Office of Planning, Environment, & Realty (HEP)
Planning • Environment • Real Estate
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Alaska | 07/24/2001 | $14,460,000 | $6,144,077 | 42.5% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $462,000 | Demand Management | Demand Management Statewide Highway Database Equipment Acquisition and Installation |
0 | 0 | 0 | QA |
| $159,198 | Demand Management | Experimental Pilot Projects Statewide Air Quality Education Project |
0 | 0 | 0 | QA |
| $9,097 | Demand Management | Demand Management FY 1998 & 1999 Unified Planning Work Program - Fairbanks Metropolitan Area Transportation Study |
0 | 0 | 0 | QA |
| $200,000 | I/M and Other TCMs | I/M and Other TCMs Develop software and fully implement EPA mandated changes to the Fairbanks I/M Program (access vehicle On-Board Diagnostics Fault Codes). |
0 | 200 | 0 | 0 |
| $227,425 | I/M and Other TCMs | I/M and Other TCMs Conduct evaluation of episodic PM10 controls through stabilization of road dust along a major arterial during elevated PM10 periods. The suitability of a number of dust control measures will be investigated as part of this project. |
0 | QA | 0 | 0 |
| $869 | I/M and Other TCMs | I/M and Other TCMs Anchorage I/M Program Implementation |
0 | PR | 0 | 0 |
| $500,335 | I/M and Other TCMs | I/M and Other TCMs Fairbanks BAR-97 Emissions Test Equipment Grant Program |
0 | 200 | 0 | 0 |
| $227,425 | I/M and Other TCMs | I/M and Other TCMs Research survey and analyze connective transportation and land use alternatives as part of the development of the Anchorage Bowl Comprehensive Plan and the Long-Range Transportation Plan. |
0 | QA | 0 | 0 |
| $63,387 | I/M and Other TCMs | I/M and Other TCMs State Equipment Fleet Emissions Testing Equipment |
0 | QA | 0 | 0 |
| $272,910 | I/M and Other TCMs | I/M and Other TCMs Purchase street sweepers that can operate at subfreezing temperatures using liquid magnesium chloride as a wetting agent to suppress dust. |
0 | 0 | 0 | QA |
| $90,970 | I/M and Other TCMs | Experimental Pilot Projects Increase early spring street sweeping activity by MOA by acquiring additional liquid deicer for subfreezing sweeping. |
0 | QA | 0 | 0 |
| $318,395 | I/M and Other TCMs | I/M and Other TCMs Follow-up to winter 1998-99 research with evaluation of CO controls including oxy sensor replacement program on-board engine heat storage systems designed to reduce cold start emissions and vehicle idle reduction programs. |
0 | 400 | 0 | 0 |
| $90,970 | I/M and Other TCMs | I/M and Other TCMs Educate the public through radio and television media about the relationship of health effects of carbon monoxide and particulate matter and what steps people may take to address their particular concerns. This will include a unique testing effort to ev |
0 | 400 | 0 | 0 |
| $709,567 | I/M and Other TCMs | Experimental Pilot Projects Complete the I/M program quality assurance as required by federal mandate. This project will address training emissions inspection and repairs. |
0 | 1100 | 0 | 0 |
| $6,278 | Miscellaneous | Miscellaneous Obligations to Previously Authorized Projects |
0 | 0 | 0 | 0 |
| $251,863 | Pedestrian/Bicycle | Pedestrian/Bicycle Construct Curb Ramps for wheelchairs and bicycles on selected corridors in then downtown Fairbanks area. |
0 | 70 | 0 | 0 |
| $538,543 | Pedestrian/Bicycle | Pedestrian/Bicycle Construct sidewalk and multi-purpose trail as part of a larger project to improve Arctic Boulevard to minor arterial standards. The road will be reconstructed as three lanes including a two-way center (left-turn lane). |
0 | 22 | 0 | 0 |
| $90,971 | Pedestrian/Bicycle | Pedestrian/Bicycle Improve trail connection from Downtown to Midtown area along the A/C Couplet. |
0 | 2 | 0 | 0 |
| $272,910 | Pedestrian/Bicycle | Pedestrian/Bicycle Extend the Coastal Trail approximately 12.5 miles from its existing southern terminus at Kincaid Park to the Potter Weigh Station on the Seward Highway. |
0 | 2 | 0 | 0 |
| $45,485 | Pedestrian/Bicycle | Pedestrian/Bicycle Funds a bicycle and pedestrian commuter education program that would include a safety component. |
0 | 2 | 0 | 0 |
| $204,683 | Traffic Flow Improvements | Traffic Flow Improvements Design improvements to NHS Intersections to reduce vehicle delay and idling times |
0 | 15 | 0 | 0 |
| $627,718 | Traffic Flow Improvements | Traffic Flow Improvements FY 1998 & 1999 Annual Planning Work Program Tasks |
0 | 0 | 0 | QA |
| $250,000 | Transit | Transit Purchase 3 additional paratransit vans for the Fairbanks North Star Borough system. |
0 | 300 | 0 | 0 |
| $409,365 | Transit | Transit Provides free bus service from November through January to reduce auto travel and promote transit ridership. |
0 | 376 | 0 | 0 |
| $113,713 | Transit | Transit Evaluates the feasibility of providing commuter bus and train service to reduce the number of commuter cars entering Anchorage each day. |
0 | QA | 0 | 0 |
| $ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % | |
|---|---|---|---|
| Totals | $1,515,632,668 | $1,141,784,533 | 75.3% |