STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Illinois |
36300 |
$57,062,697 |
$18,626,872 |
32.6% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $457,000 |
Ped/Bike |
205th over I-57 in Matteson (Pedway) |
Not Submitted |
| $1,012,000 |
Ped/Bike |
Conrail Bike Path |
|
|
|
|
| $480,000 |
Ped/Bike |
Chicago, City/ County Pedway |
|
|
|
|
| $80,000 |
Ped/Bike |
Chicago, Downtown Pedway Signage |
7 |
|
|
|
| $36,326 |
Ped/Bike |
Lake Co. Fairgrounds Bike Path |
Not Submitted |
| $212,360 |
Ped/Bike |
Frankfort - Pfeiffer Rd Bike Path |
|
|
|
|
| $18,480 |
Ped/Bike |
Frankfort - Pfeiffer Rd Bike Path R.O.W. |
|
|
|
|
| $44,480 |
Ped/Bike |
Park Forest - Sidewalks to the CBD |
Not Submitted |
| $437,061 |
Ped/Bike |
DuPage - Salt creek greenway bikepath |
87 |
|
|
|
| $7,142 |
Ped/Bike |
Grayslake - Bikeway Ziegler to Oriole, PE II |
0 |
|
|
|
| $28,192 |
Ped/Bike |
Grayslake - Bikeway from Ziegler to Oriole |
|
|
|
|
| $15,980 |
Ped/Bike |
Oak Forest - Pedway along 151st, engineering |
1 |
|
|
|
| $91,000 |
Ped/Bike |
Oak Forest - Pedway along 151st, construction |
|
|
|
|
| $27,987 |
Ped/Bike |
Lakefront Bikeway improvements - PE I |
1 |
|
|
|
| $69,580 |
Ped/Bike |
Lakefront Bikeway improvements - PE II |
|
|
|
|
| $103,545 |
Ped/Bike |
Chicago, Bike Racks and Lockers |
3 |
|
|
|
| $52,000 |
Ped/Bike |
Clarendon Hills - sidewalks in various locations |
0 |
|
|
|
| $146,630 |
Ped/Bike |
Various Citywide bikelane stripping |
P |
| $42,165 |
Ped/Bike |
Sidewalk connections in Matteson - const. |
|
|
|
|
| $7,905 |
Ped/Bike |
Grayslake - Ziegler to Oriole, Bikeway |
|
|
|
|
| $27,562 |
Ped/Bike |
Elgin - US 20, Gertrude Bikeway, engineering |
23 |
|
|
|
| $133,990 |
Ped/Bike |
Elgin - US 20, Gertrude Bikeway, construction |
|
|
|
|
| $481 |
Traffic Flow |
Signal Modernization on IL 64 at Oak Park to Ridgeland |
Previously Reported |
| $75,000 |
Traffic Flow |
Signal Interconnect - IL 59, Diehl to Aurora Rd. |
|
|
|
|
| $139,829 |
Traffic Flow |
Signal Interconnect - Rolling Meadows, Wilke to Weber |
17 |
|
|
|
| $4,400 |
Traffic Flow |
Intersection Imp. - Richton Park, Cicero @ Sauk Trail Rd. |
0 |
|
|
|
| $82,212 |
Traffic Flow |
Signal Interconnect - IL 131, Il 176 to Crystal Lake Rd. |
2 |
|
|
|
| $162,015 |
Traffic Flow |
Signal Interconnect - IL 171 Archer Av., 59th to Roberts Rd. |
3 |
|
|
|
| $12,000 |
Traffic Flow |
Intersection Imp. IL 47 @ Kreutzer Rd. |
0 |
|
|
|
| $297,955 |
Traffic Flow |
Signal Interconnect - 1st Av., I-290 to Chicago Av. |
9 |
|
|
|
| $317,022 |
Traffic Flow |
Signal Interconnect - US 20, Greenbrook to Rosedale |
10 |
|
|
|
| $301,813 |
Traffic Flow |
Signal Interconnect - IL 131, 14th to Cresent |
6 |
|
|
|
| $237,761 |
Traffic Flow |
Signal Interconnect - US 6, 71st to Laramie |
7 |
|
|
|
| $143,293 |
Traffic Flow |
Signal Interconnect - IL 47, IL 120 to State St. |
2 |
|
|
|
| $86,683 |
Traffic Flow |
Signal Interconnect - 79th @ Kedzie |
1 |
|
|
|
| $404,700 |
Traffic Flow |
Signal Interconnect - IL 31, Meadow to Pistakee Lake Rd. |
|
|
|
|
| $13,073 |
Traffic Flow |
Signal Interconnect - Cumberland Av. from Bryn Mawr Av. To Forest Preserve Dr. |
Previously Reported |
| $6,304 |
Traffic Flow |
Signal Modernization - Dempster St. from Keeler to Crawford Av. |
Previously Reported |
| $20 |
Traffic Flow |
US 41 - Signal Interconnect from Chicago Av. To Waldon Av. |
Previously Reported |
| $46,839 |
Traffic Flow |
Signal Interconnect - Main St. from 216 to 218 |
3 |
|
|
|
| $437,061 |
Traffic Flow |
Signal Interconnect - Governor's Hwy from Lawrence to 216th |
5 |
|
|
|
| $128,210 |
Traffic Flow |
Signal Interconnect - Rollins Rd. from IL 83 to Lotus Dr. |
35 |
|
|
|
| $30,757 |
Traffic Flow |
Signal Interconnect - 183rd, Governors Hwy to Halsted - engineering |
5 |
|
|
|
| $100,000 |
Traffic Flow |
Signal Interconnect - 183rd, Governors Hwy to Halsted - construction |
|
|
|
|
| $84,456 |
Traffic Flow |
Signal Interconnect - DesPlaines River Rd., engineering |
10 |
|
|
|
| $467,680 |
Traffic Flow |
Signal Interconnect - DesPlaines River Rd., construction |
|
|
|
|
| $25,506 |
Traffic Flow |
Signal Interconnect - Villa Park, St. Charles Rd. from Westmore to Villa Av. engineering |
2 |
|
|
|
| $278,675 |
Traffic Flow |
Signal Interconnect - Villa Park, St. Charles Rd. from Westmore to Villa Av. construction |
|
|
|
|
| $193,144 |
Traffic Flow |
Signal Interconnect - Near North PE II |
30 |
|
|
|
| $31,476 |
Traffic Flow |
Signal Interconnect - Hollywood, LSD to Ridge/ Peterson, engineering |
7 |
|
|
|
| $385,600 |
Traffic Flow |
Signal Interconnect - Hollywood, LSD to Ridge/ Peterson, construction |
|
|
|
|
| $31,120 |
Traffic Flow |
Signal Interconnect - Congress Parkway from Wells to Michigan Av. - engineering |
48 |
|
|
|
| $374,180 |
Traffic Flow |
Signal Interconnect - Congress Parkway from Wells to Michigan Av. - construction |
|
|
|
|
| $465,960 |
Traffic Flow |
Intersection improvement Belmont/ Sheridan |
22 |
|
|
|
| $1,221,531 |
Traffic Flow |
Signals, widen & resurfaces Virginia Rd. |
21 |
|
|
|
| $1,029,930 |
Traffic Flow |
Signals & channelization Washington St. |
69 |
|
|
|
| $192,738 |
Traffic Flow |
Signal Interconnect - IL 19 from Maple to Roselle |
2 |
|
|
|
| $554,716 |
Traffic Flow |
Signal Interconnect - Arlington Heights Rd. from Devon to Higgins |
7 |
|
|
|
| $433,360 |
Traffic Flow |
Signal Interconnect - Western Av. From 59th to 87th |
26 |
|
|
|
| $316,258 |
Traffic Flow |
Signal Interconnect - Kedzie from I-55 to 47th |
5 |
|
|
|
| $1,404,822 |
Traffic Flow |
Bottleneck elimination - Busch/ Deerfield Parkway |
6 |
|
|
|
| $2,003,200 |
Transit |
Transit commuter Parking - Various Locations |
47 |
|
|
|
| $80,000 |
Transit |
CTA - Ravenswood Line/ Montrose Station |
3 |
|
|
|
| $160,000 |
Transit |
CTA - 93rd St. Station |
|
|
|
|
| $145,585 |
Transit |
Berwyn station commuter parking, construction |
2 |
|
|
|
| $6,009 |
Transit |
Berwyn station commuter parking, engineering |
|
|
|
|
| $396,087 |
Transit |
Villa Park station commuter parking, construction |
7 |
|
|
|
| $11,527 |
Transit |
Villa Park station commuter parking, engineering |
|
|
|
|
| $34,000 |
Shared Ride |
TMA of Lake-Cook, Market and Operate Shuttle Service |
Previously Reported |
| $285,000 |
Shared Ride |
E. Hazel Crest - 174th/ Governor's Highway Parking Lot Redesign and Addition - construction |
7 |
|
|
|
| $15,163 |
Shared Ride |
E. Hazel Crest - 174th/ Governor's Highway Parking Lot Redesign and Addition - PE II |
|
|
|
|
| $950,000 |
Ped/ Bike |
St. Clair County - Metro Bike Link & Trans Program |
1 |
|
|
|
| $474,400 |
Shared Ride |
Park and Ride at Transit, City of O'Fallon |
1 |
|
|
|
| $15,936 |
Transit |
Madison County Commuter Information System |
Previously Reported |
STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Indiana |
36192 |
$11,388,315 |
$9,186,037 |
80.7% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $1,040,000 |
Traffic Flow |
Signal coordination at 50 Downtown Intersections |
548 |
4470 |
167 |
|
| $1,347,249 |
Traffic Flow |
18 Intersections on W. 10th Street |
74 |
691 |
5 |
|
| $320,000 |
Demand Mgmt |
Ozone Public Awareness |
57 |
319 |
63 |
|
| $100,000 |
Demand Mgmt |
Ozone Alert Reduced Fare Program |
19 |
106 |
21 |
|
| $648,612 |
Traffic Flow |
Traffic Signal Interconnect on Calumet and Ridge Roads in Munster |
15 |
211 |
1 |
|
| $164,410 |
Traffic Flow |
7 Signals in Merrillville |
13 |
36 |
0 |
|
| $200,000 |
Demand Mgmt |
Air Quality Public Education |
61 |
424 |
135 |
|
| $3,000,000 |
Transit |
NICTD Rail Cars |
2 |
18 |
5 |
|
| $600,092 |
Traffic Flow |
Borman ATMS (Phase II) |
11 |
107 |
26 |
|
| $120,000 |
Demand Mgmt |
Ozone Awareness |
20 |
112 |
22 |
|
| $160,000 |
Other |
CNG Conversion of Municipal Fleet |
9 |
20 |
7 |
|
| $66,674 |
Other |
Planning Activities |
0 |
1 |
0 |
|
| $720,000 |
Ped/ Bike |
Path from Goshen College to Waterford School |
8 |
6 |
1 |
|
| $214,000 |
Ped/ Bike |
St. Joseph of the Miamis Trail, (Phase I) |
0 |
2 |
0 |
|
| $215,000 |
Ped/ Bike |
St. Joseph of the Miamis Trail, (Phase II) |
0 |
2 |
0 |
|
| $200,000 |
Other |
Clean Air Public Ed. And Awareness Campaign |
34 |
232 |
44 |
|
| $70,000 |
Transit |
FreeFare by Ozone |
2 |
13 |
3 |
|
STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Iowa |
36203 |
$5,701,507 |
$8,544,356 |
149.9% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $8,544,356 |
STP/CMAQ |
RCB Culverts, Erosion Control, Erosion Control, Signing, Fencing, Fencing, Bridge, MTA Central IA Rideshare, MTA Altoona Express, Paving/Culverts, Paving, Bridges and Approaches, Erosion Control |
Not Submitted |
STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Kansas |
36201 |
$5,701,507 |
$1,410,429 |
24.7% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $13,500 |
STP/CMAQ |
I-35 NB Ramp to 75th Street |
|
|
|
|
| $43,013 |
STP/CMAQ |
Motorist Assistance Program |
|
|
|
|
| ($34,144.00) |
STP/CMAQ |
Int. 119th & US-169 |
|
|
|
|
| ($16,136.68) |
STP/CMAQ |
Int. 67th St. & Nall Ave. |
|
|
|
|
| $67,000 |
STP/CMAQ |
MARC Rideshare Program |
|
|
|
|
| $50,000 |
STP/CMAQ |
MARC Rideshare Program |
|
|
|
|
| $1,400,000.00 |
STP/CMAQ |
Mission Rd: 103rd to I-435 S R/W |
|
|
|
|
| $126,400 |
STP/CMAQ |
Int. of K-7 and Spruce Street |
|
|
|
|
| $63,439 |
STP/CMAQ |
Int. Shawnee Mission and Woodland Rd. |
|
|
|
|
| $182,400 |
STP/CMAQ |
Shawnee Mission Parkway and Monticello |
|
|
|
|
| ($510,067.63) |
STP/CMAQ |
Seneca: Pawnee to Kellogg |
|
|
|
|
| $25,025.63 |
STP/CMAQ |
31st St. S. over KTA I-35 |
|
|
|
|
STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Kentucky |
36189 |
$8,572,225 |
$7,569,020 |
88.3% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $33,431 |
Shared Ride |
Construct park and ride lot at US 127 |
4 |
22 |
4 |
|
| $503,597 |
Demand Mgmt |
ARTIMIS - Interstate Traffic Management Program |
36 |
279 |
|
|
| $45,390 |
Traffic Flow |
Left turn lane on Dixie Highway at Sleepy Hollow Road |
6 |
61 |
1 |
|
| $7,000 |
Demand Mgmt |
ARTIMIS - administration by OKI |
36 |
279 |
|
|
| $91,716 |
Traffic Flow |
Upgrade of traffic signal system: 4 locations in Florence |
52 |
|
16 |
|
| $428,114 |
Demand Mgmt |
ARTIMIS - Interstate Traffic Management Program |
36 |
279 |
|
|
| $1,900,000 |
Demand Mgmt |
ARTIMIS - Interstate Traffic Management Prog: operations |
36 |
279 |
|
|
| $40,000 |
Demand Mgmt |
Beat the jam - PR program for the ARTIMIS Project |
|
|
|
|
| $176,000 |
Demand Mgmt |
ARTIMIS - avi devises for this and TRIMARC in Louisville |
36 |
279 |
|
|
| ($50,159) |
|
CMAQ project closeouts, cost adjustments |
|
|
|
|
| $142,914 |
Traffic Flow |
Right turn lane on KY 907 at US 31W |
3 |
|
|
|
| $240,000 |
Other |
Area ozone prevention program - 2 years worth |
|
|
|
|
| $1,000,000 |
Demand Mgmt |
TRIMARC - Interstate Traffic Management Program |
38 |
274 |
|
|
| $1,000,000 |
Transit |
TARC new, structures transit service |
|
|
|
|
| $404,197 |
Traffic Flow |
Siganl systems on KY 61 (Preston Hwy) and KY 1065 (Outer Loop) |
42 |
|
13 |
|
| ($2,899) |
|
CMAQ project closeouts, cost adjustments |
|
|
|
|
| $101,854 |
Traffic Flow |
Upgrade signal systems on US 234 and US 60 |
21 |
|
6 |
|
| $1,507,865 |
Traffic Flow |
KY 168/ 29th Street Intersection Realignment |
1 |
6 |
0 |
|
STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Louisiana |
36243 |
$5,701,507 |
$6,263,296 |
109.9% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $477,000 |
Transit |
FTA Transfer (7 Bus Replacement) |
|
|
|
|
| $167,408 |
Traffic Flow |
East Baton Rouge Parish (Intersection Improvement) |
4 |
|
1 |
|
| $200,000 |
Shared Ride |
East Baton Rouge Parish Transportation Control Measures |
959 |
|
1780 |
|
| $180,720 |
Traffic Flow |
Calcaseiu Parish (Intersection Improvement) |
0 |
|
0 |
|
| $1,978,208 |
Traffic Flow |
Calcasieu (Motorist Assistance Patrol) |
2 |
|
1 |
|
| $163,120 |
Traffic Flow |
Traffic Signal System (Authorized FY95) |
Previously Reported |
| $200,880 |
Traffic Flow |
Traffic Signal System (Authorized FY95) |
Previously Reported |
| $19,616 |
Traffic Flow |
Incident Management Program (Auth. FY92) |
Previously Reported |
| $2,240 |
Other |
CNG Vehicle Conversion (Auth. FY95) |
Previously Reported |
| $1,536,746 |
Traffic Flow |
B. R. Motorist Assist. Patrol (Auth. FY96) |
Previously Reported |
| $697,616 |
Traffic Flow |
Intersection Improvement (Auth. FY97) |
Previously Reported |
| $269,808 |
Traffic Flow |
Intersection Improvement (Auth. FY97) |
Previously Reported |
| $198,000 |
Traffic Flow |
Intersection Improvement (Auth. FY97) |
Previously Reported |
| $84,208 |
Traffic Flow |
Intersection Improvement (Auth. FY97) |
Previously Reported |
| $87,726 |
Traffic Flow |
IVHS (Funds added to existing project (FY98) |
Previously Reported |
STATE |
REPORT
SUBMIT |
$ AMOUNT
APPORTION |
$ AMOUNT
OBLIGATED |
OBLIG % |
| Maine |
36236 |
$5,701,507 |
$4,439,726 |
77.9% |
$ PROJECT
AMOUNT |
PROJECT
TYPE |
PROJECT
DESCRIPTION |
VOC**
(KG/DAY) |
CO**
(KG/DAY) |
NOX**
(KG/DAY) |
PM-10**
(KG/DAY) |
| $288,500 |
Demand Mgmt |
This is a Transportation Demand Management Program to oversee the implementation of rideshare, vanpool, transit, and pedestrian/ bicycle opportunities in the Capitol Area Region |
162 |
|
261 |
|
| $678,000 |
Demand Mgmt |
Mount Desert Island League of Towns - TDM Measures (Projects elements include: purchase eight-20 passenger buses to provide seasonal transportation, build a loading area and queuing area for buses serving cruise ships, and provide linkage between bicycle |
43 |
|
31 |
|
| $276,966 |
Ped/Bike |
Lewiston, Central Ave/ Campus Bicycle Loop (This project establishes a bicycle route along Central Ave, Hogan Rd. and College Ave.) |
0 |
|
0 |
|
| $12,404.38 |
Ped/Bike |
Brunswick Bicycle/ Pedestrian Facility (This project constructs a bicycle and pedestrian corridor in Brunswick that will include bike lane markings, signage, and bike racks as needed.) |
16 |
|
28 |
|
| $16,056 |
Ped/Bike |
Standish Bicycle/ Pedestrian Facility (Construction of a pedestrian/ bicycle facility along Whiles Bridge Road |
6 |
|
6 |
|
| $80,280 |
Other |
GPCOG, Educational Outreach Program (This program will provide Cumberland County school children with both theoretical information and practical experience with alternative modes of transportation, including mass transit , bicycling, walking, and rideshar |
34 |
|
55 |
|
| $48,000 |
Other |
Engineering for Locally Administered CMAQ Projects |
Not Submitted |
| $24,084 |
Shared Ride |
Bowdoinham - Park and Ride Improvements (Install lighting as a park and ride improvement, as part of pin 6935.00) |
0 |
|
1 |
|
| $221,500 |
Shared Ride |
GPCOG, 5th and 6th Year Rideshare (This is the fifth and sixth year of an expanded rideshare program which includes maintaining an applicant database, a toll free number, highway signage, commercial advertising, etc.) |
8 |
|
14 |
|
| $12,000 |
Shared Ride |
Bar Harbor - Park and Ride Expansion (This park and ride lot is an extension of the Hancock Point Lot. It will serve commuters travelling to the ferry at Hancock Point or commuters travelling to Ellsworth.) |
6 |
|
6 |
|
| $24,886.80 |
Shared Ride |
Unity Park and Ride (A small downtown parking lot will be constructed to use as a park and ride lot. This will provide a safe and convenient place for commuters to park who car pool) |
0 |
|
1 |
|
| $101,152.80 |
Traffic Flow |
Portland Signalized Intersection Improvements |
6 |
|
4 |
|
| $34,592.43 |
Traffic Flow |
Gardiner/ Randolph Signal Improvements |
3 |
|
1 |
|
| $72,054.23 |
Traffic Flow |
Gray Signal Project |
3 |
|
1 |
|
| $23,326.58 |
Traffic Flow |
Lewiston - Main St. Signalized Intersection Improvements |
1 |
|
0 |
|
| $29,221.92 |
Traffic Flow |
Lewiston-several locations along: Lisbon St., East Ave., and Sabattus St. |
3 |
|
1 |
|
| $32,927.05 |
Traffic Flow |
Traffic Calming Phase I (Experimental) (This project uses CMAQ funds to implement temporary and permanent traffic calming measures along Stevens Avenue in Portland.) |
0 |
|
2 |
|
| $44,956.80 |
Traffic Flow |
Ogunquit Traffic and Parking Plan (This project is designed to specifically reduce congestion during the peak summer tourist season. Elements of this project include: new and improved parking areas, bike racks, sidewalk improvements, and conversion of pol |
10 |
|
7 |
|
| $44,475.12 |
Traffic Flow |
Biddeford - Access Management Project (An access management project to improve traffic safety and reduce traffic congestion along the Rte 111 corridor.) |
0 |
|
0 |
|
| $78,400 |
Traffic Flow |
Portland - Morrill's Corner Improvements (This is an intersection improvement project that will improve traffic signal operation. In addition, turning lanes will be improved to reduce vehicle delay.) |
8 |
|
4 |
|
| ($500,000) |
Transit |
Portland, Amtrak Passenger Facility |
Not Submitted |
| $1,000,000 |
Transit |
Wells Transportation Center |
Not Submitted |
| $370,080 |
Transit |
Saco, Train Station Sitework (these are four of five projects necessary for the reintroduction of passenger rail service to the Portland/Boston corridor. These facilities will support the interchange of passengers between several modes of travel and Amtra |
Not Submitted |
| $213,496 |
Transit |
Wells Trolley Service (This project involves the purchase of three trolley buses in the town of Wells that will connect the new Amtrak service with the area's accomodations, restaurants, shops, and recreational opportunities. |
8 |
|
4 |
|
| $4,000 |
Transit |
MDOT - Strategic Passenger Transportation Plan (The Strategic Passenger Transportation Plan is expected to work with private transportation providers to create transportation centers and corridors that will support vacations that are not reliant on priva |
495 |
|
423 |
|
| $1,208,366.25 |
Transit |
Bath - Rockland Intermodal Passenger Facility and Bath - Rockland Bridge Rail Corridor Upgrade (CMAQ funds will be used to extend Amtrak service from Portland to Brunswick. Also, funds will be used to upgrade Rockland Branch rail line for passenger rail s |
63 |
|
4 |
|
|