Year Nine Report

New Hampshire

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
New Hampshire1/10/2003$8,291,086$3,574,33243 %
New Hampshire
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$148,000 Demand ManagementComputerized Traffic info System 7 Locations
Demand Management Project - Operating Assistance - 1st Year - Other - Computerized Traffic Info System
Used to perform rideshare mathces, Hwy & bus related info coordinated with NHDOT & Nashua Reg. Plan. Comm. Project to be managed by SNHPC.
1   1  
$40,000 Demand ManagementImplement Computer Rideshare Info System for Multimodal transit scheduling
Demand Management Project - Operating Assistance - 1st Year - Other - Implement Computer Rideshare Info System
26   41  
$312,000 I/M and Other TCMsConstruct Fuel Stations for Alternative Fuel Vehicles
I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - Other - Infrastructure - Operation - 1st Year
1   1  
$312,000 I/M and Other TCMsConstruct Fuel Stations for Alternative Fuel Vehicles
I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - Other - Infrastructure - Operation - 1st Year
1   1  
$9,208 I/M and Other TCMsUpgrade existing Park-N-Ride & Install User Amenities
I/M or Other TCM Project - Other - Upgrade exsisting Park-N-Ride Lot & install user amenities
1   2  
$(33,053) I/M and Other TCMsNH111/NH121construct new 100 space park-and-ride-facility
I/M or Other TCM Project - Other - NH111/NH121, Construct new 100 space park and ride facility with shelter. Facility to include lighting,telephone service & bicycle storage lockers
1   2  
$(57,332) I/M and Other TCMsConstruct Park-n-Ride in area of Exit 8 FEE tpk
I/M or Other TCM Project - Other - FEE Tpk, construct park-n-ride lot in area of exit 8
3   6  
$120,000 Pedestrian/Bicycle2 E-W pathway corridors and combine with 2 N-S pathway corridors
Pedestrian/Bicycle Project - Facilities - Separate Path
Project being done in two contracts. Contract #1 done in 1999. Contract #2 advertised in November 2000.
1   1  
$(12,800) Pedestrian/BicycleNH 155 Expansion of Existing C & J Trailways Lot for A 394 ParknRide/Bus Station
Pedestrian/Bicycle Project - Facilities - Parking lot at Trailways - Other
Project dropped by applicant 8/99
QA      
$94,400 Shared RideVanpool Incentive Program
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
Provide A Declining Subsidy To New Vanpool Participants To Cover Vehicle Cost To Be More Attractive To Commuters
QA      
$4,000 Shared RideParknRide with Bike transfer Dover Shuttle Coast Pulse Shared Ride
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$428,700 Traffic Flow ImprovementsMaintenance on signal controller hardware from Allds Street to Library Hill
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2 28 3  
$287,540 Traffic Flow ImprovementsReplace exsisting signal controller hardware at 7 intersections
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Merrimack River West to FEE TPK
3 60    
$208,000 Traffic Flow ImprovementsConstruct Bypass NH9 and US 202 Western Connector
Traffic Flow Project - Traffic Engineering - Construct Bypass and US 202 Western Connector Intersection - Other
Wetland Mitigation sites 8 and 18a and construction of Park and Ride Facility
QA      
$60,000 Traffic Flow ImprovementsInstall Closed Loop Coordinated Traffic Signal System Along NH125
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2 1    
$26,592 Traffic Flow ImprovementsIntersection improvements @ NH 28 Bypass/Optomize Signal Systems
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Optomize Signal System from Martins Ferry to Granite Hill Drive
2 1    
$23,600 Traffic Flow ImprovementsInstall Traffic Signal Interconnect NH28 @ 3 intersections
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
From Massachusetts s/l to Lawrence Road
QA      
$20,000 Traffic Flow ImprovementsNH 102 Installation of Coordinated Traffic Signal System
Traffic Flow Project - Intelligent Transportation Systems - Installation of Coordinated Traffic Signal System - Other
From I-93, exit 4 Westerly to NH 128
2 1    
$8,000 Traffic Flow ImprovementsConstruct road to include 2 lanes
Traffic Flow Project - Intelligent Transportation Systems - Signalized intersections;construct 2200' road to include 2 lanes,bike lane, & will be restricted to bus/transit,hov,pedestrians & bikes during peak hours - Other
QA      
$(15,527) Traffic Flow ImprovementsSignalizationChannelization and Safety Signage for US 4 Portland St./Oak
Traffic Flow Project - Intelligent Transportation Systems - Signalization,Channelization and Safety Signage for US4, Portland St intersection with Oak. Construction complete. Air quality benifits from FY 1995 Conformity Determination - Other
14   2  
$(20,000) Traffic Flow ImprovementsInstall closed loop coordinated signal system
Traffic Flow Project - Intelligent Transportation Systems - Install closed loop cordinated signal system - Other
Martins Ferry northerly 1.5 miles to Granite Hill/Memorial School intersection
QA      
$(32,000) Traffic Flow ImprovementsSignal Coordination and Pedestrian Crossings at 7 Intersections
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing btw Greenleaf & Heritage Ave.
QA      
$1,440,000 TransitPurchase of Diesel Fueled Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
Project scope modified at request of city from CNG buses to diesel buses
3 2 20  
$282,280 TransitDevelop 2 Intermodal Transfer Facilities @ Pease International Tradeport
Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - New
3   4  
$119,200 TransitPromoting Regional Transportation Guide and Travel Alternatives
Transit Project - Transit Management Systems - Promote transit, SOV alternatives, radio education,and publishing guide
Transferred to FTA 2/2000
12   20  
$92,000 TransitPurchase Bus to Expand Commuter Service in Concord Area
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
Transferred to FTA 2/2000, Service Expansion implemented FY 2000
QA      
$22,800 TransitReplace (1) 1974 bus due to unavailable replacement parts
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
1   2  
$(1,274) TransitDevelop & print public transportation guide for Salem-Plaistow-Windham mpo regio
Transit Project - Transit Management Systems - Develop and print public transportation guide for Salem-Plaistow-Windham mpo region to provide a comprehensive source of information about transportation alternatives available to public
1   1  
$(312,002) MiscellaneousMiscellaneous
HQ's adjustment - deobligation from previously approved projects
       
  APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Nationwide Totals $1,652,593,968$1,757,819,034106 %

* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year

Updated: 07/06/2011