Construction Program Management and Inspection Guide
Appendix G (continued)
 |
DIVISION OFFICE DESIGN PROJECT CHECKLIST |
| |
Federal-Aid Project No. ____________________ District, County, Route ____________________ |
| PRE - PS&E |
DATE |
COMMENTS |
| Field Safety Walk with Minutes | | |
| Environmental - NEPA Documents | | |
| Public Hearing | | |
| T S & L Plans | | |
| Hydraulic Report (Major Structures) | | |
| Justification for Additional Access (Interstates) | | |
| Geotechnical Report (Major Structures) | | |
| Horizontal & Vertical Alignment/ Clearance | | |
| Design Report Approval | | |
| Design Exceptions (Mainline by ADA) | | |
| Lighting Plan | | |
| Value Engineering Study (if applicable) | | |
| Signing Plan | | |
| Traffic Control Plan | | |
| Pavement Design | | |
| Air/Highway Clearance | | |
| Utilities | | |
| Erosion and Sedimentation Control Plan | | |
10/03
|
Contact
Construction Feedback
E-mail Construction
|
| |
Updated: 04/04/2011 |
|