Geotechnical Aspects of Pavements Reference Manual

Appendix E: Typical Key For Boring Log Preparation

Figure E-1. Example key to boring log.

Copy of Sheet 1 of 2 of a typical key for boring log preparations to maintain uniformity as recommended by Section 4.7.1.

Figure E-1. Example key for final boring log (continued).

Copy of Sheet 2 of 2 of a typical key for boring log preparations to maintain uniformity as recommended by Section 4.7.1.

Figure E-2. Example key to core boring log.

Copy of Sheet 1 of 2 of a typical key for rock core log preparations to maintain uniformity as recommended by Section 4.7.1.

Figure E-2. Example key to core boring log (continued).

Copy of Sheet 2of 2 of a typical key for rock core log preparations to maintain uniformity as recommended by Section 4.7.1.