| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Texas | 1/10/2003 | $108,952,514 | $103,150,135 | 95 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $3,226,252 | Demand Management | FY 99 Clean Air Act Tran Fare Subsidy Demand Management Project - Operating Assistance - 1st Year - Road Pricing - By Area Various locations in Harris,Galveston, Montgomery, Lib Co. |
15 | QA | 23 | QA |
| $2,751,232 | Demand Management | FY 2000 Reg Commute Alternatives Imp Demand Management Project - Public Information - Public Education - Other - FY 2000 Reg Commute Alternatives Imp |
QA | |||
| $1,367,000 | Demand Management | FY 2000 Regional Commute Alternative Program Demand Management Project - Public Information - Public Education - Other - FY 2000 Regional Commute Alternative Program |
QA | |||
| $780,000 | Demand Management | Intelligent Transportation System/Lone Star Park Traffic Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation System |
QA | |||
| $440,000 | Demand Management | FY 2000 Clean Air Act Public Outreach Program Demand Management Project - Public Information - Public Education - Other - FY 2000 Clean Air Act Public Outreach Program |
QA | |||
| $420,000 | Demand Management | Intelligent Transportation System Lone Star Park Traffic Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation System |
QA | |||
| $400,000 | Demand Management | Intermodal Congestion Quick Response Team Demand Management Project - Operating Assistance - 1st Year - Other - Intermodal Congestion Quick Response Team |
QA | |||
| $350,000 | Demand Management | FY 2000 Reg Comm Alternatives Program MRKT Demand Management Project - Public Information - Marketing - Other - FY 2000 Reg Comm Alternatives Program MRKT |
QA | |||
| $350,000 | Demand Management | FY 2000 Reg Comm Alternatives Program MRKT Demand Management Project - Public Information - Marketing - Other - FY 2000 Reg Comm Alternatives Program MRKT |
QA | |||
| $160,000 | Demand Management | Intelligent Transportation System/US 75 South of IH 635 Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation Systems Inter-Dist Comm. Motorist Info Sys. |
QA | |||
| $116,000 | Demand Management | Air Quality Outreach Prg-Ozone Day Demand Management Project - Public Information - Public Education - Other - Air Quality Outreach Prg-Ozone Day |
1 | 3 | 1 | |
| $2,751,232 | I/M and Other TCMs | FY 2000 Reg Commute Alternatives Imp I/M or Other TCM Project - Other - FY 2000 Reg Commute Alternatives Imp |
143 | QA | 374 | QA |
| $1,802,220 | I/M and Other TCMs | FY 2000 Alternative Fleet Fueled Vehicle Program I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - Other - Vehicles - Operation - 1st Year |
75 | QA | 1 | QA |
| $440,000 | I/M and Other TCMs | FY 2000 Clean Air Act Public Outreach Program I/M or Other TCM Project - Other - Clean Air Act Public Outreach Program 8 County Non-Attainment Area |
QA | |||
| $400,000 | I/M and Other TCMs | Intermodal Congestion Quick Response Team I/M or Other TCM Project - Other - Intermodal Congestion Quick Response Team |
QA | |||
| $345,807 | I/M and Other TCMs | Major Investment Study SUP by H-GAC I/M or Other TCM Project - Other - Major Investment Study SUP by H-GAC Major Investment Study |
QA | |||
| $340,600 | I/M and Other TCMs | Incident Detection & Response System I-35E from SH183 to I-30 I/M or Other TCM Project - Other - Incident, Detection and Response System |
QA | |||
| $150,000 | I/M and Other TCMs | Project SVCS Contract & NTWK Transfer at Houston Transfer I/M or Other TCM Project - Other - Project SVCS Contract & NTWK Transfer |
QA | |||
| $1,741,082 | Pedestrian/Bicycle | Bike/Pedestrian Clear Fork/Bendbrk Bike Trail Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 7 | 2 | |
| $1,492,525 | Pedestrian/Bicycle | Bike/Ped Trail North Houston on Street Bikeway Network Pedestrian/Bicycle Project - Facilities - Separate Path North Houston on Street Bikeway Network |
2 | QA | 3 | QA |
| $1,025,222 | Pedestrian/Bicycle | Bikeway Phase 1 On Street Network W.Houston & Bikeways Katy Road Pedestrian/Bicycle Project - Facilities - Separate Path |
2 | QA | 3 | QA |
| $300,000 | Pedestrian/Bicycle | Bike/Hike Trail thru Herman Park Pedestrian/Bicycle Project - Facilities - Separate Path Herman Brow Park-HB Trail-Dunvegan WY @ I-10 |
1 | QA | 1 | QA |
| $108,954 | Pedestrian/Bicycle | Construct Hike and Bike Trail/Goose CRK TRL from WTX Ave to Garth Road Pedestrian/Bicycle Project - Facilities - Separate Path Goose CRK TRL from WTX AVE to Garth Road |
1 | QA | 1 | QA |
| $85,692 | Pedestrian/Bicycle | Bike/Pedestrian Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 7 | 2 | |
| $64,500 | Pedestrian/Bicycle | Construct Hike and Bike Trail/Goose CRK TRL Pedestrian/Bicycle Project - Facilities - Separate Path Goose CRK TRL from S of W TX AVE-W TX AVE PHII |
1 | QA | 1 | QA |
| $25,040 | Pedestrian/Bicycle | Bikeway Network Phase 2 on STR Bikeway Network Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | QA | 1 | QA |
| $1,367,000 | Shared Ride | FY 2000 Regional Commute Alternative Program Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
87 | QA | 160 | QA |
| $1,110,000 | Shared Ride | FY 2000 REG Vanpool Program Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
32 | QA | 78 | QA |
| $1,110,000 | Shared Ride | FY 2000 REG Vanpool Program Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
QA | |||
| $10,285,399 | Traffic Flow Improvements | IH-10 Construct Turnarounds @McRae Sumac Yarbrough Lomaland Traffic Flow Project - Traffic Engineering - Construct Turnarounds - Other |
8 | 64 | 1 | |
| $8,973,164 | Traffic Flow Improvements | Install Computerized Traffic Mgmt. System IH-610 Traffic Flow Project - Congestion Management Systems - Establishment, Implementation - Conmputerized Traffic Mgmt. System From US 59 to SH 288 |
72 | QA | 19 | QA |
| $7,791,808 | Traffic Flow Improvements | Construct Direct Connector US 59 @ BW 8 Traffic Flow Project - Traffic Engineering - Construct direct connector - Other |
1 | QA | 1 | QA |
| $6,723,151 | Traffic Flow Improvements | Construct Grade Separation US 290 at Mason Road Traffic Flow Project - Traffic Engineering - Construct Grade Separation - Other |
1 | QA | 1 | QA |
| $6,084,714 | Traffic Flow Improvements | Install CTMS I-45 from 61st street from Harris County Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS |
9 | QA | 2 | QA |
| $5,120,000 | Traffic Flow Improvements | STrGRBS & Pave on IH-10 @SH62 Traffic Flow Project - Traffic Engineering - STR,GR,BS & Pave - Other |
2 | 18 | 1 | |
| $3,540,135 | Traffic Flow Improvements | Construct Direct Connector BW 8 @ Hardy Toll Road Traffic Flow Project - Traffic Engineering - Construct EB to NB Direct Connector - Other |
7 | QA | 2 | QA |
| $2,496,000 | Traffic Flow Improvements | Reconstruct 2lns w/cont. Left Turn Lane Little Cypress Dr. FM 3247 Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 14 | 1 | |
| $2,406,099 | Traffic Flow Improvements | Intersection Improvements Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
78 | 1,301 | 10 | |
| $1,697,600 | Traffic Flow Improvements | TRF Light Synchronization Phase I Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
33 | 263 | 11 | |
| $1,566,314 | Traffic Flow Improvements | ATMS I-20 from US 287 Traffic Flow Project - Congestion Management Systems - Implementation - ATMS |
QA | |||
| $1,469,097 | Traffic Flow Improvements | US 62 Traffic Signal Expansion Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 24 | 1 | |
| $1,224,807 | Traffic Flow Improvements | Installation of Changeable Message Sign Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Installation of Changeable Message Sign |
12 | 113 | 1 | |
| $1,160,606 | Traffic Flow Improvements | Install CTMS SH 225 - SH 134 to Strang Rd. Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS |
2 | QA | 1 | QA |
| $1,030,426 | Traffic Flow Improvements | Provide Far Turn Lanes At Beltline Road and Midway Road Traffic Flow Project - Traffic Engineering - Turn Lanes Widen Intersection to provide lanes |
10 | 87 | 3 | |
| $1,002,714 | Traffic Flow Improvements | Install Video Detectors I-635 to US 75 to I-35E Traffic Flow Project - Congestion Management Systems - Implementation - Install Video Detectors |
QA | |||
| $970,290 | Traffic Flow Improvements | Traffic Signal Upgrades Citywide Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $846,713 | Traffic Flow Improvements | Traffic Signal Improvements/Grand Prairie Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | |||
| $835,416 | Traffic Flow Improvements | Intergrate Alternative Detection Communication Traffic Flow Project - Congestion Management Systems - Establishment - Alternative Detection Communication |
QA | |||
| $800,000 | Traffic Flow Improvements | Intersection and Traffic Signal Improvements 572 Locations in Dallas Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1,192 | 10,243 | 2,221 | |
| $755,390 | Traffic Flow Improvements | Intersection Improvements Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
3 | 25 | 4 | |
| $748,495 | Traffic Flow Improvements | Install Traffic Mgmt. System NASA 1 to E.Space Center Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Mgmt. System .38 miles E FM270 to .63 miles E Space Center |
1 | QA | 1 | QA |
| $745,614 | Traffic Flow Improvements | Provide Far Turn Lanes Belt Line Road and Midway Road Traffic Flow Project - Traffic Engineering - Turn Lanes |
QA | |||
| $730,913 | Traffic Flow Improvements | Install Changeable Message Sign I-10 Meadow St. to Spur 330 Traffic Flow Project - Congestion Management Systems - Implementation - Changeable Message Sign |
8 | QA | 2 | QA |
| $686,375 | Traffic Flow Improvements | Reconstruct 2Lns w/cont. Left Turn Lane FR SP 380 to Neches Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $604,272 | Traffic Flow Improvements | Traffic Signal Improvements Associated with ITS Program/Pleasant Grove Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | |||
| $581,433 | Traffic Flow Improvements | Traffic Signal Improvements/Duncanville and Lancaster Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
35 | 312 | 32 | |
| $486,037 | Traffic Flow Improvements | Traffic Signal Upgrade Various Intersections in Grand Prairie Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
24 | 212 | 6 | |
| $457,150 | Traffic Flow Improvements | Traffic Signals Various Intersections Grand Prairie Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
10 | 87 | 9 | |
| $413,064 | Traffic Flow Improvements | Intersection Improvements SP 474 (Rufe Snow Road) Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 8 | 1 | |
| $400,000 | Traffic Flow Improvements | Intersection Improvements IH 820 at Beach St. N Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 11 | 2 | |
| $359,912 | Traffic Flow Improvements | Signal Improvements in Grand Prairie for various intersections Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $348,000 | Traffic Flow Improvements | System Signal Interconnect Airway Blvd. from Edgemere to Airport Rd. Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
2 | 13 | 1 | |
| $339,197 | Traffic Flow Improvements | Signal System Interconnection Project Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 26 | 1 | |
| $324,960 | Traffic Flow Improvements | Intersection Improvements Keller Springs at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
2 | 18 | 4 | |
| $324,000 | Traffic Flow Improvements | Intersection Improvements SH 161 to Spur 348 Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
17 | 148 | 4 | |
| $300,000 | Traffic Flow Improvements | Add U Turns IH-610 @ Ella Blvd. N. Durham and N.Shepherd Traffic Flow Project - Traffic Engineering - Add U-Turns - Other |
1 | QA | 1 | QA |
| $300,000 | Traffic Flow Improvements | Intersection Improvement from 114 to SH 26 Traffic Flow Project - Traffic Engineering - Intersection improvements - Other |
6 | 55 | 10 | |
| $285,536 | Traffic Flow Improvements | Intersection Improvements Midway Road at Spring Valley Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
4 | 32 | 7 | |
| $267,398 | Traffic Flow Improvements | Traffic Signal Upgrade LP12 @ 4 Intersections Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $246,428 | Traffic Flow Improvements | Intersection Improvements SH 121 on Central Bedford Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 12 | 2 | |
| $216,000 | Traffic Flow Improvements | Intersection Improvements IH-820 @ Randoll Mill RD Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition |
1 | 4 | 1 | |
| $200,000 | Traffic Flow Improvements | Intersection Improvements Camp Bowie/7th Street@University Drive Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
2 | 16 | 3 | |
| $190,848 | Traffic Flow Improvements | Intersection Improvements SH356 at Mockingbird Ln. Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 10 | 2 | |
| $181,711 | Traffic Flow Improvements | US 54 IH10 Traffic Mgmt. System Signal Communication Link Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
2 | 17 | 1 | |
| $181,114 | Traffic Flow Improvements | Intersection Improvements Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
6 | 55 | 10 | |
| $151,513 | Traffic Flow Improvements | Arterial Traffic Mgmt. System SH 6 from FM 2004 to FM 519 Traffic Flow Project - Congestion Management Systems - Establishment - Arterial Traffic Mgmt. System |
1 | QA | 8 | QA |
| $150,000 | Traffic Flow Improvements | Install CTMS IH-610 from Old Katy Road to S. Braeswood Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS |
55 | QA | 14 | QA |
| $150,000 | Traffic Flow Improvements | PE for Incident Detection and Response Various Locations Traffic Flow Project - Congestion Management Systems - Implementation - Intelligent Transportation System |
QA | |||
| $150,000 | Traffic Flow Improvements | PE for Incident Detection and Response various locations Traffic Flow Project - Congestion Management Systems - Implementation - Intelligent Transportation System |
QA | |||
| $130,000 | Traffic Flow Improvements | Computerized Mgmt. System IH-10 from SH6 to Fort Bend County Line Traffic Flow Project - Congestion Management Systems - Establishment - Computerized Mgmt. System |
23 | QA | 6 | QA |
| $125,135 | Traffic Flow Improvements | Intersection Improvements Cockrell Hill Road @ Camp Wisdom Road Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition & Relocation |
2 | 16 | 3 | |
| $119,632 | Traffic Flow Improvements | Intersection Improvements Midway at Sojourn Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition & Relocation |
1 | 9 | 2 | |
| $106,000 | Traffic Flow Improvements | Signalization on Williams Trace Blvd. @ US 59 to SH 6 Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | QA | 1 | QA |
| $97,467 | Traffic Flow Improvements | Construct Right Turn Lane on FM 1764 @ SH 146 Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | QA | 1 | QA |
| $91,088 | Traffic Flow Improvements | Intersection Improvements FM 1382 @ Duncanville Road Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 7 | 1 | |
| $90,000 | Traffic Flow Improvements | Traffic Signal Improvements US77 @SycamoreMcKinneyOakHickory Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
3 | 24 | 1 | |
| $88,589 | Traffic Flow Improvements | Intersection Improvements on Central Dr. @ Bedford Rd. Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 9 | 2 | |
| $75,708 | Traffic Flow Improvements | Intersection Improvements 8th at Pennsylvania Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 7 | 2 | |
| $68,928 | Traffic Flow Improvements | Signal Synchronization on Woodlands Pkwy @ I-45 to Cochrans Xing Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | QA | 1 | QA |
| $68,800 | Traffic Flow Improvements | Signalization On Williams Trace BLVD @ SH 6 to Austin Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | QA | 1 | QA |
| $68,732 | Traffic Flow Improvements | Traffic Signal Improvements Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 8 | 1 | |
| $63,739 | Traffic Flow Improvements | SH 289 @ MaCallum Blvd Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 10 | 1 | |
| $60,550 | Traffic Flow Improvements | Intersection Improvements Grand at Oakland Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition and relocation |
2 | 17 | 4 | |
| $53,440 | Traffic Flow Improvements | Signal Synchronization on Research Road @ I-45 to Kuyendahl Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | QA | 1 | QA |
| $52,000 | Traffic Flow Improvements | Traffic Signal Upgrades In Pleasant Grove Area in Dallas Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $46,832 | Traffic Flow Improvements | Intersection Improvements McEwen at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
3 | 22 | 5 | |
| $41,826 | Traffic Flow Improvements | Intersection Improvements Central Dr at L.Don Dodson Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
2 | 17 | 3 | |
| $35,872 | Traffic Flow Improvements | Intersection Improvements Beltway at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
3 | 22 | 5 | |
| $31,407 | Traffic Flow Improvements | Intersection Improvements 7th Street/Commerce at Calhoun Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 7 | 2 | |
| $29,812 | Traffic Flow Improvements | Installation of Changeable Message Sign Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Installation of Changeable Message Signs |
1 | 3 | 1 | |
| $27,012 | Traffic Flow Improvements | Intersection Improvements Live Oak at Washington Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $24,486 | Traffic Flow Improvements | ATMS-Traffic Signal Improvement Phase/Lewisville Regional Wide Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $22,970 | Traffic Flow Improvements | Traffic Signal Improvements Inwood at Walnut Hill Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $22,586 | Traffic Flow Improvements | Intersection Improvements Inwood at Spring Valley Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Utilities |
2 | 16 | 3 | |
| $21,248 | Traffic Flow Improvements | Intersection Improvements Midway at Proton Traffic Flow Project - Traffic Engineering - Intersection Improvements Midway at Proton - Other Acquisition, Relocation |
2 | 21 | 5 | |
| $20,232 | Traffic Flow Improvements | Intersection Improvements Fitzhugh at Live Oak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $17,400 | Traffic Flow Improvements | Intersection Improvements SP 580 @ Las Vegas Trail Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 11 | 2 | |
| $17,232 | Traffic Flow Improvements | Intersection Improvements Live Oak at Peak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $16,000 | Traffic Flow Improvements | Intersection Improvements Live Oak at Munger Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $15,218 | Traffic Flow Improvements | Intersection Improvements Inwood at Park Lane Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition & Relocation |
2 | 17 | 4 | |
| $15,000 | Traffic Flow Improvements | Intersection Improvements Live Oak at Texas Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
3 | 23 | 4 | |
| $13,756 | Traffic Flow Improvements | Intersection Improvements Inwood at Walnut Hill Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $13,370 | Traffic Flow Improvements | Intersection Improvements Rufe Snow Dr. at Glenview Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 6 | 1 | |
| $12,800 | Traffic Flow Improvements | Eight Ave/Pennsylvania Intersection Improvements Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 10 | 2 | |
| $8,162 | Traffic Flow Improvements | ATMS-Traffic Signal Improvement Phase/Lewisville Regional Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $7,952 | Traffic Flow Improvements | Intersection Improvements Lindberg at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
2 | 21 | 5 | |
| $7,502 | Traffic Flow Improvements | Intersection improvment 7th Street/Commerce Street @ Calhoun Street in Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 5 | 1 | |
| $4,028 | Traffic Flow Improvements | Intersection Improvements Hall at Live Oak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition and Relocation |
2 | 17 | 4 | |
| $3,380 | Traffic Flow Improvements | Intersection Improvements Haskell at Live Oak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $200,000 | Transit | Alternative Fuel Vehicle Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
1 | 2 | 1 | |
| $1,802,220 | STP/CMAQ | FY 2000 Alternative Fleet Fueled Vehicle Program This is an STP/CMAQ Project FY 2000 Alternative Fleet Fueled Vehicle Program |
QA | |||
| $969,534 | STP/CMAQ | Construction of Non-Freeway Facility/Skillman St to W. of Audelia This is an STP/CMAQ Project Construction of non-freeway facility |
3 | 26 | 4 | |
| $345,807 | STP/CMAQ | MAJOR Investment Study This is an STP/CMAQ Project Major Investment Study (various locations) |
QA | |||
| $240,000 | STP/CMAQ | Vehicle Detector Replacement Program This is an STP/CMAQ Project Vehicle Detector Replacement Program |
4 | 33 | 1 | |
| $41,826 | STP/CMAQ | Row Acquisition & Utilities This is an STP/CMAQ Project ROW Acquisition & Utilities |
QA | |||
| $24,000 | STP/CMAQ | Vehicle Detector Repl. Program This is an STP/CMAQ Project Vehicle Detector Repl. Program |
4 | 33 | 1 | |
| $16,000 | STP/CMAQ | AQUIS Utility & Relocation Intersection of 27th street & Helena Ave. This is an STP/CMAQ Project AQUIS. Utility and Relocation |
QA | |||
| $(4,645,314) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % | |
|---|---|---|---|
| Nationwide Totals | $1,652,593,968 | $1,757,819,034 | 106 % |
* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year