State DOT Testing and Evaluation Requirements for NCHRP Projects 24-16, 24-07 (2), and 21-07Dr. Pete Lagasse Three ongoing NCHRP Projects, 24-16 (Meander Migration), 24-07(2) (Pier Scour Countermeasures), and 21-07 (Portable Scour Instruments) have significant requirements for State DOT testing and/or evaluation of methods or results. The objectives and time line for each project will be reviewed and the testing and evaluation requirements outlined. Feedback on DOT interest, lead time requirements, and other issues related to the testing and evaluation will be solicited. |