Year Nine Report

California

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
California1/10/2003$360,918,105$589,370,834163 %
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$148,431 Demand ManagementDevelop Clean Air Cities Coalition
Demand Management Project - Public Information - Public Education - Other - Develop Clean Air Cities Coalition
QA      
$100,000 Demand ManagementYARTS Outereach Program
Demand Management Project - Public Information - Public Education - Other - YARTS Outreach Program
10 99 1 48
$32,313 Demand ManagementUpgrade Dial-A-Ride Dispatch Software System
Demand Management Project - New Activity - Planning - Other - Upgrade Dial-A-Ride Dispatch Software System
    4  
$4,000,000 I/M and Other TCMsOperation of Mission Valley W.Extension
I/M or Other TCM Project - Other - Operation of Mission Valley W.Extension
14   3  
$1,948,000 I/M and Other TCMsArea Vehicle Locator (Phase 2)
I/M or Other TCM Project - Other - Area Vehicle Locator (phase 2)
1 8 1 1
$1,827,985 I/M and Other TCMsPave Dirt road for PM-10 mitigation Leon Rd.Simpson Rd to Winchester Rd.
I/M or Other TCM Project - Other - Pave dirt road for PM-10 mitigation Leon Rd, Simpson Road to Winchester Road
      190
$1,163,580 I/M and Other TCMsStreetscape
I/M or Other TCM Project - Other - Streetscape
1   1 2
$1,097,000 I/M and Other TCMsPurchase 33 CNG Vehicles
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
1 street sweeper, 14 sedans, 13 pick-ups, 1 cargo van for Madera County
1   7 1
$1,056,000 I/M and Other TCMsReconstruction and Resurfacing
I/M or Other TCM Project - Other - Reconstruction and Resurfacing
9      
$843,907 I/M and Other TCMsGrading & Paving- PM10
I/M or Other TCM Project - Other - Grading and Paving-PM10
181      
$764,899 I/M and Other TCMsCompact and seal county gravel roads
I/M or Other TCM Project - I/M - Operating - 1st Year
PM10 non-attainment project
QA QA QA 60
$486,915 I/M and Other TCMsConstruct CNG Fueling Station
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - CNG - Infrastructure - Operation - 1st Year
QA   QA  
$400,000 I/M and Other TCMsPM-10 Control Measures/Paving
I/M or Other TCM Project - Other - PM-10
Control Measures/Paving
QA      
$243,500 I/M and Other TCMsROW Perservation
I/M or Other TCM Project - Other - ROW Preservation
QA      
$241,904 I/M and Other TCMsConstruct 200 space Park & Ride Facility near SR395/I-15 Intersection
I/M or Other TCM Project - Other - Construct 200 space Park & Ride Facility near SR395/I-15 intersection
2   1  
$191,225 I/M and Other TCMsPurchase 12 CNG Pickup trucks-City of Salinas
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
1   1  
$164,610 I/M and Other TCMsPurchase 2 CNG Dump Trucks
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
    1  
$139,270 I/M and Other TCMsPurchase 7 CNG Pick-Up Trucks
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
1   1 1
$126,268 I/M and Other TCMsPurchase Training Equipment for CNG vehicle maintenace and Smog Check II
I/M or Other TCM Project - Other - Purchase
training equipment for Ventura College for CBG vehicle maintenance and Smog Check II.
2   2 1
$120,000 I/M and Other TCMsCNG Conversion
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - Modified - CNG - Vehicles - Operation - 1st Year
1 QA 7 1
$120,000 I/M and Other TCMsPurchase 4 CNG Street Sweepers
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
Will replace diesel Street Sweepers
QA QA 1 QA
$100,000 I/M and Other TCMsSecurity Enhancements
I/M or Other TCM Project - Other - Security Enhancements
QA      
$85,418 I/M and Other TCMsPurchase of 5 CNG nutrition vans
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
1   1 1
$61,950 I/M and Other TCMsPurchase 1 CNG Dump Truck
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
    1  
$60,101 I/M and Other TCMsProvide on-site improvements for Park and Ride/bicycle storage facilities
I/M or Other TCM Project - Other - Provide on-site improvements for Park and Ride/bicycle storage facilities
1 1 1  
$56,687 I/M and Other TCMsPurchase 3 CNG vehicles
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
1   1 1
$55,755 I/M and Other TCMsPurchase 2 CNG utility vehicles
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
1   1 1
$49,391 I/M and Other TCMsPurchase 2 CNG Pick Up Trucks
I/M or Other TCM Project - Non Transit
Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year
QA      
$35,411 I/M and Other TCMsRemove Traffic Sigal Poles Boxes
I/M or Other TCM Project - Other - Remove Traffic Signal, Poles, Boxes
1 1 1  
$33,000 I/M and Other TCMsPM-10 Control Measures/Windbreak
I/M or Other TCM Project - Other - PM-10
Control Measures/Windbreak
QA      
$31,400 I/M and Other TCMsExpand exsisting Freeway Serivce Patrol to SR 99, 168and 180
I/M or Other TCM Project - Other - Expand existing Freeway Service Patrol to serve additonal segements of SR99,168 and 180 in Fresno County
10 12 6  
$27,000 I/M and Other TCMsCity/Co Ordinace Non-Auto Travel
I/M or Other TCM Project - Trip Reduction Ordinances - City/Co Ordinance non-auto travel
  QA    
$27,000 I/M and Other TCMsCity/Co Ordinace Non-Auto Travel
I/M or Other TCM Project - Trip Reduction Ordinances - City/Co Ordinance non-auto travel
  QA    
$7,376 I/M and Other TCMsApply Seal Coat to Unpaved Roads
I/M or Other TCM Project - I/M - Operating - 1st Year
PM10 non-attainment area project
QA QA QA 1
$(62,800) I/M and Other TCMsExpand exsisting Freeway Service Patrol to segements of SR99168 and 180
I/M or Other TCM Project - Other - Expand exsisting Freeway Service Patrol to serve additonal segments of SR99, 168, and 180 in Fresno County
10 12 6  
$3,422,395 Pedestrian/BicycleTCM 9: Ped/Bike
Pedestrian/Bicycle Project - Facilities - Separate Path
10 projects
46   27  
$2,470,118 Pedestrian/BicycleBike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$2,477,999 Pedestrian/BicycleTCM 19: Pedestrian Enhancements
Pedestrian/Bicycle Project - Facilities - Separate Path
8 projects
646   764  
$750,000 Pedestrian/BicycleSoquel Drive Improvements
Pedestrian/Bicycle Project - Facilities - Separate Path
Traffic signal/Intersection improvements
1 QA 1 QA
$619,710 Pedestrian/BicycleTower Bridge Ped/Bike Improvements between City of Sacramento & West Sacramento
Pedestrian/Bicycle Project - Safety - Improve access and circulation
1   1 1
$533,000 Pedestrian/BicycleConstruction of Bicycle/Pedestrian Trail
Pedestrian/Bicycle Project - Facilities - Separate Path
1 1 1  
$500,000 Pedestrian/BicycleSafe school Route Phase II
Pedestrian/Bicycle Project - Facilities - Separate Path
sidewalk/bike lane road reconstruction
1   1 1
$381,400 Pedestrian/BicyclePedestrian/Bikeway/Landscaping in Planda on 140
Pedestrian/Bicycle Project - Other - Pedestrain/Bikeway/Landscaping in Planada on 140
1 3 1 1
$360,000 Pedestrian/BicyclePed/Bicycle Bridge for UP Railyard; connect Roseville and Old Town Roseville
Pedestrian/Bicycle Project - Facilities - bridge - Other
182 13 7 1
$279,429 Pedestrian/BicycleConstruction of Class II bicycle lanes
Pedestrian/Bicycle Project - Facilities - Striped Lane
Bicycle lanes along sections of Herndon,Shields,McKinley,West Palm and Cedar Aves in the city of Fresno
2 19 1 1
$272,800 Pedestrian/BicycleBike Path in Monterey
Pedestrian/Bicycle Project - Safety - Lighting and widening
2   2  
$258,507 Pedestrian/BicyclePed Bridge across State Hwy 160
Pedestrian/Bicycle Project - Facilities - Separate Path
bridge links Sacramento River Parkway trail to Freeport Shores Youth Sport Complex
1   1 1
$250,000 Pedestrian/BicycleStanislaus River Bicycle Pedestrian Bridge
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$238,619 Pedestrian/BicyclePedestrain and Bike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 2
$214,000 Pedestrian/BicycleBike Path bridge- Pine Canyon to King City
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1  
$200,000 Pedestrian/BicycleSafety Sidewalk Improvements
Pedestrian/Bicycle Project - Safety - sidewalk improvements
2   1 1
$189,883 Pedestrian/BicycleClass 1 Bikeway
Pedestrian/Bicycle Project - Facilities - Striped Lane
1   1 1
$189,883 Pedestrian/BicycleConstruct Class 1 Bikeway
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$189,000 Pedestrian/BicycleBikeway Master Plan
Pedestrian/Bicycle Project - Facilities - Striped Lane
5   5 2
$170,000 Pedestrian/BicyclePedestrian and Bike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
15 QA 10 2
$139,200 Pedestrian/BicyclePedestrian Crossing heads/Wheelchair Ramp at 1 Intersection on Monterey
Pedestrian/Bicycle Project - Facilities - ramp - Other
1   1  
$120,000 Pedestrian/BicycleAntelope Creek Bikepath-Phase I
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$115,050 Pedestrian/BicycleUeda parkway Bikeway and Recreational trail
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$111,000 Pedestrian/BicycleBike lane on San Juan Hwy from San Juan Bautista to SR 101
Pedestrian/Bicycle Project - Facilities - Striped Lane
1   1  
$107,975 Pedestrian/BicycleBike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 2
$100,000 Pedestrian/BicycleDry Creek Parkway Plan and Environmental Review
Pedestrian/Bicycle Project - Other - environmental review
1   1 1
$79,844 Pedestrian/Bicycle20th Street Bike Trail
Pedestrian/Bicycle Project - Safety - improvements
1 7 1 1
$70,236 Pedestrian/BicycleConstruction of 3620 feet of Class 1 Bikepath
Pedestrian/Bicycle Project - Facilities - Separate Path
Construction of footbridge over Fahrens Creek and undercrossing at Yosemite Ave.
1 13 1 1
$67,690 Pedestrian/BicycleModification/Improvement for Bicycle/Pedestrian
Pedestrian/Bicycle Project - Facilities - Separate Path
San Joaquin Valley railroad corridor
1 QA 1 QA
$65,415 Pedestrian/BicycleBikeway Projects
Pedestrian/Bicycle Project - Facilities - Striped Lane
1   1 1
$63,675 Pedestrian/BicycleHighway 50 Bicycle Facilities
Pedestrian/Bicycle Project - Facilities - Striped Lane
1   1 1
$63,000 Pedestrian/BicycleBikeway/Visitor Center
Pedestrian/Bicycle Project - Facilities - Separate Path
1.8 miles of Class 1 bikeway,landscaping enhancements, and Visitor's Center
QA      
$58,000 Pedestrian/BicycleConstruction Class II paved bicycle lanes
Pedestrian/Bicycle Project - Facilities - Striped Lane
1 2 1 1
$56,000 Pedestrian/BicyclePedestrian and Bike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
1 QA 1 1
$52,200 Pedestrian/BicyclePedestrian and Bike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$50,000 Pedestrian/BicycleBeach St. Bikeway
Pedestrian/Bicycle Project - Facilities - Separate Path
Class 1 bidirectional bikepath, contraflow lanes
1 QA 1 QA
$39,600 Pedestrian/BicycleInstall 130000 ft of bike lanes(class II) in Los Banos
Pedestrian/Bicycle Project - Facilities - Separate Path
Install Lockers and Storage Racks
1 1 1 1
$30,000 Pedestrian/BicyclePedestrian and Bike Path
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$27,200 Pedestrian/BicyclePurchase & Install Bike Racks on Modesto Transit Buses
Pedestrian/Bicycle Project - Facilities - Racks
32   15 10
$22,000 Pedestrian/BicycleCoutywide 64 Bike Racks & 6-8 bike racks for buses
Pedestrian/Bicycle Project - Facilities - Racks
QA      
$22,000 Pedestrian/BicycleCountywide 64 bike racks & 6-8 bike racks for buses
Pedestrian/Bicycle Project - Facilities - Racks
QA      
$22,000 Pedestrian/BicycleBike & Ped Plan
Pedestrian/Bicycle Project - Other - Plan
QA      
$20,000 Pedestrian/BicycleCSUS Bike Master Plan & Environmental Review
Pedestrian/Bicycle Project - Other - Master plan
QA      
$17,600 Pedestrian/BicycleBikeway from Lakeside Drive to Joiner Parkway along Nicholas Road
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1 1
$16,555 Pedestrian/BicycleInstall Sidewalks on Stroud Ave.
Pedestrian/Bicycle Project - Facilities - Separate Path
1 1 1 1
$13,279 Pedestrian/BicyclePedestrian Walkway
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$9,915 Pedestrian/BicycleInstall sidewalks in Sierra Ave
Pedestrian/Bicycle Project - Facilities - Separate Path
1 1 1 1
$410,000 Shared RideParkN Ride facilities at Auburn and Colfax train stations
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
QA      
$371,615 Shared RideSpare the Air regional Driving Curtailment Program
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
QA      
$158,952 Shared RideNew Park and Ride Lot Central and Huron Aves
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
New park-and-ride lot.
3 33 4 1
$107,474 Shared RidePurchase of 5 Passeneger Vans
Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase
For Vanpools
1 QA 2 1
$90,000 Shared RideAlternative Transportation
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
2 QA 3 1
$39,838 Shared RideCorcoran Dial-a-Ride Expansion Service
Shared Ride Project - Public Program - Information/Matching - Marketing
1   1 1
$27,000 Shared RideCity/Co Ordinance Non-auto Travel
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
QA      
$25,000 Shared RideSan Benito County Rideshare 00/01
Shared Ride Project - Public Program - Van Pool - Operation - 2nd Year
1   1  
$25,000 Shared RideSan Benito county Rideshare 00/01
Shared Ride Project - Public Program - Information/Matching - Matching
1   1  
$20,265 Shared RidePark and Ride Facility Right of Way Aquirement
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1 1
$20,000 Shared RideSan Benito county Rideshare 99/00
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$17,706 Shared RideCambridge Road Park and Ride Facility
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1 1
$6,982 Shared RideRegional Rideshare Activity
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
QA      
$18,925,834 Traffic Flow ImprovementsTCM 11: ITS
Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - including ramp meter/signal interconnect
Smart Corridors; 12 projects
91   -9  
$5,272,000 Traffic Flow ImprovementsConstructing new 6-lane freeway with 2 HOV lanes
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
54   9  
$4,329,000 Traffic Flow ImprovementsHOV lane Construction
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
91   59 14
$3,943,574 Traffic Flow ImprovementsFresno-Clovis Metroplitan Area Traffic Signal Synchronization Project
Traffic Flow Project - Congestion Management Systems - Implementation - Signal Synchronization Phases II and III
91 118 77  
$3,894,000 Traffic Flow ImprovementsTraffic Control/Signal Interconnect for all county major roadways
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
119   48  
$3,541,200 Traffic Flow ImprovementsAdvanced Traveller Information
Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Advanced Traveler Information
QA      
$3,264,000 Traffic Flow ImprovementsRegional Transportation Management System
Traffic Flow Project - Congestion Management Systems - Establishment - Regional Transportation Management System
QA      
$3,000,000 Traffic Flow ImprovementsConstruct new 6-lane freeway with 2 additonal HOV lanes
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
54   9  
$2,721,544 Traffic Flow ImprovementsTCM 12: Signal Interconnect/Timing improvements
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects 14 projects
90   5  
$2,445,000 Traffic Flow ImprovementsHOV Lanes
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
34      
$2,301,780 Traffic Flow ImprovementsHOV Lane/Ramp reconfiguration in Riverside County or SR 60 from I-215 to Perris
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
175 1,827 -66 -18
$2,288,000 Traffic Flow ImprovementsConstruct HOV Lanes and Widen Median
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
QA      
$1,947,000 Traffic Flow ImprovementsDesign HOV Lanes
Traffic Flow Project - High Occupancy Vehicle Lanes - Design
QA      
$1,591,000 Traffic Flow ImprovementsInterchange Reconstruction on La Sierra Avenue at SR 91
Traffic Flow Project - Traffic Engineering - Interchange Reconstruction - Other
6 69 4  
$1,416,480 Traffic Flow ImprovementsConstruction of Traffic Operations Center
Traffic Flow Project - Congestion Management Systems - Establishment - Building of Traffic Operations Center
Constructed in city of Fresno for tie into the Fresno-Clovis Metropolitan Area Signal Synchronization System
QA QA QA QA
$892,499 Traffic Flow ImprovementsPM-10 Chemical Stabilization
Traffic Flow Project - Congestion Management Systems - Implementation - PM-10 Chemical Stabilization
QA      
$778,000 Traffic Flow ImprovementsPurchase Mobile Fare Collection Equipment
Traffic Flow Project - Intelligent Transportation Systems - Electronic Fare Payment Systems - Purchase Mobile Fare Collection Equipment.
First componet of multi-phase project
QA      
$748,059 Traffic Flow ImprovementsSignal Synchronization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$708,240 Traffic Flow ImprovementsInterchangeRamp Modifications in Riverside County on SR 60 at Valley Hwy
Traffic Flow Project - Traffic Engineering - Ramp Modifications, Interchange - Other
5 91 4  
$685,498 Traffic Flow ImprovementsInterchange Improvements
Traffic Flow Project - Traffic Engineering - Interchange Improvements - Other
2   1  
$545,514 Traffic Flow ImprovementsCoordinates Traffic Signal System
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
12 50 25  
$535,000 Traffic Flow ImprovementsInterconnect Traffic Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
5 19 11  
$531,180 Traffic Flow ImprovementsConstruct HOV Lane/soundwalls seismic retrofit
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
QA      
$525,875 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
3 15 6  
$502,318 Traffic Flow ImprovementsSignal Interconnect-City of Bakersfield
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA QA QA QA
$487,932 Traffic Flow ImprovementsInstall Right Turn Lane
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$407,236 Traffic Flow ImprovementsInstall Traffic Signals
Traffic Flow Project - Intelligent Transportation Systems - Install Traffic Signals - Other
1   4  
$382,448 Traffic Flow ImprovementsTraffic Signal Improvements
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$360,000 Traffic Flow ImprovementsCoutywide TMA Employer Outreach Program
Traffic Flow Project - Other - target 6 TMAs and develop integrated System
5   4  
$325,000 Traffic Flow ImprovementsSignalization signal synchronization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Also related safety modifications
1 5 1  
$303,383 Traffic Flow ImprovementsTraffic Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$274,441 Traffic Flow ImprovementsUpgrade Traffic Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2   2  
$265,590 Traffic Flow ImprovementsConstruct Traffic Mangement Center
Traffic Flow Project - Intelligent Transportation Systems - Construct Traffic Mangement Center - Other
3 3 2  
$265,590 Traffic Flow ImprovementsTraffic Management Center
Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Management Center
QA      
$256,736 Traffic Flow ImprovementsInstallation of new traffic signal
Traffic Flow Project - Intelligent Transportation Systems - Installation of new traffic signal - Other
replacing four way stop at intersection of Clovis Ave and Alluvial in the City of Clovis
1 1 1  
$250,000 Traffic Flow ImprovementsInstallation of traffic signal/Benjamin Holt at Gettysburg Place
Traffic Flow Project - Other - Installation of traffic signal/Benjamin Holt at Herndon Place also a left turn channelization
1   1  
$249,000 Traffic Flow ImprovementsUpgrade Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
6 19 11  
$234,603 Traffic Flow ImprovementsInterconnect Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 1 1  
$233,718 Traffic Flow ImprovementsInstall Loop Detectors
Traffic Flow Project - Intelligent Transportation Systems - Ramp Meters - Freeway Management Systems
2   2  
$228,619 Traffic Flow ImprovementsTraffic signal upgrade with dual left turn phasing
Traffic Flow Project - Traffic Engineering - Turn Lanes
Also modified intersection geometrics to accomodate additonal turn lanes at the intersection of Blackstone and Shaw Aves. Also included in project is upgrade of traffic signals.
2 2 1  
$228,407 Traffic Flow ImprovementsDesign traffic signal system within the city limits of Citrus Heights
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
36 266 16  
$226,035 Traffic Flow ImprovementsMission Blvd signal installation
Traffic Flow Project - Intelligent Transportation Systems - Traffic signal installation - Other
1      
$211,584 Traffic Flow ImprovementsInstall new traffic signal
Traffic Flow Project - Intelligent Transportation Systems - Install new traffic signal - Other
Replacing four way stop
1 1 1 QA
$208,441 Traffic Flow ImprovementsTraffic Detection in Riverside County on Mission Blvd./Crestmore Rd. to Opal St.
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year
16 22 -78  
$208,200 Traffic Flow ImprovementsTraffic signal upgrade with dual left turn phasing
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
also modified intersection geometrics to accomodate additional turn lanes at the intersection of Fresno and Shaw in the city of Fresno. Also included in project is traffic signal upgrades.
1 2 1  
$207,486 Traffic Flow ImprovementsInterconnect Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 1 1  
$203,618 Traffic Flow ImprovementsExpand ATMS Northeast
Traffic Flow Project - Congestion Management Systems - Implementation - Expand ATMS Northeast
3   2  
$191,000 Traffic Flow ImprovementsTraffic Signal Timing/Coordination
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
6 25 12  
$187,250 Traffic Flow ImprovementsTraffic Signals Retiming
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
4 14 7  
$177,060 Traffic Flow ImprovementsUpgrade traffic signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA QA QA QA
$177,060 Traffic Flow ImprovementsSynchronize Signal
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
18   15  
$175,000 Traffic Flow ImprovementsInstall Electronic Changeable Message Sign
Traffic Flow Project - Intelligent Transportation Systems - Changeable Freeway Signage - Freeway Management Systems
3 9 5  
$171,100 Traffic Flow ImprovementsRoadway Reconstruction & Landscaping
Traffic Flow Project - Traffic Engineering - Roadway Reconstruction & Landscaping - Other
1   1  
$159,354 Traffic Flow ImprovementsCentral City 2-way Conversion and Community Plan
Traffic Flow Project - Traffic Engineering - Convert 2 one-way streets into 1 two-way - Other
1   1 1
$158,651 Traffic Flow ImprovementsSignalization of 165 and August St.
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
widen 165 and August Street to accomodate left turn lanes
2 18 9  
$146,337 Traffic Flow ImprovementsSignalization of 165 and American Ave.
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Widen 165 to accomodate left turn lanes
2 22 9  
$133,000 Traffic Flow ImprovementsNew Signals at intersection of Airline Hwy (SR 25) and Union Rd
Traffic Flow Project - Traffic Engineering - New signals - Other
1   1  
$128,368 Traffic Flow ImprovementsInterconnect Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 1 1  
$119,901 Traffic Flow ImprovementsInstall Traffic Signal and Lighting
Traffic Flow Project - Intelligent Transportation Systems - Install Traffic Signal - Other
1 22 1  
$119,514 Traffic Flow ImprovementsSignalization and signal synchronization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2 37 1  
$110,000 Traffic Flow ImprovementsRadio Communication System
Traffic Flow Project - Intelligent Transportation Systems - Other - Radio Communications System - Freeway Management Systems
QA      
$106,236 Traffic Flow ImprovementsTraffic signal upgrade with dual left turn phasing
Traffic Flow Project - Traffic Engineering - Turn Lanes
Also modified intersection geometrics to accomodate additonal turn lanes at the intersection of First and Shaw in the City of Fresno. Also included in project is traffic signals upgrade.
1 2 1  
$97,381 Traffic Flow ImprovementsConstruct Roundabouts
Traffic Flow Project - Traffic Engineering - Construct Roundabouts - Other
2   1  
$88,530 Traffic Flow ImprovementsFresno-Clovis Metro Area Signal Synchronization Phase 1
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
23 30 19  
$88,530 Traffic Flow ImprovementsTraffic Flow & Safety at RR Crossing
Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Flow & Safety at RR Crossing
1 2 1  
$88,530 Traffic Flow ImprovementsFresno-Clovis Metro Area Signal Synchronization Phase I
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
23 30 19  
$85,000 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
5 18 10  
$85,000 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
3 11 5  
$79,677 Traffic Flow ImprovementsATMS Northeast Expansion
Traffic Flow Project - Congestion Management Systems - Implementation - ATMS Northeast Expansion
3   2  
$76,000 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
4 14 8  
$72,000 Traffic Flow ImprovementsInterconnect Bitrans Quicknet
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
Traffic Flow Improvements
7 25 12  
$71,155 Traffic Flow ImprovementsNew Signals/Collier & Central Ave Collier Ave & Riverside Ave.
Traffic Flow Project - Intelligent Transportation Systems - New signals SR-74 at Collier/Central Ave., and at Collier Ave/Riverside Ave - Other
3 25 1  
$68,000 Traffic Flow ImprovementsCity of Lincoln Traffic Signal
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
East Ave striping and installation of cross walk
27   24  
$67,132 Traffic Flow ImprovementsInterconnect Signals Hamner Avenue-Hidden Valley Pkwy to Santa Ana River
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
2 18 1  
$66,500 Traffic Flow ImprovementsTPA Work Program element 30
Traffic Flow Project - Congestion Management Systems - Establishment
1   1 1
$61,630 Traffic Flow ImprovementsInterconnect Signals: Bernard Street & Coffee Rd
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA   QA  
$61,418 Traffic Flow ImprovementsRealignment and 3 new Signal in Lighthouse Corridor
Traffic Flow Project - Traffic Engineering - realignment - Other
plus 3 signals
9   2  
$60,000 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
7 26 16  
$60,000 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
11 43 21  
$53,804 Traffic Flow ImprovementsSignalization of Bellevue and G Street
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
widening the intersection for left turn phasing and channelization
5 32 2  
$52,000 Traffic Flow ImprovementsTraffic Signal Interconnection
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
3 16 7  
$51,578 Traffic Flow ImprovementsSingnalization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$47,643 Traffic Flow ImprovementsManagement System for Traffic
Traffic Flow Project - Congestion Management Systems - Establishment - Management System for Traffic
16 63 31  
$46,222 Traffic Flow ImprovementsTraffic Signal Replacement
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$44,265 Traffic Flow ImprovementsTCM 8: Park and Ride Lot
Traffic Flow Project - High Occupancy Vehicle Lanes - Construction
construct carppol/express bus lanes on freeways
10   10  
$40,720 Traffic Flow ImprovementsOperation of Citywide ATMS
Traffic Flow Project - Congestion Management Systems - Implementation - of Citywide ATMS
QA      
$40,000 Traffic Flow ImprovementsUpgrade Traffic Signal Coordination
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 QA QA QA
$40,000 Traffic Flow ImprovementsSignal Retiming
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
5 21 12  
$40,000 Traffic Flow ImprovementsInstall Traffic Signals at Ramona Blvd and Main St.
Traffic Flow Project - Other - Install Traffic Signals in the City of San Jacinto at Ramona Blvd and Main St.
1 9 1  
$40,000 Traffic Flow ImprovementsInstall Traffic Signals at 4th Ave and Redlands Ave
Traffic Flow Project - Other - In the City of Perris at 4th Ave and Redlands Ave., Install Traffic Signals
1 12 1  
$37,427 Traffic Flow ImprovementsSignal Coordination
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
17 54 -38  
$35,412 Traffic Flow ImprovementsSignalization Signal- In Bakersfield
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 4 1  
$34,500 Traffic Flow ImprovementsSignal ModificationInstall PPLT
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
7 23 13  
$30,985 Traffic Flow ImprovementsInstall Traffic Signal Detector Loops
Traffic Flow Project - Intelligent Transportation Systems - Install Traffic Signal Detector Loops - Other
2   2  
$30,000 Traffic Flow ImprovementsExpand Signal Coordination System
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
3 QA QA QA
$28,000 Traffic Flow ImprovementsSignalization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$27,444 Traffic Flow ImprovementsTraffic Signal for Paratransit Inc. at Florin and Woodbine Ave
Traffic Flow Project - Other - new signal
15   47  
$26,559 Traffic Flow ImprovementsNew Traffic Signals
Traffic Flow Project - Intelligent Transportation Systems - New traffic signals - Other
Replacing two-way stops
1 1 1  
$26,559 Traffic Flow ImprovementsInterconnect Signals Sunnymead Blvd Cactus & Pigeon Pass Rd
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 -1 -4  
$26,558 Traffic Flow ImprovementsTraffic Signal Interconnect Installation
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA QA QA QA
$25,319 Traffic Flow ImprovementsSignalization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Also channelization and related safety modifications
1 4 1  
$25,000 Traffic Flow ImprovementsTraffic Signals Coordination Timing
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
3 12 7  
$24,918 Traffic Flow ImprovementsSignal Interconnect Pacific & Franklin in Monterey
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
Traffic Flow Improvements
7   3  
$23,938 Traffic Flow ImprovementsInterconnect signals on Wible Rd and on Oswell Dr
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA   QA  
$22,132 Traffic Flow ImprovementsATMS Northeast Expansion
Traffic Flow Project - Congestion Management Systems - Implementation - ATMS Northeast Expansion
3   2  
$20,469 Traffic Flow ImprovementsUpgrade Intersection
Traffic Flow Project - Traffic Engineering - Upgrade Intersection - Other
1 5 1  
$19,639 Traffic Flow ImprovementsConstruct Roadway Curb Sidewalk Gutter
Traffic Flow Project - Traffic Engineering - Construct Roadway, Curb, Sidewalk, Gutter - Other
      373
$19,100 Traffic Flow ImprovementsNew Signals
Traffic Flow Project - Intelligent Transportation Systems - New Signals - Other
7 16 10  
$18,591 Traffic Flow ImprovementsTraffic Signal Interconnect-City of Bakersfield
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
18 132 2 QA
$18,000 Traffic Flow ImprovementsBenjamin Holt Traffic Signal at Herndon Place
Traffic Flow Project - Intelligent Transportation Systems - Installation of traffic signal and left turn channelization - Other
1   1  
$16,000 Traffic Flow ImprovementsMonitoring System-Video Detection
Traffic Flow Project - Intelligent Transportation Systems - Other - Monitoring System-Video Detection - Freeway Management Systems
1 5 2  
$15,000 Traffic Flow ImprovementsNew Traffic Signals Jefferson Ave@Kalmia St. and Kalmia St@Adams Ave
Traffic Flow Project - Other - New Traffic Signals Jefferson Ave@Kalmia St.and Kalmia St@Adams Ave.
1 12 3  
$12,700 Traffic Flow ImprovementsSignalization of State Highway 165 an Bloss Ave.
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Widen to accommodate left turn lanes
1 12 3  
$12,000 Traffic Flow ImprovementsTraffic Signal Modification
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA QA QA QA
$12,000 Traffic Flow ImprovementsTraffic Signal Retiming
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2 7 3  
$10,224 Traffic Flow ImprovementsSignal Interconnect City Wide in Murrieta City
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
8 21 10  
$10,000 Traffic Flow ImprovementsTraffic Signal Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 5 2  
$9,738 Traffic Flow ImprovementsInstall new traffic signal
Traffic Flow Project - Intelligent Transportation Systems - Install new traffic signal - Other
Replacing four-way stop at intersection of Thompson and Whitson
1 1 1  
$9,738 Traffic Flow ImprovementsInstall new traffic signal
Traffic Flow Project - Intelligent Transportation Systems - Install new traffic signal - Other
Replacing four way stop at the intersection of Thompson and Dinuba City of Selma
1 1 1  
$8,853 Traffic Flow ImprovementsTraffic Signalization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 QA 1 QA
$8,497 Traffic Flow ImprovementsTraffic Signal Installation
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Installation - Other
QA      
$8,000 Traffic Flow ImprovementsNew Traffic Signals Jefferson Ave @ Murrieta Hot Springs Rd.
Traffic Flow Project - Other - New Traffic Signals Jefferson Ave @ Murrieta Hot Springs Rd
1 5 1  
$5,182 Traffic Flow ImprovementsPM-10 Control Measures
Traffic Flow Project - Congestion Management Systems - Implementation - PM-10 Control Measures
QA      
$3,980 Traffic Flow ImprovementsNew Signals
Traffic Flow Project - Intelligent Transportation Systems - New Signals - Other
1 QA 1 QA
$2,988 Traffic Flow ImprovementsInstall traffic signal synchronization hardware
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
Tie into Fresno-Clovis Metro traffic signal synchronization system
2 1 -5  
$2,800 Traffic Flow ImprovementsReplace Equipment/Upgrade Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2 7 3  
$219,536,000 TransitPurchase Buses Upgrade Facilities Various
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
QA      
$74,261,591 TransitPurchase 518 Buses for LACMTA`s ongoing Accelerated Bus Procurement Program
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
54 8,243 679 18
$54,276,378 TransitPurchase 206 40-foot LNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Liquid Natural Gas (LNG) - New - Capital
62 -94 676 36
$26,863,845 TransitPurchase Replacement Buses etc.
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
    98  
$26,835,000 TransitTCM 3 Transit Project - Facilities Improvements - Other - Bus Facility Emergency Back up Power system
Purchased 8 articulated buses; Tasman Fast LRT Project: I-880 to Hostetter
10   10  
$13,412,856 TransitTCM 13: Transit Marketing and Improvements
Transit Project - Transit Management Systems - Caltrain signal INprovements. computerized dispatch system, New Park Mall transit Center, promotion, planning, marketing
San Pablo Avenue Key Transit Route, Remove/replace Transit Station; 11 projects
118   100  
$8,100,000 TransitFolsom Corridor-downtown Sacremento Light Rail Extension
Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year
45 454 36  
$7,298,766 TransitVarious San Diego Trolley Blue
Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access, Amenitities - Improved - Fare Systems, Security
10   10  
$5,280,000 TransitPurchase 15 new buses which meet 2002 emission standards
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement Svc expansion from 10 (of the 15) new articulated buses with 50% greater carrying capacity.
6   58 4
$4,100,000 TransitTCM 4: Extension projects
Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year
Caltrain Downtown and SF MUNI's Embarcadero
73   73  
$3,823,622 TransitPurchase 206 40-foot LNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Liquid Natural Gas (LNG) - New - Capital
QA      
$3,718,260 TransitPurchase 11 CNG Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles
1 21 14 7
$3,718,260 TransitPurchase 11 CNG Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
1 21 14 7
$2,625,252 TransitPurchase 4 Buses(CSUCI)Erect transit shelters(Thousand Oaksdial-a-ride service
Transit Project - Transit Management Systems - Purchase 4 buses for demo transit service to CSUCI,erect transit shelters(Thousand Oaks), Dial-A-Ride-Service(Oxnard Beach),1st yr.
Operating Mira Monte Shuttle demo
23   -10 2
$1,994,233 Transit6 CNG Buses (Simi Valley)1 Backup CNG compressor CNG fueling facility/cover
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   13 1
$1,829,000 TransitReplacement Buses for Monterey-Salinas transit
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement 10 purchases
    15  
$1,824,100 TransitPurchase 43 Clean Diesel Replacement Engines
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
43 engines
32   55  
$1,820,000 TransitPurchase 94 Clean Diesel Replacement Engines
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
94 replacement Engines
73   119  
$1,709,570 TransitReplacement of 6 diesel buses with 6 CNG buses/City of Lodi
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
    4  
$1,608,629 TransitConstruct CNG Refueling Stations
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
2      
$1,576,872 TransitPurchase six 20-passenger buses as replacements
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
Also 5 paratransit vehicles, implement "R" St.Shuttle and establish Computer Vehicle Dispatch System
3   16 1
$1,499,000 TransitPurchse 36 Clean Diesel Replacement Engines
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
36 replacement engines
27   46  
$1,460,000 Transitreplacement vehicles for SCAT Access
Dial-A-Ride Service Transit Project - Related Demand Management Stategies - Other - 19 replacement vehicles for SCAT Access Dial-A-Ride service
    1  
$1,217,288 TransitPurchase 5 CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
    10  
$1,135,122 TransitPurchase 4 buses Install AVL Technology
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified
QA      
$1,000,000 TransitVarious Sorento Valley Station
Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access, Amenitities - Improved - Fare Systems, Security
QA      
$970,000 TransitPurchase two new hybrid-electric buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
    3 1
$919,826 TransitPurchase CNG Vehicles
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   6 1
$839,200 TransitPurchase 5 CNG Buses for Dial-a-Ride and downtown trolley service
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
    1 1
$823,050 TransitPurchase 3 CNG transit vehicle for the Morongo Basin Transit Authority
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
    2 1
$663,975 TransitConstruct Transit Transfer Station
Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - New
QA QA QA QA
$637,416 TransitPurchase 3 Replacement CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1 2 1 1
$619,709 TransitConstruct CNG Fueling Station at City Corparation Yard
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
Construct CNG Fueling Station
QA QA QA QA
$613,800 TransitPurchase 3 electric Trolleys City of Visalia
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
1   1 1
$518,576 TransitPurchase 14 CNG Vehicles
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
For Ventura County Welfare-to-Work Program
1 QA 1 QA
$442,650 TransitPurchase 2 CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
  2    
$353,176 TransitConstruct transfer point facility/park and ride lot of SR 62
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - Improved - Park and Ride Lot/89 Spaces
1   1 1
$343,200 TransitPurchase 2 replacement 30 ft CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
    2  
$331,988 TransitConstruct Transit Station
Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - New
QA      
$327,562 TransitRepower 35-foot Buses with Clean Diesel Engine Replacements
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - Modified - Capital
QA      
$309,000 TransitPurchase 2 Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
QA      
$300,000 TransitTCM 17: Lease Electric Vehicles
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
18   36  
$291,913 TransitConstruct CNG Fueling Station and purchase 2 CNG minibuses
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
  1    
$274,443 TransitPurchase one CNG transit bus for Victor Valley Transit Authority
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
    23 1
$274,174 TransitInstall CNG Fueling Station at Ventura County Government Center
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
1 QA 1 QA
$265,590 TransitPurchase 5 CNG Transit Vehicles
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1  
$240,000 TransitUpgrade CNG Fuel Station
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
1 QA 2 QA
$234,879 TransitPurchase 4 low-emission paratransit vehicles for Mountian Area Transity Authority
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
1   1  
$212,000 TransitPurchase 3 Replacement Minibuses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
1 1 1 1
$200,000 TransitConejo Connection 3rd year demonstration service from Oxnard to Warner Center
Transit Project - Transit Management Systems - Transit demonstration for Conejo Connection (3rd year)
1   -1 1
$192,385 TransitPurchase CNG Vehicles
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1 1
$180,773 TransitOnsite improvement for intermodal transit area
Transit Project - Transit Management Systems - Onsite improvement for intermodal transit area for bicycle storage, bus stop,park and ride facility, and possible train depot
1 2 1  
$177,566 TransitConstruct 7 bus turnout improvements/Main St. between Maple Ave and I Ave.
Transit Project - Facilities Improvements - Other - Construct 7 bus turnout improvements on Main St. between Maple Ave and I Ave, City of Hesperia
1   0 1
$177,000 TransitExpand Camarillo Station parking facility
Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access - Improved Expand Camarillo Staion parking facility
1 QA 1 QA
$126,268 TransitPurchase of CNG vehicle maintenance and Smog Check 2
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation For Ventura College
2 QA 2 1
$106,236 TransitPurchase Commuter Bus
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
QA      
$106,200 TransitPurchase 4 Replacement CNG Transit Vehicles/City of Barstow
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1 1
$90,300 TransitPurchase CNG Vehicles
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1 1
$88,530 TransitPurchase 1 10-Passenger CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
    1 1
$71,815 TransitBus turn-outs between Twentynine Palms and Yucca Valley area on SR-62
Transit Project - Facilities Improvements - Other - Bus turn-outs between Twenynine Palms and Yucca Valley area on SR-62
1     1
$70,000 TransitOperating-Service Expansion for City of Madra`s fixed-route transit system
Transit Project - Transit Management Systems - FY99/00 Operating-Service Expansion for the City of Madera's MAX fixed-route transit system
1   1 1
$64,605 TransitPurchase one CNG Paratransit vehicle for the Morongo Basin Transit Authority
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1  
$64,605 TransitPurchase 1 Expansion Paratransit Vehicle for Morongo Basin Transit Authority
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New
1   1 1
$60,000 TransitReconstruct Bus Terminal and Driveway Circle-In Bakersfield
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - Other - Improved - terminal/driveway circle
Reconstruct bus terminal and driveway circle
1 1 1 1
$60,000 TransitWatt Ave. Transit Priority and Mobility Enhancement Demonstration
Transit Project - Transit Management Systems - ITS Smart cooridor demo project
QA      
$49,391 TransitPurchase 2 CNG pick-up trucks
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital Replace conventionally fueled trucks for the City of Madera
1   1 1
$47,600 TransitCity of Lodi/Conversion of diesel powered fixed route bus to CNG
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - Modified - Operation - 1st Year
    2  
$47,130 TransitPurchase 1 16-passenger van for the city of Chowchillas Area Transit Express
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New
    1 1
$22,133 TransitPurchase 5 Bus Shelters
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New
1   2 1
$13,600 TransitInstallation of 5 new bus shelters
Transit Project - Facilities Improvements - Other - 5 new bus shelters
1 1 1 1
$12,000 TransitTransit Operating Assistance
Transit Project - Transit Management Systems - Transit Operating Assistance
1   1 1
$(6,668,037) MiscellaneousMiscellaneous
HQ's adjustment - deobligation from previously approved projects
       
  APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Nationwide Totals $1,652,593,968$1,757,819,034106 %

* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year