CMAQ ANNUAL REPORTS (FY 1999)
Page 8
Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Vermont | * 07/24/2001 | $7,215,000 | $3,772,072 | 52.3% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $697,065 | Miscellaneous | Miscellaneous Obligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $(73,811) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $1,232,417 | STP/CMAQ | STP/CMAQ FTA -Various Operating assistance projects |
0 | 0 | 0 | 0 |
| $50,000 | STP/CMAQ | STP/CMAQ FTA -Williston Roadrunner |
0 | 0 | 0 | 0 |
| $50,000 | STP/CMAQ | STP/CMAQ FTA -Yr. 1 CCTA marketing |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $708,400 | STP/CMAQ | STP/CMAQ FTA -Various public transit capitol programs |
0 | 0 | 0 | 0 |
| $200,000 | STP/CMAQ | STP/CMAQ FTA -Expand existing transit services |
0 | 0 | 0 | 0 |
| $30,000 | STP/CMAQ | STP/CMAQ Scoping for new Park and Ride facility |
0 | 0 | 0 | 0 |
| $244,385 | STP/CMAQ | STP/CMAQ FTA -CCT transit projects |
0 | 0 | 0 | 0 |
| $423,616 | STP/CMAQ | STP/CMAQ FTA -Statewide public transit projects |
0 | 0 | 0 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Virginia | 07/24/2001 | $26,335,000 | $24,707,377 | 93.8% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $302,000 | Demand Management | Demand Management M 92 Metro Washington Telework Resource Center - Region Wide |
457 | 0 | 868 | 0 |
| $(245,223) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $54,000 | Pedestrian/Bicycle | Pedestrian/Bicycle Pedestrian Signal Heads Activators and Pavement Markers at Route 1/Junction Drive & Route 54/Cottage Drive - Ashland |
0 | 0 | 0 | 0 |
| $136,800 | Pedestrian/Bicycle | Pedestrian/Bicycle J. Clyde Morris Bikeway Phase II from Jefferson Avenue to the Mariners Museum - Newport News |
5 | 0 | 4 | 0 |
| $53,600 | Pedestrian/Bicycle | Pedestrian/Bicycle M 70A Bicycle Parking - Region wide |
4 | 0 | 3 | 0 |
| $4,800 | Pedestrian/Bicycle | Pedestrian/Bicycle M 70B Employee Outreach for Bicycling - Region wide |
1 | 0 | 1 | 0 |
| $722,000 | Shared Ride | Shared Ride Region Wide Air Pollution Reduction Program - Compool/Ridefinders & Colonial Heights |
215 | 0 | 290 | 0 |
| $110,000 | Shared Ride | Shared Ride M 47 Integrated Ridesharing - Region Wide |
4 | 0 | 8 | 0 |
| $332,000 | Shared Ride | Shared Ride M 47C Employer Outreach - Region Wide |
7 | 0 | 12 | 0 |
| $496,800 | Shared Ride | Shared Ride M 47C Guaranteed Ride Home Program - Region Wide |
89 | 0 | 152 | 0 |
| $199,500 | Shared Ride | Shared Ride TCM 47C Employer Outreach Guaranteed Ride Home Program - Region Wide |
64 | 0 | 146 | 0 |
| $1,594,000 | Shared Ride | Shared Ride M 77B Vanpool Incentive - Region Wide |
32 | 0 | 79 | 0 |
| $146,000 | Shared Ride | Shared Ride Regional Commuter connections Operations Center |
QA | 0 | QA | 0 |
| $108,000 | Shared Ride | Shared Ride Endzone Public Education Program - Region Wide |
QA | 0 | QA | 0 |
| $56,520 | Traffic Flow Improvements | Traffic Flow Improvements Left Turn Lane at Route 5/Route 607 - Charles City |
0 | 0 | 0 | 0 |
| $260,000 | Traffic Flow Improvements | Traffic Flow Improvements Regional Roadway Information System/SMART Traffic Center |
QA | 0 | QA | 0 |
| $634,000 | Traffic Flow Improvements | Traffic Flow Improvements Districtwide Marketing Analysis for Increased HOV usage |
QA | 0 | QA | 0 |
| $91,000 | Traffic Flow Improvements | Traffic Flow Improvements Compatibility with AVI Electronic Toll - CRAC |
29 | 0 | 5 | 0 |
| $930,000 | Traffic Flow Improvements | Traffic Flow Improvements Citywide Signal System Upgrade and Integrate with COMPARE & Upgrade/Relocate Overhead Utilities- Hampton |
139 | 0 | -34 | 0 |
| $1,838,000 | Traffic Flow Improvements | Traffic Flow Improvements Citywide Signal System Upgrade Phase II - Portsmouth |
107 | 0 | -21 | 0 |
| $142,866 | Traffic Flow Improvements | Traffic Flow Improvements North Main Street Signal Loop - Suffolk |
9 | 0 | 1 | 0 |
| $8,000 | Traffic Flow Improvements | Traffic Flow Improvements Intersection Improvements at Big Bethel/Michael Woods - Hampton |
0 | 0 | 0 | 0 |
| $125,000 | Traffic Flow Improvements | Traffic Flow Improvements Turn Lane at Wamsley Blvd/Helridge St-Chesterfield County |
0 | 0 | 0 | 0 |
| $193,563 | Traffic Flow Improvements | Traffic Flow Improvements Extend Left Turn Lane at Wamsley Boulevard/Newbys Bridge Road - Chesterfield County |
1 | 0 | 0 | 0 |
| $198,400 | Transit | Transit Public-Private Partnerships Hampton Fast Ferry Between - Downtown Presents |
7 | 0 | 10 | 0 |
| $416,000 | Transit | Transit Sunday Transit Service - PDTC |
14 | 0 | 20 | 0 |
| $2,086,400 | Transit | Transit Acquisition of Buses Shelter and Other Equipment for Downtown Norfolk Electric Shuttle Service - DRPT |
QA | 0 | QA | 0 |
| $200,000 | Transit | Transit Route No.15 Crosstown (Military Highway) Bus Service - TTDC |
7 | 0 | 8 | 0 |
| $256,000 | Transit | Transit Route No. 12 (Indian River Road) Bus Service - TTDC |
6 | 0 | 7 | 0 |
| $112,000 | Transit | Transit Suffolk/Chesapeake Square Transit Service - TTDC |
1 | 0 | 1 | 0 |
| $190,800 | Transit | Transit Virginia Beach/Chesapeake Express Transit Service - TTDC |
2 | 0 | 2 | 0 |
| $424,080 | Transit | Transit New Transit service to Deep Creek - TTDC |
4 | 0 | 5 | 0 |
| $399,896 | Transit | Transit New Transit service to Kempsville Road - TTDC |
4 | 0 | 5 | 0 |
| $1,920,000 | Transit | Transit Provide Free Bus Rides on Code Red Days - Region Wide & Bus Fare Buydown |
38 | 0 | 70 | 0 |
| $240,000 | Transit | Transit Jefferson Avenue Transit Service - PTDC |
5 | 0 | 6 | 0 |
| $160,000 | Transit | Transit Mercury/Central Shuttle - PTDC |
4 | 52 | 2 | 0 |
| $298,000 | Transit | Transit Surveillance Camera and Safety Program - GRTC |
0 | 0 | 1 | 0 |
| $4,205,000 | Transit | Transit Purchase 20 Alternate Fuel Buses - GRTC |
5 | 0 | 7 | 0 |
| $3,140,000 | Transit | Transit Purchase 20 - 30 Buses & 7-40 Buses - PRTC |
32 | 0 | 33 | 0 |
| $1,605,575 | Transit | Transit Purchase Replacement Buses - WMATA |
17 | 0 | 42 | 0 |
| $12,000 | Transit | Transit Bus Accessibility Improvements Citywide - City of Fairfax |
1 | 0 | 1 | 0 |
| $250,000 | Transit | Transit Operating Funds for City of Richmond Trolley - GRTC |
0 | 0 | 0 | 0 |
| $300,000 | Transit | Transit Marketing Campaign on Low Floor Buses |
47 | 0 | 66 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Washington | 07/24/2001 | $22,257,000 | $3,370,110 | 15.1% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $120,000 | Demand Management | Demand Management Study area consists of Clark County. This project will focus on improving system performance measures through additional data collection analysis of system performance and the preparation of a system performance report. |
0 | 0 | QA | 0 |
| $500,000 | Demand Management | Demand Management TDM funding |
381 | 3701 | 345 | 0 |
| $200,000 | Demand Management | Demand Management Development of a Clark Co. urbanized area transportation management and control systems ITS plan |
0 | 0 | QA | 0 |
| $80,135 | Demand Management | Demand Management Conduct operational analysis of HOV facilities in the I-5 Corridor. Study will develop various HOV lane configurations analyze the operation of the HOV lanes and adjacent travel lanes analyze the potential use of reversible lanes across the interstate. |
0 | 0 | QA | 0 |
| $22,000 | Demand Management | Demand Management Complete traffic counts at all traffic signal locations on Mill Plain between I-5 and I-205. Complete traffic timing models. |
19 | 187 | -20 | 0 |
| $108,432 | Demand Management | Demand Management Complete traffic counts at all traffic signals between I-5 and SR 503 complete traffic signal timing models provide PS&E to construct interconnect conduit and cabling between Van Mall Dr. and SR 503 and construct new controllers. |
29 | 276 | -3 | 0 |
| $937,927 | Miscellaneous | Miscellaneous Obligations To Previously Approved Projects |
0 | 0 | QA | 0 |
| $(816,017) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $58,000 | Pedestrian/Bicycle | Pedestrian/Bicycle Connect existing sidewalk on both sides of Holly Drive. Const 5-8' paved shoulders or sidewalk and striped bike lanes. Drainage improvements to meet new ESA requirements paving signing. |
73 | 54 | 36 | 0 |
| $110,201 | Pedestrian/Bicycle | Pedestrian/Bicycle Install bike racks bike lanes drain grates and bike route and regulatory signing at multiple location city wide and other safety improvements along bike routes. Develop and produce bike guide maps. Construct bike boulevard generally along several route |
36 | 181 | 18 | 0 |
| $115,477 | Pedestrian/Bicycle | Pedestrian/Bicycle Install asphalt or concrete walkways curb ramps at transit stops sidewalk extensions ped signals and lighting help fund West Lake UnionTrail East Lake Union Walkway and Wallingford Steps projects Conduct training seminar on ped design issues. |
0 | 9 | 0 | 0 |
| $86,500 | Pedestrian/Bicycle | Pedestrian/Bicycle Create bike lanes between Columbia and Andresen. Install ADA ramps at intersections. Remove on street parking and re-stripe roadway for two travel lanes and two bike lanes. Improve ADA at intersections landscape and add bus shelter and/or benches. |
1 | 17 | 1 | 0 |
| $25,455 | Pedestrian/Bicycle | Pedestrian/Bicycle Const 8' sidewalk for ped/bike faclility. |
0 | 4 | 0 | 0 |
| $1,500,000 | Traffic Flow Improvements | Traffic Flow Improvements Reconstruct travel lanes to provide a TWLTL parking landscaped median sidewalks and lighting improvements improved drainage and signal improvements. |
0 | 9 | 0 | 0 |
| $60,000 | Traffic Flow Improvements | Traffic Flow Improvements Install new traffic controllers at 44 +/- intersections. Also upgrade existing interconnected controllers at four locations to maintain efficient east/west transit and vehicle movement. Upgrade pedestrian signal heads. Also repave 50th between 7th and |
18 | 236 | -9 | 0 |
| $262,000 | Transit | Transit Design and const 5 transit link projects identified in Bellevue Transit Links Study |
18 | 100 | 0 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| West Virginia | 07/24/2001 | $6,997,000 | $2,114,421 | 30.2% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $(31,961) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $96,800 | Traffic Flow Improvements | Traffic Flow Improvements Construction at intersection of Bridge and Oakwood Roads in Charleston |
0 | 0 | QA | 0 |
| $193,500 | Traffic Flow Improvements | Traffic Flow Improvements Renovation and connection of four controllers for traffic signals in Dunbar |
0 | 0 | QA | 0 |
| $977,682 | Traffic Flow Improvements | Traffic Flow Improvements Project #U220-35 - construction Rt. 35 |
0 | 0 | QA | 0 |
| $104,000 | Traffic Flow Improvements | Traffic Flow Improvements Project #U340-34 - construction Rt. 35 |
0 | 0 | QA | 0 |
| $774,400 | Traffic Flow Improvements | Traffic Flow Improvements Construction of a turning lane just south of Parkersburg on WV 14 |
0 | 0 | QA | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Wisconsin | 07/24/2001 | $20,923,000 | $4,159,472 | 19.9% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $11,520 | I/M and Other TCMs | I/M and Other TCMs City of West Bend Compressed Natural Gas Facility/ City of New Berlin CNG Facility |
13 | 0 | 0 | 0 |
| $2,528,000 | I/M and Other TCMs | I/M and Other TCMs Enhanced Technician Education-Training Program/ Development and Implementation of a Covert Audit Program/ Enhancement of the On Board Diagnostic (OBDII) Testing Program |
QA | 0 | QA | 0 |
| $(8,536,106) | Miscellaneous | Miscellaneous Deobligations from Previously Approved Projects |
0 | 0 | 0 | 0 |
| $668,367 | Miscellaneous | Miscellaneous Obligations to Previously Approved Projects |
0 | 0 | 0 | 0 |
| $300,880 | Pedestrian/Bicycle | Pedestrian/Bicycle City of Milwaukee and WisDNR Henry Aaron Bike Trail/ City of Milwaukee Hoyt Park Bikeway-Forestry Yard Segment/ Milwaukee County Former North Shore Railway Conversion to Bikeway/ City of Waukesha Meadowbrook Road Bicycle Path |
3 | 0 | 4 | 0 |
| $503,080 | Shared Ride | Shared Ride Genoa City Park and Ride Lot/ City of Kenosha METRA Train Station Park and Ride Lot/ MATC Walker's Point Park and Ride Lot/ WisDOT Park and Ride Lot at I-94 and STH 100 |
3 | 0 | 5 | 0 |
| $1,693,199 | Traffic Flow Improvements | Traffic Flow Improvements WisDOT Sponsored Passenger Rail in I-94 North South Corridor to Mitigate Traffic During Highway Reconstruction Activities/ City of Waukesha Traffic Responsive Closed Loop Signal System/ WisDOT Freeway Traffic Management Monitor System-Operations and Maint |
304 | 0 | 129 | 0 |
| $6,990,532 | Transit | Transit City of Racine Expanded Saturday Bus Service/ City of Racine New Sunday Bus Service/ Washington County Commuter Bus Service/ Southeastern Wisconsin Transit Marketing Partnership/ Racine-Kenosha-Milwaukee Express Bus Service/ City of Kenosha Downtown Circu |
37 | 0 | 47 | 0 |
| STATE | REPORT SUBMIT |
$ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % |
|---|---|---|---|---|
| Wyoming | * 07/24/2001 | $7,340,000 | $456,673 | 6.2% |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT DESCRIPTION |
VOC** (KG/DAY) |
CO** (KG/DAY) |
NOX** (KG/DAY) |
PM-10** (KG/DAY) |
|---|---|---|---|---|---|---|
| $456,673 | STP/CMAQ | STP/CMAQ Reconstruct 10.4 miles US-87 between Casper and Glenrock Begin MP 166. Include bridge replacement over Big Muddy Creek. (Also funds in FY96 and FY97) |
0 | 0 | 0 | 0 |
| $ AMOUNT APPORTION |
$ AMOUNT OBLIGATED |
OBLIG % | |
|---|---|---|---|
| Totals | $1,515,632,668 | $1,141,784,533 | 75.3% |