Construction Program Management and Inspection Guide
Appendix G (continued)
DIVISION OFFICE DESIGN PROJECT CHECKLIST |
|
Federal-Aid Project No. ____________________ District, County, Route ____________________ |
PRE - PS&E | DATE | COMMENTS |
---|---|---|
Field Safety Walk with Minutes | ||
Environmental - NEPA Documents | ||
Public Hearing | ||
T S & L Plans | ||
Hydraulic Report (Major Structures) | ||
Justification for Additional Access (Interstates) | ||
Geotechnical Report (Major Structures) | ||
Horizontal & Vertical Alignment/ Clearance | ||
Design Report Approval | ||
Design Exceptions (Mainline by ADA) | ||
Lighting Plan | ||
Value Engineering Study (if applicable) | ||
Signing Plan | ||
Traffic Control Plan | ||
Pavement Design | ||
Air/Highway Clearance | ||
Utilities | ||
Erosion and Sedimentation Control Plan |