| California | 1/10/2003 | $360,918,105 | $589,370,834 | 163 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $148,431 | Demand Management | Develop Clean Air Cities Coalition Demand Management Project - Public Information - Public Education - Other - Develop Clean Air Cities Coalition |
QA | |||
| $100,000 | Demand Management | YARTS Outereach Program Demand Management Project - Public Information - Public Education - Other - YARTS Outreach Program |
10 | 99 | 1 | 48 |
| $32,313 | Demand Management | Upgrade Dial-A-Ride Dispatch Software System Demand Management Project - New Activity - Planning - Other - Upgrade Dial-A-Ride Dispatch Software System |
4 | |||
| $4,000,000 | I/M and Other TCMs | Operation of Mission Valley W.Extension I/M or Other TCM Project - Other - Operation of Mission Valley W.Extension |
14 | 3 | ||
| $1,948,000 | I/M and Other TCMs | Area Vehicle Locator (Phase 2) I/M or Other TCM Project - Other - Area Vehicle Locator (phase 2) |
1 | 8 | 1 | 1 |
| $1,827,985 | I/M and Other TCMs | Pave Dirt road for PM-10 mitigation Leon Rd.Simpson Rd to Winchester Rd. I/M or Other TCM Project - Other - Pave dirt road for PM-10 mitigation Leon Rd, Simpson Road to Winchester Road |
190 | |||
| $1,163,580 | I/M and Other TCMs | Streetscape I/M or Other TCM Project - Other - Streetscape |
1 | 1 | 2 | |
| $1,097,000 | I/M and Other TCMs | Purchase 33 CNG Vehicles I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year 1 street sweeper, 14 sedans, 13 pick-ups, 1 cargo van for Madera County |
1 | 7 | 1 | |
| $1,056,000 | I/M and Other TCMs | Reconstruction and Resurfacing I/M or Other TCM Project - Other - Reconstruction and Resurfacing |
9 | |||
| $843,907 | I/M and Other TCMs | Grading & Paving- PM10 I/M or Other TCM Project - Other - Grading and Paving-PM10 |
181 | |||
| $764,899 | I/M and Other TCMs | Compact and seal county gravel roads I/M or Other TCM Project - I/M - Operating - 1st Year PM10 non-attainment project |
QA | QA | QA | 60 |
| $486,915 | I/M and Other TCMs | Construct CNG Fueling Station I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - CNG - Infrastructure - Operation - 1st Year |
QA | QA | ||
| $400,000 | I/M and Other TCMs | PM-10 Control Measures/Paving I/M or Other TCM Project - Other - PM-10 Control Measures/Paving |
QA | |||
| $243,500 | I/M and Other TCMs | ROW Perservation I/M or Other TCM Project - Other - ROW Preservation |
QA | |||
| $241,904 | I/M and Other TCMs | Construct 200 space Park & Ride Facility near SR395/I-15 Intersection I/M or Other TCM Project - Other - Construct 200 space Park & Ride Facility near SR395/I-15 intersection |
2 | 1 | ||
| $191,225 | I/M and Other TCMs | Purchase 12 CNG Pickup trucks-City of Salinas I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | 1 | ||
| $164,610 | I/M and Other TCMs | Purchase 2 CNG Dump Trucks I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | |||
| $139,270 | I/M and Other TCMs | Purchase 7 CNG Pick-Up Trucks I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | 1 | 1 | |
| $126,268 | I/M and Other TCMs | Purchase Training Equipment for CNG vehicle maintenace and Smog Check II I/M or Other TCM Project - Other - Purchase training equipment for Ventura College for CBG vehicle maintenance and Smog Check II. |
2 | 2 | 1 | |
| $120,000 | I/M and Other TCMs | CNG Conversion I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - Modified - CNG - Vehicles - Operation - 1st Year |
1 | QA | 7 | 1 |
| $120,000 | I/M and Other TCMs | Purchase 4 CNG Street Sweepers I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year Will replace diesel Street Sweepers |
QA | QA | 1 | QA |
| $100,000 | I/M and Other TCMs | Security Enhancements I/M or Other TCM Project - Other - Security Enhancements |
QA | |||
| $85,418 | I/M and Other TCMs | Purchase of 5 CNG nutrition vans I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | 1 | 1 | |
| $61,950 | I/M and Other TCMs | Purchase 1 CNG Dump Truck I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | |||
| $60,101 | I/M and Other TCMs | Provide on-site improvements for Park and Ride/bicycle storage facilities I/M or Other TCM Project - Other - Provide on-site improvements for Park and Ride/bicycle storage facilities |
1 | 1 | 1 | |
| $56,687 | I/M and Other TCMs | Purchase 3 CNG vehicles I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | 1 | 1 | |
| $55,755 | I/M and Other TCMs | Purchase 2 CNG utility vehicles I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
1 | 1 | 1 | |
| $49,391 | I/M and Other TCMs | Purchase 2 CNG Pick Up Trucks I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - CNG - Vehicles - Operation - 1st Year |
QA | |||
| $35,411 | I/M and Other TCMs | Remove Traffic Sigal Poles Boxes I/M or Other TCM Project - Other - Remove Traffic Signal, Poles, Boxes |
1 | 1 | 1 | |
| $33,000 | I/M and Other TCMs | PM-10 Control Measures/Windbreak I/M or Other TCM Project - Other - PM-10 Control Measures/Windbreak |
QA | |||
| $31,400 | I/M and Other TCMs | Expand exsisting Freeway Serivce Patrol to SR 99, 168and 180 I/M or Other TCM Project - Other - Expand existing Freeway Service Patrol to serve additonal segements of SR99,168 and 180 in Fresno County |
10 | 12 | 6 | |
| $27,000 | I/M and Other TCMs | City/Co Ordinace Non-Auto Travel I/M or Other TCM Project - Trip Reduction Ordinances - City/Co Ordinance non-auto travel |
QA | |||
| $27,000 | I/M and Other TCMs | City/Co Ordinace Non-Auto Travel I/M or Other TCM Project - Trip Reduction Ordinances - City/Co Ordinance non-auto travel |
QA | |||
| $7,376 | I/M and Other TCMs | Apply Seal Coat to Unpaved Roads I/M or Other TCM Project - I/M - Operating - 1st Year PM10 non-attainment area project |
QA | QA | QA | 1 |
| $(62,800) | I/M and Other TCMs | Expand exsisting Freeway Service Patrol to segements of SR99168 and 180 I/M or Other TCM Project - Other - Expand exsisting Freeway Service Patrol to serve additonal segments of SR99, 168, and 180 in Fresno County |
10 | 12 | 6 | |
| $3,422,395 | Pedestrian/Bicycle | TCM 9: Ped/Bike Pedestrian/Bicycle Project - Facilities - Separate Path 10 projects |
46 | 27 | ||
| $2,470,118 | Pedestrian/Bicycle | Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $2,477,999 | Pedestrian/Bicycle | TCM 19: Pedestrian Enhancements Pedestrian/Bicycle Project - Facilities - Separate Path 8 projects |
646 | 764 | ||
| $750,000 | Pedestrian/Bicycle | Soquel Drive Improvements Pedestrian/Bicycle Project - Facilities - Separate Path Traffic signal/Intersection improvements |
1 | QA | 1 | QA |
| $619,710 | Pedestrian/Bicycle | Tower Bridge Ped/Bike Improvements between City of Sacramento & West Sacramento Pedestrian/Bicycle Project - Safety - Improve access and circulation |
1 | 1 | 1 | |
| $533,000 | Pedestrian/Bicycle | Construction of Bicycle/Pedestrian Trail Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $500,000 | Pedestrian/Bicycle | Safe school Route Phase II Pedestrian/Bicycle Project - Facilities - Separate Path sidewalk/bike lane road reconstruction |
1 | 1 | 1 | |
| $381,400 | Pedestrian/Bicycle | Pedestrian/Bikeway/Landscaping in Planda on 140 Pedestrian/Bicycle Project - Other - Pedestrain/Bikeway/Landscaping in Planada on 140 |
1 | 3 | 1 | 1 |
| $360,000 | Pedestrian/Bicycle | Ped/Bicycle Bridge for UP Railyard; connect Roseville and Old Town Roseville Pedestrian/Bicycle Project - Facilities - bridge - Other |
182 | 13 | 7 | 1 |
| $279,429 | Pedestrian/Bicycle | Construction of Class II bicycle lanes Pedestrian/Bicycle Project - Facilities - Striped Lane Bicycle lanes along sections of Herndon,Shields,McKinley,West Palm and Cedar Aves in the city of Fresno |
2 | 19 | 1 | 1 |
| $272,800 | Pedestrian/Bicycle | Bike Path in Monterey Pedestrian/Bicycle Project - Safety - Lighting and widening |
2 | 2 | ||
| $258,507 | Pedestrian/Bicycle | Ped Bridge across State Hwy 160 Pedestrian/Bicycle Project - Facilities - Separate Path bridge links Sacramento River Parkway trail to Freeport Shores Youth Sport Complex |
1 | 1 | 1 | |
| $250,000 | Pedestrian/Bicycle | Stanislaus River Bicycle Pedestrian Bridge Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $238,619 | Pedestrian/Bicycle | Pedestrain and Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 2 | |
| $214,000 | Pedestrian/Bicycle | Bike Path bridge- Pine Canyon to King City Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | ||
| $200,000 | Pedestrian/Bicycle | Safety Sidewalk Improvements Pedestrian/Bicycle Project - Safety - sidewalk improvements |
2 | 1 | 1 | |
| $189,883 | Pedestrian/Bicycle | Class 1 Bikeway Pedestrian/Bicycle Project - Facilities - Striped Lane |
1 | 1 | 1 | |
| $189,883 | Pedestrian/Bicycle | Construct Class 1 Bikeway Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $189,000 | Pedestrian/Bicycle | Bikeway Master Plan Pedestrian/Bicycle Project - Facilities - Striped Lane |
5 | 5 | 2 | |
| $170,000 | Pedestrian/Bicycle | Pedestrian and Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
15 | QA | 10 | 2 |
| $139,200 | Pedestrian/Bicycle | Pedestrian Crossing heads/Wheelchair Ramp at 1 Intersection on Monterey Pedestrian/Bicycle Project - Facilities - ramp - Other |
1 | 1 | ||
| $120,000 | Pedestrian/Bicycle | Antelope Creek Bikepath-Phase I Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $115,050 | Pedestrian/Bicycle | Ueda parkway Bikeway and Recreational trail Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $111,000 | Pedestrian/Bicycle | Bike lane on San Juan Hwy from San Juan Bautista to SR 101 Pedestrian/Bicycle Project - Facilities - Striped Lane |
1 | 1 | ||
| $107,975 | Pedestrian/Bicycle | Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 2 | |
| $100,000 | Pedestrian/Bicycle | Dry Creek Parkway Plan and Environmental Review Pedestrian/Bicycle Project - Other - environmental review |
1 | 1 | 1 | |
| $79,844 | Pedestrian/Bicycle | 20th Street Bike Trail Pedestrian/Bicycle Project - Safety - improvements |
1 | 7 | 1 | 1 |
| $70,236 | Pedestrian/Bicycle | Construction of 3620 feet of Class 1 Bikepath Pedestrian/Bicycle Project - Facilities - Separate Path Construction of footbridge over Fahrens Creek and undercrossing at Yosemite Ave. |
1 | 13 | 1 | 1 |
| $67,690 | Pedestrian/Bicycle | Modification/Improvement for Bicycle/Pedestrian Pedestrian/Bicycle Project - Facilities - Separate Path San Joaquin Valley railroad corridor |
1 | QA | 1 | QA |
| $65,415 | Pedestrian/Bicycle | Bikeway Projects Pedestrian/Bicycle Project - Facilities - Striped Lane |
1 | 1 | 1 | |
| $63,675 | Pedestrian/Bicycle | Highway 50 Bicycle Facilities Pedestrian/Bicycle Project - Facilities - Striped Lane |
1 | 1 | 1 | |
| $63,000 | Pedestrian/Bicycle | Bikeway/Visitor Center Pedestrian/Bicycle Project - Facilities - Separate Path 1.8 miles of Class 1 bikeway,landscaping enhancements, and Visitor's Center |
QA | |||
| $58,000 | Pedestrian/Bicycle | Construction Class II paved bicycle lanes Pedestrian/Bicycle Project - Facilities - Striped Lane |
1 | 2 | 1 | 1 |
| $56,000 | Pedestrian/Bicycle | Pedestrian and Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | QA | 1 | 1 |
| $52,200 | Pedestrian/Bicycle | Pedestrian and Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $50,000 | Pedestrian/Bicycle | Beach St. Bikeway Pedestrian/Bicycle Project - Facilities - Separate Path Class 1 bidirectional bikepath, contraflow lanes |
1 | QA | 1 | QA |
| $39,600 | Pedestrian/Bicycle | Install 130000 ft of bike lanes(class II) in Los Banos Pedestrian/Bicycle Project - Facilities - Separate Path Install Lockers and Storage Racks |
1 | 1 | 1 | 1 |
| $30,000 | Pedestrian/Bicycle | Pedestrian and Bike Path Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $27,200 | Pedestrian/Bicycle | Purchase & Install Bike Racks on Modesto Transit Buses Pedestrian/Bicycle Project - Facilities - Racks |
32 | 15 | 10 | |
| $22,000 | Pedestrian/Bicycle | Coutywide 64 Bike Racks & 6-8 bike racks for buses Pedestrian/Bicycle Project - Facilities - Racks |
QA | |||
| $22,000 | Pedestrian/Bicycle | Countywide 64 bike racks & 6-8 bike racks for buses Pedestrian/Bicycle Project - Facilities - Racks |
QA | |||
| $22,000 | Pedestrian/Bicycle | Bike & Ped Plan Pedestrian/Bicycle Project - Other - Plan |
QA | |||
| $20,000 | Pedestrian/Bicycle | CSUS Bike Master Plan & Environmental Review Pedestrian/Bicycle Project - Other - Master plan |
QA | |||
| $17,600 | Pedestrian/Bicycle | Bikeway from Lakeside Drive to Joiner Parkway along Nicholas Road Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | |
| $16,555 | Pedestrian/Bicycle | Install Sidewalks on Stroud Ave. Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | 1 |
| $13,279 | Pedestrian/Bicycle | Pedestrian Walkway Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $9,915 | Pedestrian/Bicycle | Install sidewalks in Sierra Ave Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | 1 | 1 |
| $410,000 | Shared Ride | ParkN Ride facilities at Auburn and Colfax train stations Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
QA | |||
| $371,615 | Shared Ride | Spare the Air regional Driving Curtailment Program Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
QA | |||
| $158,952 | Shared Ride | New Park and Ride Lot Central and Huron Aves Shared Ride Project - Public Program - Van Pool - Operation - 1st Year New park-and-ride lot. |
3 | 33 | 4 | 1 |
| $107,474 | Shared Ride | Purchase of 5 Passeneger Vans Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase For Vanpools |
1 | QA | 2 | 1 |
| $90,000 | Shared Ride | Alternative Transportation Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
2 | QA | 3 | 1 |
| $39,838 | Shared Ride | Corcoran Dial-a-Ride Expansion Service Shared Ride Project - Public Program - Information/Matching - Marketing |
1 | 1 | 1 | |
| $27,000 | Shared Ride | City/Co Ordinance Non-auto Travel Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
QA | |||
| $25,000 | Shared Ride | San Benito County Rideshare 00/01 Shared Ride Project - Public Program - Van Pool - Operation - 2nd Year |
1 | 1 | ||
| $25,000 | Shared Ride | San Benito county Rideshare 00/01 Shared Ride Project - Public Program - Information/Matching - Matching |
1 | 1 | ||
| $20,265 | Shared Ride | Park and Ride Facility Right of Way Aquirement Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | 1 | |
| $20,000 | Shared Ride | San Benito county Rideshare 99/00 Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $17,706 | Shared Ride | Cambridge Road Park and Ride Facility Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | 1 | |
| $6,982 | Shared Ride | Regional Rideshare Activity Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
QA | |||
| $18,925,834 | Traffic Flow Improvements | TCM 11: ITS Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - including ramp meter/signal interconnect Smart Corridors; 12 projects |
91 | -9 | ||
| $5,272,000 | Traffic Flow Improvements | Constructing new 6-lane freeway with 2 HOV lanes Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
54 | 9 | ||
| $4,329,000 | Traffic Flow Improvements | HOV lane Construction Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
91 | 59 | 14 | |
| $3,943,574 | Traffic Flow Improvements | Fresno-Clovis Metroplitan Area Traffic Signal Synchronization Project Traffic Flow Project - Congestion Management Systems - Implementation - Signal Synchronization Phases II and III |
91 | 118 | 77 | |
| $3,894,000 | Traffic Flow Improvements | Traffic Control/Signal Interconnect for all county major roadways Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
119 | 48 | ||
| $3,541,200 | Traffic Flow Improvements | Advanced Traveller Information Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Advanced Traveler Information |
QA | |||
| $3,264,000 | Traffic Flow Improvements | Regional Transportation Management System Traffic Flow Project - Congestion Management Systems - Establishment - Regional Transportation Management System |
QA | |||
| $3,000,000 | Traffic Flow Improvements | Construct new 6-lane freeway with 2 additonal HOV lanes Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
54 | 9 | ||
| $2,721,544 | Traffic Flow Improvements | TCM 12: Signal Interconnect/Timing improvements Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects 14 projects |
90 | 5 | ||
| $2,445,000 | Traffic Flow Improvements | HOV Lanes Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
34 | |||
| $2,301,780 | Traffic Flow Improvements | HOV Lane/Ramp reconfiguration in Riverside County or SR 60 from I-215 to Perris Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
175 | 1,827 | -66 | -18 |
| $2,288,000 | Traffic Flow Improvements | Construct HOV Lanes and Widen Median Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
QA | |||
| $1,947,000 | Traffic Flow Improvements | Design HOV Lanes Traffic Flow Project - High Occupancy Vehicle Lanes - Design |
QA | |||
| $1,591,000 | Traffic Flow Improvements | Interchange Reconstruction on La Sierra Avenue at SR 91 Traffic Flow Project - Traffic Engineering - Interchange Reconstruction - Other |
6 | 69 | 4 | |
| $1,416,480 | Traffic Flow Improvements | Construction of Traffic Operations Center Traffic Flow Project - Congestion Management Systems - Establishment - Building of Traffic Operations Center Constructed in city of Fresno for tie into the Fresno-Clovis Metropolitan Area Signal Synchronization System |
QA | QA | QA | QA |
| $892,499 | Traffic Flow Improvements | PM-10 Chemical Stabilization Traffic Flow Project - Congestion Management Systems - Implementation - PM-10 Chemical Stabilization |
QA | |||
| $778,000 | Traffic Flow Improvements | Purchase Mobile Fare Collection Equipment Traffic Flow Project - Intelligent Transportation Systems - Electronic Fare Payment Systems - Purchase Mobile Fare Collection Equipment. First componet of multi-phase project |
QA | |||
| $748,059 | Traffic Flow Improvements | Signal Synchronization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $708,240 | Traffic Flow Improvements | InterchangeRamp Modifications in Riverside County on SR 60 at Valley Hwy Traffic Flow Project - Traffic Engineering - Ramp Modifications, Interchange - Other |
5 | 91 | 4 | |
| $685,498 | Traffic Flow Improvements | Interchange Improvements Traffic Flow Project - Traffic Engineering - Interchange Improvements - Other |
2 | 1 | ||
| $545,514 | Traffic Flow Improvements | Coordinates Traffic Signal System Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
12 | 50 | 25 | |
| $535,000 | Traffic Flow Improvements | Interconnect Traffic Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
5 | 19 | 11 | |
| $531,180 | Traffic Flow Improvements | Construct HOV Lane/soundwalls seismic retrofit Traffic Flow Project - High Occupancy Vehicle Lanes - Construction |
QA | |||
| $525,875 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 15 | 6 | |
| $502,318 | Traffic Flow Improvements | Signal Interconnect-City of Bakersfield Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | QA | QA | QA |
| $487,932 | Traffic Flow Improvements | Install Right Turn Lane Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $407,236 | Traffic Flow Improvements | Install Traffic Signals Traffic Flow Project - Intelligent Transportation Systems - Install Traffic Signals - Other |
1 | 4 | ||
| $382,448 | Traffic Flow Improvements | Traffic Signal Improvements Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $360,000 | Traffic Flow Improvements | Coutywide TMA Employer Outreach Program Traffic Flow Project - Other - target 6 TMAs and develop integrated System |
5 | 4 | ||
| $325,000 | Traffic Flow Improvements | Signalization signal synchronization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing Also related safety modifications |
1 | 5 | 1 | |
| $303,383 | Traffic Flow Improvements | Traffic Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $274,441 | Traffic Flow Improvements | Upgrade Traffic Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | 2 | ||
| $265,590 | Traffic Flow Improvements | Construct Traffic Mangement Center Traffic Flow Project - Intelligent Transportation Systems - Construct Traffic Mangement Center - Other |
3 | 3 | 2 | |
| $265,590 | Traffic Flow Improvements | Traffic Management Center Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Management Center |
QA | |||
| $256,736 | Traffic Flow Improvements | Installation of new traffic signal Traffic Flow Project - Intelligent Transportation Systems - Installation of new traffic signal - Other replacing four way stop at intersection of Clovis Ave and Alluvial in the City of Clovis |
1 | 1 | 1 | |
| $250,000 | Traffic Flow Improvements | Installation of traffic signal/Benjamin Holt at Gettysburg Place Traffic Flow Project - Other - Installation of traffic signal/Benjamin Holt at Herndon Place also a left turn channelization |
1 | 1 | ||
| $249,000 | Traffic Flow Improvements | Upgrade Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
6 | 19 | 11 | |
| $234,603 | Traffic Flow Improvements | Interconnect Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | 1 | 1 | |
| $233,718 | Traffic Flow Improvements | Install Loop Detectors Traffic Flow Project - Intelligent Transportation Systems - Ramp Meters - Freeway Management Systems |
2 | 2 | ||
| $228,619 | Traffic Flow Improvements | Traffic signal upgrade with dual left turn phasing Traffic Flow Project - Traffic Engineering - Turn Lanes Also modified intersection geometrics to accomodate additonal turn lanes at the intersection of Blackstone and Shaw Aves. Also included in project is upgrade of traffic signals. |
2 | 2 | 1 | |
| $228,407 | Traffic Flow Improvements | Design traffic signal system within the city limits of Citrus Heights Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
36 | 266 | 16 | |
| $226,035 | Traffic Flow Improvements | Mission Blvd signal installation Traffic Flow Project - Intelligent Transportation Systems - Traffic signal installation - Other |
1 | |||
| $211,584 | Traffic Flow Improvements | Install new traffic signal Traffic Flow Project - Intelligent Transportation Systems - Install new traffic signal - Other Replacing four way stop |
1 | 1 | 1 | QA |
| $208,441 | Traffic Flow Improvements | Traffic Detection in Riverside County on Mission Blvd./Crestmore Rd. to Opal St. Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year |
16 | 22 | -78 | |
| $208,200 | Traffic Flow Improvements | Traffic signal upgrade with dual left turn phasing Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing also modified intersection geometrics to accomodate additional turn lanes at the intersection of Fresno and Shaw in the city of Fresno. Also included in project is traffic signal upgrades. |
1 | 2 | 1 | |
| $207,486 | Traffic Flow Improvements | Interconnect Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | 1 | 1 | |
| $203,618 | Traffic Flow Improvements | Expand ATMS Northeast Traffic Flow Project - Congestion Management Systems - Implementation - Expand ATMS Northeast |
3 | 2 | ||
| $191,000 | Traffic Flow Improvements | Traffic Signal Timing/Coordination Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
6 | 25 | 12 | |
| $187,250 | Traffic Flow Improvements | Traffic Signals Retiming Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
4 | 14 | 7 | |
| $177,060 | Traffic Flow Improvements | Upgrade traffic signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | QA | QA | QA |
| $177,060 | Traffic Flow Improvements | Synchronize Signal Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
18 | 15 | ||
| $175,000 | Traffic Flow Improvements | Install Electronic Changeable Message Sign Traffic Flow Project - Intelligent Transportation Systems - Changeable Freeway Signage - Freeway Management Systems |
3 | 9 | 5 | |
| $171,100 | Traffic Flow Improvements | Roadway Reconstruction & Landscaping Traffic Flow Project - Traffic Engineering - Roadway Reconstruction & Landscaping - Other |
1 | 1 | ||
| $159,354 | Traffic Flow Improvements | Central City 2-way Conversion and Community Plan Traffic Flow Project - Traffic Engineering - Convert 2 one-way streets into 1 two-way - Other |
1 | 1 | 1 | |
| $158,651 | Traffic Flow Improvements | Signalization of 165 and August St. Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing widen 165 and August Street to accomodate left turn lanes |
2 | 18 | 9 | |
| $146,337 | Traffic Flow Improvements | Signalization of 165 and American Ave. Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing Widen 165 to accomodate left turn lanes |
2 | 22 | 9 | |
| $133,000 | Traffic Flow Improvements | New Signals at intersection of Airline Hwy (SR 25) and Union Rd Traffic Flow Project - Traffic Engineering - New signals - Other |
1 | 1 | ||
| $128,368 | Traffic Flow Improvements | Interconnect Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | 1 | 1 | |
| $119,901 | Traffic Flow Improvements | Install Traffic Signal and Lighting Traffic Flow Project - Intelligent Transportation Systems - Install Traffic Signal - Other |
1 | 22 | 1 | |
| $119,514 | Traffic Flow Improvements | Signalization and signal synchronization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | 37 | 1 | |
| $110,000 | Traffic Flow Improvements | Radio Communication System Traffic Flow Project - Intelligent Transportation Systems - Other - Radio Communications System - Freeway Management Systems |
QA | |||
| $106,236 | Traffic Flow Improvements | Traffic signal upgrade with dual left turn phasing Traffic Flow Project - Traffic Engineering - Turn Lanes Also modified intersection geometrics to accomodate additonal turn lanes at the intersection of First and Shaw in the City of Fresno. Also included in project is traffic signals upgrade. |
1 | 2 | 1 | |
| $97,381 | Traffic Flow Improvements | Construct Roundabouts Traffic Flow Project - Traffic Engineering - Construct Roundabouts - Other |
2 | 1 | ||
| $88,530 | Traffic Flow Improvements | Fresno-Clovis Metro Area Signal Synchronization Phase 1 Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
23 | 30 | 19 | |
| $88,530 | Traffic Flow Improvements | Traffic Flow & Safety at RR Crossing Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Flow & Safety at RR Crossing |
1 | 2 | 1 | |
| $88,530 | Traffic Flow Improvements | Fresno-Clovis Metro Area Signal Synchronization Phase I Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
23 | 30 | 19 | |
| $85,000 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
5 | 18 | 10 | |
| $85,000 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 11 | 5 | |
| $79,677 | Traffic Flow Improvements | ATMS Northeast Expansion Traffic Flow Project - Congestion Management Systems - Implementation - ATMS Northeast Expansion |
3 | 2 | ||
| $76,000 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
4 | 14 | 8 | |
| $72,000 | Traffic Flow Improvements | Interconnect Bitrans Quicknet Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects Traffic Flow Improvements |
7 | 25 | 12 | |
| $71,155 | Traffic Flow Improvements | New Signals/Collier & Central Ave Collier Ave & Riverside Ave. Traffic Flow Project - Intelligent Transportation Systems - New signals SR-74 at Collier/Central Ave., and at Collier Ave/Riverside Ave - Other |
3 | 25 | 1 | |
| $68,000 | Traffic Flow Improvements | City of Lincoln Traffic Signal Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects East Ave striping and installation of cross walk |
27 | 24 | ||
| $67,132 | Traffic Flow Improvements | Interconnect Signals Hamner Avenue-Hidden Valley Pkwy to Santa Ana River Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
2 | 18 | 1 | |
| $66,500 | Traffic Flow Improvements | TPA Work Program element 30 Traffic Flow Project - Congestion Management Systems - Establishment |
1 | 1 | 1 | |
| $61,630 | Traffic Flow Improvements | Interconnect Signals: Bernard Street & Coffee Rd Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | QA | ||
| $61,418 | Traffic Flow Improvements | Realignment and 3 new Signal in Lighthouse Corridor Traffic Flow Project - Traffic Engineering - realignment - Other plus 3 signals |
9 | 2 | ||
| $60,000 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
7 | 26 | 16 | |
| $60,000 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
11 | 43 | 21 | |
| $53,804 | Traffic Flow Improvements | Signalization of Bellevue and G Street Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing widening the intersection for left turn phasing and channelization |
5 | 32 | 2 | |
| $52,000 | Traffic Flow Improvements | Traffic Signal Interconnection Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 16 | 7 | |
| $51,578 | Traffic Flow Improvements | Singnalization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $47,643 | Traffic Flow Improvements | Management System for Traffic Traffic Flow Project - Congestion Management Systems - Establishment - Management System for Traffic |
16 | 63 | 31 | |
| $46,222 | Traffic Flow Improvements | Traffic Signal Replacement Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $44,265 | Traffic Flow Improvements | TCM 8: Park and Ride Lot Traffic Flow Project - High Occupancy Vehicle Lanes - Construction construct carppol/express bus lanes on freeways |
10 | 10 | ||
| $40,720 | Traffic Flow Improvements | Operation of Citywide ATMS Traffic Flow Project - Congestion Management Systems - Implementation - of Citywide ATMS |
QA | |||
| $40,000 | Traffic Flow Improvements | Upgrade Traffic Signal Coordination Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | QA | QA | QA |
| $40,000 | Traffic Flow Improvements | Signal Retiming Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
5 | 21 | 12 | |
| $40,000 | Traffic Flow Improvements | Install Traffic Signals at Ramona Blvd and Main St. Traffic Flow Project - Other - Install Traffic Signals in the City of San Jacinto at Ramona Blvd and Main St. |
1 | 9 | 1 | |
| $40,000 | Traffic Flow Improvements | Install Traffic Signals at 4th Ave and Redlands Ave Traffic Flow Project - Other - In the City of Perris at 4th Ave and Redlands Ave., Install Traffic Signals |
1 | 12 | 1 | |
| $37,427 | Traffic Flow Improvements | Signal Coordination Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
17 | 54 | -38 | |
| $35,412 | Traffic Flow Improvements | Signalization Signal- In Bakersfield Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 4 | 1 | |
| $34,500 | Traffic Flow Improvements | Signal ModificationInstall PPLT Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
7 | 23 | 13 | |
| $30,985 | Traffic Flow Improvements | Install Traffic Signal Detector Loops Traffic Flow Project - Intelligent Transportation Systems - Install Traffic Signal Detector Loops - Other |
2 | 2 | ||
| $30,000 | Traffic Flow Improvements | Expand Signal Coordination System Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
3 | QA | QA | QA |
| $28,000 | Traffic Flow Improvements | Signalization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $27,444 | Traffic Flow Improvements | Traffic Signal for Paratransit Inc. at Florin and Woodbine Ave Traffic Flow Project - Other - new signal |
15 | 47 | ||
| $26,559 | Traffic Flow Improvements | New Traffic Signals Traffic Flow Project - Intelligent Transportation Systems - New traffic signals - Other Replacing two-way stops |
1 | 1 | 1 | |
| $26,559 | Traffic Flow Improvements | Interconnect Signals Sunnymead Blvd Cactus & Pigeon Pass Rd Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | -1 | -4 | |
| $26,558 | Traffic Flow Improvements | Traffic Signal Interconnect Installation Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | QA | QA | QA |
| $25,319 | Traffic Flow Improvements | Signalization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing Also channelization and related safety modifications |
1 | 4 | 1 | |
| $25,000 | Traffic Flow Improvements | Traffic Signals Coordination Timing Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
3 | 12 | 7 | |
| $24,918 | Traffic Flow Improvements | Signal Interconnect Pacific & Franklin in Monterey Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects Traffic Flow Improvements |
7 | 3 | ||
| $23,938 | Traffic Flow Improvements | Interconnect signals on Wible Rd and on Oswell Dr Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | QA | ||
| $22,132 | Traffic Flow Improvements | ATMS Northeast Expansion Traffic Flow Project - Congestion Management Systems - Implementation - ATMS Northeast Expansion |
3 | 2 | ||
| $20,469 | Traffic Flow Improvements | Upgrade Intersection Traffic Flow Project - Traffic Engineering - Upgrade Intersection - Other |
1 | 5 | 1 | |
| $19,639 | Traffic Flow Improvements | Construct Roadway Curb Sidewalk Gutter Traffic Flow Project - Traffic Engineering - Construct Roadway, Curb, Sidewalk, Gutter - Other |
373 | |||
| $19,100 | Traffic Flow Improvements | New Signals Traffic Flow Project - Intelligent Transportation Systems - New Signals - Other |
7 | 16 | 10 | |
| $18,591 | Traffic Flow Improvements | Traffic Signal Interconnect-City of Bakersfield Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
18 | 132 | 2 | QA |
| $18,000 | Traffic Flow Improvements | Benjamin Holt Traffic Signal at Herndon Place Traffic Flow Project - Intelligent Transportation Systems - Installation of traffic signal and left turn channelization - Other |
1 | 1 | ||
| $16,000 | Traffic Flow Improvements | Monitoring System-Video Detection Traffic Flow Project - Intelligent Transportation Systems - Other - Monitoring System-Video Detection - Freeway Management Systems |
1 | 5 | 2 | |
| $15,000 | Traffic Flow Improvements | New Traffic Signals Jefferson Ave@Kalmia St. and Kalmia St@Adams Ave Traffic Flow Project - Other - New Traffic Signals Jefferson Ave@Kalmia St.and Kalmia St@Adams Ave. |
1 | 12 | 3 | |
| $12,700 | Traffic Flow Improvements | Signalization of State Highway 165 an Bloss Ave. Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing Widen to accommodate left turn lanes |
1 | 12 | 3 | |
| $12,000 | Traffic Flow Improvements | Traffic Signal Modification Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | QA | QA | QA |
| $12,000 | Traffic Flow Improvements | Traffic Signal Retiming Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | 7 | 3 | |
| $10,224 | Traffic Flow Improvements | Signal Interconnect City Wide in Murrieta City Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
8 | 21 | 10 | |
| $10,000 | Traffic Flow Improvements | Traffic Signal Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | 5 | 2 | |
| $9,738 | Traffic Flow Improvements | Install new traffic signal Traffic Flow Project - Intelligent Transportation Systems - Install new traffic signal - Other Replacing four-way stop at intersection of Thompson and Whitson |
1 | 1 | 1 | |
| $9,738 | Traffic Flow Improvements | Install new traffic signal Traffic Flow Project - Intelligent Transportation Systems - Install new traffic signal - Other Replacing four way stop at the intersection of Thompson and Dinuba City of Selma |
1 | 1 | 1 | |
| $8,853 | Traffic Flow Improvements | Traffic Signalization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | QA | 1 | QA |
| $8,497 | Traffic Flow Improvements | Traffic Signal Installation Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Installation - Other |
QA | |||
| $8,000 | Traffic Flow Improvements | New Traffic Signals Jefferson Ave @ Murrieta Hot Springs Rd. Traffic Flow Project - Other - New Traffic Signals Jefferson Ave @ Murrieta Hot Springs Rd |
1 | 5 | 1 | |
| $5,182 | Traffic Flow Improvements | PM-10 Control Measures Traffic Flow Project - Congestion Management Systems - Implementation - PM-10 Control Measures |
QA | |||
| $3,980 | Traffic Flow Improvements | New Signals Traffic Flow Project - Intelligent Transportation Systems - New Signals - Other |
1 | QA | 1 | QA |
| $2,988 | Traffic Flow Improvements | Install traffic signal synchronization hardware Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects Tie into Fresno-Clovis Metro traffic signal synchronization system |
2 | 1 | -5 | |
| $2,800 | Traffic Flow Improvements | Replace Equipment/Upgrade Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | 7 | 3 | |
| $219,536,000 | Transit | Purchase Buses Upgrade Facilities Various Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
QA | |||
| $74,261,591 | Transit | Purchase 518 Buses for LACMTA`s ongoing Accelerated Bus Procurement Program Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
54 | 8,243 | 679 | 18 |
| $54,276,378 | Transit | Purchase 206 40-foot LNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Liquid Natural Gas (LNG) - New - Capital |
62 | -94 | 676 | 36 |
| $26,863,845 | Transit | Purchase Replacement Buses etc. Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement |
98 | |||
| $26,835,000 | Transit | TCM 3 Transit Project - Facilities Improvements - Other - Bus Facility Emergency Back up Power system Purchased 8 articulated buses; Tasman Fast LRT Project: I-880 to Hostetter |
10 | 10 | ||
| $13,412,856 | Transit | TCM 13: Transit Marketing and Improvements Transit Project - Transit Management Systems - Caltrain signal INprovements. computerized dispatch system, New Park Mall transit Center, promotion, planning, marketing San Pablo Avenue Key Transit Route, Remove/replace Transit Station; 11 projects |
118 | 100 | ||
| $8,100,000 | Transit | Folsom Corridor-downtown Sacremento Light Rail Extension Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year |
45 | 454 | 36 | |
| $7,298,766 | Transit | Various San Diego Trolley Blue Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access, Amenitities - Improved - Fare Systems, Security |
10 | 10 | ||
| $5,280,000 | Transit | Purchase 15 new buses which meet 2002 emission standards Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement Svc expansion from 10 (of the 15) new articulated buses with 50% greater carrying capacity. |
6 | 58 | 4 | |
| $4,100,000 | Transit | TCM 4: Extension projects Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year Caltrain Downtown and SF MUNI's Embarcadero |
73 | 73 | ||
| $3,823,622 | Transit | Purchase 206 40-foot LNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Liquid Natural Gas (LNG) - New - Capital |
QA | |||
| $3,718,260 | Transit | Purchase 11 CNG Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles |
1 | 21 | 14 | 7 |
| $3,718,260 | Transit | Purchase 11 CNG Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
1 | 21 | 14 | 7 |
| $2,625,252 | Transit | Purchase 4 Buses(CSUCI)Erect transit shelters(Thousand Oaksdial-a-ride service Transit Project - Transit Management Systems - Purchase 4 buses for demo transit service to CSUCI,erect transit shelters(Thousand Oaks), Dial-A-Ride-Service(Oxnard Beach),1st yr. Operating Mira Monte Shuttle demo |
23 | -10 | 2 | |
| $1,994,233 | Transit | 6 CNG Buses (Simi Valley)1 Backup CNG compressor CNG fueling facility/cover Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 13 | 1 | |
| $1,829,000 | Transit | Replacement Buses for Monterey-Salinas transit Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement 10 purchases |
15 | |||
| $1,824,100 | Transit | Purchase 43 Clean Diesel Replacement Engines Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital 43 engines |
32 | 55 | ||
| $1,820,000 | Transit | Purchase 94 Clean Diesel Replacement Engines Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital 94 replacement Engines |
73 | 119 | ||
| $1,709,570 | Transit | Replacement of 6 diesel buses with 6 CNG buses/City of Lodi Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
4 | |||
| $1,608,629 | Transit | Construct CNG Refueling Stations Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation |
2 | |||
| $1,576,872 | Transit | Purchase six 20-passenger buses as replacements Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement Also 5 paratransit vehicles, implement "R" St.Shuttle and establish Computer Vehicle Dispatch System |
3 | 16 | 1 | |
| $1,499,000 | Transit | Purchse 36 Clean Diesel Replacement Engines Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital 36 replacement engines |
27 | 46 | ||
| $1,460,000 | Transit | replacement vehicles for SCAT Access Dial-A-Ride Service Transit Project - Related Demand Management Stategies - Other - 19 replacement vehicles for SCAT Access Dial-A-Ride service |
1 | |||
| $1,217,288 | Transit | Purchase 5 CNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
10 | |||
| $1,135,122 | Transit | Purchase 4 buses Install AVL Technology Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified |
QA | |||
| $1,000,000 | Transit | Various Sorento Valley Station Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access, Amenitities - Improved - Fare Systems, Security |
QA | |||
| $970,000 | Transit | Purchase two new hybrid-electric buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
3 | 1 | ||
| $919,826 | Transit | Purchase CNG Vehicles Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 6 | 1 | |
| $839,200 | Transit | Purchase 5 CNG Buses for Dial-a-Ride and downtown trolley service Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
1 | 1 | ||
| $823,050 | Transit | Purchase 3 CNG transit vehicle for the Morongo Basin Transit Authority Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
2 | 1 | ||
| $663,975 | Transit | Construct Transit Transfer Station Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - New |
QA | QA | QA | QA |
| $637,416 | Transit | Purchase 3 Replacement CNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 2 | 1 | 1 |
| $619,709 | Transit | Construct CNG Fueling Station at City Corparation Yard Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation Construct CNG Fueling Station |
QA | QA | QA | QA |
| $613,800 | Transit | Purchase 3 electric Trolleys City of Visalia Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
1 | 1 | 1 | |
| $518,576 | Transit | Purchase 14 CNG Vehicles Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital For Ventura County Welfare-to-Work Program |
1 | QA | 1 | QA |
| $442,650 | Transit | Purchase 2 CNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
2 | |||
| $353,176 | Transit | Construct transfer point facility/park and ride lot of SR 62 Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - Improved - Park and Ride Lot/89 Spaces |
1 | 1 | 1 | |
| $343,200 | Transit | Purchase 2 replacement 30 ft CNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
2 | |||
| $331,988 | Transit | Construct Transit Station Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - New |
QA | |||
| $327,562 | Transit | Repower 35-foot Buses with Clean Diesel Engine Replacements Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - Modified - Capital |
QA | |||
| $309,000 | Transit | Purchase 2 Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
QA | |||
| $300,000 | Transit | TCM 17: Lease Electric Vehicles Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
18 | 36 | ||
| $291,913 | Transit | Construct CNG Fueling Station and purchase 2 CNG minibuses Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation |
1 | |||
| $274,443 | Transit | Purchase one CNG transit bus for Victor Valley Transit Authority Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
23 | 1 | ||
| $274,174 | Transit | Install CNG Fueling Station at Ventura County Government Center Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation |
1 | QA | 1 | QA |
| $265,590 | Transit | Purchase 5 CNG Transit Vehicles Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | ||
| $240,000 | Transit | Upgrade CNG Fuel Station Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation |
1 | QA | 2 | QA |
| $234,879 | Transit | Purchase 4 low-emission paratransit vehicles for Mountian Area Transity Authority Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
1 | 1 | ||
| $212,000 | Transit | Purchase 3 Replacement Minibuses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
1 | 1 | 1 | 1 |
| $200,000 | Transit | Conejo Connection 3rd year demonstration service from Oxnard to Warner Center Transit Project - Transit Management Systems - Transit demonstration for Conejo Connection (3rd year) |
1 | -1 | 1 | |
| $192,385 | Transit | Purchase CNG Vehicles Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | 1 | |
| $180,773 | Transit | Onsite improvement for intermodal transit area Transit Project - Transit Management Systems - Onsite improvement for intermodal transit area for bicycle storage, bus stop,park and ride facility, and possible train depot |
1 | 2 | 1 | |
| $177,566 | Transit | Construct 7 bus turnout improvements/Main St. between Maple Ave and I Ave. Transit Project - Facilities Improvements - Other - Construct 7 bus turnout improvements on Main St. between Maple Ave and I Ave, City of Hesperia |
1 | 0 | 1 | |
| $177,000 | Transit | Expand Camarillo Station parking facility Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access - Improved Expand Camarillo Staion parking facility |
1 | QA | 1 | QA |
| $126,268 | Transit | Purchase of CNG vehicle maintenance and Smog Check 2 Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation For Ventura College |
2 | QA | 2 | 1 |
| $106,236 | Transit | Purchase Commuter Bus Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
QA | |||
| $106,200 | Transit | Purchase 4 Replacement CNG Transit Vehicles/City of Barstow Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | 1 | |
| $90,300 | Transit | Purchase CNG Vehicles Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | 1 | |
| $88,530 | Transit | Purchase 1 10-Passenger CNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | ||
| $71,815 | Transit | Bus turn-outs between Twentynine Palms and Yucca Valley area on SR-62 Transit Project - Facilities Improvements - Other - Bus turn-outs between Twenynine Palms and Yucca Valley area on SR-62 |
1 | 1 | ||
| $70,000 | Transit | Operating-Service Expansion for City of Madra`s fixed-route transit system Transit Project - Transit Management Systems - FY99/00 Operating-Service Expansion for the City of Madera's MAX fixed-route transit system |
1 | 1 | 1 | |
| $64,605 | Transit | Purchase one CNG Paratransit vehicle for the Morongo Basin Transit Authority Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | ||
| $64,605 | Transit | Purchase 1 Expansion Paratransit Vehicle for Morongo Basin Transit Authority Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New |
1 | 1 | 1 | |
| $60,000 | Transit | Reconstruct Bus Terminal and Driveway Circle-In Bakersfield Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - Other - Improved - terminal/driveway circle Reconstruct bus terminal and driveway circle |
1 | 1 | 1 | 1 |
| $60,000 | Transit | Watt Ave. Transit Priority and Mobility Enhancement Demonstration Transit Project - Transit Management Systems - ITS Smart cooridor demo project |
QA | |||
| $49,391 | Transit | Purchase 2 CNG pick-up trucks Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital Replace conventionally fueled trucks for the City of Madera |
1 | 1 | 1 | |
| $47,600 | Transit | City of Lodi/Conversion of diesel powered fixed route bus to CNG Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - Modified - Operation - 1st Year |
2 | |||
| $47,130 | Transit | Purchase 1 16-passenger van for the city of Chowchillas Area Transit Express Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New |
1 | 1 | ||
| $22,133 | Transit | Purchase 5 Bus Shelters Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New |
1 | 2 | 1 | |
| $13,600 | Transit | Installation of 5 new bus shelters Transit Project - Facilities Improvements - Other - 5 new bus shelters |
1 | 1 | 1 | 1 |
| $12,000 | Transit | Transit Operating Assistance Transit Project - Transit Management Systems - Transit Operating Assistance |
1 | 1 | 1 | |
| $(6,668,037) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % | |
|---|---|---|---|
| Nationwide Totals | $1,652,593,968 | $1,757,819,034 | 106 % |
* States without ozone or CO Nonattainment or maintenance areas