GTR Review Checklist for Centerline Cuts and Embankments
B. Centerline Cuts and Embankments
(Pgs. 2-2 to 2-6)
In addition to the basic information listed in Section A, is the following information provided in the project geotechnical report.
Are station-to-station descriptions included for:
-
Existing surface and subsurface drainage?
(Yes / No / Unknown or N/A)
-
Evidence of springs and excessively wet areas?
(Yes / No / Unknown or N/A)
-
Slides, slumps, and faults noted along the alignment?
(Yes / No / Unknown or N/A)
Are station-to-station recommendations included for the following?
General Soil Cut or Fill
-
Specific surface/subsurface drainage recommendations?
(Yes / No / Unknown or N/A)
-
Excavation limits of unsuitable materials?
(Yes / No / Unknown or N/A)
-
*Erosion protection measures for back slopes, side slopes, and ditches, including riprap recommendations or special slope treatment.
(Yes / No / Unknown or N/A)
Soil Cuts
(Pgs. 5-23, 5-24)
-
*Recommended cut slope design?
(Yes / No / Unknown or N/A)
-
Are clay cut slopes designed for minimum F.S. = 1.50?
(Yes / No / Unknown or N/A)
-
Special usage of excavated soils?
(Yes / No / Unknown or N/A)
-
Estimated shrink-swell factors for excavated materials?
(Yes / No / Unknown or N/A)
-
If answer to 3 is yes, are recommendations provided for design treatment?
(Yes / No / Unknown or N/A)
Fills
(Pgs. 5-1 to 5-3)
-
Recommended fill slope design?
(Yes / No / Unknown or N/A)
-
Will fill slope design provide minimum F.S. = 1.25?
(Yes / No / Unknown or N/A)
Rock Slopes
-
*Are recommended slope designs and blasting specifications provided?
(Yes / No / Unknown or N/A)
-
*Is the need for special rock slope Stabilization measures, e.g., rockfall catch ditch, wire mesh slope protection, shotcrete, rock bolts, addressed?
(Yes / No / Unknown or N/A)
-
Has the use of "template" designs been avoided (such as designing all rock slopes on 0.25:1 rather than designing based on orientation of major rock jointing)?
(Yes / No / Unknown or N/A)
-
*Have effects of blast induced vibrations on adjacent structures been evaluated?
(Yes / No / Unknown or N/A)
*A response other than (yes) or (N/A) for any of these checklist questions is cause to contact the appropriate geotechnical engineer for a clarification and/or to discuss the project.