CMAQ ANNUAL REPORTS (FY 1999)

Page 1

Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals

STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Alabama 07/24/2001 $7,618,000 $10,708,344 140.6%
Alabama
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$5,381,200 I/M and Other TCMs I/M or Other TCM Project - I/M
CapitalCongestion Management Plan Implementation (Phase 2: I-65 I-459 Phase 5:I-59 Diversion Route Plan) - This is an IM or Other TCM.
76 0 14 0
$497,274 Miscellaneous Miscellaneous
Additional Obligations to Previously Authorized Projects
0 0 0 0
$100,000 Pedestrian/Bicycle Pedestrian/Bicycle
Hoover City-Wide Bicycle Pedestrian and Greenway Plan
0 0 QA 0
$132,000 Shared Ride Shared Ride
Commute Options Program (Regional TMA Dev.)
0 0 QA 0
$358,320 Traffic Flow Improvements Traffic Flow Improvements
Hoover TOPICS phase 2 (SR 150/Lorna Rd @ US 31)
11 0 2 0
$2,239,550 Traffic Flow Improvements Traffic Flow Improvements
Congestion/Incident Mangement Projects Hoover
11 0 2 0
$2,000,000 Transit Transit
FTA Transfer - Birmingham Paratransit Consortium (operations)
8 0 6 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Alaska 07/24/2001 $14,460,000 $6,144,077 42.5%
Alaska
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$462,000 Demand Management Demand Management
Statewide Highway Database Equipment Acquisition and Installation
0 0 0 QA
$159,198 Demand Management Experimental Pilot Projects
Statewide Air Quality Education Project
0 0 0 QA
$9,097 Demand Management Demand Management
FY 1998 & 1999 Unified Planning Work Program - Fairbanks Metropolitan Area Transportation Study
0 0 0 QA
$200,000 I/M and Other TCMs I/M and Other TCMs
Develop software and fully implement EPA mandated changes to the Fairbanks I/M Program (access vehicle On-Board Diagnostics Fault Codes).
0 200 0 0
$227,425 I/M and Other TCMs I/M and Other TCMs
Conduct evaluation of episodic PM10 controls through stabilization of road dust along a major arterial during elevated PM10 periods. The suitability of a number of dust control measures will be investigated as part of this project.
0 QA 0 0
$869 I/M and Other TCMs I/M and Other TCMs
Anchorage I/M Program Implementation
0 PR 0 0
$500,335 I/M and Other TCMs I/M and Other TCMs
Fairbanks BAR-97 Emissions Test Equipment Grant Program
0 200 0 0
$227,425 I/M and Other TCMs I/M and Other TCMs
Research survey and analyze connective transportation and land use alternatives as part of the development of the Anchorage Bowl Comprehensive Plan and the Long-Range Transportation Plan.
0 QA 0 0
$63,387 I/M and Other TCMs I/M and Other TCMs
State Equipment Fleet Emissions Testing Equipment
0 QA 0 0
$272,910 I/M and Other TCMs I/M and Other TCMs
Purchase street sweepers that can operate at subfreezing temperatures using liquid magnesium chloride as a wetting agent to suppress dust.
0 0 0 QA
$90,970 I/M and Other TCMs Experimental Pilot Projects
Increase early spring street sweeping activity by MOA by acquiring additional liquid deicer for subfreezing sweeping.
0 QA 0 0
$318,395 I/M and Other TCMs I/M and Other TCMs
Follow-up to winter 1998-99 research with evaluation of CO controls including oxy sensor replacement program on-board engine heat storage systems designed to reduce cold start emissions and vehicle idle reduction programs.
0 400 0 0
$90,970 I/M and Other TCMs I/M and Other TCMs
Educate the public through radio and television media about the relationship of health effects of carbon monoxide and particulate matter and what steps people may take to address their particular concerns. This will include a unique testing effort to ev
0 400 0 0
$709,567 I/M and Other TCMs Experimental Pilot Projects
Complete the I/M program quality assurance as required by federal mandate. This project will address training emissions inspection and repairs.
0 1100 0 0
$6,278 Miscellaneous Miscellaneous
Obligations to Previously Authorized Projects
0 0 0 0
$251,863 Pedestrian/Bicycle Pedestrian/Bicycle
Construct Curb Ramps for wheelchairs and bicycles on selected corridors in then downtown Fairbanks area.
0 70 0 0
$538,543 Pedestrian/Bicycle Pedestrian/Bicycle
Construct sidewalk and multi-purpose trail as part of a larger project to improve Arctic Boulevard to minor arterial standards. The road will be reconstructed as three lanes including a two-way center (left-turn lane).
0 22 0 0
$90,971 Pedestrian/Bicycle Pedestrian/Bicycle
Improve trail connection from Downtown to Midtown area along the A/C Couplet.
0 2 0 0
$272,910 Pedestrian/Bicycle Pedestrian/Bicycle
Extend the Coastal Trail approximately 12.5 miles from its existing southern terminus at Kincaid Park to the Potter Weigh Station on the Seward Highway.
0 2 0 0
$45,485 Pedestrian/Bicycle Pedestrian/Bicycle
Funds a bicycle and pedestrian commuter education program that would include a safety component.
0 2 0 0
$204,683 Traffic Flow Improvements Traffic Flow Improvements
Design improvements to NHS Intersections to reduce vehicle delay and idling times
0 15 0 0
$627,718 Traffic Flow Improvements Traffic Flow Improvements
FY 1998 & 1999 Annual Planning Work Program Tasks
0 0 0 QA
$250,000 Transit Transit
Purchase 3 additional paratransit vans for the Fairbanks North Star Borough system.
0 300 0 0
$409,365 Transit Transit
Provides free bus service from November through January to reduce auto travel and promote transit ridership.
0 376 0 0
$113,713 Transit Transit
Evaluates the feasibility of providing commuter bus and train service to reduce the number of commuter cars entering Anchorage each day.
0 QA 0 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Arizona 07/24/2001 $31,445,000 $24,425,963 77.7%
Arizona
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$308,000 Demand Management Experimental Pilot Projects
Telecomuting and Teleconferencing
QA 0 0 0
$4,546,200 Demand Management Demand Management
Trip Reduction Program 910000 Parking Management Systems 3636200
387 2867 371 406
$504,500 I/M and Other TCMs I/M and Other TCMs
Street Sweeper Demonstration 33000 Dust Stabilization Program 471500
0 0 0 QA
$(46,663) Miscellaneous Miscellaneous
Deobligations From Previously Authorized Projects
0 0 0 0
$564,648 Pedestrian/Bicycle Pedestrian/Bicycle
Pedestrian and Bicycle Projects
0 0 0 0
$829,000 Shared Ride Shared Ride
Regional Rideshare Program Capitol Rideshare Ozone Campaign
463 3430 444 486
$7,168,396 Traffic Flow Improvements Traffic Flow Improvements
Freeway Management Systems
QA 0 0 0
$2,520,202 Traffic Flow Improvements Traffic Flow Improvements
Incident management installation of video cameras ramp meters and traffic loops
0 0 QA 0
$8,031,680 Transit Transit
Purchase Transit Vehicles Regional Rail Development
QA 0 0 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Arkansas * 07/24/2001 $7,768,000 $4,327,693 55.7%
Arkansas
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$4,327,693 STP/CMAQ STP/CMAQ
Federal Aid Project
0 0 0 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
California 07/24/2001 $308,441,000 $295,927,016 95.9%
California
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$1,635,000 Demand Management Demand Management
San Francisco Bay Traveler Information System
0 0 QA 0
$442,650 Demand Management Demand Management
San Diego Fiber Optic Network
8 28 17 0
$50,000 Demand Management Demand Management
San Diego Traffic Signal Interconnect
1 2 1 0
$53,000 Demand Management Demand Management
San Diego Communication System
3 11 7 0
$40,000 Demand Management Demand Management
San Diego Design Traffic Monitoring System
2 10 5 0
$62,800 Demand Management Demand Management
Fresno Expand Freeway Service Patrol
10 9 6 0
$349,340 Demand Management Demand Management
Fresno Traffic Signal Management System
12 16 9 0
$14,695 I/M and Other TCMs I/M and Other TCMs
Kern
0 0 QA 0
$52,700 I/M and Other TCMs Experimental Pilot Projects
Riverside Golf Cart Transportation Program
0 0 QA 0
$80,743 I/M and Other TCMs I/M and Other TCMs
Riverside Chemical Stabilization
0 0 QA 0
$53,118 I/M and Other TCMs Experimental Pilot Projects
Stanislaus Purchase GIS Software and Equipment
0 0 QA 0
$2,832,232 I/M and Other TCMs I/M and Other TCMs
Riverside PM10 Control Measures
0 0 QA 0
$(8,865,488) Miscellaneous Miscellaneous
Deobligations from Previously Authorized Projects
0 0 0 0
$142,500 Pedestrian/Bicycle Pedestrian/Bicycle
Fresno Operating Assistance for Transit
0 0 1 0
$27,887 Pedestrian/Bicycle Pedestrian/Bicycle
Fresno Bicycle Path
0 0 0 0
$234,604 Pedestrian/Bicycle Pedestrian/Bicycle
Kings Bicycle Lanes
0 0 QA 0
$104,475 Pedestrian/Bicycle Pedestrian/Bicycle
Kings Ped Facilities/Sidewalks
0 0 QA 0
$100,000 Pedestrian/Bicycle Pedestrian/Bicycle
Ventura Engineering and Environmental Studies for Santa Paula/Santa Clara River Valley Bicycle/Ped Trail
0 0 QA 0
$150,000 Pedestrian/Bicycle Pedestrian/Bicycle
San Diego Bicycle Path
0 0 QA 0
$309,855 Pedestrian/Bicycle Pedestrian/Bicycle
San Diego Construct Class 1 Bicycle Path
0 0 QA 0
$3,364,000 Pedestrian/Bicycle Pedestrian/Bicycle
Riverside Pedestrian Overcrossing
0 0 QA 0
$283,296 Pedestrian/Bicycle Pedestrian/Bicycle
Ventura Constructed Bicycle Lanes
0 0 QA 0
$1,477,420 Shared Ride Shared Ride
Park and Ride Facilities Sacramento Valley
3 0 4 0
$175,000 Shared Ride Shared Ride
Ventura Guaranteed Ride Home Program
12 0 17 7
$1,667,000 Shared Ride Shared Ride
Los Angeles HOV Lanes
0 0 QA 0
$240,000 Shared Ride Shared Ride
Riverside Park and Ride Lot Rehabilitation
1 0 2 1
$300,000 Shared Ride Shared Ride
Riverside HOV Facility
0 3 0 0
$36,000 Shared Ride Shared Ride
Stanislaus SAAG Rideshare Program
0 0 QA 0
$900,000 Shared Ride Shared Ride
Orange County Wide Rideshare Services
0 0 QA 0
$17,694 Shared Ride Shared Ride
Stanislaus SAAG Rideshare Project
0 0 QA 0
$340,000 Shared Ride Shared Ride
Riverside HOV Facility
0 2 0 0
$384,000 Shared Ride Shared Ride
Riverside HOV Facility
0 1 0 0
$17,706 Traffic Flow Improvements Traffic Flow Improvements
Contra Costa Signal Upgrade
0 0 QA 0
$37,200 Traffic Flow Improvements Traffic Flow Improvements
Monterey Install Traffic Signal
0 0 QA 0
$42,214 Traffic Flow Improvements Traffic Flow Improvements
San Joaquin Valley Signal Upgrade/Intersection Improvements
2 2 1 0
$37,735 Traffic Flow Improvements Traffic Flow Improvements
Fresno Signal Upgrade/Intersection Improvements
1 2 1 0
$178,212 Traffic Flow Improvements Traffic Flow Improvements
Fresno Traffic Signal Interconnect
0 0 0 0
$251,224 Traffic Flow Improvements Traffic Flow Improvements
Riverside Traffic Signal Interconnect
8 21 10 0
$226,035 Traffic Flow Improvements Traffic Flow Improvements
Riverside Traffic Signal Interconnect
0 0 QA 0
$217,351 Traffic Flow Improvements Traffic Flow Improvements
Ventura Purchase Equipment for Smartcard Program
1 0 2 1
$140,000 Traffic Flow Improvements Traffic Flow Improvements
Kings Install Traffic Signal
0 0 QA 0
$81,005 Traffic Flow Improvements Traffic Flow Improvements
Kern Install 4 Multi-duct
0 0 QA 0
$24,788 Traffic Flow Improvements Traffic Flow Improvements
Fresno Install Traffic Signal
0 0 0 0
$27,444 Traffic Flow Improvements Traffic Flow Improvements
Fresno Install Traffic Signal
0 1 0 0
$46,920 Traffic Flow Improvements Traffic Flow Improvements
Fresno Grade Separation
0 0 0 0
$233,800 Traffic Flow Improvements Traffic Flow Improvements
Fresno Traffic Signal Interconnect
1 1 0 0
$19,500 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
1 2 2 0
$10,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Management System
0 1 1 0
$130,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Install Traffic Signal
0 2 0 0
$10,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego SANDAG Traffic Signal Interconnect
2 7 4 0
$49,500 Traffic Flow Improvements Traffic Flow Improvements
San Diego SANDAG Traffic Signal Timing
21 74 44 0
$18,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego SANDAG Traffic Signal Timing
9 31 18 0
$199,635 Traffic Flow Improvements Traffic Flow Improvements
Stanislaus SAAG Modify Intersection and Traffic Signal
0 0 QA 0
$26,559 Traffic Flow Improvements Traffic Flow Improvements
Stanislaus SAAG Install Traffic Signal
0 0 QA 0
$235,224 Traffic Flow Improvements Traffic Flow Improvements
Merced MCAG Traffic Signals Crosswalks Improve Traffic Flow Improvement
7 32 3 0
$295,140 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Re-timing
6 23 12 0
$21,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
1 2 1 0
$201,159 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
4 15 7 0
$12,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Feasibility Study for Traffic Signal Phasing
0 1 1 0
$60,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Upgrade Traffic Signal
4 11 6 0
$17,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Timing and Phasing
1 7 1 0
$19,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Timing and Phasing
0 5 1 0
$23,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
1 3 2 0
$47,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
1 4 2 0
$69,350 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
5 18 9 0
$32,400 Traffic Flow Improvements Traffic Flow Improvements
San Diego Traffic Signal Interconnect
3 11 6 0
$317,000 Traffic Flow Improvements Traffic Flow Improvements
San Diego Study for Traffic Signal Interconnect
4 14 9 0
$10,600 Traffic Flow Improvements Traffic Flow Improvements
Fresno Install Traffic Signal
0 0 0 0
$111,548 Traffic Flow Improvements Traffic Flow Improvements
Fresno Bicycle Lanes
0 0 0 0
$39,994 Traffic Flow Improvements Traffic Flow Improvements
Fresno Signal Upgrade/Intersection Improvements
1 2 1 0
$117,744 Traffic Flow Improvements Traffic Flow Improvements
Contra Costa Traffic Signal Interconnect
0 0 QA 0
$442,500 Traffic Flow Improvements Traffic Flow Improvements
Contra Costa Traffic Signal Retiming
0 0 QA 0
$7,082 Traffic Flow Improvements Traffic Flow Improvements
Monterey Traffic Signal Interconnect
0 0 QA 0
$127,483 Traffic Flow Improvements Traffic Flow Improvements
Monterey Install Traffic Signal
0 0 QA 0
$599,959 Transit Transit
FTA Transfer Sacramento Valley
0 0 35 0
$35,000,000 Transit Transit
Purchase New and Re-built Rail Cars and Locomotives Los Angeles County
0 0 QA 0
$57,544 Transit Transit
Purchase One Bus Kern County
0 0 QA 0
$212,472 Transit Transit
Purchase CNG Bus Kern County
0 0 QA 0
$88,530 Transit Transit
Purchase CNG Bus Kern County
0 0 QA 0
$20,048,000 Transit Transit
Rail Replacement Subway Station Improvements San Francisco County
0 0 QA 0
$45,922,150 Transit Transit
Advanced Automatic Train Control from Daly City to Downtown Oakland
0 0 0 0
$146,074 Transit Transit
Riverside Purchase 3 CNG Vans
0 0 QA 0
$291,706 Transit Transit
Ventura Purchase New Van
0 0 0 0
$440,000 Transit Transit
Ventura Purchase Buses Bicycle Program and Operating Assistance
0 0 -7 0
$708,000 Transit Transit
Purchase 4 Buses San Bernardino County
0 0 0 0
$54,870 Transit Transit
Purchase 1 Bus San Bernardino County
0 0 0 0
$243,457 Transit Transit
Purchase 1 Bus San Bernardino County
0 0 3 0
$247,800 Transit Transit
Purchase 4 Buses San Bernardino County
0 0 0 0
$176,690 Transit Transit
Purchase 3 Buses San Bernardino County
0 0 0 0
$187,620 Transit Transit
Purchase 2 CNG Buses San Bernardino County
0 0 0 0
$88,500 Transit Transit
Purchase 2 CNG Buses San Bernardino County
0 0 QA 0
$19,100,000 Transit Transit
Acquire Revenue Vehicles Los Angeles County
24 0 109 35
$124,344,400 Transit Transit
Light Rail-Red Line Los Angeles County
568 0 644 232
$19,100,000 Transit Transit
Los Angeles Revenue Vehicle Acquisition
24 0 109 35
$137,118 Transit Transit
Kings Purchase Bus
1 0 1 0
$141,648 Transit Transit
Kings Purchase Bus
0 0 QA 0
$84,000 Transit Transit
Kings Saturday Service Expansion
0 0 0 0
$432,648 Transit Transit
Kings Lemore/Hanford Service Expansion
5 0 3 3
$57,544 Transit Transit
Kern Purchase Bus
0 0 1 0
$212,472 Transit Transit
Kern Purchase CNG Bus
0 0 1 0
$88,530 Transit Transit
Kern Purchase CNG Bus
0 0 QA 0
$2,096,000 Transit Transit
Purchase Bus San Joaquin County
2 0 8 2
$45,150 Transit Transit
Purchase 1 Dial-a-Ride Van Kern County
0 0 QA 0
$6,325,009 Transit Transit
San Diego Purchase 26 Buses
0 0 28 0
$3,060,988 Transit Transit
San Joaquin SJCOG Purchase 9 Clean Diesel Fueled Buses
2 0 8 2
$169,414 Transit Transit
Saturday Bus Service Demo/Improve Transit Service 12 Busses
0 0 QA 0
$45,150 Transit Transit
Kern ADA Van Replacement
0 0 QA 0
$1,745,000 Transit Transit
Spare the Air Outreach Program
0 0 QA 0
$1,275,000 Transit Transit
Monterey Purchase Replacement Buses
0 0 QA 0
$190,000 Transit Transit
Santa Barbara CNG Slow Fill Fuel Maker
0 0 QA 0
$1,275,000 Transit Transit
Monterey Purchase Replacement Buses
0 0 QA 0
$203,000 Transit Transit
Santa Barbara Operating Expenses for UCSB Express Bus
8 80 10 4
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Colorado 07/24/2001 $21,576,000 $6,705,442 31.1%
Colorado
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$143,074 Demand Management Demand Management
99 AQ Action Plan
0 0 0 0
$100,000 Demand Management Demand Management
Trans. Demand Mgmt. - (TDM)
0 0 QA 0
$158,000 I/M and Other TCMs I/M and Other TCMs
US-36 TMO: I-25 to Foothills
1 7 1 1
$178,441 I/M and Other TCMs I/M and Other TCMs
Canon City CMAQ
0 0 0 305
$417,969 I/M and Other TCMs I/M and Other TCMs
Sweeper Purchase CMAQ
0 0 0 457
$141,635 I/M and Other TCMs I/M and Other TCMs
Steamboat CMAQ
0 0 0 1218
$156,095 I/M and Other TCMs I/M and Other TCMs
'Telluride Liq Deicer 98 & 99; RWIS 98 & 99; 2000; Tank 98 & 99'
0 0 0 199
$24,114 I/M and Other TCMs I/M and Other TCMs
Mtn Village Liquid Deicer Dist
0 0 0 21
$80,378 I/M and Other TCMs I/M and Other TCMs
Mtn Village Sweeper 98-2000
0 0 0 8
$80,379 I/M and Other TCMs I/M and Other TCMs
Telluride St Sweeper 2000
0 0 0 18
$196,284 I/M and Other TCMs I/M and Other TCMs
'Pagosa Spgs Liq Deicer Tank RWIS 2000; 98; 99 & 2000'
0 0 0 604
$47,000 I/M and Other TCMs I/M and Other TCMs
Niver Creek Trail: Thornton Pky
2 15 2 1
$500,000 I/M and Other TCMs I/M and Other TCMs
San CR Greenway: Brighton Blvd
2 12 2 1
$500,000 I/M and Other TCMs I/M and Other TCMs
Big Dry Creek Trail: Wadsworth
2 12 2 1
$(18,778) Miscellaneous Miscellaneous
Health Facilities TMO (FY 96)
0 0 0 0
$(27,000) Miscellaneous Miscellaneous
Employer Assistance/Alt Mode I
0 0 0 0
$(3,999) Miscellaneous Miscellaneous
Deobligation From Previously Approved Projects
0 0 0 0
$52,000 Pedestrian/Bicycle Pedestrian/Bicycle
120th to 128th Ave: Highline
0 5 1 0
$1,367,000 Shared Ride Shared Ride
FY 1999 Ridearrangers
177 1409 205 114
$1,422,000 Shared Ride Shared Ride
FY 2000 Ridearrangers
0 0 QA 0
$362,379 Shared Ride Shared Ride
NFR Smarttrips FY 99
0 89 0 0
$50,000 Traffic Flow Improvements Traffic Flow Improvements
Improvements DRCOG Traffic Signal Program
0 5699 0 0
$134,693 Traffic Flow Improvements Traffic Flow Improvements
Improvements Mulberry & Lemay (FT Collins)
0 0 QA 0
$175,000 Traffic Flow Improvements Traffic Flow Improvements
Improvements Misc Traffic Signal Systems
0 0 QA 0
$400,000 Traffic Flow Improvements Traffic Flow Improvements
Improvements Aurora Signal System - PH 2
0 0 QA 0
$18,778 Transit Transit
S. Colo. Blvd/Cherry Cr. TMA
3 22 3 2
$50,000 Transit Transit
Downtown TMA: Access/Parking
0 0 QA 0