|
|
FY 2001 PLHD Awards
| State |
Project Description |
Total Award |
"Earmarked" Portion ** |
Discretionary Portion |
| Alabama | Unimproved County Road from Alabama Highway 69 to Old Lock One Park, Tombigbee River, U.S. Army Corps of Engineers, Clarke County - prepare and pave the existing dirt road | $879,000 | $879,000 | |
| Alaska | Steese Highway, State Route 6, from Milepost 44, near Boston Creek to Milepost 62, near Cripple Creek, Fairbanks North Star Borough - roadway rehabilitation, minor widening and paving approximately 18 miles | $3,000,000 | | $3,000,000 |
| Alaska | Walden Point Road on the Metlakatla Indian Reservation on Annette Island in Southeast Alaska, near Ketchikan - design and construction of the Tain Creek Bridge; and construction equipment rental | $1,970,000 | $1,098,750 | $871,250 |
| Alaska | Chugach Road from the City of Whittier to Neptune Point, East of Shotgun Cove, Alaska - Environmental review and preliminary engineering | $219,750 | $219,750 | |
| Alaska | Iditarod Millennium Trail extending along the Kenai Peninsula between Seward and Anchorage - Reestablish the location of a historic trail along the Kenai Peninsula | $966,900 | $966,900 | |
| Alaska | Pasagshak Road, MP 0 to 16, Kodiak Island Borough - Design and construction of roadway realignment and rehabilitation | $439,500 | $439,500 | |
| Alaska | Eureka to Rampart Connector - Construction of approximately 14 miles of two-lane road and rehabilitation of the remaining portions of this 26-mile route | $439,500 | $439,500 | |
| Arizona | Diamond Bar Road, Route 261, Mohave County Road, accessing the Hualapai Indian Reservation, Mohave County - Grading, draining, gravel base and bituminous surfacing of 14 (22.4 km ) miles of roadway | $2,000,000 | | $2,000,000 |
| Arkansas | River Trails Bridge on Arkansas River Corps of Engineers Murray Lock and Dam, Pulaski County - Construction of bicycle/pedestrian bridge | $1,100,000 | | $1,100,000 |
| California | Yosemite Area Regional Transportation System (YARTS) improvements at Yosemite National Park, Mariposa, Merced, and Mono Counties - Provide enhanced public transportation services | $600,000 | | $600,000 |
| California | Fort Baker Transportation Demand Management Program, Golden Gate National Recreation Area, Marin County - Development of immediate short, mid and long-term strategies with marketing to provide alternative access through transit shuttles, off-site/satellite parking, circulation changes and other transportation demand management strategies | $87,900 | $87,900 | |
| California | Historic Kelso Railway Depot, in the Mojave National Preserve, approximately 34 miles southeast of Baker, San Bernardino County - Restoration and preservation of historic building | $2,197,500 | $2,197,500 | |
| California | Utah Trail, City of 29 Palms, Joshua Tree National Park, San Bernardino County - Roadway rehabilitation | $1,318,500 | $1,318,500 | |
| Colorado | State Highway 139, Canyon Pintado National Historic District, South of Rangely, MP 52.7 - MP 57.8, Rio Blanco County - Roadway reconstruction | $4,000,000 | | $4,000,000 |
| District of Columbia | Anacostia Riverwalk and Trail, along both the West and East banks of the Anacostia River - Phase II (Design, Engineering and Interim Trail Construction) | $1,300,000 | | $1,300,000 |
| Independence Avenue (eastbound and westbound lanes) from Kutz Bridge (17th Street) to 14th Street, excluding the bridge over Maine Avenue, and eastbound Maine Avenue from Independence Avenue to Raoul Wallenberg Place - Roadway rehabilitation (Phase 2b of National Mall Roads Improvement Initiative) | $2,000,000 | | $2,000,000 |
| Florida | Timucuan Preserve Bicycle Touring Route along US Highway A-1-A, Duval County - Final design and construction of the remaining 9 miles of the touring bike route | $395,550 | $395,550 | |
| Georgia | Kennesaw Mountain to Chattahoochee River Trail - North Leg, Cobb County - Design and construction of a twelve-foot wide paved multi-use, non-motorized pathway | $910,000 | | $910,000 |
| Georgia | U.S. 23 at the Bond Swamp National Wildlife Refuge, Bibb and Twiggs Counties - Turn Lane Evaluation, Facility Engineering, and Information Kiosks | $61,000 | | $61,000 |
| Hawaii | Hanalei Valley/Hanalei Wildlife Refuge scenic stop on Route 56 (Kuhio Highway), Island of Kauai, Kauai County - Design of relocation of scenic stop | $630,500 | $630,500 | |
| Hawaii | Eruption Site at Hawaii Volcanoes National Park, end of Chain of Craters Road, Hawaii County - Construct parking, turnaround, and pedestrian safety improvements at the Eruption Site | $588,000 | $588,000 | |
| Hawaii | Ohiki Road (entrance road to the Hanalei National Wildlife Refuge), 1 ½ Miles East of Hanalei Town, Kauai County - Roadway rehabilitation | $100,000 | $100,000 | |
| Idaho | Clark Fork River Bridge near the City of Clark Fork, at Kanisku National Forest, Bonner County - Phase II (Final bridge replacement design, right-of-way procurement, and construction) | $1,318,500 | $1,318,500 | |
| Idaho | City of Rocks Back Country Byway, from Connor's Corner to City of Rocks National Reserve entrance, one mile south of Almo, Cassia County - Phase 2 (Complete Preliminary Engineering and Right of Way Acquisition for roadway reconstruction) | $439,500 | $439,500 | |
| Idaho/Wyoming | Teton Pass Trail, in the Bridger-Teton and Targhee National Forests, Teton County Idaho, and Teton County Wyoming - Trail design and construction (two components, one on east side and one on west side of Teton Pass) | $439,500 | $439,500 | |
| Kansas | Broughton Bridge (County Road 837, FAS 124) six miles north of Wakefield at north end of Milford Lake, Clay County - Bridge replacement | $307,650 | $307,650 | |
| Kentucky | Cumberland Gap Tunnel, US 25E, Cumberland Gap National Historical Park, Bell County - Completion of the punch list for Cumberland Gap Tunnel construction project including improvements to the Electrical/Grounding, SCADA, data acquisition and communications systems, and additional safety features, and Wilderness Road Trail | $791,100 | $791,100 | |
| Kentucky | Daniel Boone Parkway, from Hazard to London, Daniel Boone National Forest; Laurel, Clay, Leslie and Perry Counties - Safety improvements including installation of raised pavement markers, centerline rumble strips and rehabilitate shoulder pavement at fatal and critical crash locations. ITS Deployment (Advance Curve Warning System, Speed Limit Awareness System, Passing Lane Electronic Monitoring System, Remote Weather Information System, and Reference Markers) | $879,000 | $879,000 | |
| Kentucky | Lake Cumberland Access Road Project, North side of Lake Cumberland in Alligator Creek Embayment about 15 miles from Russell Springs, Russell County - Design and partial construction (environmental required) of improvements include a parking lot expansion to accommodate access to Alligator No. 2 Marina at Lake Cumberland | $659,250 | $659,250 | |
| Louisiana | Louisiana Hwy 10 from Louisiana Hwy 467 to Texas Avenue, at Fort Polk military installation, Vernon Parish - Widen to a four-lane divided roadway between Louisiana Hwy 467 and Texas Avenue (approximately 1.2 miles) | $1,000,000 | | $1,000,000 |
| Maine | Duck Brook Road from Rt. 233 at Eagle Lake to West Street, within Acadia National Park, town of Bar Harbor, Hancock County - Roadway rehabilitation | $439,500 | $439,500 | |
| Massachusetts | Lowell National Historic Park, western canal walkway improvements, adjacent to Suffolk Street, from Dutton Street to Broadway, Middlesex County - Construction of handicapped accessible walkway along canal | $439,500 | $439,500 | |
| Michigan | Skanee Road from 1.7 miles east of Whirligig Road to Townline Road in L'Anse Township, within the L'Anse Indian Reservation, Baraga County - Reconstruction of 6.6 miles of roadway | $500,000 | | $500,000 |
| Mississippi | Natchez Trace Parkway multi-use trail near the metropolitan area of Jackson and near the City of Natchez, in Madison, Hinds, and Adams Counties - Preliminary engineering and environmental assessment for trail construction | $263,700 | $263,700 | |
| Missouri | Public Access to the Harlow Island Division of the Mark Twain National Wildlife Refuge, Jefferson County - Repairing / improving an existing access road, constructing a small parking area, installing a pedestrian bridge across a narrow creek adjacent to the parking area and refurbishing an existing concrete bridge across this same creek | $76,000 | | $76,000 |
| Missouri | Robert Allen Recreation Area Access Road (Monroe County Road # 520) from State Route 154 3.0 miles to Corps of Engineers' access at the Army Corps of Engineers' Mark Twain Lake, Monroe County - Roadway resurfacing | $199,200 | | $199,200 |
| Montana | State Secondary Highway 419 (PFH-83) between MP 14.1 to 20.5, from Benbow Road at the community of Dean to Carter's Camp, in the community of Nye, Stillwater County - Roadway reconstruction | $2,285,400 | $2,285,400 | |
| Montana | Giant Springs Road (Montana Urban Route 5221), Cascade County - Relocate 0.5 miles of roadway | $703,200 | $703,200 | |
| Montana | Montana Secondary route 323 (S-323) from Ekalaka to Alzada, Carter County - Design, right-of-way acquisition and utility relocation for reconstruction of 10-mile segment of roadway from MP 52 to 62 | $879,000 | $879,000 | |
| Montana | Charles M. Russell/Fort Peck Roads coalition access project (northern 49 miles of Valentine/Dovetail/Crooked Creek roads between Winnett and the refuge), Petroleum County - Rehabilitation of six-mile segment of roadway | $439,500 | $439,500 | |
| Nebraska | Garden County Road 181 - Crescent Lake Refuge Access Road, Garden County - Roadway rehabilitation | $439,500 | $439,500 | |
| Nebraska | Extension of Route 34, at the entrance of Boyer Chute National Wildlife Refuge, Washington County - Roadway and parking lots paving | $2,197,500 | $2,197,500 | |
| Nebraska | River Road (County Roads P-51, 51 and 34) from the Douglas County Line north 5 miles to Boyer Chute National Wildlife Refuge, Washington County - Roadway paving and right-of-way acquisition |
| Nevada | US 50 from approximately 2.9 to 5.8 miles north of California State line, within the Lake Tahoe Basin, Douglas County - Environmental improvements including erosion control, water quality enhancement, upgrade of drainage facilities, stabilization of roadway cut and fills slopes, rock fall mitigation, and repair/replacement of deteriorated binwall type retaining walls. | $439,500 | $439,500 | |
| New Hampshire | Route 112 from Loon Mountain Road easterly 3.5 miles to the Big Rock Campground, within the White Mountain National Forest, Grafton County - Shoulder Widening and Pavement Overlay | $1,000,000 | | $1,000,000 |
| New Jersey | South Old Mine Road and North Old Mine Road within the Delaware Water Gap National Recreational Area, Warren and Sussex Counties - Roadway reconstruction including bridge rehabilitation | $879,000 | $879,000 | |
| New Mexico | Jicarilla Apache Indian Reservation Access Road, NM 537, from milepost 45.5, north for 10.4 miles to the US 64 junction, Rio Arriba County - Roadway reconstruction | $3,500,000 | | $3,500,000 |
| New Mexico | Jemez Pueblo Bypass, NM 4, from junction with NM 44(to be renamed US 550), north for 6.16 miles to junction with NM 290, within the Jemez Pueblo Indian Reservation, Sandoval County - Preliminary and Final Design of Jemez Bypass | $263,700 | $263,700 | |
| New York | Mongaup Visitor Center within the Upper Delaware Scenic & Recreational River, Orange County - Planning of the Mongaup Visitor Center | $791,100 | $791,100 | |
| New York | Mongaup Visitor Center within the Upper Delaware Scenic & Recreational River, Orange County - Design of the Mongaup Visitor Center | |
| Oregon | US 26, Antone Road to John Day River, Wheeler County - 17 miles of roadway resurfacing, including climbing lanes, rock fall mitigation, drainage work, vehicle turnouts | $3,000,000 | $1,318,500 | $1,681,500 |
| South Dakota | SD-240 (Badlands Loop Road) at Cedar Pass Slide in Badlands National Park, Jackson County - Roadway rehabilitation including relocation of water storage system | $1,494,300 | $1,494,300 | |
| South Dakota | Forest Highway 26 from 0.9 miles south of Sturgis south for 11.2 miles, in the Black Hills National Forest, Meade County - Roadway resurfacing, fencing, guardrail, and retaining walls | $571,350 | $571,350 | |
| South Dakota | Crazy Horse Trail Road (BIA 2 from BIA 27 to BIA 41, and BIA 41 from BIA 2 north one mile and south two miles), on the Pine Ridge Indian Reservation, Shannon County - Roadway reconstruction | $3,000,000 | | $3,000,000 |
| Texas | Big Mineral Creek Bridge within the Hagerman National Wildlife Refuge, Grayson County - Bridge rehabilitation | $229,840 | | $229,840 |
| Utah | Soldier Hollow Access Phase II (Tate Lane, Cascade Springs Road, and Stringtown Road), Wasatch County - Widening and realigning roadways to two 3.6 meter travel lanes with two 1.8 meter shoulders | $1,054,800 | $1,054,800 | |
| Utah | Bear River Migratory Bird Refuge access road from the Refuge 12.26 miles to I-15, Box Elder County - Preliminary engineering, including environmental documentation, for road reconstruction | $835,050 | $835,050 | |
| Vermont | Nulhegan Basin Division of the Silvio O. Conte National Fish and Wildlife Refuge, north of State Route 105 in towns of Brunswick, Bloomfield, Lewis and Ferdinand, Essex County - Bridge construction, roadway reconstruction, Public Use Plan Data Gathering, and visitor center | $439,500 | $439,500 | |
| Virginia | Chincoteague National Wildlife Refuge, Assateague Island, Accomack - Demolition of the existing headquarters building; site preparation; initial construction of buildings, parking lots, and access roads; Beach Road realignment; trail construction for bicycles and pedestrians; and, vegetative removal and replanting | $439,500 | $439,500 | |
| Virginia | Fort Eustis Second Access Road, from Route 60 (Warwick Boulevard) and Ashton Green Boulevard and proceeding over the Warwick River to Fort Eustis, City of Newport News - Completion of engineering and construction of a three-lane access road and bridge across the Warwick River to Fort Eustis and modifications to intersection with U.S Route 60 (Warwick Blvd) | $2,538,250 | $1,538,250 | $1,000,000 |
| Virginia | Route 600 Mount Rogers Access Improvement, in Jefferson National Forest, Smyth County - Realign and reconstruct 3.046 miles of roadway | $1,362,450 | $1,362,450 | |
| Virginia | Traffic Circle at the Mount Vernon Memorial Parkway (George Washington Memorial Parkway) and Virginia State Route 235 at the entrance to the Mt. Vernon Estate and Gardens, Fairfax County - Preliminary engineering and environmental documentation for safety and traffic operational improvements and construction or reconstruction of parking areas at the traffic circle intersection of the Mt. Vernon Memorial Highway and Virginia State Route 235 | $219,750 | $219,750 | |
| Virginia | Rte. 29 at Rte. 234 Aerial Utility Relocation Improvements - Manassas National Battlefield Park, Prince William County - Subsurface relocation of existing aerial utilities along U.S. Route 29 and State Route 234 | $439,500 | $439,500 | |
| Virginia / District of Columbia | I-395 14th Street Bridges over the Potomac River and Ohio Drive, including the Arland D. Williams Bridge, Rochambeau Bridge, and George Mason Bridge in Virginia and the District of Columbia; and George Washington Memorial Parkway (NPS Route 10) and the Humpback Bridge in Virginia - Preliminary engineering, construction, and construction engineering for safety and capacity improvements to the 14th Street Bridges, I-395 approaching the 14th Street Bridges, GWMP Humpback Bridge, and the interchange between them. Bridge construction may include widening for acceleration and deceleration lanes, and possibly an additional lane across the 14th Street bridges, and other safety improvements. The project may also include spot improvements on roads within the District of Columbia. | $2,197,500 | $2,197,500 | |
| Washington | SR-504 at Mount St. Helens National Volcanic Monument, Cowlitz, Skamania, and Lewis Counties - Feasibility study for extension of SR-504 | $87,900 | $87,900 | |
| Washington | Oaks to Wetlands Project, Ridgefield National Wildlife Refuge in Ridgefield, Clark County - Interpretive signage, hiking trails, foot bridge from parking area to project site, rehabilitation of parking lot and entrance road, restrooms, visitor facility design and engineering | $175,800 | $175,800 | |
| West Virginia | Glade Creek Road (NR014) and Brooklyn Road (NR008), New River Gorge National River, Fayette County - Roadway reconstruction | $2,637,000 | $2,637,000 | |
| Wisconsin | CTH GG from CTH M at Clam Lake to a point approximately 0.8 miles north of Spider Lake Road, within the Chequamegon National Forest, Ashland County - Roadway rehabilitation | $400,000 | | $400,000 |
| Wyoming | Seminoe Road (Phase III), from milepost 14.7 to 24.7, Carbon County - Roadway reconstruction | $4,500,000 | | $4,500,000 |
| TOTALS | 69 Projects | $72,395,890 | $39,467,100 | $32,928,790 |
** This funding was designated by Congress in the FY 2001 DOT Appropriations Act (Public Law 106-346) conference report (House Report 106-940).
|
Contact
Cindi Ptak
Office of Federal Lands Highway 202-366-1586 E-mail Cindi
|