|
|
FY 2004 Interstate Maintenance Discretionary (IMD) Awards (as of April 24, 2008)
This table is also available in the following formats:
| State |
Project |
Designated Amount In Conf. Rept. 108-401 (1) |
Award Amount After 0.59% Rescission & Obligation Limitation Lop-Off (2) |
Funds Allocated To State |
Funds Yet To Be Allocated To State |
| Alabama | Madison I-565 Interchange at County Line Road, Alabama |
$1,000,000 |
$940,419 |
$450,000.00 |
$490,419.00 |
| Alabama | Valleydale Road at I-65, Alabama |
$5,000,000 |
$4,702,093 |
$4,702,093.00 |
|
| Arkansas | Interstate 430/630: Interchange Modification, Arkansas |
$800,000 |
$752,335 |
$752,335.00 |
|
| California | I-5/Ortege Highway Interchange Construction, California |
$800,000 |
$752,335 |
|
$752,335.00 |
| California | Interstate 10 Cypress Avenue Overcrossing, California |
$800,000 |
$752,335 |
$752,335.00 |
|
| California | Laval Road Interchange Upgrades at I-5, California |
$800,000 |
$752,335 |
$752,335.00 |
|
| California | Rancho Cucamonga I-15 & Base Line Road Interchange Improvements, California |
$800,000 |
$752,335 |
$752,335.00 |
|
| California | Interstate 80 (I-80) Colfax Narrows Project, California [This project is listed under Nevada in the Conference Report 108-401. However, both States agreed that the project location is in California, and California submitted the application for this project. Legal review had been conducted by FHWA.] |
$2,000,000 |
$1,880,837 |
|
$1,880,837.00 |
| Colorado | City of Wheat Ridge, Colorado, I-70 and State Highway 58 Interchange Reconstruction, Colorado |
$800,000 |
$752,335 |
$752,335.00 |
|
| Colorado | I-25, US 36, I-270 Interchange, Colorado |
$450,000 |
$423,188 |
$423,188.00 |
|
| Colorado | I-76, Fort Morgan, Colorado to Brush, Colorado |
$200,000 |
$188,083 |
$188,083.00 |
|
| Connecticut | I-84/Route 2 East Hartford Connecticut, operational improvements (flyover access) |
$750,000 |
$705,314 |
$705,314.00 |
|
| Florida | Central Sarasota Parkway Interchange at I-75, Sarasota, Florida |
$500,000 |
$470,209 |
$470,209.00 |
|
| Georgia | I-285 Noise Walls, Henderson Mill to Chamblee Tucker Road, Georgia |
$500,000 |
$470,209 |
|
$470,209.00 |
| Georgia | I-285 Noise Walls, I-20 to Bouldercrest Road, Georgia |
$480,000 |
$451,401 |
|
$451,401.00 |
| Georgia | I-75/Aviation Blvd Atlanta, Georgia |
$800,000 |
$752,335 |
|
$752,335.00 |
| Georgia | I-85 Coweta County Noise Barriers, Georgia |
$750,000 |
$705,314 |
$705,314.00 |
|
| Georgia | Noise Walls on I-20 from Fulton Industrial Boulevard to H. E. Holmes, Fulton County, Georgia |
$500,000 |
$470,209 |
$289,946.00 |
$180,263.00 |
| Idaho | I-84, Glenns Ferry to King Hill, Idaho |
$2,000,000 |
$1,880,837 |
$1,880,837.00 |
|
| Indiana | Louisville--Southern Indiana Ohio River Bridges project, Indiana |
$3,250,000 |
$3,056,360 |
$3,056,360.00 |
|
| Iowa | I-80/Iowa 945 interchange, Polk County |
$3,000,000 |
$2,821,256 |
$2,821,256.00 |
|
| Kansas | Four interchanges at I-435 and I-35 in Johnson County, Kansas |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Kansas | I-35/127th Street Overpass, Olathe, Kansas |
$3,000,000 |
$2,821,256 |
$2,821,256.00 |
|
| Kentucky | Ohio River Bridges, Kentucky |
$6,550,000 |
$6,159,742 |
$6,159,742.00 |
|
| Louisiana | I-12 Sound Barriers, Slidell, Louisiana |
$750,000 |
$705,314 |
|
$705,314.00 |
| Louisiana | I-20 Downing Pines Interchange, Louisiana |
$1,000,000 |
$940,419 |
|
$940,419.00 |
| Louisiana | I-210 and Highway 14 Interchange, Lake Charles, Louisiana |
$800,000 |
$752,335 |
$184,832.32 |
$567,502.68 |
| Louisiana | I-49 South, Louisiana |
$3,000,000 |
$2,821,256 |
$1,739,675.00 |
$1,081,581.00 |
| Maryland | I-695 Baltimore Beltway N/E Inner Loop, Maryland |
$750,000 |
$705,314 |
$705,314.00 |
|
| Maryland | I-70 Improvement Project: Frederick, Maryland |
$4,025,000 |
$3,785,185 |
$3,785,185.00 |
|
| Massachusetts | Waltham, Massachusetts I-95/Rt 20 Interchange |
$1,700,000 |
$1,598,712 |
|
$1,598,712.00 |
| Michigan | I-96/Latson Road Interchange, Michigan |
$750,000 |
$705,314 |
|
$705,314.00 |
| Mississippi | Conceptual Development & Preliminary Design improvements to the intersections of Interstate 59, Mississippi |
$265,000 |
$249,211 |
$249,211.00 |
|
| Mississippi | I-69/SR 304 Paving, Mississippi |
$5,925,000 |
$5,571,980 |
$5,571,980.00 |
|
| Missouri | Interstate 44 and US 65 Interchange, Missouri |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Missouri | Phase II, I-44 Modification (Widen Eastbound I-44 Bridge at Meramec River), Missouri |
$200,000 |
$188,083 |
$188,083.00 |
|
| Nevada | I-80 Truck Climbing Lane, Keystone to Robb Drive, Nevada |
$500,000 |
$470,209 |
$470,209.00 |
|
| New Jersey | I-676 Martin Luther King Boulevard, Camden County, New Jersey |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| New Jersey | Interstate 295/Route 38 Interchange Improvements, New Jersey |
$750,000 |
$705,314 |
$705,314.00 |
|
| New Mexico | Coors/Interstate 40 Interchange Reconstruction, New Mexico |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| New Mexico | I-25/Tramway Interchange, Albuquerque, New Mexico |
$1,500,000 |
$1,410,628 |
$1,410,628.00 |
|
| New Mexico | Isleta Boulevard Improvement Project |
$500,000 |
$470,209 |
$470,209.00 |
|
| New York | New York State Thruway Authority, Westchester County, Byram Bridge Rehabilitation |
$800,000 |
$752,335 |
$752,335.00 |
|
| North Carolina | Cawtawba Avenue Interchange (I-77) Improvement, North Carolina |
$750,000 |
$705,314 |
$705,314.00 |
|
| North Carolina | Pavement and Bridge Rehabilitation on I-85, North Carolina |
$800,000 |
$752,335 |
$752,335.00 |
|
| Ohio | I-77/Lauby Road exit, Ohio |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Ohio | Montgomery County, Ohio--Interstate 75, Ohio |
$2,000,000 |
$1,880,837 |
$1,880,837.00 |
|
| Ohio | Northbound I-675 Sound Barrier, Ohio |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Oklahoma | I-44 Rogers Lane Interchange, Lawton, Oklahoma |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Pennsylvania | I-476 Reconstruction and Widening Project, Pennsylvania (3) |
|
|
|
|
| Pennsylvania | Interstate 80-Exits 298-299 Renovation Project, Pennsylvania |
$750,000 |
$705,314 |
$705,314.00 |
|
| Pennsylvania | Pennsylvania Turnpike--Interstate 95 Interchange Project (3) |
$2,830,000 |
$2,661,384 |
$2,661,384.00 |
|
| South Dakota | Reconstruct Exit 60--I-90 in Rapid City, South Dakota |
$5,100,000 |
$4,796,135 |
$4,796,135.00 |
|
| Tennessee | I-40 and I-55 ramps, Memphis, Tennessee |
$1,000,000 |
$940,419 |
|
$940,419.00 |
| Texas | I-35 East/I-635 interchange, Texas |
$925,000 |
$869,887 |
$869,887.00 |
|
| Texas | IH35/SH45 interchange at Round Rock, Texas |
$200,000 |
$188,083 |
$188,083.00 |
|
| Texas | Kelly USA: New Luke Road, Texas |
$200,000 |
$188,083 |
$188,083.00 |
|
| Texas | Widening Interstate 35 East between FM 2181 and Lake Lewisville, Denton County, Texas |
$200,000 |
$188,083 |
$188,083.00 |
|
| Utah | I-15 Reconstruction: 10800 South to 600 North, Utah |
$6,000,000 |
$5,642,512 |
$5,642,512.00 |
|
| Virginia | I-295/Meadowville Interchange, Virginia |
$1,500,000 |
$1,410,628 |
|
$1,410,628.00 |
| Washington | Ellensburg Interchange I-90, Milepost 108.31, Washington |
$1,500,000 |
$1,410,628 |
$1,410,628.00 |
|
| Washington | I-182, Queensgate to SR 240, Richland, Washington |
$2,000,000 |
$1,880,837 |
$1,880,837.00 |
|
| Washington | I-405 Corridor Improvements, Washington |
$2,000,000 |
$1,880,837 |
$1,880,837.00 |
|
| Washington | I-5 Rush Road to Maytown Widening, Lewis County, Washington |
$2,000,000 |
$1,880,837 |
$1,880,837.00 |
|
| Washington | I-5 Vancouver Interchange Improvements, Washington |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Washington | I-5, Lynnwood City Center Exit, Washington |
$1,000,000 |
$940,419 |
$940,419.00 |
|
| Washington | I-90, Spokane to Idaho State Line, Washington |
$2,000,000 |
$1,880,837 |
$1,880,837.00 |
|
| Washington | Valley Mall Boulevard Interchange and South Union Gap Interchange, Washington |
$500,000 |
$470,209 |
$470,209.00 |
|
| TOTALS |
|
$100,000,000 |
$94,041,860 |
$81,114,171.32 |
$12,927,688.68 |
- All FY2004 available IMD funds were designated for specific projects by Congress in the conference report accompanying the FY2004 Transportation Appropriations Act (Division F of Public Law 108-199).
- The Surface Transportation Extension Act of 2004, Part IV (Public Law 108-280) authorized $100 million for IMD for FY2004. After the FY2004 government-wide 0.59% rescission, and takedown of 5.4% for the obligation limitation lop-off, $94,041,860 is available to fund these designated projects.
- In a January 12, 2006 clarification letter, the House and Senate Appropriations Transportation Subcommittees indicated that the $830,000 designated for the PA I-476 project should be made available for the PA Turnpike/I-95 Interchange project. This reduced the designated amount for I-476 to $0, and raised the designated amount for the Turnpike Interchange project to $2,830,000.
|
Contact
Bob Wright
Office of Program Administration 202-366-4630 E-mail Bob
|