CMAQ DETAILED PROJECT LISTING REPORT (FY 2000)
Page 4
Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Maryland | 1/10/2003 | $50,283,517 | $39,550,709 | 79 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $766,000 | Shared Ride | 10 Maryland Ridesharing Programs Shared Ride Project - Public Program - Information/Matching - Matching |
17 | 53 | ||
| $138,329 | Shared Ride | MD 2/4 at Ball Road New Park and Ride Lot Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 5 | ||
| $132,817 | Shared Ride | I-95/MD 279 Interchange Two 25 space Park and Ride lots Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $5,069,943 | Traffic Flow Improvements | Expenditure for CHART Operations Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year |
QA | |||
| $4,451,053 | Traffic Flow Improvements | US 1: Oak Street to MD 198 Traffic Flow Project - Traffic Engineering - Congestion intersection inprovements from Intercounty Connnector Study - Other |
1 | 1 | ||
| $1,932,086 | Traffic Flow Improvements | Chart Technical support with University of Maryland Traffic Flow Project Intelligent Transportation Systems - technical support with University of Maryland - Other |
QA | |||
| $1,923,221 | Traffic Flow Improvements | Install advanced traffic management equipment Traffic Flow Project - Intelligent Transportation Systems - Other - Install advanced traffic management equipment - Incident Management Systems I-70,I-83,I-695,I-795 Phase I |
QA | |||
| $1,717,127 | Traffic Flow Improvements | MD 355/MD 124 Intersection Improvements Traffic Flow Project - Traffic Engineering - intersection IMprovements from Intercounty Connector /Congestion Relief Study - Other |
8 | 4 | ||
| $1,602,892 | Traffic Flow Improvements | MD115/Shady Grove Road and MD 115/Redland Road Intersection Improvements Traffic Flow Project - Congestion Management Systems - Development, Establishment, Implementation - from the InterCounty Connector Study at key intersections |
2 | 1 | ||
| $1,443,898 | Traffic Flow Improvements | MD 97/Emory Lane Congested Intersection Improvement Traffic Flow Project - Other - intersection imporvements from congestion relief study/Intercounty Connector Study |
1 | 1 | ||
| $1,265,977 | Traffic Flow Improvements | MD 650/Ednor Road Intersection Improvement Traffic Flow Project - Congestion Management Systems - Development, Establishment, Implementation - from InterCounty Connector Study |
1 | 1 | ||
| $1,146,002 | Traffic Flow Improvements | MD 201/MD212 Traffic Flow Project - Traffic Engineering - intersection improvements from Intercounty Connector/Congestion Relief Study - Other |
2 | 1 | ||
| $629,878 | Traffic Flow Improvements | MD 28/East Gude Drive Traffic Flow Project - Traffic Engineering - Intersection Improvements from intercounty Connector/Congestion Relief Study - Other |
1 | 1 | ||
| $563,280 | Traffic Flow Improvements | Statewide Operations Centers renovations and reconfiguration Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year |
QA | |||
| $473,000 | Traffic Flow Improvements | Expenditure for CHART vehicle purchases Traffic Flow Project - Intelligent Transportation Systems - Vehicle Purchase - Incident Management Systems |
QA | |||
| $426,512 | Traffic Flow Improvements | Install Speed Dectors Traffic Flow Project - Intelligent Transportation Systems - Other - Install speed detectors - Incident Management Systems MD 295: South of MD 202 to MD 175 |
QA | |||
| $87,413 | Traffic Flow Improvements | Expenditure for CHART incident management equipment Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year |
QA | |||
| $8,370,000 | Transit | 18 Light Rail Vehicles Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Rail - New - Light Rail |
15 | 50 | ||
| $4,726,740 | Transit | Transit Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New FTA Transfers - various transit projects |
QA | QA | ||
| $360,000 | Transit | 175 Bus Engine Overhauls Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified |
17 | |||
| $60,000 | STP/CMAQ | Expenditure for Maryland State Police Cycles This is an STP/CMAQ Project Expenditure for Maryland State Police Cycles |
QA | |||
| $2,264,541 | Miscellaneous | Miscellaneous HQ's adjustment - obligation to previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Massachusetts | 1/10/2003 | $25,600,975 | $28,792,822 | 112 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $212,666 | Demand Management | TMA Program Demand Management Project - New Activity - Capital Expense - Other - TMA not specified |
QA | |||
| $40,000 | Demand Management | TDM Greater Lowell TMA- Year 3 Demand Management Project - Operating Assistance - 3rd Year - Other - TMA not specified |
9 | 14 | ||
| $40,000 | Demand Management | TDM-Junction TMO Demand Management Project - Public Information - Marketing - Other - TMA not specified |
1 | 2 | ||
| $40,000 | Demand Management | TDM-Route 9 TMA Demand Management Project - Public Information - Marketing - Other - TMA not specified |
20 | 34 | ||
| $2,789,600 | Pedestrian/Bicycle | Ayer-Dunstable Rail trail Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $1,691,768 | Pedestrian/Bicycle | Bike Path-Neponset (MDC) Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 1 | ||
| $1,167,936 | Pedestrian/Bicycle | Harborwalk-Children`s Museum Wharf Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $880,000 | Pedestrian/Bicycle | Dartmouth St. Pedestrian Mall Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $546,248 | Pedestrian/Bicycle | Downtown Riverwalk-Waltham Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $524,000 | Pedestrian/Bicycle | East Boston Greenway Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $364,800 | Pedestrian/Bicycle | South Street Pathway Pedestrian/Bicycle Project - Facilities - Separate Path |
QA | |||
| $80,000 | Shared Ride | TDM-Metrowest Carpool/Vanpool Subsidy Shared Ride Project - Public Program - Van Pool - Commuter Matching |
QA | |||
| $3,302,942 | Traffic Flow Improvements | Interium Operations Center Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year |
24 | 5 | ||
| $1,698,000 | Traffic Flow Improvements | Motorist Assistance Program Traffic Flow Project - Intelligent Transportation Systems - Travel Management Centers - Operation - Freeway Management Systems - 1st Year |
QA | |||
| $1,460,876 | Traffic Flow Improvements | Statewide Traffic Management Program Traffic Flow Project - Intelligent Transportation Systems - Program - Other |
QA | |||
| $1,272,128 | Traffic Flow Improvements | North Shore Signal System Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
9 | 3 | ||
| $1,046,032 | Traffic Flow Improvements | Calvin Coolidge Bridge Traffic Flow Project - Intelligent Transportation Systems - Other - Bridge - Incident Management Systems |
1 | 32 | ||
| $986,457 | Traffic Flow Improvements | Traffic Signals Lynn (4 locations) Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
19 | 7 | ||
| $769,305 | Traffic Flow Improvements | Geometric and Signal Improvements Worcester Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
4 | 2 | ||
| $706,548 | Traffic Flow Improvements | Traffic Signals Rte. 85 Hopkinton Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | 1 | ||
| $627,871 | Traffic Flow Improvements | Signal Upgrades Springfield Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
7 | 3 | ||
| $556,794 | Traffic Flow Improvements | Traffic Signal update Sunderland Franklin County Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
14 | 5 | ||
| $467,689 | Traffic Flow Improvements | Intersection Improvements Fall River Traffic Flow Project - Traffic Engineering - Other |
5 | 2 | ||
| $450,384 | Traffic Flow Improvements | Signal Upgrade Maynard Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 1 | ||
| $400,400 | Traffic Flow Improvements | Traffic Operations Center Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Operations center |
10 | 4 | ||
| $350,754 | Traffic Flow Improvements | Traffic signals Peabody Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 1 | ||
| $293,682 | Traffic Flow Improvements | Road reconstruction and signals Leominster Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
10 | 4 | ||
| $4,490,798 | Transit | Intermodal Center Union Station-Worcester Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - Improved |
15 | 22 | ||
| $162,095 | Transit | Crosstown Shuttle-Somerville Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $145,600 | Transit | Transit Operating Assistance-office parks Transit Project - Transit Management Systems - office parks |
1 | 1 | ||
| $112,525 | Transit | Eastin Express Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
1 | 1 | ||
| $109,996 | Transit | TDM-Early morning Airport Bus Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 3rd Year |
QA | |||
| $103,530 | Transit | TDM-Easthampton Van Service Transit Project - Related Demand Management Stategies - Other - van service |
1 | 1 | ||
| $100,253 | Transit | Waltham INtra-City Bus Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 3rd Year |
1 | 7 | ||
| $80,000 | Transit | TDM-Natick Raillink Transit Project - Facilities Improvements - Rail Track - New - Light Rail |
QA | |||
| $80,000 | Transit | TDM Cap Cod Smart Card-year 1 Transit Project - Related Demand Management Stategies - Fare Subsidies - Seasonal |
1 | 1 | ||
| $78,200 | Transit | TSM-Oneal-Wareham Extension Transit Project - Related Demand Management Stategies - Fare Subsidies - Seasonal |
3 | 3 | ||
| $72,000 | Transit | Industrial Park Bus Service-Avon/Brockton Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $67,973 | Transit | Route 52 Bus Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year |
1 | 1 | ||
| $64,883 | Transit | Route 53 Bus Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 2 | ||
| $40,000 | Transit | TDM-Framingham-Marborough Bus Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $20,000 | Transit | TDM-Commuter Transit Passes-Martha`s Vineyard Transit Project - Related Demand Management Stategies - Fare Subsidies - Seasonal |
1 | 1 | ||
| $298,089 | Miscellaneous | Miscellaneous HQ's adjustment - obligation to previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Michigan | 1/10/2003 | $37,865,714 | $29,194,423 | 77 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $376,800 | Demand Management | 3 year Ozone Action Outreach Program Demand Management Project - Public Information - Public Education - Other - Promote and educate general public over 3 years of the Ozone Action Outreach Program |
90 | |||
| $223,700 | Demand Management | Reverse Commute Demonstration Project Demand Management Project - Public Information - Public Education - Other - Reverse Commute Demostration Project |
6 | |||
| $25,200 | Demand Management | Ozone Program-CMAQ Grant #9908 Demand Management Project - Public Information - Marketing - Other - Ozone Program-Metro Area |
25 | 25 | ||
| $25,000 | Demand Management | Support Ozone Action Day Activities/Materials/Initiatives Demand Management Project - Public Information - Public Education - Other - Support Ozone Action Day Activites/Materials/Initiatives |
QA | |||
| $24,800 | Demand Management | Muskegon Clean Cities-FY 1999 Demand Management Project - Public Information - Public Education - Other - Muskegon Clean Cities FY 1999 Alternative Fuel Marketing Development Program/Outreach |
QA | |||
| $1,415,957 | I/M and Other TCMs | Regional-Semsim Winter Maintenance Operations/General Micellaneous I/M or Other TCM Project - Other - Regional-Semsim Winter Maintenance Operations/General Miscellaneous |
2,460 | |||
| $26,400 | I/M and Other TCMs | Employment Mobility/How Retention I/M or Other TCM Project - Other - Employment Mobility/How Retention-CMAG Grant #0005 |
2 | 2 | ||
| $25,000 | I/M and Other TCMs | Ozone Action Program/Muskegon Urbanized Area I/M or Other TCM Project - Other - Ozone Action Program/Muskegon Urbanized Area |
25 | 1 | ||
| $20,000 | I/M and Other TCMs | Voluntary Ozone Action Program/Holland Metro Area I/M or Other TCM Project - Other - Voluntary Ozone Action Program/Holland Metro Area |
164 | 165 | ||
| $7,500 | I/M and Other TCMs | Muskegon County-Michivan FY2000 Employment Mobility/HOV Retention I/M or Other TCM Project - Other - Employment Mobility/HOV Retention |
1 | 1 | ||
| $6,300 | I/M and Other TCMs | Ottawa County-Michivan FY2000 Employment Mobility/HOV Retention I/M or Other TCM Project - Other - Employment Mobility/HOV Retention |
1 | 1 | ||
| $5,600 | I/M and Other TCMs | Upgrade exsisting carpool lot at M-50 I/M or Other TCM Project - Other - Upgrade existing carpool lot at M-50 |
4 | 7 | ||
| $358,368 | Pedestrian/Bicycle | Construction of Non-Moterized Pathway 88 & 120th & Riley St. Pedestrian/Bicycle Project - Facilities - Separate Path |
4 | 4 | ||
| $292,133 | Pedestrian/Bicycle | Widen Bridge for Pedestrian Traffic over south channel of Grand River Pedestrian/Bicycle Project - Facilities - Separate Path |
2 | 2 | ||
| $136,000 | Pedestrian/Bicycle | Construction of Non-Motorized Pathway Pedestrian/Bicycle Project - Facilities - Separate Path |
4 | 4 | ||
| $80,000 | Pedestrian/Bicycle | Bridge Widening for Pedestrian Traffic over the Grand River Pedestrian/Bicycle Project - Facilities - Separate Path |
2 | 2 | ||
| $7,863 | Pedestrian/Bicycle | Non-Motorized Path 92nd to 96th and Perry to Mapleview Pedestrian/Bicycle Project - Facilities - Separate Path |
3 | 4 | ||
| $341,000 | Shared Ride | Southeastern Michigan Ridesharing Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
1,917 | |||
| $100,000 | Shared Ride | Michi-Van Southeastern Michigan Employment Mobility Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
7 | |||
| $95,000 | Shared Ride | Southeastern Michigan-Ridesharing FY2000 Shared Ride Project - Public Program - Information/Matching - Matching |
148 | |||
| $70,000 | Shared Ride | Southeastren Michigan-Michivan FY2000 Operating/Marketing Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
8 | |||
| $50,000 | Shared Ride | Southeastern Michigan-HOV Retention-FY 2000/Michi-Van(HOV) Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
7 | |||
| $34,000 | Shared Ride | Michivan-GIS implementation and administration FY2000 Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
4 | |||
| $11,700 | Shared Ride | Holland/Zeeland-MICHIVAN FY2000 Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $11,600 | Shared Ride | Grand Rapids-Michigan FY2000-Operating/Marketing-CMAQ Grant #0037 Shared Ride Project - Public Program - Information/Matching - Marketing |
2 | 2 | ||
| $5,300 | Shared Ride | Holland/Zeeland-Michivan FY2000 Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $3,500 | Shared Ride | Muskegon County-Michigan FY2000-Operating/Marketing Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $2,700 | Shared Ride | Ottawa County-Michivan FY2000 Operating/Marketing Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $3,500,000 | Traffic Flow Improvements | DetroitWayneOaklandand Macomb Counties ITS Infrastructure Traffic Flow Project - Intelligent Transportation Systems - Maintain 180 miles of ITS Infrastructure, preventative and remedial Maintenance - Other |
539 | 3,583 | ||
| $2,320,000 | Traffic Flow Improvements | Superstructure replacement & widening Under 76th StS of Wyoming Traffic Flow Project - Traffic Engineering - superstructure replacement & widening (2 to 6lanes) - Other |
35 | 3 | ||
| $1,040,000 | Traffic Flow Improvements | Operate County (Oakland) Wide ITS Center Traffic Flow Project - Intelligent Transportation Systems - Operate County Wide ITS Center - Other |
2,265 | |||
| $920,000 | Traffic Flow Improvements | Reconstruct SB & NB exit ramps at Plymouth Road Traffic Flow Project - Traffic Engineering - Construct SB & NB Exit Ramps - Other |
10 | |||
| $800,000 | Traffic Flow Improvements | Intersection Improvements at Frankline and 12 Mile Roads Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | |||
| $800,000 | Traffic Flow Improvements | Various Routes in Metro Region Traffic Flow Project - Intelligent Transportation Systems - Other - Courtsey Patrol-Incident Management-CMAQ grant #00055 - Freeway Management Systems |
438 | 99 | ||
| $720,000 | Traffic Flow Improvements | Relocate the exsisting US-131Ionia St NB Off Ramp Traffic Flow Project - Traffic Engineering - Relocation the exsisting US-131, Ionia St. NB Off Ramp - Other |
1 | 1 | ||
| $542,000 | Traffic Flow Improvements | Relocate the exsisting US-131Ionia St NB Off Ramp Traffic Flow Project - Traffic Engineering - Relocation the exsisting US-131, Ionia St. NB Off Ramp - Other |
1 | 1 | ||
| $459,058 | Traffic Flow Improvements | Traffic Signal Upgrading Ten Locations in Grand Haven Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $450,000 | Traffic Flow Improvements | Intersection Improvements Leonard Street at Collingdale Traffic Flow Project - Traffic Engineering - Intersection Improvements Leonard Street at Collingdale - Other |
1 | 1 | ||
| $448,575 | Traffic Flow Improvements | Signal Modernization and Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
59 | |||
| $446,695 | Traffic Flow Improvements | Construct center/L turn lane at Eastbound Under Pickney Road-Howell Traffic Flow Project - Traffic Engineering - Construct center/L turn lane at Eastbound onramp with improvements at WB ramp terminals - Other |
1 | 1 | ||
| $411,598 | Traffic Flow Improvements | Traffic Signal Upgrading Ten Locations in Grand Haven Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $400,000 | Traffic Flow Improvements | ITS Metro Airport 5-10 mile radius around I-94 & I-2175 Traffic Flow Project - Intelligent Transportation Systems - ITS Metro Airport - Other |
586 | 2,694 | ||
| $388,806 | Traffic Flow Improvements | Consruct Center Left Turn Lane US-31 SB Ramps West to Peterson Road Traffic Flow Project - Traffic Engineering - Construct Center Left Turn Lane - Other |
2 | 1 | ||
| $344,000 | Traffic Flow Improvements | Intersection Improvements Ann Arbor/Saline Road at Water/Lohr Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | |||
| $305,760 | Traffic Flow Improvements | Intersection Improvements Leonard Street at Diamond Traffic Flow Project - Traffic Engineering - Intersection Improvements Leonard Street at Diamond - Other |
3 | 1 | ||
| $285,000 | Traffic Flow Improvements | ATMS Traffic Signal Progression in Farmington Hills Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
623 | 119 | ||
| $235,000 | Traffic Flow Improvements | Traffic Signal Upgrading/Optimization Stone/Thomas to Meijer Drive Port Huron Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
8 | 10 | ||
| $200,000 | Traffic Flow Improvements | ITS Expansion/Continuation Cities of Grand Rapids and Walker Traffic Flow Project - Intelligent Transportation Systems - Other - Additonal signs and cameras - Freeway Management Systems |
16 | 3 | ||
| $200,000 | Traffic Flow Improvements | Bridge replacementapproach replacementguardrail upgrades Black River Spillway Traffic Flow Project - Traffic Engineering - Bridge replacement,approach replacement,and guardrail upgrades over Black River Spillway in Port Huron - Other |
QA | |||
| $200,000 | Traffic Flow Improvements | Detroit/MITS Center Traffic Flow Project - Intelligent Transportation Systems - Other - Courtesy Patrol - Freeway Management Systems |
22 | 5 | ||
| $200,000 | Traffic Flow Improvements | Detroit/MITS Center Traffic Flow Project - Intelligent Transportation Systems - Other - Courtesy Patrol - Freeway Management Systems |
22 | 5 | ||
| $190,000 | Traffic Flow Improvements | Traffic Signals at 3 locations Traffic Flow Project - Other - Traffic Signals at Norton/Henry & Seminole/Henry & Lakeshore Marketplace/Harvey Norton/Henry & Seminole/Lakeshore & Marketplace/Harvey |
3 | 1 | ||
| $186,949 | Traffic Flow Improvements | Intersection Improvements- Construct Indirect Turnaround Traffic Flow Project - Traffic Engineering - Construct Indirect Turnaround (East approach)32ND Avenue-City of Hudsonville - Other |
2 | 1 | ||
| $180,000 | Traffic Flow Improvements | Traffic Signal Upgrading/ Northland/Asbury Park Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
28 | 19 | ||
| $150,000 | Traffic Flow Improvements | Widen Alpine Ave. to Hackmuth from 2 to 3 lanes Traffic Flow Project - Traffic Engineering - Widen Alpine Ave to Hackmuth from 2 to 3 lanes - Other |
1 | 1 | ||
| $150,000 | Traffic Flow Improvements | Signal Upgrading at 10 locations South University to US-23 Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
9 | 4 | ||
| $139,784 | Traffic Flow Improvements | Traffic Signal Fernwood-1st Detroit Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals - Other |
11 | |||
| $127,595 | Traffic Flow Improvements | Traffic Signal Fernwood-1st Detroit Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals - Other |
11 | |||
| $122,469 | Traffic Flow Improvements | Intersection Improvement at 96th Avenue Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 1 | ||
| $120,000 | Traffic Flow Improvements | Construct Widening for Dual Left Turn Lanes I94 EB/WB off ramps Traffic Flow Project - Traffic Engineering - Turn Lanes |
4 | |||
| $101,368 | Traffic Flow Improvements | ON Ramp Eastbound GRND River Ave. Traffic Flow Project - Traffic Engineering - On Ramp Eastbound SE QDRNT/I96/GRND RVR AV. - Other |
3 | |||
| $96,000 | Traffic Flow Improvements | Intersection Improvements-Construction of Directional Crossovers 88th Ave Traffic Flow Project - Traffic Engineering - Intersection Improvements-Construction of Directional Crossovers - Other |
3 | 1 | ||
| $91,323 | Traffic Flow Improvements | ON Ramp Eastbound GRND River Ave. Traffic Flow Project - Traffic Engineering - On Ramp Eastbound SE QDRNT/I96/GRND RVR AV. - Other |
3 | |||
| $80,000 | Traffic Flow Improvements | Dexter Road to Peaceful Valley Dr./Village of Pinckney Traffic Flow Project - Traffic Engineering - Construct Center Lane for Left Turn Lanes - Other |
1 | |||
| $72,966 | Traffic Flow Improvements | CMAQ project Signalization Miller to Washtenaw Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
8 | 1 | ||
| $60,000 | Traffic Flow Improvements | Upgrade Scats Signals Williams Lake Rd. to US-24 Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
37 | |||
| $45,600 | Traffic Flow Improvements | Construct Right Turn Lane on SB Maple at I94BL Traffic Flow Project - Traffic Engineering - Turn Lanes |
5 | |||
| $41,600 | Traffic Flow Improvements | Consruction Lane for Additonal Vehicle Storage Traffic Flow Project - Traffic Engineering - Construct Lane for Additonal Vehicle Storage - Other |
3 | |||
| $35,000 | Traffic Flow Improvements | Traffic Signal Upgrading/Optimization Huron River to Ban Horn Road Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
3 | 1 | ||
| $24,646 | Traffic Flow Improvements | Widen and add Center Left Turn Lane Crooks-Old Perch-Detroit Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $21,000 | Traffic Flow Improvements | Traffic Signals at 3 locations Traffic Flow Project - Other - Traffic Signals at Norton/Henry & Seminole/Henry & Lakeshore Marketplace/Harvey Norton/Henry & Seminole/Lakeshore & Marketplace/Harvey |
3 | 1 | ||
| $20,000 | Traffic Flow Improvements | Widen Connector for Center Left Turn Lane at Dorsett Connector Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | |||
| $19,656 | Traffic Flow Improvements | Signal Interconnect of Arterials Platt to State/Ann Arbor Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
14 | 2 | ||
| $12,000 | Traffic Flow Improvements | Intersection Improvement at 96th Avenue Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 1 | ||
| $10,000 | Traffic Flow Improvements | Traffic Signals (9 Mile MarshallCambourne) Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals (9 Mile, Marshall,Cambourne) - Other |
QA | |||
| $6,887 | Traffic Flow Improvements | Turn Lane and Signal at Fuller Street Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 44 | ||
| $4,231 | Traffic Flow Improvements | Traffic Signal at Hackley Road Intersection Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | |||
| $3,976 | Traffic Flow Improvements | Traffic Signal Dequindre-Jefferson-DET Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
34 | 5 | ||
| $3,530 | Traffic Flow Improvements | Traffic Signal Dequindre-Jefferson-DET Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
34 | 5 | ||
| $3,413 | Traffic Flow Improvements | Right Turn Lane at Patterson Ave. Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $877 | Traffic Flow Improvements | Traffic Signal Upgrade Sherman Street Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
2 | 0 | ||
| $600 | Traffic Flow Improvements | Lengthen Center Left Turn Lane Traffic Flow Project - Traffic Engineering - Lengthen Center Left Turn Lane - Other |
1 | 1 | ||
| $160 | Traffic Flow Improvements | Signal Modernization Utica Rd-Hall Rd Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
25 | |||
| $(400) | Traffic Flow Improvements | Signalize Intersection at Dan Hoey Traffic Flow Project - Intelligent Transportation Systems - Signalize Intersection at Dan Hoey - Other |
1 | 1 | ||
| $(460) | Traffic Flow Improvements | Right Turn Lane at Patterson Ave. Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $(460) | Traffic Flow Improvements | Right Turn Lane at Patterson Ave. Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $(2,466) | Traffic Flow Improvements | Update and Inteconnect Signal at Broadway Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
9 | -1 | ||
| $(3,416) | Traffic Flow Improvements | Turn Lane and Signal at College Ave Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 16 | ||
| $(3,829) | Traffic Flow Improvements | Sinal Interconnect at Carpenter Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | 1 | ||
| $(4,333) | Traffic Flow Improvements | Signal Interconnect along 8.72 miles of arterial Schoolcraft and Seven Mile Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
13 | 2 | ||
| $(5,185) | Traffic Flow Improvements | Traffic Signal at Hoyt and Mason Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal at Hoyt and Mason - Other |
1 | 1 | ||
| $(6,344) | Traffic Flow Improvements | Baseline Road-Avery Road Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
30 | 4 | ||
| $(9,682) | Traffic Flow Improvements | CMAQ project intersection reviews at Fonda Drive Traffic Flow Project - Traffic Engineering - CMAQ project intersection reviews at Fonda Drive - Other |
2 | 0 | ||
| $(10,264) | Traffic Flow Improvements | 3 LOCS in Detriot Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
39 | 5 | ||
| $(16,948) | Traffic Flow Improvements | Widen and add Left Turn Lane at LivernoisBrwstr & Rchstr Traffic Flow Project - Traffic Engineering - Turn Lanes |
4 | -1 | ||
| $(18,404) | Traffic Flow Improvements | Traffic Signals Joy Rd. to Baseline Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Joy Rd to Baseline - Other |
23 | |||
| $(21,018) | Traffic Flow Improvements | Traffic Signals Goddard to Plymouth Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Goddard to Plymouth - Other |
32 | |||
| $(24,279) | Traffic Flow Improvements | Traffic Signal Interconnect Huron to Plymouth Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
14 | 2 | ||
| $(36,294) | Traffic Flow Improvements | Widen and add Turn Lane at Squirrel Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 0 | ||
| $(45,600) | Traffic Flow Improvements | Advanced Traffic Monitoring System Additions BTW US24 & I75 Traffic Flow Project - Intelligent Transportation Systems - Other - Advanced Traffic Monitoring System Additions - Freeway Management Systems |
395 | |||
| $(48,020) | Traffic Flow Improvements | Turn Lane at Big Beaver Intersection Traffic Flow Project - Traffic Engineering - Turn Lanes |
-7 | |||
| $(136,000) | Traffic Flow Improvements | Advanced Traffic Monitoring System Additions Traffic Flow Project - Intelligent Transportation Systems - Other - Advanced Traffic Monitoring System Additions - Freeway Management Systems |
395 | |||
| $(139,461) | Traffic Flow Improvements | Signal Interconnect US 23 to Swift Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
55 | 1 | ||
| $(170,239) | Traffic Flow Improvements | Traffic Signal Modernization Saline to Fernwood/ Ann Arbor Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
7 | 1 | ||
| $(186,942) | Traffic Flow Improvements | Traffic Signals Fielding/Spencer to Lone Pine Road Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Fielding/Spencer to Lone Pine Road (26 Locations) - Other |
69 | 9 | ||
| $(448,575) | Traffic Flow Improvements | Signal Modernization and Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
59 | |||
| $2,000,000 | Transit | SMART 11 routes Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
41 | 41 | ||
| $1,800,000 | Transit | DDOT construct alt. fuel facility Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation |
111 | |||
| $1,142,074 | Transit | SMART - New Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year |
249 | |||
| $749,484 | Transit | SMART - 16 Paratransit bues purch. Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New |
1 | |||
| $670,000 | Transit | COD-People Mover Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year |
27 | |||
| $600,000 | Transit | Purchase ROW for Additonal Parking for AMTRAK Station in the City of Holland Transit Project Facilities Improvements - Passenger Facilities - Rail Stations - Access - Improved |
2 | |||
| $508,442 | Transit | SMART - 11 Expansion Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified |
1 | |||
| $480,000 | Transit | Purchase 2 buses extension Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
6 | 8 | ||
| $480,000 | Transit | Construct CNG fueling station Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation |
QA | QA | ||
| $343,200 | Transit | Replace 2 Diesel Buses with CNG Buses Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
6 | 43 | ||
| $240,000 | Transit | GRATA-pilot bus route extension Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
6 | 7 | ||
| $200,000 | Transit | Replace Diesel Bus with CNG Bus Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital |
1 | 1 | ||
| $200,000 | Transit | Monroe County Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
4 | |||
| $192,000 | Transit | Pilot bus route extension Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
4 | 48 | ||
| $174,720 | Transit | Regional Operating Assistance Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year |
2 | 2 | ||
| $165,762 | Transit | SMART - 2 replacemetn buses/Monroe Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement |
3 | |||
| $65,520 | Transit | Go BUS Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year |
1 | |||
| $64,000 | Transit | Purchase medium bus replacement Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
2 | 9 | ||
| $48,000 | Transit | Small Bus replacement Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement |
2 | 9 | ||
| $(1,109,703) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Minnesota | 1/10/2003 | $21,198,900 | $10,268,388 | 48 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $357,254 | Demand Management | Metropolitan Council Travel Demand Management Program Demand Management Project - Public Information - Marketing - Other - Vanpool, bike, transit, and other alternatives |
4,923 | |||
| $183,700 | Demand Management | I-494 Travel Demand Management Program Demand Management Project - New Activity - Planning - Other - 7 city effort of techniques |
319 | |||
| $10,813,788 | Traffic Flow Improvements | Regional Traffic Management Center Traffic Flow Project - Other - construction of new facility to manage roadways CMAQ amount includes advance construction. Will be charged in 01/02 |
7,736 | |||
| $353,703 | Traffic Flow Improvements | HOV Ramp Meter Bypasses I-35E at Yankee Doodle and Lone Oak Rd in Eagan Traffic Flow Project - Intelligent Transportation Systems - Ramp Meters - Freeway Management Systems |
48 | |||
| $5,448,150 | Transit | Metro Transit-Purchase of 26 Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New Buses are 40 ft in length |
29 | |||
| $1,083,013 | Transit | Southwest Metro Transit Reverse Commute Management Team Transit Project - Transit Management Systems - coordinating sub-regional transit services, match jobs with employees, greater efficiency of current routes |
485 | |||
| $(7,971,220) | Miscellaneous | Miscellaneous HQ's adjustment - deobligations from previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Mississippi | 1/10/2003 | $7,861,832 | $10,721,573 | 136 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $6,000,000 | STP/CMAQ | US 82 from Montgomery County line to Europa bypass | ||||
| $4,700,000 | STP/CMAQ | SR 25 Relocation South of Starkville from Winston County | ||||
| $21,573 | STP/CMAQ | Miscellaneous |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Missouri | 1/10/2003 | $22,131,276 | $9,221,710 | 42 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $336,484 | Demand Management | Reduced fare ozone red alert program Demand Management Project - Public Information - Promotion - Marketing - Telecommuting |
57 | |||
| $2,000,000 | I/M and Other TCMs | Low income emission repair program TCM or I/M Project - I/M - Capital |
701 | |||
| $459,024 | I/M and Other TCMs | Alternate Fuel Vehicle Purchases I/M or Other TCM Project - I/M - Capital |
QA | |||
| $198,000 | I/M and Other TCMs | Alternative Fuel Program I/M or Other TCM Project - Other - Alternate Fuel Program |
QA | |||
| $130,215 | Pedestrian/Bicycle | Bike and breathe easy outreach program Pedestrian/Bicycle Project - Education/Promotion - Bike and Breathe Easy Outreach Program |
1 | |||
| $923,060 | Traffic Flow Improvements | Citywide traffic signal control | 72 | |||
| $480,000 | Traffic Flow Improvements | Traffic signal modification-Sappington & Seibert Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | |||
| $400,000 | Traffic Flow Improvements | Traffic signal modification-ERB & Sappington Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | |||
| $287,441 | Traffic Flow Improvements | ITS field Equipment and systems plan Traffic Flow Project - Intelligent Transportation Systems - Other - Field Equipment and Sytems Plan - Freeway Management Systems |
30 | |||
| $90,000 | Traffic Flow Improvements | Signal controller & geometrics (Mid Rivers Dr & Mexico Rd) Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
4 | |||
| $89,140 | Traffic Flow Improvements | Signals and geometrics (Brentwood Blvd d/Clayton Rd) Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | |||
| $80,000 | Traffic Flow Improvements | Fiber Optic Signal Loop (RT JJ to Boop Road) Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
15 | |||
| $35,614 | Traffic Flow Improvements | Geometric improvements at Northbound 366 & Watson Rd Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | |||
| $8,584 | Traffic Flow Improvements | Windsor harbor traffic signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing Jefferson County |
1 | |||
| $7,000 | Traffic Flow Improvements | Traffic signal modification-Lackland & Woodson Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | |||
| $690,994 | Transit | New transit service Transit Project - Operating Assistance (New or Expanded Service) - Rail - New Service - 1st Year |
43 | |||
| $525,638 | Transit | New shuttle bus service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
5 | |||
| $450,862 | Transit | Peak hour commuter bus service | 5 | |||
| $439,070 | Transit | Peak hour commuter bus service Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
7 | |||
| $396,036 | Transit | Peak hour commuter bus service Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
8 | |||
| $369,440 | Transit | Public transportation outreach program Transit Project - Related Demand Management Stategies - Other - Transportation Outreach Program |
31 | |||
| $284,340 | Transit | Peak hour commuter bus service Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
5 | |||
| $60,768 | Transit | Midday & evening bus service Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
5 | |||
| $480,000 | Miscellaneous | Miscellaneous HQ's adjustment - obligation to previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Montana | 1/10/2003 | $9,635,871 | $9,870,357 | 102 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $108,225 | Demand Management | Missoula TDM planning Demand Management Project - New Activity - Planning - Other |
QA | |||
| $503,896 | I/M and Other TCMs | Air quality equipment TCM or I/M Project - Other - Acquisition of new sweepers, flush trucks, liquid de-icer equipment for at-risk PM10 areas. |
1,561 | |||
| $159,381 | I/M and Other TCMs | Air quality equipment TCM or I/M Project - Other - new sweapers, flush trucks, de-icing equipment for PM-10 nonattainment or "risk" areas. |
QA | |||
| $28,545 | I/M and Other TCMs | Missoula City paving of alleys to reduce amount of re-entrained road dust (PM10) I/M or Other TCM Project - Other - Paving as a dust control measure. |
294 | |||
| $3,718,153 | Pedestrian/Bicycle | Clark Fork River Bike Ped Bridge Bicycle/Pedestrian Project - Other - Clark Fork River bike ped bridge, vehicle bridge. Qualitative emissions benefits (1998). |
QA | |||
| $1,632,055 | Pedestrian/Bicycle | Primary sidewalk newtwork-Missoula Bicycle/Pedestrian Project - Facilities - Construct sidewalks along primary system at various locations in Missoula. - Sidewalks. - Other |
||||
| $20,463 | Pedestrian/Bicycle | Missoula Bike/Ped Program Bicycle/Pedestrian Project - Other - Funding of bike/ped coordinator position in Missoula. |
QA | QA | QA | |
| $13,026 | Pedestrian/Bicycle | Bike/ped facilities improvement-Great Falls Bicycle/Pedestrian Project - Facilities - Bike racks, lockers; public awareness campaign. - Other |
6 | |||
| $(14,977) | Pedestrian/Bicycle | South Avenue bike/ped path Bicycle/Pedestrian Project - Other - De-obligating funds away from this project, for which emission benefits were reported in 1995. |
||||
| $(15,926) | Pedestrian/Bicycle | Bicycle commuter network Bicycle/Pedestrian Project - Other - Money deobligated from bike path project. Benefits of initial project reported in 1995. |
||||
| $1,366,275 | Traffic Flow Improvements | Main Street-Kalispelli Traffic Flow Project - Traffic Engineering - Turning lanes. - Turn Lanes |
13 | |||
| $315,242 | Traffic Flow Improvements | Custer Ave signal synch & intersection realignment Traffic Flow Project - Traffic Engineering - Reconfiguring intersection and upgrading 5 signals to provide signal synchronization within the corridor. Emission benefits reported in 1999. - Turn Lanes Project in Helena attainment area |
||||
| $212,121 | Traffic Flow Improvements | Brooks/South/Russell intersection Traffic Flow Project - Other - Intersection Improvement. Estimated benefits first reported in 1993. |
||||
| $105,522 | Traffic Flow Improvements | Signal Upgrade-Butte Traffic Flow Project - Traffic Engineering - Upgrade of signals, signal-interconnection. - Other |
25 | |||
| $91,866 | Traffic Flow Improvements | 19th & Main-Bozeman Traffic Flow Project - Traffic Engineering - Turning lanes. - Turn Lanes |
23 | |||
| $21,475 | Traffic Flow Improvements | Signal Operation Improvement - Missoula Traffic Flow Project - Other - Upgrade signals and surface at 50 intersections. |
||||
| $(22,352) | Traffic Flow Improvements | Idaho/LaSalle & N 93 signals Kalispell Montana Traffic Flow Project - Other - De-obligation of money from this project. benefits previously reported for CO as 44.2 kg/day |
||||
| $618,402 | Transit | Bike shelter new buses fare incentives Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement |
QA | QA | QA | |
| $500,000 | Transit | Transit center rehabilitation Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - Rehabilitation of a transit center in Great Falls. - Improved |
4 | 1 | ||
| $405,314 | STP/CMAQ | Signal - N. 19th and Baxter Bozeman This is an STP/CMAQ Project Intersection improvement and signal. |
||||
| $125,816 | STP/CMAQ | Signal - N. 7th & Griffin - Bozeman This is an STP/CMAQ Project Install signal |
||||
| $6,927 | STP/CMAQ | Whitefish Stage Rd-Kalispell This is an STP/CMAQ Project |
||||
| $6,927 | STP/CMAQ | Bridge Street - Miles City This is an STP/CMAQ Project Plant mix surfacing - overlay, seal and cover |
||||
| $4,329 | STP/CMAQ | County Road 350 - Sidney This is an STP/CMAQ Project Level, plant mix surfacing - overlay, seal and cover |
||||
| $(40,348) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year