| Earth and Rock Works | Earth Retaining Structures | Geotechnical Hazards | Ground Improvement | Structural Foundations | Subsurface Investigation |
| FHWA > Engineering > Geotechnical > Geotechnical Hazards > Mines |
| Subject | From | Posted |
|---|---|---|
| Team Effort Required to Prepare for Long Wall Mining Effects on Interstate 70 | SCANNER - the Newsletter of the American Society of Highway Engineers, September 2000 - 3 | 09/27/2000 10:37AM |
Messages posted for Team Effort Required to Prepare for Long Wall Mining Effects on Interstate 70
|
Subject: Team Effort Required to Prepare for Long Wall Mining Effects on Interstate 70 From: SCANNER - the Newsletter of the American Society of Highway Engineers, September 2000 - 3 Date: 09/27/2000 | ||
| One page article on the preparations that PennDOT did to ready the roadway for the settlement impacts of the mining. Includes instrumentation, structure treatment, alternate traffic routes, signing and public awareness. | ||
We are sorry this forum is currently closed. If you have a topic you would like to add, pleas contact Tom Lefchik