| State | NY |
| Completion Date | 2000 |
| Contact Person | George A. Christian P.E. Acting Director Structures Design and Construction Division New York State Department of Transportation State Campus Building 5, 6th Floor 1220 Washington Avenue Albany NY 12232 Phone: (518) 457-6827 Fax: (518) 485-7826 Email: Gchristian@gw.dot.state.ny.us |
| Description | Replacement of a through-girder bridge over a busy commuter railroad in the village of Tuckahoe presented challenges for NYSDOT: maintaining two way traffic, conducting all work between 2 and 4 AM on weekends to limit disruptions for rail commuters and adjacent stores, maintaining utility lines while relocating them on the new bridge, and raising the railroad vertical clearance five inches without affecting the street profile. NYSDOT chose a commercial system of precast prestressed concrete/steel composite superstructure modules that allowed for smaller beams than conventional construction, which helped attain the increased vertical clearance and had a short installation time. |
| Photo |  |
| Prefabricated Elements | Total superstructure systems |
| Other Keywords | Precast prestressed concrete and steel composite superstructure units,precast prestressed deck composite units,prefabricated total superstructure,total superstructure prefabrication |
| Advantages | Improved constructibility by allowing staged construction over a busy commuter railroad, Minimized traffic disruption. |
| Photo Credits | New York State Department of Transportation |
|
Events
More Information
Contact
Reggie Holt
Office of Bridge Technology
202-366-4596
E-mail Reggie
|
| |
This page last modified on 05/12/08 | |