Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Discretionary

FY 2006 Public Lands Highways Discretionary (PLHD) Awards (as of November 30, 2009)

This table is also available in the following formats:

STATE PROJECT DESIGNATED AMOUNT IN CONF. REPT. 109–307 (1) AWARD AMOUNT AFTER RESCISSION, TAKEDOWNS & OBLIGATION LIMITATION LOP–OFF (2) PROJECT ADMIN. THRU STATE, FLH or OTHER AGENCY(3) FUNDS ALLOCATED TO STATE FUNDS YET TO BE ALLOCATED TO STATE FUNDS ALLOTTED TO FEDERAL LANDS HIGHWAY (FLH) OR OTHER AGENCY FUNDS YET TO BE ALLOTTED TO FEDERAL LANDS HIGHWAY (FLH) OR OTHER AGENCY
Alaska Alaska Trails Initiative – statewide development and construction of trails and related facilities $2,525,000 $2,123,663 FLH     $2,123,663.00  
Arizona Hoover Dam Bypass Bridge on US–93, Mohave County, Arizona and Clark County, Nevada – construction of a bridge over the Colorado River $6,000,000 $5,046,329 STATE $5,046,329.00      
Arizona Hopi/Navajo Route 60, Navajo County – roadway improvements $1,000,000 $841,055 FLH     $841,055.00  
Arizona Turquoise Trail, BIA Route 4, Navajo County – roadway improvements, including paving $750,000 $630,791 FLH     $630,791.00  
Arizona Lone Pine Dam Road, between State Route 260 and State Route 77, Navajo County – construction of bridge over the Show Low Creek and realignment of roadway approaches $2,000,000 $1,682,110 STATE $1,682,110.00      
Arizona Roadways within Tohono Oodham Indian Reservation, Pima and Pinal Counties – roadway improvements $850,000 $714,897 FLH     $714,897.00  
Arizona & Nevada Hoover Dam Bypass Bridge on US–93, Mohave County, Arizona and Clark County, Nevada – construction of a bridge over the Colorado River $1,000,000 $841,055 STATE $841,055.00      
California Agua Caliente Cultural Museum Road, Riverside County – planning and engineering of roadway, interpretive signage, drainage, vehicular parking areas, and appurtenant structures and facilities $750,000 $630,791 STATE $630,791.00      
California Golden Gate National Park, San Francisco, San Mateo, Marin Counties – improvements to park trails, bikeways, trailheads, trail connectors, transit links, and visitor amenities as part of the larger Trails Forever initiative $600,000 $504,633 FLH     $504,633.00  
California NeedlesHighway, from "N" street south of Interstate 40 north to the Nevada State line, passing through the Fort Mojave reservation, San Bernardino County – roadway realignment and safety improvements $1,000,000 $841,055 STATE $841,055.00      
California South Access to the Golden Gate Bridge, Doyle Drive, City and County of San Francisco – environmental and design phase for roadway reconstruction $1,250,000 $1,051,319 STATE $1,051,319.00      
California Calaveras Wagon Trail on State Route 4, between Stockton and Angels Camp, Calaveras County – environmental and design phases of roadway reconstruction $750,000 $630,791 STATE $630,791.00      
California Summit Valley Road, east of Interstate 15 in the Cajon Pass Area, from State Highway 138 north and east to Hesperia city limits, San Bernardino County – paving and safety Improvements $1,000,000 $841,055 STATE $841,055.00      
California Golden Gate National Park (Trails Forever), San Francisco, San Mateo, Marin Counties – build new trailheads and overlooks, install trail furnishings and signage, build restrooms, and realign trail routes to protect natural and historic resources along Coastal Trail corridor $400,000 $336,422 FLH     $336,422.00  
Colorado Pikes Peak Highway, off U.S. 24 near Cascade, El Paso County – erosion and sedimentation control $1,200,000 $1,009,266 FLH     $1,009,266.00  
Colorado State Highway 145 (Forest Highway 1), from Dolores to Stoner, Montezuma County – roadway reconstruction $4,800,000 $4,037,063 STATE $3,671,393.00 $365,670.00    
Colorado West Vail Pass Habitat Linkage on Interstate 70, west of Vail Pass Summit, Eagle County – construction of vegetated wildlife overpass over Interstate 70 $500,000 $420,527 STATE $420,527.00      
Florida Ft. George Island, Jacksonville, Duval County – comprehensive traffic study $300,000 $252,316 STATE $252,316.00      
Idaho City of Rocks Back Country Byway, from Connor's Corner to the City of Rocks National Reserve entrance near Almo, Cassia County – roadway reconstruction $3,000,000 $2,523,164 STATE $2,523,164.00      
Idaho FH–24, from Banks to Lowman, Boise County – roadway reconstruction, including replacement of Middle Fork Payette River bridge $1,000,000 $841,055 FLH     $841,055.00  
Idaho Salmon Falls Creek Bridge, 7–½ miles west of U.S. 93 and 15 miles North of the Idaho/Nevada border, Twin Falls County – bridge construction including approach roadways $200,000 $168,211 STATE   $168,211.00    
Kansas Cedar Creek Bridge at Wilson Lake, Russell County – construction of new bridge $130,000 $109,337 STATE $109,337.00      
Kentucky 41A at Fort Campbell, Christian County – provide a physical protection barrier between US 41A traffic and Fort Campbell's property $1,600,000 $1,345,688 FLH     $1,345,688.00  
Louisiana Red River National Wildlife Refuge, Arthur Ray Teague Parkway Extension, Bossier Parish – improvements to existing roads within the Refuge for access to the Visitors Center/Headquarters building $1,250,000 $1,051,319 FLH     $1,051,319.00  
Louisiana LA Highway 117 Corridor between LA 8 (Leesville) and LA 6 (Hagewood), Vernon Parish – completion of environmental assessment for roadway reconstruction $500,000 $420,527 STATE $420,527.00      
Maine Roosevelt Campobello International Park, Campobello Island, Lubec, Maine and New Brunswick, Canada – roadway and parking improvements $1,500,000 $1,261,582 FLH     $1,261,582.00  
Maryland U.S. Food & Drug Administration (FDA) Headquarters Facility, Montgomery County – design and construction of access road $500,000 $420,527 STATE $420,527.00      
Massachusetts Boston Harbor Islands National Park, Suffolk County – access improvements, including design, fabrication and installation of universal access systems, including floats and ramps, and related public safety improvements $1,000,000 $841,055 FLH     $841,055.00  
Massachusetts Elm Street Garage, New Bedford, Bristol County – renovation of existing elevators, and comprehensive electrical repairs to the parking garage $300,000 $252,316 FLH     $252,316.00  
Massachusetts Lowell Canal Walkway, Red Cross Reach, Middlesex County – acquisition, design and development of a pedestrian walkway along the Merrimack River connecting the Upper Pawtucket Canalway with the Northern Canal Walkway $1,000,000 $841,055 FLH     $841,055.00  
Massachusetts Lowell Riverwalk Phase II, Middlesex County – construction of the second section of the proposed extension to the 'Mile of Mills' Riverwalk $1,000,000 $841,055 FLH     $841,055.00  
Mississippi Chickasaw Museum and Cultural Center, Natchez Trace Parkway, Lee County – feasibility study, concept plan, environmental assessment, design, and construction of museum and cultural center $450,000 $378,475 FLH     $378,475.00  
Mississippi Crow's Neck Environmental Education Center at Corps of Engineers Tombigbee River Valley Water District, Tishomingo County – reconstruction/overlay of parking lot, entrance road and service roads $150,000 $126,158 STATE $126,158.00      
Mississippi Hwy 49/Hwy 7 Connector Road, north of City of Greenwood, Leflore County – construction of roadway connecting MS Hwy Route 49 and MS Hwy Route 7 $1,000,000 $841,055 STATE $841,055.00      
Montana Fort Peck Reservoir fishing access roads in several counties – roadway rehabilitation with crushed gravel $3,000,000 $2,523,164 FLH     $2,523,164.00  
Montana S–323 from Alzada to Ekalaka in Carter County – roadway reconstruction $400,000 $336,422 STATE $336,422.00      
Montana US–93 from Evaro to Polson in Missoula and Lake Counties – roadway reconstruction $600,000 $504,633 STATE $504,633.00      
Nebraska Preston North and South, from southwest corner of Section 33, T1N, R17E, north to Nebraska Highway 159 intersection, Richardson County – approximately 4 miles of county road reconstruction $200,000 $168,211 STATE $168,211.00      
Nevada Craig Road (SR 573), from Berg Street to Pecos Road, Clark County – railroad grade separation and roadway widening $5,000,000 $4,205,274 STATE $4,205,274.00      
Nevada Interstate 580 Freeway Extension, from Mt. Rose Highway to the Bowers Mansion Road Interchange, Washoe County – roadway reconstruction including construction of bridges $1,000,000 $841,055 STATE $841,055.00      
Nevada Lake Mead Parkway/Lake Las Vegas Gateway, from just west of the intersection with Boulder Highway east to the entrance to Lake Mead National Recreational Area, City of Henderson, Clark County – roadway widening and reconstruction $3,000,000 $2,523,164 STATE $2,523,164.00      
Nevada SR 160 Blue Diamond Highway, from Valley View to Rainbow Boulevard, Clark County – roadway widening and reconstruction $3,750,000 $3,153,955 STATE $3,153,955.00      
New Jersey Route 539 adjacent to Lakehurst Naval Air Engineering Station, Ocean County – roadway reconstruction including intersection improvements $250,000 $210,264 STATE $210,264.00      
New Mexico National Forest Service Road  (NFSR) 235, Magdalena Ranger District, within the Cibola National Forest, Socorro County – roadway rehabilitation, including safety turn–outs, rest areas, trailhead parking, and interpretative signing $1,165,000 $979,829 STATE $979,829.00      
New Mexico Navajo Route 13 (BIA 13) from Cove in the Red Valley area of the Navajo Nation to US491, San Juan County – roadway rehabilitation $1,540,000 $1,295,224 FLH     $1,295,224.00  
New Mexico Valles Caldera National Preserve, Sandoval County – various infrastructure improvements, including roadway rehabilitation $1,475,000 $1,240,556 FLH     $1,240,556.00  
New York Hyde Park Information and Transportation Center, Dutchess County – various site and transportation improvements $1,500,000 $1,261,582 FLH     $1,261,582.00  
New York Thomas Cole National Historic Site, Greene County – various access and site improvements $745,000 $626,586 STATE $626,586.00      
North Dakota Spirit Lake TribeTokio–Ephriam Road, on the Spirit Lake Reservation, on BIA 20 and 21, Benson County – nine miles of shoulder widening and safety improvements $400,000 $336,422 FLH     $336,422.00  
Oklahoma Sequoyah National Wildlife Refuge access road, 2 miles south of the City of Vian, Sequoyah County – asphalt overlay of existing roadway $60,000 $50,463 STATE $50,463.00      
Oklahoma Skiatook Lake Access Road, within U.S. Army Corps of Engineers Lake Skiatook, Osage County – construction of access road $150,000 $126,158 STATE $126,158.00      
Oregon Historic Columbia River Highway (HCRH), Cascade Locks segment, Hood River County – bury above ground utility lines $500,000 $420,527 STATE $420,527.00      
Oregon Sumpter Valley Railroad, 22 miles southwest of Baker City adjacent to Highway 7, Baker County – track extension and infrastructure improvements associated with the restoration of theSumpter Valley railroad $500,000 $420,527 FRA     $420,527.00  
Oregon U.S. 26 Passing Lanes, Wasco County – construction of passing lanes between milepost 93.0 and 95.5 $500,000 $420,527 STATE $420,527.00      
Rhode Island Blackstone River Bikeway, Segment 4A, from Cumberland to Lincoln – bikeway construction $3,650,000 $3,069,850 STATE $3,069,850.00      
South Dakota BIA Route 27, within the Pine Ridge Indian Reservation, beginning approximately 2 miles south of Wounded Knee and proceeding northeast for 8 miles, Shannon County – roadway reconstruction $1,000,000 $841,055 FLH     $841,055.00  
South Dakota SD 40 from the city of Hermosa southeast to the Shannon County line, Custer County – roadway resurfacing $3,000,000 $2,523,164 STATE $2,523,164.00      
South Dakota South Dupree Road (BIA Route 15, County Route 33), from the City of Dupree south approximately 22.5 miles, Ziebach County – roadway reconstruction $500,000 $420,527 FLH     $420,527.00  
Tennessee Stones River National Battlefield Auto Tour Road, Rutherford County – rehabilitation of auto tour road, including waysides and trails, and new park entry roads $500,000 $420,527 FLH     $420,527.00  
Utah Bear River Access Road, from the Bear River Migratory Bird Refuge to the I–15 southbound ramps, Box Elder County – preliminary engineering and roadway reconstruction $750,000 $630,791 FLH     $630,791.00  
Utah BluffStreet Corridor (SR–18), between I–15 and Dixie National Forest, Washington County – interchange improvements at Exit 6 on I–15, and construction along SR–18 from Milepost 0.0 to Milepost 11.0 $575,000 $483,606 STATE $483,606.00      
Utah San Juan County Road 442 (Gothic Creek Road), from intersection of County Road 443 to Arizona border, in the Navajo Nation, San Juan County – roadway reconstruction $150,000 $126,158 STATE $126,158.00      
Utah San Juan County Road 444 (Navajo White Mesa Road), from the intersection of County Road 406 northeast 1.7 miles to intersection of County Road 499, then continuing north to the intersection of County Road 406, in the Navajo Reservation, San Juan County – roadway reconstruction $330,000 $277,548 STATE $277,548.00      
Utah San Juan County Road 470 (Teec Nos Pos Road), from the intersection of County Road 444 southeast to the Arizona border, in Navajo Nation, San Juan County – roadway reconstruction $250,000 $210,264 STATE $210,264.00      
Utah SR–92/ I–15 Interchange, on State Route 92 , between I–15 and Timpanogos Cave National Monument, Utah County – interchange improvements on I–15 and widening SR–92 $1,500,000 $1,261,582 STATE $1,261,582.00      
Utah SR–92, from I–15 Interchange to SR–146 at Timpanogos Cave National Monument, Utah County – interchange improvements on I–15 and widening SR–92 $500,000 $420,527 STATE $420,527.00      
Virginia 14th Street Bridge Corridor, including 14th Street Bridges over the Potomac River and Ohio Drive, including the Arland D. Williams Bridge, Rochambeau Bridge, and George Mason Bridge, George Washington Memorial Parkway and the Humpback Bridge, George Washington Memorial Parkway's Columbia Island Marina, and I–395, Arlington County, Virginia and the District of Columbia – safety and traffic operation improvements, access improvements to the Columbia Island Marina, bridge construction, and may also include improvements on roads within the District. $800,000 $672,844 FLH     $672,844.00  
Virginia Battlefield Parkway Expansion, from Kincaid Boulevard on the west to East Market Street (Route 7) on the east, City of Leesburg – construction of four lanes on new location $3,000,000 $2,523,164 STATE $2,523,164.00      
Virginia Jamestown 2007 Project, Colonial National Historic Park, James City County – various park improvements for the Jamestown 400th anniversary commemoration in 2007, including shuttle bus service $1,625,000 $1,366,714 FLH     $1,366,714.00  
Virginia U.S. Marine Corps Heritage Center, at intersection of Route 1 and Route 619, Prince William County – design and reconstruction of intersection and other Route 1 improvements required to serve the entrance to the Center $1,000,000 $841,055 STATE $841,055.00      
Virginia Northern Virginia Trails Connections, from Telegraph Road to the Mt. Vernon Trail, City of Alexandria – conduct a feasibility study and preliminary engineering of a bicycle/pedestrian trail access $500,000 $420,527 STATE $420,527.00      
Washington Makah 200–Line Road, Neah Bay, Clallam County – road and parking lot for the new Makah Tribe Health Facilities $1,500,000 $1,261,582 FLH     $1,261,582.00  
Washington Elwha Valley Access – Lower Elwha Tribe Access Road, through Lower Elwha Reservation and connecting to the County Road System, Clallam County – roadway reconstruction $1,000,000 $841,055 FLH     $841,055.00  
Washington Elwha Valley Access – Road to the Lower Elwha Klallam Tribe Reservation, Clallam County – roadway reconstruction $750,000 $630,791 FLH     $630,791.00  
Washington Taholah School Access Road, Quinault Indian Reservation, Grays Harbor County – new roadway construction $2,500,000 $2,102,637 STATE $2,102,637.00      
Wisconsin Delta/Drummond Road (Forest Highway 35), Bayfield County – roadway reconstruction $2,300,000 $1,934,426 STATE $2,230,774.77      
Wyoming 17–Mile Roadwithin the Wind River Indian Reservation, Fremont County – roadway reconstruction $530,000 $445,759 STATE $445,759.00      
TOTALS   $95,200,000 $80,068,413   $51,853,192.77 $533,881.00 $27,977,688.00 $0.00
  1. All FY2006 available PLHD funds were designated for specific projects by Congress in the conference report accompanying the FY2006 Transportation Appropriations Act (Public Law 109–115).
  2. SAFETEA–LU authorized $95.2 million for PLHD for FY 2006. After the 1%; across–the–board rescission in Section 3801 of the FY2006 Defense Appropriations Act, and takedowns of 2.35% for Section 112 of the FY 2006 Transportation Appropriations Act, 13.0% for FY2006 obligation limitation lop–off under SAFETEA–LU Section 1102(f), and $1,901,875 for planning and administration costs of Federal Land Management Agencies under 23 U.S.C. 204(i), $80,068,413 is available for these designated projects. All of these projects were designated for funding in the Statement of Managers of the conference report (H.Rept. 109–307) accompanying the FY 2006 Transportation Appropriations Act.
  3. For projects administered through the State, contact Larry Beidel, FHWA Office of Program Administration, 202–366–4653. For projects administered through Federal Lands Highway (FLH), contact Aron Reif, FHWA Office of FLH, 202–366–9489.
Excel files can be viewed with the Excel Viewer
PDF files can be viewed with the Acrobat® Reader®

Contact

Cindi Ptak
Office of Federal Lands Highway
202-366-1586
E-mail Cindi

 
 
Updated: 04/06/2011
 

FHWA
United States Department of Transportation - Federal Highway Administration