STATE |
REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
| South Carolina |
|
$5,701,507 |
$1,658,770 |
29.1% |
$ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
| $1,658,770 |
STP/CMAQ |
No Report Submitted |
|
|
|
|
STATE |
REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
| South Dakota |
|
$5,701,507 |
$3,580,586 |
62.8% |
$ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
| $3,580,586 |
STP/CMAQ |
Various |
|
|
|
|
STATE |
REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
| Tennessee |
36188 |
$9,999,698 |
$3,843,046 |
38.4% |
$ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
| $131,000 |
Shared Ride |
Vanpool Project |
10 |
|
18 |
|
| $39,941 |
Shared Ride |
Park and Ride Lot, Campbell Station Road at I-40/ I-75 |
0 |
|
1 |
|
| ($17,110) |
Traffic Flow |
Intersection Improvements Sutherland Avenue at Tober Lane City of Knoxville |
6 |
|
6 |
|
| $52,332 |
Traffic Flow |
Intersection Improvements State Route 33 (Maynardville Highway) at SR-71 (Norris freeway) and SR-131 (East Emory Road) |
12 |
|
11 |
|
| $65,000 |
Traffic Flow |
Intersection Improvement State Route 62 (Oak Ridge Highway) at Harrell Road |
6 |
|
6 |
|
| ($37,041) |
Traffic Flow |
Broadway Corridor Signal System Study 19 Traffic Signals in a 3.5 mile Corridor |
|
|
|
|
| $31,153.72 |
Traffic Flow |
Signal System Implementation State Route 33 (Maynardville Highway) at Foley, Afton, Neal Dorris, etc. |
37 |
|
34 |
|
| ($100,462) |
Ped/Bike |
Sidewalk, On Pleasant Hill Road and Brooks Road |
2 |
|
3 |
|
| $15,857 |
Ped/Bike |
Sidewalk, Near Schools in Farragut |
4 |
|
5 |
|
| $55,000 |
Shared Ride |
Regional Commuter Transit Demo Program Franklin-Nashville |
1 |
|
0 |
|
| $450,000 |
Shared Ride |
Regional Ridesharing Program FY 1997-98 |
98 |
|
0 |
|
| $200,000 |
Shared Ride |
Regional Ridesharing Program FY 1998-99 |
|
|
|
|
| $10,000 |
Shared Ride |
Park-nRide lot, Liberty Lane at Franklin Road City of Franklin |
0 |
3 |
0 |
|
| $25,000 |
Shared Ride |
Park and Ride Study Update |
|
|
|
|
| ($55,000) |
Shared Ride |
Bus and Vanpool Seat Guarantee Program |
|
|
|
|
| $149,000 |
Shared Ride |
FHWA CMAQ Funds Transferred to FTA |
|
|
|
|
| $301,391 |
Traffic Flow |
Closed Circuit TV Traffic System City of Murfreesboro |
0 |
9 |
1 |
|
| ($45,369.08) |
Traffic Flow |
Intersection Study throughout Davidson County |
0 |
|
|
|
| ($5,452.64) |
Traffic Flow |
Intersection Improvement Old Shackle Island Road between New Shackle Road and Wessington Place City of Hendersonville |
55 |
|
8 |
|
| $47,232.89 |
Traffic Flow |
Intersection Improvement State Route 6 (Gallatin Pike) and Callendar Lane City of Hendersonville |
4 |
32 |
1 |
|
| $40,000 |
Traffic Flow |
Intersection Improvement State Route 26 (Sparta Highway) at Maddox-Simpson Parkway City of Lebanon |
1 |
14 |
0 |
|
| ($108,225.03) |
Traffic Flow |
Intersection Improvement SR-26 (US 70 Bypass) at Babb Drive City of Lebanon |
1 |
|
0 |
|
| $99,800 |
Traffic Flow |
Intrersection Improvement State Route 45 (Old Hickory Boulevard) at Graycroft Road Nashville and Davidson County |
0 |
3 |
0 |
|
| $160,000 |
Traffic Flow |
Intersection Improvement Andrew Jackson Parkway at Chandler Road and Old Lebanon Dirt Road Nashville and Davidson County |
1 |
7 |
0 |
|
| $121,600 |
Traffic Flow |
Intersection improvement State Route 6 (Gallatin Pike) at State Route 45 (Old Hickory Boulevard) Nashville and Davidson County |
7 |
80 |
1 |
|
| $162,500 |
Traffic Flow |
Intersection Improvement Tusculum Road at State Route 11 (Nolensville Road) Nashville and Davidson County |
0 |
0 |
0 |
|
| $340,150 |
Traffic Flow |
Intersection Improvement State Route 255 (Harding Place) at State Route 11 Nolensville Road Nashville and Davidson County |
15 |
255 |
5 |
|
| $14,000 |
Traffic Flow |
Intersection Improvement Woodmont Boulevard at Estes Road Nashville and Davidson County |
0 |
6 |
0 |
|
| $280,000 |
Traffic Flow |
Intersection Improvements State Route 106 (Hillsboro Road) at Woodmont Boulevard, Crestmoor Road, Glen Echo Road, ect. Nashville and Davidson County |
7 |
70 |
1 |
|
| $700,000 |
Shared Ride |
1998 Memphis Area Ridesharing Vanpool, Commuter Club, etc. |
387 |
3870 |
391 |
|
| $700,000 |
Shared Ride |
Riverside Loop Rail Extension |
3 |
25 |
3 |
|
| $12,842.13 |
Traffic Flow |
Signal System Upgrade SR-57 (Poplar Avenue) Corridor Four Locations. Germantown and Farmington |
129 |
1081 |
8 |
|
| $7,906 |
Traffic Flow |
Intersection Improvement Alturia Road at Yale Road |
1 |
7 |
0 |
|
STATE |
REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
| Texas |
36329 |
$64,379,343 |
$53,387,858 |
82.9% |
$ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
| $9,212,020 |
Traffic Flow |
CM98 (361) Construct Overpass US69 at FM3514 |
4 |
32 |
0 |
|
| $135,168 |
Traffic Flow |
CM98 (166) PE to Reconstruct to 2 Ln. w/ LF Turn LN. Main Ave. SH73 to SH87 |
2 |
16 |
|
|
| $160,000 |
Traffic Flow |
CM98 (230) Reconstruct To 2Ln. W/ const. LFTurn Ln. on Franklin, SP300 to Neches |
0 |
4 |
|
|
| $86,616 |
Traffic Flow |
CM98 (324) Purch Mat of Synchr Signs on Hous Ave and Gulfway Pt Arthur |
1 |
6 |
0 |
|
| $94,800 |
Traffic Flow |
CM98 (325) Evaluate All State Maintained Signals - Various Counties |
10 |
75 |
3 |
|
| $486,801 |
Traffic Flow |
CM97 (388) Misc. Work-TX U-Turn on US75 at Plano Pkwy |
2 |
15 |
3 |
|
| $160,000 |
Traffic Flow |
CM98 (177) Upgrade Non-Frwy Facility On SH5 from Chapparral Rd to Exchange Pkwy |
2 |
12 |
3 |
|
| $12,123 |
Traffic Flow |
CM98 (489) ROW Acqu. On N. Garland at State Street in Garland |
|
|
|
|
| $361,453 |
Traffic Flow |
CM88 (778) Constr. Of New Loc. Non-Frwy facility on Royal Ln. from Skillman St. to W. of Audelia |
0 |
1 |
0 |
|
| $888,686 |
Traffic Flow |
CM98 (917) Upgrade Traffic Signals var. loccations in City of Mesquite |
1 |
8 |
2 |
|
| $32,526 |
Traffic Flow |
CM98 (509) ROW Acqu. On N. Garland at Walnut Street in Garland |
|
|
|
|
| $324,000 |
Traffic Flow |
CM94 (104) Widen 3 in. facility to 6 ln. facility on MH1204 from SH161 to Spur 348 |
2 |
11 |
3 |
|
| $38,000 |
Traffic Flow |
CM96 (071) PE for interchange improv. Various locations on Easgel Dr. in Denton |
2 |
15 |
4 |
|
| $83,021 |
Traffic Flow |
CM98 (137) Traf. Signals on Field St at Woodall Rogers Frwy |
1 |
9 |
2 |
|
| $31,000 |
Ped/Bike |
CM98 (255) Const. Bike Parking and Storage in Dallas |
2 |
11 |
3 |
|
| $22,800 |
Ped/Bike |
CM98 (347) Const. Bikeway 5mi. Crk. Bikeway I35 to Combs Creek |
2 |
16 |
4 |
|
| $160,000 |
Traffic Flow |
CM98 (475) Inter. Dist. Comm. Motorist Info Sys US75 South of IH635 |
25 |
163 |
40 |
|
| $4,896 |
Traffic Flow |
CM98 (039) ROW Acqu. On Pleasant Run Rd. at Chattey Rd. in Desoto |
|
|
|
|
| $100,845 |
Traffic Flow |
CM98 (039) Adding Turn Lns. FM 423 and N. Colony Blvd. |
1 |
8 |
2 |
|
| $734,242 |
Ped/Bike |
CM94 (025) Const. Clr. Frk/ Bendbrk Bike Trail Southwest Blvd. To Lk. Benbrk |
1 |
7 |
2 |
|
| $75,000 |
Demand Mgmt |
CM98 (341) TDM Prog. FTW Transit Auth. FTA #TX-90-TX437 |
8 |
54 |
13 |
|
| $3,520,000 |
Traffic Flow |
CM97 (594) Traf. Surv. Sys. Building, IH20 and McCarty St. in FTW |
|
|
|
|
| $40,847 |
Traffic Flow |
CM98 (238) Traffic Signal Improvement. At Hospital Pkwy on W Pipeline Rd Euless |
|
|
|
|
| $16,000 |
Traffic Flow |
CM98 (249) Intersection Improvement. Beford at Murphy Drive in Bedford |
1 |
4 |
1 |
|
| $51,148 |
Traffic Flow |
CM98 (254) Traffic Signal US377 at Springlake Pkwy in Haltom City |
1 |
7 |
2 |
|
| $90,000 |
Demand Mgmt |
CM98 (510) TDM Mgmt. Prog. Arlington Trans. Mgmt. Association |
8 |
54 |
13 |
|
| $2,000,000 |
Transit |
CM98 (380) Railtran Rail Project #TX-90-X326-04 |
|
|
|
|
| $20,800 |
Ped/Bike |
CM98 (321 ) Bikeway Route Signs |
|
|
|
|
| $1,645,677 |
Traffic Flow |
CM97 (258) Addition of intersection improvements to exist. Widening proj. |
2 |
17 |
4 |
|
| $52,794 |
Traffic Flow |
CM97 (386) Traffic Signal FM 544 at intersection with FM 2551 in Murphy |
1 |
7 |
2 |
|
| $86,173 |
Traffic Flow |
CM98 (137) On Field St. at Woodall Rogers Frwy install NB and SB Left Turn Lanes |
|
|
|
|
| $457,150 |
Traffic Flow |
CM97 (385) Various Inter. IN Grand Prairie Traffic Signal Upgrades |
|
|
|
|
| $160,000 |
Traffic Flow |
CM98 (475) US75 S of IH635 Inter - Dist Communications |
25 |
163 |
40 |
|
| $4,896 |
Traffic Flow |
CM98 (490) ROW Acquis Pleasant Run/ Chartty Rd. to Beltline/ Main Street |
|
|
|
|
| $720,000 |
Transit |
CM98 (353) Operating and Admin Costs (TX-90-X390) City of El Paso Rubber Tire Trolley Operations |
8 |
68 |
7 |
|
| $60,000 |
Transit |
CM98 (349) Design Transit Terminal in El Paso - Westside |
0 |
1 |
0 |
|
| $400,000 |
Transit |
CM98 (350) Design Transit/ Multimodal Facility in City of El Paso |
0 |
3 |
0 |
|
| $400,000 |
Exper. Pilot |
Alternative Fuel Conversion in City of El Paso |
1 |
|
|
|
| $450,000 |
Traffic Flow |
CM98 (352) Install Bridge Traffic Counters in the City of El Paso |
1 |
8 |
0 |
|
| $2,800,000 |
Traffic Flow |
CM98 (367) Install Communication System in the City of El Paso |
1 |
9 |
2 |
|
| $316,179 |
Traffic Flow |
CM98 (412) Add Turn Lanes at Intersection FM 359 at US90A |
2 |
|
|
|
| $186,985 |
Traffic Flow |
CM98 (280) Add Shoulders and Rt. Turn Lanes SH146 at Edgewater/ LP97 |
2 |
|
|
|
| $97,467 |
Traffic Flow |
CM98 (414) Const. Right Turn Lane on FM 1764 at SH 146 |
0 |
|
|
|
| $700,000 |
Other |
CM95 (040) Alternative Fleet Fueled Vehs. Various Locations in Harris City |
238 |
|
|
|
| $2,889,661 |
Traffic Flow |
CM98 (056) Install CTMS US59 FR GR. S. Bayou to 28m N of Sanders Rd. |
37 |
|
|
|
| $160,000 |
Other |
CM98 (109) Alternative Fleet Fuel Vehs. Various Locations in Harris City |
101 |
|
|
|
| $1,840,000 |
Traffic Flow |
CM98 (329) Enhance and Expand of Comp. Sys. BLDG, Houston Transtar Center |
|
|
|
|
| $2,553,152 |
Traffic Flow |
CM98 (427) Const. HOV Lane I45 FR S of Tamina to N. of FM1488 |
4 |
|
|
|
| $480,000 |
Transit |
CM98 (436) Prov. Oper of 6 Additional Buses- RSH Fore. Various Locations in City |
16 |
|
|
|
| $1,276,000 |
Demand Mgmt |
CM97 (126) Regional Vanpool Quick Start Program. Various Counties |
88 |
|
|
|
| $2,500,000 |
Transit |
CM98 (330) Clean Air Act Transit Fare Subsidy - Various Counties |
15 |
|
|
|
| $29,600 |
Ped/Bike |
CM98 (306) Bike Racks/ Lockers and P and R Lots and TR - Various Counties |
9 |
|
|
|
| $3,500,000 |
Traffic Flow |
CM98 (307) Reg. Computerized Traffic Signal System - Various Counties |
2 |
|
|
|
| $427,000 |
Demand Mgmt |
CM98 (327) FY97 Reg. Commute Alternatives Prog - Various Counties |
82 |
|
|
|
| $320,000 |
Other |
CM98 (328) Alternative Fleet Fueled Vehicle Prg FY98 |
73 |
|
|
|
| $287,000 |
Demand Mgmt |
CM98 (331) Telecomm. Pilot Prg. FY97 - 2000 - Various Counties |
505 |
|
|
|
| $1,840,000 |
Traffic Flow |
CM98 (332) Enhance and Expand Comp. Sys, Bldg Transtar Center Phase II |
|
|
|
|
| $1,000,000 |
Demand Mgmt |
CM98 (437) Regional Alternatives Prg. FY98 Reg. Comm. Altern. |
86 |
|
|
|
| $440,000 |
Other |
CM98 (438) FY98 Clean Air Actions-Public Outreach Prg. Various Counties |
|
|
|
|
| $210,400 |
Other |
CM98 (439) Outreach Program By H-GAC FY98 Various Counties |
|
|
|
|
| $140,000 |
Other |
CM98 (440) H-GAC Invest. Study FY98 Various Counties |
553 |
|
|
|
| $221,953 |
Traffic Flow |
CM97 (563) Const. Accident Invest. Sites on IH10 from Washington Ave. to SH6 |
11 |
|
|
|
| $11,182,213 |
Traffic Flow |
Additional Obligations to Previously Authorized Projects |
|
|
|
|
| ($5,389,234) |
|
De-obligations from Previously Authorized Projects |
|
|
|
|
STATE |
REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
| Utah |
36192 |
$7,596,481 |
$2,290,022 |
30.1% |
$ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
| $214,429 |
Shared Ride |
Park and Ride Lot (6200 South at 3000 East ) Salt Lake |
4 |
43 |
5 |
|
| $13,327 |
Shared Ride |
Park and Ride Lot (6200 South at 950 East ) Salt Lake |
2 |
19 |
2 |
|
| $4,662 |
Shared Ride |
Park and Ride Lot (I-15 at 5600 South) Ogden |
17 |
180 |
26 |
|
| $1,266,108 |
Traffic Flow |
Regional Traffic Management System for the Salt Lake Area: This project evaluates traffic management needs in the Salt Lake area to reduce congestion and auto emissions by improving traffic flow |
3364 |
322 |
417 |
|
| $4,662 |
Traffic Flow |
Salt Lake County Southeast Quadrant Canyon Information System: This project will design and construct a variable message sign system for the southeast corner of Salt Lake County serving the recreational canyon areas |
19 |
2 |
0 |
|
| $175,829 |
Traffic Flow |
Ogden Traffic Signal Coordination Roy City Area: This project will identify and evaluate a coordinated signal system for traffic management needs in the Roy City area to reduce congestion and auto emissions by improving traffic flow. |
34 |
3 |
5 |
|
| $320,000 |
Demand Mgmt |
Salt Lake/Ogden Areas. Regional Traffic Demand Management for the Salt Lake Area: This project consists of rideshare maching activities, vanpool matching and van pool lease programs. |
364 |
322 |
417 |
|
| $15,144 |
Ped/Bike |
Sunnyside Ave Bike Lane Salt Lake: This project will provide for the design of a ClassII bike route near the University of Utah family housing and a large high school. The project will extend the existing route on 800 South. The project corridor is identi |
0 |
3 |
0 |
|
| $100,000 |
Traffic Flow |
Salt Lake Incident Management: This project will provide for the expansion of the existing program. The expansion is for an over-the-road incident specialist and a responsive vehicle. |
12 |
112 |
4 |
|
| $125,861 |
Other |
Utah County Remote Sensing Network. Utah County will be implementing a system of remote sensing equiptment to detect gross emitters and ultimately repair those automobiles. |
|
10224 |
|
|
| $50,000 |
Transit |
Travel Demand Management-Car pool matching: Purchase 10 Van pool vans for business in Utah County over the five year period, $100,000 per year. |
|
20 |
|
|
|