New Hampshire

STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
New Hampshire07/24/2001$7,634,000$10,788,025141.3%
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$88,000 I/M and Other TCMsI/M and Other TCMs
Governor's Energy Office- Construct Fuel Stations for Alternate Fuel Vehicles (94-06CM)
1 0 0 0
$(63,266) MiscellaneousMiscellaneous
Improvements to sidewalk system for Nashua School District (94-25CM)
0 0 0 0
$(80,000) MiscellaneousMiscellaneous
Construct 'CNG' fueling facility for City transit system to include bus storage repair servicing parts operating storage & space (96-29CM)
0 0 0 0
$(188,515) MiscellaneousMiscellaneous
Bus route initiating an intracity route to serve residents students employees/ers in Rochester (94-05CM)
0 0 0 0
$(3,638) MiscellaneousMiscellaneous
Optimize signals from FE Everett Turnpike to NH 122 install new controller to improve flow (1994 project)
0 0 0 0
$66,031 Pedestrian/BicyclePedestrian/Bicycle
To provide for 2 E-W pathway corridors and combine with 2 N-S pathway corridors (96-08CM)
1 0 1 0
$8,000 Pedestrian/BicyclePedestrian/Bicycle
Citywide bike improvements including: lockers signs striping. Facility locations include: city parking Dover rail station Dover Point Road (98-14CM)
0 0 QA 0
$28,000 Shared RideShared Ride
Construct 'park and ride' approx. 90 spaces with improved access/egress; will serve: park 'n' ride shared ride Dover shuttle Coast Pulse & Bike Transfer (98-15CM)
0 0 QA 0
$88,000 Shared RideShared Ride
Construct 400 space park'n'ride near B&M RR with rail platform; facility will be used for car pool vanpool & passenger rail modes (98-13CM)
0 0 QA 0
$5,513,811 Shared RideShared Ride
Construct 500 Space Park-N-Ride with bus terminal on NH 101 near I-95 Exit 3.
4 0 24 0
$453,605 Shared RideShared Ride
NH 111/ NH 121 construct new 100 space p-n-r facility with shelter. Facility to include lighting telephone service & bicycle storage lockers (96-25CM)
0 0 QA 0
$2,572,000 Shared RideShared Ride
I-93 (EXIT 1) Construct 500+ space park'n'ride with bus terminal @ Rockingham Blvd (98-09CM)
0 0 QA 0
$7,867 Shared RideShared Ride
Provide safety & convenience improvements to NHDOT p-n-r lot west of I-93. Includes; lighting signage shelter telephones & bike locker storage (96-24CM)
0 0 1 0
$(5,692) Traffic Flow ImprovementsTraffic Flow Improvements
North State Street Upgrade and coordinate signals from Pleasant to Centre Street and turning lanes (94-17CM)
0 0 0 0
$(21,940) Traffic Flow ImprovementsTraffic Flow Improvements
Intersection improvements along Mast Rd. @ Rockland Rd. & College Rd. Add center turn lane.
1 11 0 0
$13,600 Traffic Flow ImprovementsTraffic Flow Improvements
Intersection improvement @ Back River; signalize and coordinate with adjacent signal @ Mill St to reduce severe congestion occuring during peak hours (96-10CM)
0 0 QA 0
$(25,453) Traffic Flow ImprovementsTraffic Flow Improvements
Upgrading of signal systems at 8 locations. This will result in a closed loop signal system. (CMAQ Project)
8 64 0 0
$96,000 Traffic Flow ImprovementsTraffic Flow Improvements
Signalized intersections; construct 2200' road to include 2 lanes bike lane & will be restricted to bus/transit hov pedestrians & bikes during peak hours (98-12CM)
0 0 QA 0
$74,400 Traffic Flow ImprovementsTraffic Flow Improvements
Signal coordination and pedestrian crossing at 7 intersections between Greenleaf & Heritage Ave. (96-21CM)
0 0 QA 0
$55,182 Traffic Flow ImprovementsTraffic Flow Improvements
NH 101A construction of roadway widenings in conjunction with signal coordination
0 0 QA 0
$40,352 Traffic Flow ImprovementsTraffic Flow Improvements
Replace existing signal controller hardware with compatible state of the art equipment at 7 intersections from Merrimack River west to FEE TPK (96-28-CM)
3 60 0 0
$30,048 Traffic Flow ImprovementsTraffic Flow Improvements
Main Street replace existing signal controller hardware with compatible state of the art equipment from Allds Street to Library Hill (96-27CM)
2 28 3 0
$20,000 TransitTraffic Flow Improvements
Install closed loop coordinated signal system from Martins Ferry northerly 1.5 miles to Granite Hill/Memorial School intersection (98-20CM)
5 0 0 0
$1,980,034 TransitTransit
Replace transit vehicles with mixed fleet (96-15CM)
0 0 1 0
$25,600 TransitTransit
Construct rail platform and re-furbish existing infrastructure for intermodal rail terminal
0 0 QA 0
$16,000 TransitTransit
Lincoln Street construct rail passenger station with handicapped access paved parking for 70 cars lighting
0 0 QA 0
  $ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Totals $1,515,632,668$1,141,784,53375.3%
Updated: 07/06/2011