CMAQ ANNUAL REPORTS (FY 1999)

Page 4

Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals

STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Maryland 07/24/2001 $44,867,000 $27,897,784 62.2%
Maryland
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$2,826,600 I/M and Other TCMs I/M and Other TCMs
Expenditure for CHART Operations and equipment
QA 0 QA 0
$518,200 I/M and Other TCMs I/M and Other TCMs
CHART program in Washington/Baltimore Metropolitan areas Purchase 12 patrol vehicles
QA 0 QA 0
$581,600 I/M and Other TCMs I/M and Other TCMs
97 Loop detectors at 45 locations
QA 0 QA 0
$316,200 I/M and Other TCMs I/M and Other TCMs
I-95 I-695 I-495 Installation of 7 closed circuit television
QA 0 QA 0
$298,500 I/M and Other TCMs I/M and Other TCMs
CHART program in Washington/Baltimore Metropolitan areas Purchase 5 Customer Response Vehicles
QA 0 QA 0
$37,700 I/M and Other TCMs I/M and Other TCMs
I-95 at I-195 and MD 100 Install Closed Circuit Television Cameras
QA 0 QA 0
$52,800 I/M and Other TCMs I/M and Other TCMs
Conversion of portable Traffic Advisory Response fleets to solar power
QA 0 QA 0
$4,286,200 I/M and Other TCMs I/M and Other TCMs
Expenditure for CHART Communication network project
QA 0 QA 0
$962,949 Miscellaneous Miscellaneous
Obligations to Previously Approved Projects (FMIS)
0 0 0 0
$1,762,245 Miscellaneous Miscellaneous
Additional Obligations to Previously Approved Projects
0 0 0 0
$174,400 Shared Ride Shared Ride
Construction of a 54 space park and ride lot at I-70/MD 75 interchange
1 0 4 0
$1,227,800 Shared Ride Shared Ride
Construction of a 500 space park and ride lot at I-270/MD 124 interchange
3 0 11 0
$99,600 Shared Ride Shared Ride
Construction of a 25 space Park and Ride lot at MD 231 south of Barston Rd
1 0 2 0
$108,700 Traffic Flow Improvements Traffic Flow Improvements
Project Planning study for the I-95 I-495 Transportation Corridor Study
QA 0 QA 0
$1,045,141 Traffic Flow Improvements Traffic Flow Improvements
ITS equipment on I-95 and MD-32
0 0 QA 0
$1,153,020 Traffic Flow Improvements Traffic Flow Improvements
I-95 Corridor Coalition Technical Support Services - ITS Project
0 0 QA 0
$1,031,988 Traffic Flow Improvements Traffic Flow Improvements
ITS equipment on I-70 and I-83
0 0 QA 0
$544,141 Traffic Flow Improvements Traffic Flow Improvements
Preliminary engineering for HOV lane
0 0 QA 0
$1,816,000 Transit Transit
Transfer to FTA
QA 0 QA 0
$4,953,000 Transit Transit
Acquisition of 68 new transit buses
3 0 143 0
$5,000 Transit Transit
State of Maryland Ridesharing Program
8 0 28 0
$4,096,000 Transit Transit
Acquisition of 18 new light rail vehicles
15 0 50 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Massachusetts 07/24/2001 $56,350,000 $6,270,367 11.1%
Massachusetts
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$124,000 Demand Management Demand Management
Boston Region Design Services/ITS Program
0 0 QA 0
$45,080 Demand Management Demand Management
Statewide Emergency Response Program
0 0 QA 0
$40,000 Demand Management Demand Management
Andover MVPC River Road TMA Year 3
8 80 12 0
$40,000 Demand Management Demand Management
Lowell TMA Funding Year 2
0 0 QA 0
$40,000 Demand Management Demand Management
Umass Creation of TMA
20 217 34 0
$32,886 Demand Management Demand Management
MVPC Innovative media reduce demand
45 0 70 0
$80,000 Demand Management Demand Management
Boston Region Design Services/ITS Program
0 0 QA 0
$800,000 I/M and Other TCMs I/M and Other TCMs
Statewide Enhance I&M - 2 Year Program With DEP
209 0 149 0
$(1,445,867) Miscellaneous Miscellaneous
Deobligations from Previously Approved Projects
0 0 0 0
$49,001 Pedestrian/Bicycle Pedestrian/Bicycle
Locust Rd-Construction of Cape Cod Bike Trail Extension
0 0 QA 0
$78,560 Pedestrian/Bicycle Pedestrian/Bicycle
PVPC Bike to Work
6 39 7 0
$80,000 Traffic Flow Improvements Traffic Flow Improvements
PVPC Signalized Intersection Study
27 60 7 0
$20,000 Traffic Flow Improvements Traffic Flow Improvements
Traffic Signals - Route 9 at South Pleasant Street in Amherst
0 0 QA 0
$560,000 Transit Transit
Statewide Caravans TMA Assistance and Commuter Options Program
0 0 QA 0
$136,000 Transit Transit
FRTA Bus Route
1 0 0 0
$204,240 Transit Transit
CCRTA Capewide Vehicle Replacement
0 0 0 0
$115,200 Transit Transit
OCPC BAT Bus Shelters
1 0 2 0
$648,000 Transit Transit
MVTA Vehicle Replacement
0 0 QA 0
$472,000 Transit Transit
WRTA Bus Replacement
0 0 1 0
$76,367 Transit Transit
PVTA Palmer Shuttle Bus
2 30 1 0
$194,400 Transit Transit
PVTA Sunderland Express
4 53 0 0
$171,200 Transit Transit
PVTA Minuteman Service
3 0 3 0
$2,500,000 Transit Transit
PVTA Bus Replacement
0 0 5 0
$80,000 Transit Transit
Wareham Summer Shuttle
2 0 1 0
$128,053 Transit Transit
MAPC Logan Airport East/e Express
0 1 0 0
$256,800 Transit Transit
MRTA Bus Route
2 0 2 0
$48,000 Transit Transit
MVRTA Flexible Bus
1 0 7 0
$67,973 Transit Transit
MVRTA Route 52 Bus
318 0 6 0
$40,000 Transit Transit
Newburyport I-95 at S.R. 113 Expand Commuter Lot
0 0 QA 0
$61,627 Transit Transit
CCC Barnstable Trans Guide System
11 0 19 0
$85,000 Transit Transit
GATRA Mansfield Ozone Alert
4 47 5 0
$72,800 Transit Transit
GATRA Plymouth Bus Service
5 57 4 0
$40,000 Transit Transit
NPEDC Nantucket SSA/Ticket
0 0 0 0
$241,047 Transit Transit
MAPC Waltham Shuttle Bus
1 -4 7 0
$88,000 Transit Transit
MAPC Norwood Shuttle Bus
3 30 5 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Michigan 07/24/2001 $36,309,000 $29,125,500 80.2%
Michigan
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$(50) Miscellaneous Miscellaneous
Rideshare Program Muskegon
0 0 0 0
$(820,044) Miscellaneous Miscellaneous
Deobligations from Previously Approved Projects
0 0 0 0
$(41,073) Miscellaneous Miscellaneous
Signal Upgrade US-24 to Miller RD(17 Locations)
0 0 0 0
$(36,000) Miscellaneous Miscellaneous
Between Greenfield Road & I-696 ATMS add
0 0 0 0
$(36,000) Miscellaneous Miscellaneous
I-75 E-M150 ATMS SCNDI
0 0 0 0
$(9,604) Pedestrian/Bicycle Pedestrian/Bicycle
Bike/Pedestrian Facility Holland/Zeeland
3 0 3 0
$23,701 Pedestrian/Bicycle Pedestrian/Bicycle
Sidewalk Construction Waverly 24th St and Country Club
3 0 3 0
$101,122 Pedestrian/Bicycle Pedestrian/Bicycle
Non-Motorized Path 92nd to 96th and Perry To Mapleview
3 0 4 0
$1,744 Pedestrian/Bicycle Pedestrian/Bicycle
Non-Motorized Bicycle/Pedestrian Facility Holland Zeeland Urbanized Area
0 0 QA 0
$52,000 Pedestrian/Bicycle Pedestrian/Bicycle
Bike/Pedestrian Facility Various Routes on 152 Avenue
4 0 4 0
$75,000 Shared Ride Shared Ride
Rideshare Program Muskegon
16 0 3 0
$160,000 Shared Ride Shared Ride
Rideshare -CMG#9750 SE Michigan
16 0 -3 0
$260,000 Shared Ride Shared Ride
Rideshare Program-FY1999 CMG Grant 9943
13 0 0 0
$40,000 Shared Ride Shared Ride
Mobility Enhancement Vanpool Project-CMAQ Grant #9750
10 0 10 0
$85,000 Shared Ride Shared Ride
Promote/Market Vanpooling in 3 Urban Areas
0 0 0 0
$(15,633) Traffic Flow Improvements Traffic Flow Improvements
Pine Ave-8th ST & Fairbanks Signal Upgrade
5 0 0 0
$37,526 Traffic Flow Improvements Traffic Flow Improvements
Turn Lane and Signal at College Avenue
1 0 16 0
$240,000 Traffic Flow Improvements Traffic Flow Improvements
Widen Left and Right Turn Lane at Rickett Road
10 0 1 0
$(4,349) Traffic Flow Improvements Traffic Flow Improvements
Sherman Street Intersection Traffic Signal Upgrade
2 0 0 0
$(4,613) Traffic Flow Improvements Traffic Flow Improvements
Laketon to Hackley Road Reconstruction
0 0 0 0
$13,017 Traffic Flow Improvements Traffic Flow Improvements
Baseline Road-Avery Road-Det Traf Sgnl
31 0 -4 0
$27,265 Traffic Flow Improvements Traffic Flow Improvements
3 Locations in Detroit Traf Sgnl
31 0 -4 0
$(47,631) Traffic Flow Improvements Traffic Flow Improvements
8MI-14MI&14MI-15MI Road Traf Sgnls
32 0 -4 0
$(79,089) Traffic Flow Improvements Traffic Flow Improvements
Dequindre Rd-Harper-Det Traf Sgnls
34 0 -5 0
$271,121 Traffic Flow Improvements Traffic Flow Improvements
Dequindre Rd-Jefrsn-Det Traf Sgnls
38 0 -5 0
$24,220 Traffic Flow Improvements Traffic Flow Improvements
8 MI Road-23 MI Road Traf Signls
50 0 0 0
$128,357 Traffic Flow Improvements Traffic Flow Improvements
Widening and Signal Work at M-59 Intersection
3 0 0 0
$840,000 Traffic Flow Improvements Traffic Flow Improvements
Various Locations in Oakland County Operations and Maintanence
658 0 0 0
$(21,622) Traffic Flow Improvements Traffic Flow Improvements
Traffic Signals at Alexander
7 0 1 0
$8,250 Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal Modernization at Rochester Road
7 0 1 0
$1,635,111 Traffic Flow Improvements Traffic Flow Improvements
Fielding/Spencer to Lone Pine Road (26 Locations) Traf Sgnls
69 0 9 0
$(80,466) Traffic Flow Improvements Traffic Flow Improvements
9 MI Rd-Lone PI 13 Locations Traf Sgnls
67 0 9 0
$2,793,000 Traffic Flow Improvements Traffic Flow Improvements
Remove Island Widen Railing Replacement Joint Repair and Bit Overlay at Grand R Ave/Ten MI Rd
2 0 0 0
$175,000 Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal at Hoyt and Mason
1 0 0 0
$(21,419) Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal at Hackley Road Intersection
2 0 0 0
$62,000 Traffic Flow Improvements Traffic Flow Improvements
Reconstruction and Turn Lane at Peck Road Intersection
1 0 0 0
$100,000 Traffic Flow Improvements Traffic Flow Improvements
Intersection Add Turn Lane at Green Ann Arbor Urban Area
12 0 2 0
$154,000 Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal Interconnect Huron to Plymouth
14 0 3 0
$497,160 Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal Modernization Ann Arbor-Saline to Fernwood
7 0 1 0
$178,034 Traffic Flow Improvements Traffic Flow Improvements
CMAQ Project Signalization Miller to Washtenaw
8 0 1 0
$(19,657) Traffic Flow Improvements Traffic Flow Improvements
Signal Interconnect of Arterials Platt to State - Ann Arbor
14 0 2 0
$6,270 Traffic Flow Improvements Traffic Flow Improvements
Signal Interconnect at Carpenter
0 0 0 0
$2,926 Traffic Flow Improvements Traffic Flow Improvements
Signalize Intersection at Dan Hoey
0 0 0 0
$162,470 Traffic Flow Improvements Traffic Flow Improvements
Reconstruct Intersection and Signal at Quincy Street
0 0 2 0
$(10,974) Traffic Flow Improvements Traffic Flow Improvements
Reconstruction and Signalize at Riley Road Intersection
0 0 0 0
$168,000 Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal Ann Arbor to Six Mile Road
8 0 -1 0
$206,000 Traffic Flow Improvements Traffic Flow Improvements
CMAQ Project Signalization Southfield Road to Beech Road
6 0 -1 0
$(30,061) Traffic Flow Improvements Traffic Flow Improvements
Signal Interconnect Along 3.33 Miles of Arterial Henry Ruff to Fenton
12 0 -2 0
$(61,998) Traffic Flow Improvements Traffic Flow Improvements
Signal Interconnect Along 8.72 Miles of Arterial Schoolcraft & Seven Mile
7 0 -1 0
$(10,594) Traffic Flow Improvements Traffic Flow Improvements
Sgnl Southfield-Greenfield
8 0 0 0
$(6,910) Traffic Flow Improvements Traffic Flow Improvements
Sgnls Plymouth-Six Mile Road
11 0 -1 0
$(15,968) Traffic Flow Improvements Traffic Flow Improvements
Traf Sgnl Greenfield-E/Wyoming
11 0 0 0
$17,100 Traffic Flow Improvements Traffic Flow Improvements
Trfc Sgnl from Wyoming to Lennan
34 0 0 0
$4,825 Traffic Flow Improvements Traffic Flow Improvements
Trfc Sgnl from Wyoming to Five Point
26 0 0 0
$1,000,000 Traffic Flow Improvements Traffic Flow Improvements
3 000 Miles of Roadway in Tri-County area semsim snow and ice (counts winter emissions only)
QA 0 0 0
$400,000 Traffic Flow Improvements Traffic Flow Improvements
Freeway Incident Management Program Detroit/SEMCOG Area CORR
22 0 5 0
$118,000 Traffic Flow Improvements Traffic Flow Improvements
CMAQ project Signalization Village Road to Southfield Road
4 0 -1 0
$218,000 Traffic Flow Improvements Traffic Flow Improvements
CMAQ project Signalization Joy Road to M-14
8 0 -1 0
$134,000 Traffic Flow Improvements Traffic Flow Improvements
CMAQ project Signalization Wick to Southfield
5 0 -1 0
$1,000,000 Traffic Flow Improvements Traffic Flow Improvements
Interconnect Signals I-75 To Kelly-Detroit
21 0 0 0
$(69,001) Traffic Flow Improvements Traffic Flow Improvements
Signal Upgrade Gibralter-Schaefer (34 Locations)
160 0 0 0
$10,224 Traffic Flow Improvements Traffic Flow Improvements
Traf Sgnls 6 MI RD-Bringard Det (6 Locations)
2 0 0 0
$25,000 Traffic Flow Improvements Traffic Flow Improvements
Traf Sgnls Palmer-Outer Dr Det (15 locations)
13 0 -2 0
$(86,839) Traffic Flow Improvements Traffic Flow Improvements
Traffic Signal Upgrading Pilgrim/Ferris to Adams (35 Locations)
20 0 -3 0
$21,406 Traffic Flow Improvements Traffic Flow Improvements
Signal Upgrade Lafayette-State Fair(22 Locations)
72 0 0 0
$480,000 Traffic Flow Improvements Traffic Flow Improvements
Reconstruct Intersection at Huron Parkway Ann Arbor
51 0 9 0
$358,688 Traffic Flow Improvements Traffic Flow Improvements
Signal Interconnect US-23 To Swift
55 0 6 0
$(58,823) Traffic Flow Improvements Traffic Flow Improvements
Pine Ave-8th ST/Fairbanks Traf Sgnls
2 0 0 0
$13,078 Traffic Flow Improvements Traffic Flow Improvements
School-Maint at M-11 Grndville
7 0 0 0
$1,260,000 Traffic Flow Improvements Traffic Flow Improvements
Maintenance and Engineering for Scats
1423 0 93 0
$992,000 Traffic Flow Improvements Traffic Flow Improvements
Interconnect Scats Lincoln Center to 14 Mile Road
106 0 13 0
$80,000 Traffic Flow Improvements Traffic Flow Improvements
WB and NB Right Turn at John R and 11 Mile-Madison Heights
4 0 -93 0
$590,664 Traffic Flow Improvements Traffic Flow Improvements
27 Intersections Upgrade Signal Controllers County Wide
151 0 -26 0
$142,920 Traffic Flow Improvements Traffic Flow Improvements
CMAQ Project Signalization at Travelers Tower Midway Franklin & Clara Lane
3 0 0 0
$123,012 Traffic Flow Improvements Traffic Flow Improvements
Intersections Revision at Fonda Drive
2 0 0 0
$1,250,000 Traffic Flow Improvements Traffic Flow Improvements
32 locations in the City of Grand Rapids Signal Upgrading
1 0 0 0
$700,000 Traffic Flow Improvements Traffic Flow Improvements
Turn Lane at Market Avenue
2 0 0 0
$1,750,177 Traffic Flow Improvements Traffic Flow Improvements
28th Street to Ann Street-Grand Rapids install Changeable Message Sign
6 0 43 0
$4,486,267 Traffic Flow Improvements Traffic Flow Improvements
Downtown Grand Rapids Off Ramp (Ionia Street)
1 0 0 0
$146,041 Traffic Flow Improvements Traffic Flow Improvements
Right Turn Lane at Patterson Avenue
0 0 QA 0
$34,879 Traffic Flow Improvements Traffic Flow Improvements
Turn Lane and Signal at Clay/Estrn & Clay/Clyd Pk
8 0 0 0
$(53,657) Traffic Flow Improvements Traffic Flow Improvements
Rmp and L and RTL at M11 N Rmps and Appr G.R.
7 0 0 0
$80,000 Transit Transit
Route Extension And Development (Add More Services To The Route-CMAQ #9901) Grand Rapids Area
0 0 0 0
$400,000 Transit I/M and Other TCMs
Detroit-Semcog Nonattainment Area Ozone Action
1403 0 1 0
$2,000,000 Transit Transit
New Service-CMAQ Grant #9833
0 0 0 0
$2,000,000 Transit Transit
Purchase up to 7 CNG Trollies City of Detroit
8 0 0 0
$166,000 Transit Transit
TDM Program for CBD including Transit Passes and Coordinator -1999 CM Grant #9928 Ann Arbor
179 0 119 0
$384,000 Transit Transit
Purchase 1 Large CNG Bus St Clair County
3 0 0 0
$480,000 Transit Transit
Purchase 6 Expansion Buses-CMAQ #9920 City of Holland
1 0 1 0
$60,000 Transit Transit
Provide Public Transportation Across Bascule Bridge (through consturction zone) for 2 mos.
1 0 1 0
$175,000 Transit Transit
Medium Bus Expansion(Regional) Year 1 Operating-CMAQ Grant #9915 Muskegon Area
2 0 2 0
$66,000 Transit Transit
Small Bus Expansion-Year 1 Operating-CMAQ Grant #9914 Muskegon Area
0 0 0 0
$128,000 Transit Transit
Purchase up to 2 Medium Duty Buses-CMAQ Grant #9913 Muskegon Area
2 0 2 0
$48,000 Transit Transit
Purchase Small Bus Expansion-CMAQ Grant #9912 Muskegon Area
0 0 0 0
$48,000 Transit Transit
Purchase Small Bus Replacement-CMAQ Grant #9911 Muskegon Area
0 0 QA 0
$496,000 Transit Transit
Purchase up to 2 Alternative Fuel Trolleys Muskegon Area
0 0 QA 0
$192,000 Transit Transit
Route Extension And Development Extend Route 28 Year 2-CMAQ #9903 Grand Rapids Area
0 0 1 0
$160,000 Transit Transit
Route Extension And Development Extend Route 28 Year 1-CMAQ #9902 Grand Rapids Area
0 0 2 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Minnesota 07/24/2001 $19,370,000 $8,006,923 41.3%
Minnesota
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$444,750 Demand Management Demand Management
Downtown Minneapolis Transportation Management Organization bus pass incentives/carpool/vanpool/bicycle
0 1187 0 0
$2,428,364 Demand Management Demand Management
TH 10: I-35W to Main St in Anoka- Traffic Management System
0 181 0 0
$405,317 Miscellaneous Miscellaneous
Adjustments to previously authorized projects
0 0 0 0
$312,595 Traffic Flow Improvements Traffic Flow Improvements
HOV Ramp Meter Bypass-I-35E at Lone Oak Rd (CSAH 26) in Eagan
0 23 0 0
$250,742 Traffic Flow Improvements Traffic Flow Improvements
HOV Ramp Meter Bypass-TH 169: Loop from EB TH 62 to NB TH 169
0 21 0 0
$357,254 Traffic Flow Improvements Traffic Flow Improvements
HOV Ramp Meter Bypass-I-94: Co. Rd. 81 to EB I-94
0 23 0 0
$678,818 Traffic Flow Improvements Traffic Flow Improvements
HOV Ramp Meter Bypass- TH 77: Diffley and TH 13/127th and Cliff to TH 77
0 21 0 0
$3,129,083 Transit Transit
Metro Transit-Purchase 26 40-foot buses
0 29 0 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Mississippi * 07/24/2001 $7,255,000 $4,285,571 59.1%
Mississippi
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$(469,686) Miscellaneous Miscellaneous
Deobligations from previously approved projects
0 0 0 0
$2,993,240 STP/CMAQ STP/CMAQ
Construction of Clinton Parkway between US 80 and Northside Drive
0 0 0 0
$200,000 STP/CMAQ STP/CMAQ
P.E. for four lanes
0 0 0 0
$800,000 STP/CMAQ STP/CMAQ
P.E. from Hernando to Tennessee State Line
0 0 0 0
$762,017 STP/CMAQ STP/CMAQ
Bypass
0 0 0 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Missouri 07/24/2001 $20,833,000 $39,004,112 187.2%
Missouri
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$(4,000) Miscellaneous Miscellaneous
Deobligations from Previously Approved Projects
0 0 0 0
$1,549,723 Traffic Flow Improvements Traffic Flow Improvements
Congestion Mitigation And Air Quality - Motorist Assistance Program
154 0 0 0
$273,000 Traffic Flow Improvements Traffic Flow Improvements
CMAQ St. Louis County Area - Closed Loop System - Traffic Signals
QA 0 0 0
$1,960,115 Traffic Flow Improvements Traffic Flow Improvements
Citywide Traffic Sig Control Modern
97 0 0 0
$2,087,249 Traffic Flow Improvements Traffic Flow Improvements
Central Corr Traffic Signal Sync
38 0 0 0
$242,000 Traffic Flow Improvements Traffic Flow Improvements
Old Halls Ferry Road And Redman Avenue Traffic Signals
1 0 0 0
$6,588 Traffic Flow Improvements Traffic Flow Improvements
Hanley Road - Widening for Traffic Flow
2 0 0 0
$6,789,690 Traffic Flow Improvements Traffic Flow Improvements
Intelligent Transportation System
41 0 0 0
$6,772 Traffic Flow Improvements Traffic Flow Improvements
Elm Avenue and Glendale Traffic Signalization
1 0 0 0
$196,691 Traffic Flow Improvements Traffic Flow Improvements
Various Locations TR HH and 100 and 61 and 67 - traffic Signal Improvements
QA 0 0 0
$132,558 Traffic Flow Improvements Traffic Flow Improvements
Various Locations on RT 340 - Traffic Signal Improvements
QA 0 0 0
$358,621 Transit Transit
Mid-America Regional Council Reduced Transit Fare on Ozone Alert Days
57 0 0 0
$1,380,000 Transit Transit
Bi-State Development Agency -West County Transfer Center
5 0 0 0
$1,478,554 Transit Transit
Bi-State Development - Chesterfield Shuttle Service Reverse Commute
499 0 0 0
$10,445,107 Transit Transit
Bi-State Development - Bus Replacement
275 0 0 0
$5,056 Transit Transit
Commuter Park-Ride Lot
8 0 0 0
$1,279,450 Transit Transit
Bi-State Development - St Louis Regional Clean Air Partnership
295 0 0 0
$10,816,938 Transit Transit
Bi-State Development Agency Bus Replacement
573 0 0 0
STATE REPORT
SUBMIT
$ AMOUNT
APPORTION
$ AMOUNT
OBLIGATED
OBLIG %
Montana 07/24/2001 $8,830,000 $2,883,863 32.7%
Montana
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT
DESCRIPTION
VOC**
(KG/DAY)
CO**
(KG/DAY)
NOX**
(KG/DAY)
PM-10**
(KG/DAY)
$86,580 Demand Management Demand Management
Missoula TDM: This project will implement TDM strategies with the assistance of a consultant.
0 QA 0 QA
$(67,191) Miscellaneous Miscellaneous
This project is for the design and construction of a non-motorized overpass crossing on Montana Rail Link (MRL) right of way. It will provide Bike/Pedestrian access on the Northside of Missoula Montana.
0 0 0 0
$(306,547) Miscellaneous Miscellaneous
Application of asphalt on unpaved alleys and streets in Missoula County located within the urban area to reduce the amount of re-entrained road dust emissions (PM-10).
0 0 0 0
$1,926,977 Pedestrian/Bicycle Pedestrian/Bicycle
Various Ped/Bike projects
0 77 0 140
$568,139 Traffic Flow Improvements Traffic Flow Improvements
Idaho/LaSalle/North 93 Signals: This project will increase the efficiency of traffic movement by making improvements at 18 intersections in Kalispell. It includes upgrading signals and equipment. The signals will be connected.
0 44 0 0
$297,246 Traffic Flow Improvements Traffic Flow Improvements
Intersection Improvement
PR PR PR PR
$8,658 Traffic Flow Improvements Traffic Flow Improvements
Custer Avenue Signal Synchronization: This project will increase the efficiency of traffic movement by making improvements at five signalized intersections in Helena. It includes upgrades to traffic signal equipment.
0 8 0 0
$370,000 Transit Transit
This CMAQ transfer to FTA funds the construction of the transit center and operating assistance for the downtown
0 QA 0 QA