Skip to Contents U.S. Department of Transportation, Federal Highway Administration FHWA Home Feedback
   Bridge Technology
  
FHWA > Infrastructure > Bridge > Seismic

MAE CENTER RESEARCH SUCCESS WITH DOTs

Return to slides

Figure 2-4: Integration of Transportation Officials Stakeholder Thrust Area Research with Core Research

The purpose of this slide is to show that transportation tasks (SE, ST, RR, and GT) interrelate with this core research or "Consequence-Based Engineering" program, i.e., the Damage Synthesis Thrust Area, Consequence Minimization Thrust Area, and Hazard Definition Thrust Area.

Tasks

Damage Synthesis Thrust Area
DS-2Inventory Technologies
DS-3Response Analysis Tools
DS-4Vulnerability Functions
DS-5Regional Response Simulation
DS-6Network Loss
DS-7aNetwork Vulnerability
DS-7bDamage - Functionality
DS-8S - E Impact Assessment
DS-9Risk Assessment
 
SE-3Inventory of Transportation Networks
 
ST-63Piers and Abutments
ST-62Elastomeric Bearings
ST-17I-40 Bridge Instrumentation
 
RR-5Fragility of Transportation Networks
SE-13Vulnerability of Air/Rail Networks

Consequence Minimization Thrust Area
 
QM-1Decision Support Tools
CM-2Acceptable Consequences
CM-3Network Strategies
CM-4Structural Retrofit Strategies
CM-5Multi-Hazard Application
 
SE-11Network Retrofit Benefit - Cost
SE-28Emergency Priority Routes
 
ST-13Retrofit of Bridge Columns
ST-12Response Modification of Bridges
GT-5Foundation Improvement

Hazard Definition Thrust Area
HD-1Synthetic EQ Hazards
HD-2EQ Source Modeling
HD-3Ground Motion Data
HD-4Gujarat - N M S Relations
HD-5EQ Path Modeling
HD-6EQ Site Modeling
HD-7Ground Deformations
 
GT-13Deep Soil Response
 

Task Interactions


Between DS-2 and SE-3
Between DS-3 and ST-63
From DS-3 to ST-14
Between DS-4 and ST-63
Between DS-5 and ST-14
From DS-6 to RR-5
From DS-7a to RR-5
From DS-7b to RR-5
From SE-13 to DS-8 and DS-9

Between ST-17, ST-19 and CM-4

Between CM-3 and SE-11
Between CM-4 and ST-13

From HD-6 to GT-5
From HD-7 to GT-5

Between HD-6 and GT-19
Between HD-7 and GT-19

Return to slides



FHWA Home | Infrastructure Home | Bridge Home | Feedback
FHWA