Office of Planning, Environment, & Realty (HEP)
Planning • Environment • Real Estate
| STATE |
REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|||
|---|---|---|---|---|---|---|---|
| Montana | 36195 | $5,701,507 | $10,468,484 | 183.6% | |||
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|
| $810,652 | Ped/Bike | This project is for the design and construction of a non-motorized overpass crossing on Montana Rail Link (MRL) right of way. It will provide Bike/Pedestrian access on the Northside of Missoula, Montana. | Reported Previously | ||||
| $1,072,233 | Ped/Bike | This project consists of design and construction of a bike/pedestrian bridge with approaches and connections to an existing street and trail. | Reported Previously | ||||
| $608,000 | Other | Application of asphalt on unpaved alleys and streets in Missoula County located within the urban area to reduce the amount of re-entrained road dust emissions (PM-10) | Reported Previously | ||||
| $271,905 | Ped/Bike | This project will provide new bicycle/pedestrian paths along several routes in Missoula, MT, which will create an integrated network on N/S/E/W connections within the urban area. | Reported Previously | ||||
| $48,475 | Demand Mgmt | This project will implement TDM strategies with the assistance of a consultant. | Reported Previously | ||||
| $470,934 | Traffic Flow | This project will increase the efficiency of traffic movement by making improvements at 50 signalized intersections. It includes upgrades to traffic signal equipment and roadway surface. | Reported Previously | ||||
| $174,083 | Ped/Bike | This project will develop a bicycle lane network utilizing epoxy striping to facilitate non-motorized commuting at 21 locations in the City of Missoula. | Reported Previously | ||||
| $401,724 | Ped/Bike | This project will provide for the construction of facilities serving non-motorized traffic. | Reported Previously | ||||
| $458,034 | Other | Application of asphalt on unpaved alleys and streets in the City of Missoula to reduce the amount of re-entrained road dust emissions (PM-10) | Reported Previously | ||||
| $81,963 | Traffic Flow | Intersection Improvement | Reported Previously | ||||
| $25,974 | Ped/Bike | This project helps fund the bike/ped coordinator position for the City of Missoula. Activities contained within the project are eligible under current CMAQ guidance. | |||||
| $417,923 | Ped/Bike | The funds will provide for bicycle and pedestrian structure alongside of the Orange Street Bridge which crosses the Clark Fork river in Missoula. | |||||
| $452,189 | Transit | This CMAQ transfer to FTA funds the design and construction of the transit center and operating assistance for the downtown circulator bus for an additional year. | |||||
| $5,196,560 | Other | The project is for the acquisition of new sweepers, flush trucks and liquid de-icer application equipment. The equipment has been distributed to the areas identification as being non-attainment or "high risk" for PM-10. | Qualitative Analysis | ||||
| ($19,200) | Ped/Bike | This project consists of constructing a bike/ped facility to encourage sov reduction in Missoula. | |||||
| ($2,965) | Ped/Bike | This project consisted of landscaping which included a bike/ped path through the landscaped area. | Reported Previously | ||||
| $ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|||||
| Totals | $1,140,126,664 | $682,559,020 | 59.9% | ||||