Michigan1/10/2003$37,865,714$29,194,42377 %
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$376,800 Demand Management3 year Ozone Action Outreach Program
Demand Management Project - Public Information - Public Education - Other - Promote and educate general public over 3 years of the Ozone Action Outreach Program
90      
$223,700 Demand ManagementReverse Commute Demonstration Project
Demand Management Project - Public Information - Public Education - Other - Reverse Commute Demostration Project
6      
$25,200 Demand ManagementOzone Program-CMAQ Grant #9908
Demand Management Project - Public Information - Marketing - Other - Ozone Program-Metro Area
25   25  
$25,000 Demand ManagementSupport Ozone Action Day Activities/Materials/Initiatives
Demand Management Project - Public Information - Public Education - Other - Support Ozone Action Day Activites/Materials/Initiatives
QA      
$24,800 Demand ManagementMuskegon Clean Cities-FY 1999
Demand Management Project - Public Information - Public Education - Other - Muskegon Clean Cities FY 1999 Alternative Fuel Marketing Development Program/Outreach
QA      
$1,415,957 I/M and Other TCMsRegional-Semsim Winter Maintenance Operations/General Micellaneous
I/M or Other TCM Project - Other - Regional-Semsim Winter Maintenance Operations/General Miscellaneous
2,460      
$26,400 I/M and Other TCMsEmployment Mobility/How Retention
I/M or Other TCM Project - Other - Employment Mobility/How Retention-CMAG Grant #0005
2   2  
$25,000 I/M and Other TCMsOzone Action Program/Muskegon Urbanized Area
I/M or Other TCM Project - Other - Ozone Action Program/Muskegon Urbanized Area
25   1  
$20,000 I/M and Other TCMsVoluntary Ozone Action Program/Holland Metro Area
I/M or Other TCM Project - Other - Voluntary Ozone Action Program/Holland Metro Area
164   165  
$7,500 I/M and Other TCMsMuskegon County-Michivan FY2000 Employment Mobility/HOV Retention
I/M or Other TCM Project - Other - Employment Mobility/HOV Retention
1   1  
$6,300 I/M and Other TCMsOttawa County-Michivan FY2000 Employment Mobility/HOV Retention
I/M or Other TCM Project - Other - Employment Mobility/HOV Retention
1   1  
$5,600 I/M and Other TCMsUpgrade exsisting carpool lot at M-50
I/M or Other TCM Project - Other - Upgrade existing carpool lot at M-50
4   7  
$358,368 Pedestrian/BicycleConstruction of Non-Moterized Pathway 88 & 120th & Riley St.
Pedestrian/Bicycle Project - Facilities - Separate Path
4   4  
$292,133 Pedestrian/BicycleWiden Bridge for Pedestrian Traffic over south channel of Grand River
Pedestrian/Bicycle Project - Facilities - Separate Path
2   2  
$136,000 Pedestrian/BicycleConstruction of Non-Motorized Pathway
Pedestrian/Bicycle Project - Facilities - Separate Path
4   4  
$80,000 Pedestrian/BicycleBridge Widening for Pedestrian Traffic over the Grand River
Pedestrian/Bicycle Project - Facilities - Separate Path
2   2  
$7,863 Pedestrian/BicycleNon-Motorized Path 92nd to 96th and Perry to Mapleview
Pedestrian/Bicycle Project - Facilities - Separate Path
3   4  
$341,000 Shared RideSoutheastern Michigan Ridesharing
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
1,917      
$100,000 Shared RideMichi-Van Southeastern Michigan Employment Mobility
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
7      
$95,000 Shared RideSoutheastern Michigan-Ridesharing FY2000
Shared Ride Project - Public Program - Information/Matching - Matching
148      
$70,000 Shared RideSoutheastren Michigan-Michivan FY2000 Operating/Marketing
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
8      
$50,000 Shared RideSoutheastern Michigan-HOV Retention-FY 2000/Michi-Van(HOV)
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
7      
$34,000 Shared RideMichivan-GIS implementation and administration FY2000
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
4      
$11,700 Shared RideHolland/Zeeland-MICHIVAN FY2000
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$11,600 Shared RideGrand Rapids-Michigan FY2000-Operating/Marketing-CMAQ Grant #0037
Shared Ride Project - Public Program - Information/Matching - Marketing
2   2  
$5,300 Shared RideHolland/Zeeland-Michivan FY2000
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$3,500 Shared RideMuskegon County-Michigan FY2000-Operating/Marketing
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$2,700 Shared RideOttawa County-Michivan FY2000 Operating/Marketing
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$3,500,000 Traffic Flow ImprovementsDetroitWayneOaklandand Macomb Counties ITS Infrastructure
Traffic Flow Project - Intelligent Transportation Systems - Maintain 180 miles of ITS Infrastructure, preventative and remedial Maintenance - Other
539   3,583  
$2,320,000 Traffic Flow ImprovementsSuperstructure replacement & widening Under 76th StS of Wyoming
Traffic Flow Project - Traffic Engineering - superstructure replacement & widening (2 to 6lanes) - Other
35   3  
$1,040,000 Traffic Flow ImprovementsOperate County (Oakland) Wide ITS Center
Traffic Flow Project - Intelligent Transportation Systems - Operate County Wide ITS Center - Other
2,265      
$920,000 Traffic Flow ImprovementsReconstruct SB & NB exit ramps at Plymouth Road
Traffic Flow Project - Traffic Engineering - Construct SB & NB Exit Ramps - Other
10      
$800,000 Traffic Flow ImprovementsIntersection Improvements at Frankline and 12 Mile Roads
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1      
$800,000 Traffic Flow ImprovementsVarious Routes in Metro Region
Traffic Flow Project - Intelligent Transportation Systems - Other - Courtsey Patrol-Incident Management-CMAQ grant #00055 - Freeway Management Systems
438   99  
$720,000 Traffic Flow ImprovementsRelocate the exsisting US-131Ionia St NB Off Ramp
Traffic Flow Project - Traffic Engineering - Relocation the exsisting US-131, Ionia St. NB Off Ramp - Other
1   1  
$542,000 Traffic Flow ImprovementsRelocate the exsisting US-131Ionia St NB Off Ramp
Traffic Flow Project - Traffic Engineering - Relocation the exsisting US-131, Ionia St. NB Off Ramp - Other
1   1  
$459,058 Traffic Flow ImprovementsTraffic Signal Upgrading Ten Locations in Grand Haven
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$450,000 Traffic Flow ImprovementsIntersection Improvements Leonard Street at Collingdale
Traffic Flow Project - Traffic Engineering - Intersection Improvements Leonard Street at Collingdale - Other
1   1  
$448,575 Traffic Flow ImprovementsSignal Modernization and Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
59      
$446,695 Traffic Flow ImprovementsConstruct center/L turn lane at Eastbound Under Pickney Road-Howell
Traffic Flow Project - Traffic Engineering - Construct center/L turn lane at Eastbound onramp with improvements at WB ramp terminals - Other
1   1  
$411,598 Traffic Flow ImprovementsTraffic Signal Upgrading Ten Locations in Grand Haven
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$400,000 Traffic Flow ImprovementsITS Metro Airport 5-10 mile radius around I-94 & I-2175
Traffic Flow Project - Intelligent Transportation Systems - ITS Metro Airport - Other
586   2,694  
$388,806 Traffic Flow ImprovementsConsruct Center Left Turn Lane US-31 SB Ramps West to Peterson Road
Traffic Flow Project - Traffic Engineering - Construct Center Left Turn Lane - Other
2   1  
$344,000 Traffic Flow ImprovementsIntersection Improvements Ann Arbor/Saline Road at Water/Lohr
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1      
$305,760 Traffic Flow ImprovementsIntersection Improvements Leonard Street at Diamond
Traffic Flow Project - Traffic Engineering - Intersection Improvements Leonard Street at Diamond - Other
3   1  
$285,000 Traffic Flow ImprovementsATMS Traffic Signal Progression in Farmington Hills
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
623   119  
$235,000 Traffic Flow ImprovementsTraffic Signal Upgrading/Optimization Stone/Thomas to Meijer Drive Port Huron
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
8   10  
$200,000 Traffic Flow ImprovementsITS Expansion/Continuation Cities of Grand Rapids and Walker
Traffic Flow Project - Intelligent Transportation Systems - Other - Additonal signs and cameras - Freeway Management Systems
16   3  
$200,000 Traffic Flow ImprovementsBridge replacementapproach replacementguardrail upgrades Black River Spillway
Traffic Flow Project - Traffic Engineering - Bridge replacement,approach replacement,and guardrail upgrades over Black River Spillway in Port Huron - Other
QA      
$200,000 Traffic Flow ImprovementsDetroit/MITS Center
Traffic Flow Project - Intelligent Transportation Systems - Other - Courtesy Patrol - Freeway Management Systems
22   5  
$200,000 Traffic Flow ImprovementsDetroit/MITS Center
Traffic Flow Project - Intelligent Transportation Systems - Other - Courtesy Patrol - Freeway Management Systems
22   5  
$190,000 Traffic Flow ImprovementsTraffic Signals at 3 locations
Traffic Flow Project - Other - Traffic Signals at Norton/Henry & Seminole/Henry & Lakeshore Marketplace/Harvey Norton/Henry & Seminole/Lakeshore & Marketplace/Harvey
3   1  
$186,949 Traffic Flow ImprovementsIntersection Improvements- Construct Indirect Turnaround
Traffic Flow Project - Traffic Engineering - Construct Indirect Turnaround (East approach)32ND Avenue-City of Hudsonville - Other
2   1  
$180,000 Traffic Flow ImprovementsTraffic Signal Upgrading/ Northland/Asbury Park
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
28   19  
$150,000 Traffic Flow ImprovementsWiden Alpine Ave. to Hackmuth from 2 to 3 lanes
Traffic Flow Project - Traffic Engineering - Widen Alpine Ave to Hackmuth from 2 to 3 lanes - Other
1   1  
$150,000 Traffic Flow ImprovementsSignal Upgrading at 10 locations South University to US-23
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
9   4  
$139,784 Traffic Flow ImprovementsTraffic Signal Fernwood-1st Detroit
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals - Other
11      
$127,595 Traffic Flow ImprovementsTraffic Signal Fernwood-1st Detroit
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals - Other
11      
$122,469 Traffic Flow ImprovementsIntersection Improvement at 96th Avenue
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1   1  
$120,000 Traffic Flow ImprovementsConstruct Widening for Dual Left Turn Lanes I94 EB/WB off ramps
Traffic Flow Project - Traffic Engineering - Turn Lanes
4      
$101,368 Traffic Flow ImprovementsON Ramp Eastbound GRND River Ave.
Traffic Flow Project - Traffic Engineering - On Ramp Eastbound SE QDRNT/I96/GRND RVR AV. - Other
3      
$96,000 Traffic Flow ImprovementsIntersection Improvements-Construction of Directional Crossovers 88th Ave
Traffic Flow Project - Traffic Engineering - Intersection Improvements-Construction of Directional Crossovers - Other
3   1  
$91,323 Traffic Flow ImprovementsON Ramp Eastbound GRND River Ave.
Traffic Flow Project - Traffic Engineering - On Ramp Eastbound SE QDRNT/I96/GRND RVR AV. - Other
3      
$80,000 Traffic Flow ImprovementsDexter Road to Peaceful Valley Dr./Village of Pinckney
Traffic Flow Project - Traffic Engineering - Construct Center Lane for Left Turn Lanes - Other
1      
$72,966 Traffic Flow ImprovementsCMAQ project Signalization Miller to Washtenaw
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
8   1  
$60,000 Traffic Flow ImprovementsUpgrade Scats Signals Williams Lake Rd. to US-24
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
37      
$45,600 Traffic Flow ImprovementsConstruct Right Turn Lane on SB Maple at I94BL
Traffic Flow Project - Traffic Engineering - Turn Lanes
5      
$41,600 Traffic Flow ImprovementsConsruction Lane for Additonal Vehicle Storage
Traffic Flow Project - Traffic Engineering - Construct Lane for Additonal Vehicle Storage - Other
3      
$35,000 Traffic Flow ImprovementsTraffic Signal Upgrading/Optimization Huron River to Ban Horn Road
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
3   1  
$24,646 Traffic Flow ImprovementsWiden and add Center Left Turn Lane Crooks-Old Perch-Detroit
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$21,000 Traffic Flow ImprovementsTraffic Signals at 3 locations
Traffic Flow Project - Other - Traffic Signals at Norton/Henry & Seminole/Henry & Lakeshore Marketplace/Harvey Norton/Henry & Seminole/Lakeshore & Marketplace/Harvey
3   1  
$20,000 Traffic Flow ImprovementsWiden Connector for Center Left Turn Lane at Dorsett Connector
Traffic Flow Project - Traffic Engineering - Turn Lanes
1      
$19,656 Traffic Flow ImprovementsSignal Interconnect of Arterials Platt to State/Ann Arbor
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
14   2  
$12,000 Traffic Flow ImprovementsIntersection Improvement at 96th Avenue
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1   1  
$10,000 Traffic Flow ImprovementsTraffic Signals (9 Mile MarshallCambourne)
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals (9 Mile, Marshall,Cambourne) - Other
QA      
$6,887 Traffic Flow ImprovementsTurn Lane and Signal at Fuller Street
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   44  
$4,231 Traffic Flow ImprovementsTraffic Signal at Hackley Road Intersection
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2      
$3,976 Traffic Flow ImprovementsTraffic Signal Dequindre-Jefferson-DET
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
34   5  
$3,530 Traffic Flow ImprovementsTraffic Signal Dequindre-Jefferson-DET
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
34   5  
$3,413 Traffic Flow ImprovementsRight Turn Lane at Patterson Ave.
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$877 Traffic Flow ImprovementsTraffic Signal Upgrade Sherman Street
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2   0  
$600 Traffic Flow ImprovementsLengthen Center Left Turn Lane
Traffic Flow Project - Traffic Engineering - Lengthen Center Left Turn Lane - Other
1   1  
$160 Traffic Flow ImprovementsSignal Modernization Utica Rd-Hall Rd
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
25      
$(400) Traffic Flow ImprovementsSignalize Intersection at Dan Hoey
Traffic Flow Project - Intelligent Transportation Systems - Signalize Intersection at Dan Hoey - Other
1   1  
$(460) Traffic Flow ImprovementsRight Turn Lane at Patterson Ave.
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$(460) Traffic Flow ImprovementsRight Turn Lane at Patterson Ave.
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$(2,466) Traffic Flow ImprovementsUpdate and Inteconnect Signal at Broadway
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
9   -1  
$(3,416) Traffic Flow ImprovementsTurn Lane and Signal at College Ave
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   16  
$(3,829) Traffic Flow ImprovementsSinal Interconnect at Carpenter
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1   1  
$(4,333) Traffic Flow ImprovementsSignal Interconnect along 8.72 miles of arterial Schoolcraft and Seven Mile
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
13   2  
$(5,185) Traffic Flow ImprovementsTraffic Signal at Hoyt and Mason
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal at Hoyt and Mason - Other
1   1  
$(6,344) Traffic Flow ImprovementsBaseline Road-Avery Road
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
30   4  
$(9,682) Traffic Flow ImprovementsCMAQ project intersection reviews at Fonda Drive
Traffic Flow Project - Traffic Engineering - CMAQ project intersection reviews at Fonda Drive - Other
2     0
$(10,264) Traffic Flow Improvements3 LOCS in Detriot
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
39   5  
$(16,948) Traffic Flow ImprovementsWiden and add Left Turn Lane at LivernoisBrwstr & Rchstr
Traffic Flow Project - Traffic Engineering - Turn Lanes
4   -1  
$(18,404) Traffic Flow ImprovementsTraffic Signals Joy Rd. to Baseline
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Joy Rd to Baseline - Other
23      
$(21,018) Traffic Flow ImprovementsTraffic Signals Goddard to Plymouth
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Goddard to Plymouth - Other
32      
$(24,279) Traffic Flow ImprovementsTraffic Signal Interconnect Huron to Plymouth
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
14   2  
$(36,294) Traffic Flow ImprovementsWiden and add Turn Lane at Squirrel
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   0  
$(45,600) Traffic Flow ImprovementsAdvanced Traffic Monitoring System Additions BTW US24 & I75
Traffic Flow Project - Intelligent Transportation Systems - Other - Advanced Traffic Monitoring System Additions - Freeway Management Systems
395      
$(48,020) Traffic Flow ImprovementsTurn Lane at Big Beaver Intersection
Traffic Flow Project - Traffic Engineering - Turn Lanes
-7      
$(136,000) Traffic Flow ImprovementsAdvanced Traffic Monitoring System Additions
Traffic Flow Project - Intelligent Transportation Systems - Other - Advanced Traffic Monitoring System Additions - Freeway Management Systems
395      
$(139,461) Traffic Flow ImprovementsSignal Interconnect US 23 to Swift
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
55   1  
$(170,239) Traffic Flow ImprovementsTraffic Signal Modernization Saline to Fernwood/ Ann Arbor
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
7   1  
$(186,942) Traffic Flow ImprovementsTraffic Signals Fielding/Spencer to Lone Pine Road
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Fielding/Spencer to Lone Pine Road (26 Locations) - Other
69   9  
$(448,575) Traffic Flow ImprovementsSignal Modernization and Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
59      
$2,000,000 TransitSMART 11 routes
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
41   41  
$1,800,000 TransitDDOT construct alt. fuel facility
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
111      
$1,142,074 TransitSMART - New Service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year
249      
$749,484 TransitSMART - 16 Paratransit bues purch.
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New
1      
$670,000 TransitCOD-People Mover
Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year
27      
$600,000 TransitPurchase ROW for Additonal Parking for AMTRAK Station in the City of Holland Transit Project
Facilities Improvements - Passenger Facilities - Rail Stations - Access - Improved
2      
$508,442 TransitSMART - 11 Expansion Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified
1      
$480,000 TransitPurchase 2 buses extension
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
6   8  
$480,000 TransitConstruct CNG fueling station
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
QA   QA  
$343,200 TransitReplace 2 Diesel Buses with CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
6   43  
$240,000 TransitGRATA-pilot bus route extension
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
6   7  
$200,000 TransitReplace Diesel Bus with CNG Bus
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1  
$200,000 TransitMonroe County
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
    4  
$192,000 TransitPilot bus route extension
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
4   48  
$174,720 TransitRegional Operating Assistance
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year
2   2  
$165,762 TransitSMART - 2 replacemetn buses/Monroe
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
3      
$65,520 TransitGo BUS
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year
1      
$64,000 TransitPurchase medium bus replacement
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
2   9  
$48,000 TransitSmall Bus replacement
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
2   9  
$(1,109,703) MiscellaneousMiscellaneous
HQ's adjustment - deobligation from previously approved projects
       
  APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Nationwide Totals $1,652,593,968$1,757,819,034106 %

* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year

Updated: 07/06/2011
HEP Home Planning Environment Real Estate
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000