CMAQ ANNUAL REPORTS (FY 1999)
Page 4
Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Maryland | 07/24/2001 | $44,867,000 | $27,897,784 | 62.2% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $2,826,600 | I/M and Other TCMs | I/M and Other TCMs Expenditure for CHART Operations and equipment |
QA | 0 | QA | 0 |
| $518,200 | I/M and Other TCMs | I/M and Other TCMs CHART program in Washington/Baltimore Metropolitan areas Purchase 12 patrol vehicles |
QA | 0 | QA | 0 |
| $581,600 | I/M and Other TCMs | I/M and Other TCMs 97 Loop detectors at 45 locations |
QA | 0 | QA | 0 |
| $316,200 | I/M and Other TCMs | I/M and Other TCMs I-95 I-695 I-495 Installation of 7 closed circuit television |
QA | 0 | QA | 0 |
| $298,500 | I/M and Other TCMs | I/M and Other TCMs CHART program in Washington/Baltimore Metropolitan areas Purchase 5 Customer Response Vehicles |
QA | 0 | QA | 0 |
| $37,700 | I/M and Other TCMs | I/M and Other TCMs I-95 at I-195 and MD 100 Install Closed Circuit Television Cameras |
QA | 0 | QA | 0 |
| $52,800 | I/M and Other TCMs | I/M and Other TCMs Conversion of portable Traffic Advisory Response fleets to solar power |
QA | 0 | QA | 0 |
| $4,286,200 | I/M and Other TCMs | I/M and Other TCMs Expenditure for CHART Communication network project |
QA | 0 | QA | 0 |
| $962,949 | Miscellaneous | Miscellaneous Obligations to Previously Approved Projects (FMIS) |
0 | 0 | 0 | 0 |
| $1,762,245 | Miscellaneous | Miscellaneous Additional Obligations to Previously Approved Projects |
0 | 0 | 0 | 0 |
| $174,400 | Shared Ride | Shared Ride Construction of a 54 space park and ride lot at I-70/MD 75 interchange |
1 | 0 | 4 | 0 |
| $1,227,800 | Shared Ride | Shared Ride Construction of a 500 space park and ride lot at I-270/MD 124 interchange |
3 | 0 | 11 | 0 |
| $99,600 | Shared Ride | Shared Ride Construction of a 25 space Park and Ride lot at MD 231 south of Barston Rd |
1 | 0 | 2 | 0 |
| $108,700 | Traffic Flow Improvements | Traffic Flow Improvements Project Planning study for the I-95 I-495 Transportation Corridor Study |
QA | 0 | QA | 0 |
| $1,045,141 | Traffic Flow Improvements | Traffic Flow Improvements ITS equipment on I-95 and MD-32 |
0 | 0 | QA | 0 |
| $1,153,020 | Traffic Flow Improvements | Traffic Flow Improvements I-95 Corridor Coalition Technical Support Services - ITS Project |
0 | 0 | QA | 0 |
| $1,031,988 | Traffic Flow Improvements | Traffic Flow Improvements ITS equipment on I-70 and I-83 |
0 | 0 | QA | 0 |
| $544,141 | Traffic Flow Improvements | Traffic Flow Improvements Preliminary engineering for HOV lane |
0 | 0 | QA | 0 |
| $1,816,000 | Transit | Transit Transfer to FTA |
QA | 0 | QA | 0 |
| $4,953,000 | Transit | Transit Acquisition of 68 new transit buses |
3 | 0 | 143 | 0 |
| $5,000 | Transit | Transit State of Maryland Ridesharing Program |
8 | 0 | 28 | 0 |
| $4,096,000 | Transit | Transit Acquisition of 18 new light rail vehicles |
15 | 0 | 50 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Massachusetts | 07/24/2001 | $56,350,000 | $6,270,367 | 11.1% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $124,000 | Demand Management | Demand Management Boston Region Design Services/ITS Program |
0 | 0 | QA | 0 |
| $45,080 | Demand Management | Demand Management Statewide Emergency Response Program |
0 | 0 | QA | 0 |
| $40,000 | Demand Management | Demand Management Andover MVPC River Road TMA Year 3 |
8 | 80 | 12 | 0 |
| $40,000 | Demand Management | Demand Management Lowell TMA Funding Year 2 |
0 | 0 | QA | 0 |
| $40,000 | Demand Management | Demand Management Umass Creation of TMA |
20 | 217 | 34 | 0 |
| $32,886 | Demand Management | Demand Management MVPC Innovative media reduce demand |
45 | 0 | 70 | 0 |
| $80,000 | Demand Management | Demand Management Boston Region Design Services/ITS Program |
0 | 0 | QA | 0 |
| $800,000 | I/M and Other TCMs | I/M and Other TCMs Statewide Enhance I&M - 2 Year Program With DEP |
209 | 0 | 149 | 0 |
| $(1,445,867) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $49,001 | Pedestrian/Bicycle | Pedestrian/Bicycle Locust Rd-Construction of Cape Cod Bike Trail Extension |
0 | 0 | QA | 0 |
| $78,560 | Pedestrian/Bicycle | Pedestrian/Bicycle PVPC Bike to Work |
6 | 39 | 7 | 0 |
| $80,000 | Traffic Flow Improvements | Traffic Flow Improvements PVPC Signalized Intersection Study |
27 | 60 | 7 | 0 |
| $20,000 | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signals - Route 9 at South Pleasant Street in Amherst |
0 | 0 | QA | 0 |
| $560,000 | Transit | Transit Statewide Caravans TMA Assistance and Commuter Options Program |
0 | 0 | QA | 0 |
| $136,000 | Transit | Transit FRTA Bus Route |
1 | 0 | 0 | 0 |
| $204,240 | Transit | Transit CCRTA Capewide Vehicle Replacement |
0 | 0 | 0 | 0 |
| $115,200 | Transit | Transit OCPC BAT Bus Shelters |
1 | 0 | 2 | 0 |
| $648,000 | Transit | Transit MVTA Vehicle Replacement |
0 | 0 | QA | 0 |
| $472,000 | Transit | Transit WRTA Bus Replacement |
0 | 0 | 1 | 0 |
| $76,367 | Transit | Transit PVTA Palmer Shuttle Bus |
2 | 30 | 1 | 0 |
| $194,400 | Transit | Transit PVTA Sunderland Express |
4 | 53 | 0 | 0 |
| $171,200 | Transit | Transit PVTA Minuteman Service |
3 | 0 | 3 | 0 |
| $2,500,000 | Transit | Transit PVTA Bus Replacement |
0 | 0 | 5 | 0 |
| $80,000 | Transit | Transit Wareham Summer Shuttle |
2 | 0 | 1 | 0 |
| $128,053 | Transit | Transit MAPC Logan Airport East/e Express |
0 | 1 | 0 | 0 |
| $256,800 | Transit | Transit MRTA Bus Route |
2 | 0 | 2 | 0 |
| $48,000 | Transit | Transit MVRTA Flexible Bus |
1 | 0 | 7 | 0 |
| $67,973 | Transit | Transit MVRTA Route 52 Bus |
318 | 0 | 6 | 0 |
| $40,000 | Transit | Transit Newburyport I-95 at S.R. 113 Expand Commuter Lot |
0 | 0 | QA | 0 |
| $61,627 | Transit | Transit CCC Barnstable Trans Guide System |
11 | 0 | 19 | 0 |
| $85,000 | Transit | Transit GATRA Mansfield Ozone Alert |
4 | 47 | 5 | 0 |
| $72,800 | Transit | Transit GATRA Plymouth Bus Service |
5 | 57 | 4 | 0 |
| $40,000 | Transit | Transit NPEDC Nantucket SSA/Ticket |
0 | 0 | 0 | 0 |
| $241,047 | Transit | Transit MAPC Waltham Shuttle Bus |
1 | -4 | 7 | 0 |
| $88,000 | Transit | Transit MAPC Norwood Shuttle Bus |
3 | 30 | 5 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Michigan | 07/24/2001 | $36,309,000 | $29,125,500 | 80.2% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $(50) | Miscellaneous | Miscellaneous Rideshare Program Muskegon |
0 | 0 | 0 | 0 |
| $(820,044) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $(41,073) | Miscellaneous | Miscellaneous Signal Upgrade US-24 to Miller RD(17 Locations) |
0 | 0 | 0 | 0 |
| $(36,000) | Miscellaneous | Miscellaneous Between Greenfield Road & I-696 ATMS add |
0 | 0 | 0 | 0 |
| $(36,000) | Miscellaneous | Miscellaneous I-75 E-M150 ATMS SCNDI |
0 | 0 | 0 | 0 |
| $(9,604) | Pedestrian/Bicycle | Pedestrian/Bicycle Bike/Pedestrian Facility Holland/Zeeland |
3 | 0 | 3 | 0 |
| $23,701 | Pedestrian/Bicycle | Pedestrian/Bicycle Sidewalk Construction Waverly 24th St and Country Club |
3 | 0 | 3 | 0 |
| $101,122 | Pedestrian/Bicycle | Pedestrian/Bicycle Non-Motorized Path 92nd to 96th and Perry To Mapleview |
3 | 0 | 4 | 0 |
| $1,744 | Pedestrian/Bicycle | Pedestrian/Bicycle Non-Motorized Bicycle/Pedestrian Facility Holland Zeeland Urbanized Area |
0 | 0 | QA | 0 |
| $52,000 | Pedestrian/Bicycle | Pedestrian/Bicycle Bike/Pedestrian Facility Various Routes on 152 Avenue |
4 | 0 | 4 | 0 |
| $75,000 | Shared Ride | Shared Ride Rideshare Program Muskegon |
16 | 0 | 3 | 0 |
| $160,000 | Shared Ride | Shared Ride Rideshare -CMG#9750 SE Michigan |
16 | 0 | -3 | 0 |
| $260,000 | Shared Ride | Shared Ride Rideshare Program-FY1999 CMG Grant 9943 |
13 | 0 | 0 | 0 |
| $40,000 | Shared Ride | Shared Ride Mobility Enhancement Vanpool Project-CMAQ Grant #9750 |
10 | 0 | 10 | 0 |
| $85,000 | Shared Ride | Shared Ride Promote/Market Vanpooling in 3 Urban Areas |
0 | 0 | 0 | 0 |
| $(15,633) | Traffic Flow Improvements | Traffic Flow Improvements Pine Ave-8th ST & Fairbanks Signal Upgrade |
5 | 0 | 0 | 0 |
| $37,526 | Traffic Flow Improvements | Traffic Flow Improvements Turn Lane and Signal at College Avenue |
1 | 0 | 16 | 0 |
| $240,000 | Traffic Flow Improvements | Traffic Flow Improvements Widen Left and Right Turn Lane at Rickett Road |
10 | 0 | 1 | 0 |
| $(4,349) | Traffic Flow Improvements | Traffic Flow Improvements Sherman Street Intersection Traffic Signal Upgrade |
2 | 0 | 0 | 0 |
| $(4,613) | Traffic Flow Improvements | Traffic Flow Improvements Laketon to Hackley Road Reconstruction |
0 | 0 | 0 | 0 |
| $13,017 | Traffic Flow Improvements | Traffic Flow Improvements Baseline Road-Avery Road-Det Traf Sgnl |
31 | 0 | -4 | 0 |
| $27,265 | Traffic Flow Improvements | Traffic Flow Improvements 3 Locations in Detroit Traf Sgnl |
31 | 0 | -4 | 0 |
| $(47,631) | Traffic Flow Improvements | Traffic Flow Improvements 8MI-14MI&14MI-15MI Road Traf Sgnls |
32 | 0 | -4 | 0 |
| $(79,089) | Traffic Flow Improvements | Traffic Flow Improvements Dequindre Rd-Harper-Det Traf Sgnls |
34 | 0 | -5 | 0 |
| $271,121 | Traffic Flow Improvements | Traffic Flow Improvements Dequindre Rd-Jefrsn-Det Traf Sgnls |
38 | 0 | -5 | 0 |
| $24,220 | Traffic Flow Improvements | Traffic Flow Improvements 8 MI Road-23 MI Road Traf Signls |
50 | 0 | 0 | 0 |
| $128,357 | Traffic Flow Improvements | Traffic Flow Improvements Widening and Signal Work at M-59 Intersection |
3 | 0 | 0 | 0 |
| $840,000 | Traffic Flow Improvements | Traffic Flow Improvements Various Locations in Oakland County Operations and Maintanence |
658 | 0 | 0 | 0 |
| $(21,622) | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signals at Alexander |
7 | 0 | 1 | 0 |
| $8,250 | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal Modernization at Rochester Road |
7 | 0 | 1 | 0 |
| $1,635,111 | Traffic Flow Improvements | Traffic Flow Improvements Fielding/Spencer to Lone Pine Road (26 Locations) Traf Sgnls |
69 | 0 | 9 | 0 |
| $(80,466) | Traffic Flow Improvements | Traffic Flow Improvements 9 MI Rd-Lone PI 13 Locations Traf Sgnls |
67 | 0 | 9 | 0 |
| $2,793,000 | Traffic Flow Improvements | Traffic Flow Improvements Remove Island Widen Railing Replacement Joint Repair and Bit Overlay at Grand R Ave/Ten MI Rd |
2 | 0 | 0 | 0 |
| $175,000 | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal at Hoyt and Mason |
1 | 0 | 0 | 0 |
| $(21,419) | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal at Hackley Road Intersection |
2 | 0 | 0 | 0 |
| $62,000 | Traffic Flow Improvements | Traffic Flow Improvements Reconstruction and Turn Lane at Peck Road Intersection |
1 | 0 | 0 | 0 |
| $100,000 | Traffic Flow Improvements | Traffic Flow Improvements Intersection Add Turn Lane at Green Ann Arbor Urban Area |
12 | 0 | 2 | 0 |
| $154,000 | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal Interconnect Huron to Plymouth |
14 | 0 | 3 | 0 |
| $497,160 | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal Modernization Ann Arbor-Saline to Fernwood |
7 | 0 | 1 | 0 |
| $178,034 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ Project Signalization Miller to Washtenaw |
8 | 0 | 1 | 0 |
| $(19,657) | Traffic Flow Improvements | Traffic Flow Improvements Signal Interconnect of Arterials Platt to State - Ann Arbor |
14 | 0 | 2 | 0 |
| $6,270 | Traffic Flow Improvements | Traffic Flow Improvements Signal Interconnect at Carpenter |
0 | 0 | 0 | 0 |
| $2,926 | Traffic Flow Improvements | Traffic Flow Improvements Signalize Intersection at Dan Hoey |
0 | 0 | 0 | 0 |
| $162,470 | Traffic Flow Improvements | Traffic Flow Improvements Reconstruct Intersection and Signal at Quincy Street |
0 | 0 | 2 | 0 |
| $(10,974) | Traffic Flow Improvements | Traffic Flow Improvements Reconstruction and Signalize at Riley Road Intersection |
0 | 0 | 0 | 0 |
| $168,000 | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal Ann Arbor to Six Mile Road |
8 | 0 | -1 | 0 |
| $206,000 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ Project Signalization Southfield Road to Beech Road |
6 | 0 | -1 | 0 |
| $(30,061) | Traffic Flow Improvements | Traffic Flow Improvements Signal Interconnect Along 3.33 Miles of Arterial Henry Ruff to Fenton |
12 | 0 | -2 | 0 |
| $(61,998) | Traffic Flow Improvements | Traffic Flow Improvements Signal Interconnect Along 8.72 Miles of Arterial Schoolcraft & Seven Mile |
7 | 0 | -1 | 0 |
| $(10,594) | Traffic Flow Improvements | Traffic Flow Improvements Sgnl Southfield-Greenfield |
8 | 0 | 0 | 0 |
| $(6,910) | Traffic Flow Improvements | Traffic Flow Improvements Sgnls Plymouth-Six Mile Road |
11 | 0 | -1 | 0 |
| $(15,968) | Traffic Flow Improvements | Traffic Flow Improvements Traf Sgnl Greenfield-E/Wyoming |
11 | 0 | 0 | 0 |
| $17,100 | Traffic Flow Improvements | Traffic Flow Improvements Trfc Sgnl from Wyoming to Lennan |
34 | 0 | 0 | 0 |
| $4,825 | Traffic Flow Improvements | Traffic Flow Improvements Trfc Sgnl from Wyoming to Five Point |
26 | 0 | 0 | 0 |
| $1,000,000 | Traffic Flow Improvements | Traffic Flow Improvements 3 000 Miles of Roadway in Tri-County area semsim snow and ice (counts winter emissions only) |
QA | 0 | 0 | 0 |
| $400,000 | Traffic Flow Improvements | Traffic Flow Improvements Freeway Incident Management Program Detroit/SEMCOG Area CORR |
22 | 0 | 5 | 0 |
| $118,000 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ project Signalization Village Road to Southfield Road |
4 | 0 | -1 | 0 |
| $218,000 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ project Signalization Joy Road to M-14 |
8 | 0 | -1 | 0 |
| $134,000 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ project Signalization Wick to Southfield |
5 | 0 | -1 | 0 |
| $1,000,000 | Traffic Flow Improvements | Traffic Flow Improvements Interconnect Signals I-75 To Kelly-Detroit |
21 | 0 | 0 | 0 |
| $(69,001) | Traffic Flow Improvements | Traffic Flow Improvements Signal Upgrade Gibralter-Schaefer (34 Locations) |
160 | 0 | 0 | 0 |
| $10,224 | Traffic Flow Improvements | Traffic Flow Improvements Traf Sgnls 6 MI RD-Bringard Det (6 Locations) |
2 | 0 | 0 | 0 |
| $25,000 | Traffic Flow Improvements | Traffic Flow Improvements Traf Sgnls Palmer-Outer Dr Det (15 locations) |
13 | 0 | -2 | 0 |
| $(86,839) | Traffic Flow Improvements | Traffic Flow Improvements Traffic Signal Upgrading Pilgrim/Ferris to Adams (35 Locations) |
20 | 0 | -3 | 0 |
| $21,406 | Traffic Flow Improvements | Traffic Flow Improvements Signal Upgrade Lafayette-State Fair(22 Locations) |
72 | 0 | 0 | 0 |
| $480,000 | Traffic Flow Improvements | Traffic Flow Improvements Reconstruct Intersection at Huron Parkway Ann Arbor |
51 | 0 | 9 | 0 |
| $358,688 | Traffic Flow Improvements | Traffic Flow Improvements Signal Interconnect US-23 To Swift |
55 | 0 | 6 | 0 |
| $(58,823) | Traffic Flow Improvements | Traffic Flow Improvements Pine Ave-8th ST/Fairbanks Traf Sgnls |
2 | 0 | 0 | 0 |
| $13,078 | Traffic Flow Improvements | Traffic Flow Improvements School-Maint at M-11 Grndville |
7 | 0 | 0 | 0 |
| $1,260,000 | Traffic Flow Improvements | Traffic Flow Improvements Maintenance and Engineering for Scats |
1423 | 0 | 93 | 0 |
| $992,000 | Traffic Flow Improvements | Traffic Flow Improvements Interconnect Scats Lincoln Center to 14 Mile Road |
106 | 0 | 13 | 0 |
| $80,000 | Traffic Flow Improvements | Traffic Flow Improvements WB and NB Right Turn at John R and 11 Mile-Madison Heights |
4 | 0 | -93 | 0 |
| $590,664 | Traffic Flow Improvements | Traffic Flow Improvements 27 Intersections Upgrade Signal Controllers County Wide |
151 | 0 | -26 | 0 |
| $142,920 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ Project Signalization at Travelers Tower Midway Franklin & Clara Lane |
3 | 0 | 0 | 0 |
| $123,012 | Traffic Flow Improvements | Traffic Flow Improvements Intersections Revision at Fonda Drive |
2 | 0 | 0 | 0 |
| $1,250,000 | Traffic Flow Improvements | Traffic Flow Improvements 32 locations in the City of Grand Rapids Signal Upgrading |
1 | 0 | 0 | 0 |
| $700,000 | Traffic Flow Improvements | Traffic Flow Improvements Turn Lane at Market Avenue |
2 | 0 | 0 | 0 |
| $1,750,177 | Traffic Flow Improvements | Traffic Flow Improvements 28th Street to Ann Street-Grand Rapids install Changeable Message Sign |
6 | 0 | 43 | 0 |
| $4,486,267 | Traffic Flow Improvements | Traffic Flow Improvements Downtown Grand Rapids Off Ramp (Ionia Street) |
1 | 0 | 0 | 0 |
| $146,041 | Traffic Flow Improvements | Traffic Flow Improvements Right Turn Lane at Patterson Avenue |
0 | 0 | QA | 0 |
| $34,879 | Traffic Flow Improvements | Traffic Flow Improvements Turn Lane and Signal at Clay/Estrn & Clay/Clyd Pk |
8 | 0 | 0 | 0 |
| $(53,657) | Traffic Flow Improvements | Traffic Flow Improvements Rmp and L and RTL at M11 N Rmps and Appr G.R. |
7 | 0 | 0 | 0 |
| $80,000 | Transit | Transit Route Extension And Development (Add More Services To The Route-CMAQ #9901) Grand Rapids Area |
0 | 0 | 0 | 0 |
| $400,000 | Transit | I/M and Other TCMs Detroit-Semcog Nonattainment Area Ozone Action |
1403 | 0 | 1 | 0 |
| $2,000,000 | Transit | Transit New Service-CMAQ Grant #9833 |
0 | 0 | 0 | 0 |
| $2,000,000 | Transit | Transit Purchase up to 7 CNG Trollies City of Detroit |
8 | 0 | 0 | 0 |
| $166,000 | Transit | Transit TDM Program for CBD including Transit Passes and Coordinator -1999 CM Grant #9928 Ann Arbor |
179 | 0 | 119 | 0 |
| $384,000 | Transit | Transit Purchase 1 Large CNG Bus St Clair County |
3 | 0 | 0 | 0 |
| $480,000 | Transit | Transit Purchase 6 Expansion Buses-CMAQ #9920 City of Holland |
1 | 0 | 1 | 0 |
| $60,000 | Transit | Transit Provide Public Transportation Across Bascule Bridge (through consturction zone) for 2 mos. |
1 | 0 | 1 | 0 |
| $175,000 | Transit | Transit Medium Bus Expansion(Regional) Year 1 Operating-CMAQ Grant #9915 Muskegon Area |
2 | 0 | 2 | 0 |
| $66,000 | Transit | Transit Small Bus Expansion-Year 1 Operating-CMAQ Grant #9914 Muskegon Area |
0 | 0 | 0 | 0 |
| $128,000 | Transit | Transit Purchase up to 2 Medium Duty Buses-CMAQ Grant #9913 Muskegon Area |
2 | 0 | 2 | 0 |
| $48,000 | Transit | Transit Purchase Small Bus Expansion-CMAQ Grant #9912 Muskegon Area |
0 | 0 | 0 | 0 |
| $48,000 | Transit | Transit Purchase Small Bus Replacement-CMAQ Grant #9911 Muskegon Area |
0 | 0 | QA | 0 |
| $496,000 | Transit | Transit Purchase up to 2 Alternative Fuel Trolleys Muskegon Area |
0 | 0 | QA | 0 |
| $192,000 | Transit | Transit Route Extension And Development Extend Route 28 Year 2-CMAQ #9903 Grand Rapids Area |
0 | 0 | 1 | 0 |
| $160,000 | Transit | Transit Route Extension And Development Extend Route 28 Year 1-CMAQ #9902 Grand Rapids Area |
0 | 0 | 2 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Minnesota | 07/24/2001 | $19,370,000 | $8,006,923 | 41.3% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $444,750 | Demand Management | Demand Management Downtown Minneapolis Transportation Management Organization bus pass incentives/carpool/vanpool/bicycle |
0 | 1187 | 0 | 0 |
| $2,428,364 | Demand Management | Demand Management TH 10: I-35W to Main St in Anoka- Traffic Management System |
0 | 181 | 0 | 0 |
| $405,317 | Miscellaneous | Miscellaneous Adjustments to previously authorized projects |
0 | 0 | 0 | 0 |
| $312,595 | Traffic Flow Improvements | Traffic Flow Improvements HOV Ramp Meter Bypass-I-35E at Lone Oak Rd (CSAH 26) in Eagan |
0 | 23 | 0 | 0 |
| $250,742 | Traffic Flow Improvements | Traffic Flow Improvements HOV Ramp Meter Bypass-TH 169: Loop from EB TH 62 to NB TH 169 |
0 | 21 | 0 | 0 |
| $357,254 | Traffic Flow Improvements | Traffic Flow Improvements HOV Ramp Meter Bypass-I-94: Co. Rd. 81 to EB I-94 |
0 | 23 | 0 | 0 |
| $678,818 | Traffic Flow Improvements | Traffic Flow Improvements HOV Ramp Meter Bypass- TH 77: Diffley and TH 13/127th and Cliff to TH 77 |
0 | 21 | 0 | 0 |
| $3,129,083 | Transit | Transit Metro Transit-Purchase 26 40-foot buses |
0 | 29 | 0 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Mississippi | * 07/24/2001 | $7,255,000 | $4,285,571 | 59.1% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $(469,686) | Miscellaneous | Miscellaneous Deobligations from previously approved projects |
0 | 0 | 0 | 0 |
| $2,993,240 | STP/CMAQ | STP/CMAQ Construction of Clinton Parkway between US 80 and Northside Drive |
0 | 0 | 0 | 0 |
| $200,000 | STP/CMAQ | STP/CMAQ P.E. for four lanes |
0 | 0 | 0 | 0 |
| $800,000 | STP/CMAQ | STP/CMAQ P.E. from Hernando to Tennessee State Line |
0 | 0 | 0 | 0 |
| $762,017 | STP/CMAQ | STP/CMAQ Bypass |
0 | 0 | 0 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Missouri | 07/24/2001 | $20,833,000 | $39,004,112 | 187.2% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $(4,000) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $1,549,723 | Traffic Flow Improvements | Traffic Flow Improvements Congestion Mitigation And Air Quality - Motorist Assistance Program |
154 | 0 | 0 | 0 |
| $273,000 | Traffic Flow Improvements | Traffic Flow Improvements CMAQ St. Louis County Area - Closed Loop System - Traffic Signals |
QA | 0 | 0 | 0 |
| $1,960,115 | Traffic Flow Improvements | Traffic Flow Improvements Citywide Traffic Sig Control Modern |
97 | 0 | 0 | 0 |
| $2,087,249 | Traffic Flow Improvements | Traffic Flow Improvements Central Corr Traffic Signal Sync |
38 | 0 | 0 | 0 |
| $242,000 | Traffic Flow Improvements | Traffic Flow Improvements Old Halls Ferry Road And Redman Avenue Traffic Signals |
1 | 0 | 0 | 0 |
| $6,588 | Traffic Flow Improvements | Traffic Flow Improvements Hanley Road - Widening for Traffic Flow |
2 | 0 | 0 | 0 |
| $6,789,690 | Traffic Flow Improvements | Traffic Flow Improvements Intelligent Transportation System |
41 | 0 | 0 | 0 |
| $6,772 | Traffic Flow Improvements | Traffic Flow Improvements Elm Avenue and Glendale Traffic Signalization |
1 | 0 | 0 | 0 |
| $196,691 | Traffic Flow Improvements | Traffic Flow Improvements Various Locations TR HH and 100 and 61 and 67 - traffic Signal Improvements |
QA | 0 | 0 | 0 |
| $132,558 | Traffic Flow Improvements | Traffic Flow Improvements Various Locations on RT 340 - Traffic Signal Improvements |
QA | 0 | 0 | 0 |
| $358,621 | Transit | Transit Mid-America Regional Council Reduced Transit Fare on Ozone Alert Days |
57 | 0 | 0 | 0 |
| $1,380,000 | Transit | Transit Bi-State Development Agency -West County Transfer Center |
5 | 0 | 0 | 0 |
| $1,478,554 | Transit | Transit Bi-State Development - Chesterfield Shuttle Service Reverse Commute |
499 | 0 | 0 | 0 |
| $10,445,107 | Transit | Transit Bi-State Development - Bus Replacement |
275 | 0 | 0 | 0 |
| $5,056 | Transit | Transit Commuter Park-Ride Lot |
8 | 0 | 0 | 0 |
| $1,279,450 | Transit | Transit Bi-State Development - St Louis Regional Clean Air Partnership |
295 | 0 | 0 | 0 |
| $10,816,938 | Transit | Transit Bi-State Development Agency Bus Replacement |
573 | 0 | 0 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Montana | 07/24/2001 | $8,830,000 | $2,883,863 | 32.7% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $86,580 | Demand Management | Demand Management Missoula TDM: This project will implement TDM strategies with the assistance of a consultant. |
0 | QA | 0 | QA |
| $(67,191) | Miscellaneous | Miscellaneous This project is for the design and construction of a non-motorized overpass crossing on Montana Rail Link (MRL) right of way. It will provide Bike/Pedestrian access on the Northside of Missoula Montana. |
0 | 0 | 0 | 0 |
| $(306,547) | Miscellaneous | Miscellaneous Application of asphalt on unpaved alleys and streets in Missoula County located within the urban area to reduce the amount of re-entrained road dust emissions (PM-10). |
0 | 0 | 0 | 0 |
| $1,926,977 | Pedestrian/Bicycle | Pedestrian/Bicycle Various Ped/Bike projects |
0 | 77 | 0 | 140 |
| $568,139 | Traffic Flow Improvements | Traffic Flow Improvements Idaho/LaSalle/North 93 Signals: This project will increase the efficiency of traffic movement by making improvements at 18 intersections in Kalispell. It includes upgrading signals and equipment. The signals will be connected. |
0 | 44 | 0 | 0 |
| $297,246 | Traffic Flow Improvements | Traffic Flow Improvements Intersection Improvement |
PR | PR | PR | PR |
| $8,658 | Traffic Flow Improvements | Traffic Flow Improvements Custer Avenue Signal Synchronization: This project will increase the efficiency of traffic movement by making improvements at five signalized intersections in Helena. It includes upgrades to traffic signal equipment. |
0 | 8 | 0 | 0 |
| $370,000 | Transit | Transit This CMAQ transfer to FTA funds the construction of the transit center and operating assistance for the downtown |
0 | QA | 0 | QA |