Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Geotechnical Engineering

 

Abandoned Underground Mines Discussion Group


 
Subject Messages Last Post
Dynamic compaction as Remediation  5   01/28/2000  
Team Effort Required to Prepare for Long Wall Mining Effects on Interstate 70  1   09/27/2000  
Dynamic compaction, theoretical methods for analysis  2   01/29/2001  
Falling Weight Deflectometer (FWD)  6   02/11/2004  
Mine Fires  2   01/09/2003  
I-39 (Abraham Lincoln Bridge) LaSalle Illinois  6   12/03/2003  
Indiana Bat Gates  3   01/18/2006  
Sunsidence of room and pillar coal mines  3   01/21/2004  
Angle of Draw  6   04/19/2004  
geophysics  3   05/12/2004  
Cost Estimate  4   07/23/2004  
Cost info for Deep Foundations through Abandon Coal Mines  2   07/28/2004  
Remediation Of Mine Workings Exposed in Cut Slopes, and Backfilling and Stabilization of Vertical Mine Shafts  7   02/09/2005  
Early Warning System  7   12/29/2004  
Down hole video camera  1   10/28/2004  
bore hole systems  5   02/10/2005  

Post a New Message

We are sorry this forum is currently not available. If you have a topic you would like to add, pleas contact Tom Lefchik

Note: this is a moderated group and the message will only be posted on approval of the moderator.

Contact:

Tom Lefchik
Ohio Division Office
614-280-6845
thomas.lefchik@fhwa.dot.gov

 
This page last modified on 02/23/06
 

FHWA
United States Department of Transportation - Federal Highway Administration