CMAQ DETAILED PROJECT LISTING REPORT (FY 2000)

Page 4

Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Maryland 1/10/2003 $50,283,517 $39,550,709 79 %
Maryland
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$766,000 Shared Ride 10 Maryland Ridesharing Programs
Shared Ride Project - Public Program - Information/Matching - Matching
17   53  
$138,329 Shared Ride MD 2/4 at Ball Road New Park and Ride Lot
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   5  
$132,817 Shared Ride I-95/MD 279 Interchange Two 25 space Park and Ride lots
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$5,069,943 Traffic Flow Improvements Expenditure for CHART Operations
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year
QA      
$4,451,053 Traffic Flow Improvements US 1: Oak Street to MD 198
Traffic Flow Project - Traffic Engineering - Congestion intersection inprovements from Intercounty Connnector Study - Other
1   1  
$1,932,086 Traffic Flow Improvements Chart Technical support with University of Maryland Traffic Flow Project
Intelligent Transportation Systems - technical support with University of Maryland - Other
QA      
$1,923,221 Traffic Flow Improvements Install advanced traffic management equipment
Traffic Flow Project - Intelligent Transportation Systems - Other - Install advanced traffic management equipment - Incident Management Systems
I-70,I-83,I-695,I-795 Phase I
QA      
$1,717,127 Traffic Flow Improvements MD 355/MD 124 Intersection Improvements
Traffic Flow Project - Traffic Engineering - intersection IMprovements from Intercounty Connector /Congestion Relief Study - Other
8   4  
$1,602,892 Traffic Flow Improvements MD115/Shady Grove Road and MD 115/Redland Road Intersection Improvements
Traffic Flow Project - Congestion Management Systems - Development, Establishment, Implementation - from the InterCounty Connector Study at key intersections
2   1  
$1,443,898 Traffic Flow Improvements MD 97/Emory Lane Congested Intersection Improvement
Traffic Flow Project - Other - intersection imporvements from congestion relief study/Intercounty Connector Study
1   1  
$1,265,977 Traffic Flow Improvements MD 650/Ednor Road Intersection Improvement
Traffic Flow Project - Congestion Management Systems - Development, Establishment, Implementation - from InterCounty Connector Study
1   1  
$1,146,002 Traffic Flow Improvements MD 201/MD212
Traffic Flow Project - Traffic Engineering - intersection improvements from Intercounty Connector/Congestion Relief Study - Other
2   1  
$629,878 Traffic Flow Improvements MD 28/East Gude Drive
Traffic Flow Project - Traffic Engineering - Intersection Improvements from intercounty Connector/Congestion Relief Study - Other
1   1  
$563,280 Traffic Flow Improvements Statewide Operations Centers renovations and reconfiguration
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year
QA      
$473,000 Traffic Flow Improvements Expenditure for CHART vehicle purchases
Traffic Flow Project - Intelligent Transportation Systems - Vehicle Purchase - Incident Management Systems
QA      
$426,512 Traffic Flow Improvements Install Speed Dectors
Traffic Flow Project - Intelligent Transportation Systems - Other - Install speed detectors - Incident Management Systems
MD 295: South of MD 202 to MD 175
QA      
$87,413 Traffic Flow Improvements Expenditure for CHART incident management equipment
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year
QA      
$8,370,000 Transit 18 Light Rail Vehicles
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Rail - New - Light Rail
15   50  
$4,726,740 Transit Transit
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New
FTA Transfers - various transit projects
QA   QA  
$360,000 Transit 175 Bus Engine Overhauls
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified
      17
$60,000 STP/CMAQ Expenditure for Maryland State Police Cycles
This is an STP/CMAQ Project
Expenditure for Maryland State Police Cycles
QA      
$2,264,541 Miscellaneous Miscellaneous
HQ's adjustment - obligation to previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Massachusetts 1/10/2003 $25,600,975 $28,792,822 112 %
Massachusetts
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$212,666 Demand Management TMA Program
Demand Management Project - New Activity - Capital Expense - Other - TMA not specified
QA      
$40,000 Demand Management TDM Greater Lowell TMA- Year 3
Demand Management Project - Operating Assistance - 3rd Year - Other - TMA not specified
9   14  
$40,000 Demand Management TDM-Junction TMO
Demand Management Project - Public Information - Marketing - Other - TMA not specified
1   2  
$40,000 Demand Management TDM-Route 9 TMA
Demand Management Project - Public Information - Marketing - Other - TMA not specified
20   34  
$2,789,600 Pedestrian/Bicycle Ayer-Dunstable Rail trail
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$1,691,768 Pedestrian/Bicycle Bike Path-Neponset (MDC)
Pedestrian/Bicycle Project - Facilities - Separate Path
1   1  
$1,167,936 Pedestrian/Bicycle Harborwalk-Children`s Museum Wharf
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$880,000 Pedestrian/Bicycle Dartmouth St. Pedestrian Mall
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$546,248 Pedestrian/Bicycle Downtown Riverwalk-Waltham
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$524,000 Pedestrian/Bicycle East Boston Greenway
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$364,800 Pedestrian/Bicycle South Street Pathway
Pedestrian/Bicycle Project - Facilities - Separate Path
QA      
$80,000 Shared Ride TDM-Metrowest Carpool/Vanpool Subsidy
Shared Ride Project - Public Program - Van Pool - Commuter Matching
QA      
$3,302,942 Traffic Flow Improvements Interium Operations Center
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year
24   5  
$1,698,000 Traffic Flow Improvements Motorist Assistance Program
Traffic Flow Project - Intelligent Transportation Systems - Travel Management Centers - Operation - Freeway Management Systems - 1st Year
QA      
$1,460,876 Traffic Flow Improvements Statewide Traffic Management Program
Traffic Flow Project - Intelligent Transportation Systems - Program - Other
QA      
$1,272,128 Traffic Flow Improvements North Shore Signal System
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
9   3  
$1,046,032 Traffic Flow Improvements Calvin Coolidge Bridge
Traffic Flow Project - Intelligent Transportation Systems - Other - Bridge - Incident Management Systems
1   32  
$986,457 Traffic Flow Improvements Traffic Signals Lynn (4 locations)
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
19   7  
$769,305 Traffic Flow Improvements Geometric and Signal Improvements Worcester
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
4   2  
$706,548 Traffic Flow Improvements Traffic Signals Rte. 85 Hopkinton
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2   1  
$627,871 Traffic Flow Improvements Signal Upgrades Springfield
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
7   3  
$556,794 Traffic Flow Improvements Traffic Signal update Sunderland Franklin County
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
14   5  
$467,689 Traffic Flow Improvements Intersection Improvements Fall River
Traffic Flow Project - Traffic Engineering - Other
5   2  
$450,384 Traffic Flow Improvements Signal Upgrade Maynard
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1   1  
$400,400 Traffic Flow Improvements Traffic Operations Center
Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Operations center
10   4  
$350,754 Traffic Flow Improvements Traffic signals Peabody
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1   1  
$293,682 Traffic Flow Improvements Road reconstruction and signals Leominster
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
10   4  
$4,490,798 Transit Intermodal Center Union Station-Worcester
Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - Improved
15   22  
$162,095 Transit Crosstown Shuttle-Somerville
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
1   1  
$145,600 Transit Transit Operating Assistance-office parks
Transit Project - Transit Management Systems - office parks
1   1  
$112,525 Transit Eastin Express
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year
1   1  
$109,996 Transit TDM-Early morning Airport Bus
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 3rd Year
QA      
$103,530 Transit TDM-Easthampton Van Service
Transit Project - Related Demand Management Stategies - Other - van service
1   1  
$100,253 Transit Waltham INtra-City Bus
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 3rd Year
1   7  
$80,000 Transit TDM-Natick Raillink
Transit Project - Facilities Improvements - Rail
Track - New - Light Rail
QA      
$80,000 Transit TDM Cap Cod Smart Card-year 1
Transit Project - Related Demand Management Stategies - Fare Subsidies - Seasonal
1   1  
$78,200 Transit TSM-Oneal-Wareham Extension
Transit Project - Related Demand Management Stategies - Fare Subsidies - Seasonal
3   3  
$72,000 Transit Industrial Park Bus Service-Avon/Brockton
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
1   1  
$67,973 Transit Route 52 Bus
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year
1   1  
$64,883 Transit Route 53 Bus
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
1   2  
$40,000 Transit TDM-Framingham-Marborough Bus
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
1   1  
$20,000 Transit TDM-Commuter Transit Passes-Martha`s Vineyard
Transit Project - Related Demand Management Stategies - Fare Subsidies - Seasonal
1   1  
$298,089 Miscellaneous Miscellaneous
HQ's adjustment - obligation to previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Michigan 1/10/2003 $37,865,714 $29,194,423 77 %
Michigan
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$376,800 Demand Management 3 year Ozone Action Outreach Program
Demand Management Project - Public Information - Public Education - Other - Promote and educate general public over 3 years of the Ozone Action Outreach Program
90      
$223,700 Demand Management Reverse Commute Demonstration Project
Demand Management Project - Public Information - Public Education - Other - Reverse Commute Demostration Project
6      
$25,200 Demand Management Ozone Program-CMAQ Grant #9908
Demand Management Project - Public Information - Marketing - Other - Ozone Program-Metro Area
25   25  
$25,000 Demand Management Support Ozone Action Day Activities/Materials/Initiatives
Demand Management Project - Public Information - Public Education - Other - Support Ozone Action Day Activites/Materials/Initiatives
QA      
$24,800 Demand Management Muskegon Clean Cities-FY 1999
Demand Management Project - Public Information - Public Education - Other - Muskegon Clean Cities FY 1999 Alternative Fuel Marketing Development Program/Outreach
QA      
$1,415,957 I/M and Other TCMs Regional-Semsim Winter Maintenance Operations/General Micellaneous
I/M or Other TCM Project - Other - Regional-Semsim Winter Maintenance Operations/General Miscellaneous
2,460      
$26,400 I/M and Other TCMs Employment Mobility/How Retention
I/M or Other TCM Project - Other - Employment Mobility/How Retention-CMAG Grant #0005
2   2  
$25,000 I/M and Other TCMs Ozone Action Program/Muskegon Urbanized Area
I/M or Other TCM Project - Other - Ozone Action Program/Muskegon Urbanized Area
25   1  
$20,000 I/M and Other TCMs Voluntary Ozone Action Program/Holland Metro Area
I/M or Other TCM Project - Other - Voluntary Ozone Action Program/Holland Metro Area
164   165  
$7,500 I/M and Other TCMs Muskegon County-Michivan FY2000 Employment Mobility/HOV Retention
I/M or Other TCM Project - Other - Employment Mobility/HOV Retention
1   1  
$6,300 I/M and Other TCMs Ottawa County-Michivan FY2000 Employment Mobility/HOV Retention
I/M or Other TCM Project - Other - Employment Mobility/HOV Retention
1   1  
$5,600 I/M and Other TCMs Upgrade exsisting carpool lot at M-50
I/M or Other TCM Project - Other - Upgrade existing carpool lot at M-50
4   7  
$358,368 Pedestrian/Bicycle Construction of Non-Moterized Pathway 88 & 120th & Riley St.
Pedestrian/Bicycle Project - Facilities - Separate Path
4   4  
$292,133 Pedestrian/Bicycle Widen Bridge for Pedestrian Traffic over south channel of Grand River
Pedestrian/Bicycle Project - Facilities - Separate Path
2   2  
$136,000 Pedestrian/Bicycle Construction of Non-Motorized Pathway
Pedestrian/Bicycle Project - Facilities - Separate Path
4   4  
$80,000 Pedestrian/Bicycle Bridge Widening for Pedestrian Traffic over the Grand River
Pedestrian/Bicycle Project - Facilities - Separate Path
2   2  
$7,863 Pedestrian/Bicycle Non-Motorized Path 92nd to 96th and Perry to Mapleview
Pedestrian/Bicycle Project - Facilities - Separate Path
3   4  
$341,000 Shared Ride Southeastern Michigan Ridesharing
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
1,917      
$100,000 Shared Ride Michi-Van Southeastern Michigan Employment Mobility
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
7      
$95,000 Shared Ride Southeastern Michigan-Ridesharing FY2000
Shared Ride Project - Public Program - Information/Matching - Matching
148      
$70,000 Shared Ride Southeastren Michigan-Michivan FY2000 Operating/Marketing
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
8      
$50,000 Shared Ride Southeastern Michigan-HOV Retention-FY 2000/Michi-Van(HOV)
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
7      
$34,000 Shared Ride Michivan-GIS implementation and administration FY2000
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
4      
$11,700 Shared Ride Holland/Zeeland-MICHIVAN FY2000
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$11,600 Shared Ride Grand Rapids-Michigan FY2000-Operating/Marketing-CMAQ Grant #0037
Shared Ride Project - Public Program - Information/Matching - Marketing
2   2  
$5,300 Shared Ride Holland/Zeeland-Michivan FY2000
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$3,500 Shared Ride Muskegon County-Michigan FY2000-Operating/Marketing
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$2,700 Shared Ride Ottawa County-Michivan FY2000 Operating/Marketing
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
1   1  
$3,500,000 Traffic Flow Improvements DetroitWayneOaklandand Macomb Counties ITS Infrastructure
Traffic Flow Project - Intelligent Transportation Systems - Maintain 180 miles of ITS Infrastructure, preventative and remedial Maintenance - Other
539   3,583  
$2,320,000 Traffic Flow Improvements Superstructure replacement & widening Under 76th StS of Wyoming
Traffic Flow Project - Traffic Engineering - superstructure replacement & widening (2 to 6lanes) - Other
35   3  
$1,040,000 Traffic Flow Improvements Operate County (Oakland) Wide ITS Center
Traffic Flow Project - Intelligent Transportation Systems - Operate County Wide ITS Center - Other
2,265      
$920,000 Traffic Flow Improvements Reconstruct SB & NB exit ramps at Plymouth Road
Traffic Flow Project - Traffic Engineering - Construct SB & NB Exit Ramps - Other
10      
$800,000 Traffic Flow Improvements Intersection Improvements at Frankline and 12 Mile Roads
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1      
$800,000 Traffic Flow Improvements Various Routes in Metro Region
Traffic Flow Project - Intelligent Transportation Systems - Other - Courtsey Patrol-Incident Management-CMAQ grant #00055 - Freeway Management Systems
438   99  
$720,000 Traffic Flow Improvements Relocate the exsisting US-131Ionia St NB Off Ramp
Traffic Flow Project - Traffic Engineering - Relocation the exsisting US-131, Ionia St. NB Off Ramp - Other
1   1  
$542,000 Traffic Flow Improvements Relocate the exsisting US-131Ionia St NB Off Ramp
Traffic Flow Project - Traffic Engineering - Relocation the exsisting US-131, Ionia St. NB Off Ramp - Other
1   1  
$459,058 Traffic Flow Improvements Traffic Signal Upgrading Ten Locations in Grand Haven
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$450,000 Traffic Flow Improvements Intersection Improvements Leonard Street at Collingdale
Traffic Flow Project - Traffic Engineering - Intersection Improvements Leonard Street at Collingdale - Other
1   1  
$448,575 Traffic Flow Improvements Signal Modernization and Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
59      
$446,695 Traffic Flow Improvements Construct center/L turn lane at Eastbound Under Pickney Road-Howell
Traffic Flow Project - Traffic Engineering - Construct center/L turn lane at Eastbound onramp with improvements at WB ramp terminals - Other
1   1  
$411,598 Traffic Flow Improvements Traffic Signal Upgrading Ten Locations in Grand Haven
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$400,000 Traffic Flow Improvements ITS Metro Airport 5-10 mile radius around I-94 & I-2175
Traffic Flow Project - Intelligent Transportation Systems - ITS Metro Airport - Other
586   2,694  
$388,806 Traffic Flow Improvements Consruct Center Left Turn Lane US-31 SB Ramps West to Peterson Road
Traffic Flow Project - Traffic Engineering - Construct Center Left Turn Lane - Other
2   1  
$344,000 Traffic Flow Improvements Intersection Improvements Ann Arbor/Saline Road at Water/Lohr
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1      
$305,760 Traffic Flow Improvements Intersection Improvements Leonard Street at Diamond
Traffic Flow Project - Traffic Engineering - Intersection Improvements Leonard Street at Diamond - Other
3   1  
$285,000 Traffic Flow Improvements ATMS Traffic Signal Progression in Farmington Hills
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
623   119  
$235,000 Traffic Flow Improvements Traffic Signal Upgrading/Optimization Stone/Thomas to Meijer Drive Port Huron
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
8   10  
$200,000 Traffic Flow Improvements ITS Expansion/Continuation Cities of Grand Rapids and Walker
Traffic Flow Project - Intelligent Transportation Systems - Other - Additonal signs and cameras - Freeway Management Systems
16   3  
$200,000 Traffic Flow Improvements Bridge replacementapproach replacementguardrail upgrades Black River Spillway
Traffic Flow Project - Traffic Engineering - Bridge replacement,approach replacement,and guardrail upgrades over Black River Spillway in Port Huron - Other
QA      
$200,000 Traffic Flow Improvements Detroit/MITS Center
Traffic Flow Project - Intelligent Transportation Systems - Other - Courtesy Patrol - Freeway Management Systems
22   5  
$200,000 Traffic Flow Improvements Detroit/MITS Center
Traffic Flow Project - Intelligent Transportation Systems - Other - Courtesy Patrol - Freeway Management Systems
22   5  
$190,000 Traffic Flow Improvements Traffic Signals at 3 locations
Traffic Flow Project - Other - Traffic Signals at Norton/Henry & Seminole/Henry & Lakeshore Marketplace/Harvey Norton/Henry & Seminole/Lakeshore & Marketplace/Harvey
3   1  
$186,949 Traffic Flow Improvements Intersection Improvements- Construct Indirect Turnaround
Traffic Flow Project - Traffic Engineering - Construct Indirect Turnaround (East approach)32ND Avenue-City of Hudsonville - Other
2   1  
$180,000 Traffic Flow Improvements Traffic Signal Upgrading/ Northland/Asbury Park
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
28   19  
$150,000 Traffic Flow Improvements Widen Alpine Ave. to Hackmuth from 2 to 3 lanes
Traffic Flow Project - Traffic Engineering - Widen Alpine Ave to Hackmuth from 2 to 3 lanes - Other
1   1  
$150,000 Traffic Flow Improvements Signal Upgrading at 10 locations South University to US-23
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
9   4  
$139,784 Traffic Flow Improvements Traffic Signal Fernwood-1st Detroit
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals - Other
11      
$127,595 Traffic Flow Improvements Traffic Signal Fernwood-1st Detroit
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals - Other
11      
$122,469 Traffic Flow Improvements Intersection Improvement at 96th Avenue
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1   1  
$120,000 Traffic Flow Improvements Construct Widening for Dual Left Turn Lanes I94 EB/WB off ramps
Traffic Flow Project - Traffic Engineering - Turn Lanes
4      
$101,368 Traffic Flow Improvements ON Ramp Eastbound GRND River Ave.
Traffic Flow Project - Traffic Engineering - On Ramp Eastbound SE QDRNT/I96/GRND RVR AV. - Other
3      
$96,000 Traffic Flow Improvements Intersection Improvements-Construction of Directional Crossovers 88th Ave
Traffic Flow Project - Traffic Engineering - Intersection Improvements-Construction of Directional Crossovers - Other
3   1  
$91,323 Traffic Flow Improvements ON Ramp Eastbound GRND River Ave.
Traffic Flow Project - Traffic Engineering - On Ramp Eastbound SE QDRNT/I96/GRND RVR AV. - Other
3      
$80,000 Traffic Flow Improvements Dexter Road to Peaceful Valley Dr./Village of Pinckney
Traffic Flow Project - Traffic Engineering - Construct Center Lane for Left Turn Lanes - Other
1      
$72,966 Traffic Flow Improvements CMAQ project Signalization Miller to Washtenaw
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
8   1  
$60,000 Traffic Flow Improvements Upgrade Scats Signals Williams Lake Rd. to US-24
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
37      
$45,600 Traffic Flow Improvements Construct Right Turn Lane on SB Maple at I94BL
Traffic Flow Project - Traffic Engineering - Turn Lanes
5      
$41,600 Traffic Flow Improvements Consruction Lane for Additonal Vehicle Storage
Traffic Flow Project - Traffic Engineering - Construct Lane for Additonal Vehicle Storage - Other
3      
$35,000 Traffic Flow Improvements Traffic Signal Upgrading/Optimization Huron River to Ban Horn Road
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
3   1  
$24,646 Traffic Flow Improvements Widen and add Center Left Turn Lane Crooks-Old Perch-Detroit
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$21,000 Traffic Flow Improvements Traffic Signals at 3 locations
Traffic Flow Project - Other - Traffic Signals at Norton/Henry & Seminole/Henry & Lakeshore Marketplace/Harvey Norton/Henry & Seminole/Lakeshore & Marketplace/Harvey
3   1  
$20,000 Traffic Flow Improvements Widen Connector for Center Left Turn Lane at Dorsett Connector
Traffic Flow Project - Traffic Engineering - Turn Lanes
1      
$19,656 Traffic Flow Improvements Signal Interconnect of Arterials Platt to State/Ann Arbor
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
14   2  
$12,000 Traffic Flow Improvements Intersection Improvement at 96th Avenue
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1   1  
$10,000 Traffic Flow Improvements Traffic Signals (9 Mile MarshallCambourne)
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals (9 Mile, Marshall,Cambourne) - Other
QA      
$6,887 Traffic Flow Improvements Turn Lane and Signal at Fuller Street
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   44  
$4,231 Traffic Flow Improvements Traffic Signal at Hackley Road Intersection
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2      
$3,976 Traffic Flow Improvements Traffic Signal Dequindre-Jefferson-DET
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
34   5  
$3,530 Traffic Flow Improvements Traffic Signal Dequindre-Jefferson-DET
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
34   5  
$3,413 Traffic Flow Improvements Right Turn Lane at Patterson Ave.
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$877 Traffic Flow Improvements Traffic Signal Upgrade Sherman Street
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
2   0  
$600 Traffic Flow Improvements Lengthen Center Left Turn Lane
Traffic Flow Project - Traffic Engineering - Lengthen Center Left Turn Lane - Other
1   1  
$160 Traffic Flow Improvements Signal Modernization Utica Rd-Hall Rd
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
25      
$(400) Traffic Flow Improvements Signalize Intersection at Dan Hoey
Traffic Flow Project - Intelligent Transportation Systems - Signalize Intersection at Dan Hoey - Other
1   1  
$(460) Traffic Flow Improvements Right Turn Lane at Patterson Ave.
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$(460) Traffic Flow Improvements Right Turn Lane at Patterson Ave.
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   1  
$(2,466) Traffic Flow Improvements Update and Inteconnect Signal at Broadway
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
9   -1  
$(3,416) Traffic Flow Improvements Turn Lane and Signal at College Ave
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   16  
$(3,829) Traffic Flow Improvements Sinal Interconnect at Carpenter
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1   1  
$(4,333) Traffic Flow Improvements Signal Interconnect along 8.72 miles of arterial Schoolcraft and Seven Mile
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
13   2  
$(5,185) Traffic Flow Improvements Traffic Signal at Hoyt and Mason
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal at Hoyt and Mason - Other
1   1  
$(6,344) Traffic Flow Improvements Baseline Road-Avery Road
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
30   4  
$(9,682) Traffic Flow Improvements CMAQ project intersection reviews at Fonda Drive
Traffic Flow Project - Traffic Engineering - CMAQ project intersection reviews at Fonda Drive - Other
2     0
$(10,264) Traffic Flow Improvements 3 LOCS in Detriot
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
39   5  
$(16,948) Traffic Flow Improvements Widen and add Left Turn Lane at LivernoisBrwstr & Rchstr
Traffic Flow Project - Traffic Engineering - Turn Lanes
4   -1  
$(18,404) Traffic Flow Improvements Traffic Signals Joy Rd. to Baseline
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Joy Rd to Baseline - Other
23      
$(21,018) Traffic Flow Improvements Traffic Signals Goddard to Plymouth
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Goddard to Plymouth - Other
32      
$(24,279) Traffic Flow Improvements Traffic Signal Interconnect Huron to Plymouth
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
14   2  
$(36,294) Traffic Flow Improvements Widen and add Turn Lane at Squirrel
Traffic Flow Project - Traffic Engineering - Turn Lanes
1   0  
$(45,600) Traffic Flow Improvements Advanced Traffic Monitoring System Additions BTW US24 & I75
Traffic Flow Project - Intelligent Transportation Systems - Other - Advanced Traffic Monitoring System Additions - Freeway Management Systems
395      
$(48,020) Traffic Flow Improvements Turn Lane at Big Beaver Intersection
Traffic Flow Project - Traffic Engineering - Turn Lanes
-7      
$(136,000) Traffic Flow Improvements Advanced Traffic Monitoring System Additions
Traffic Flow Project - Intelligent Transportation Systems - Other - Advanced Traffic Monitoring System Additions - Freeway Management Systems
395      
$(139,461) Traffic Flow Improvements Signal Interconnect US 23 to Swift
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
55   1  
$(170,239) Traffic Flow Improvements Traffic Signal Modernization Saline to Fernwood/ Ann Arbor
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
7   1  
$(186,942) Traffic Flow Improvements Traffic Signals Fielding/Spencer to Lone Pine Road
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signals Fielding/Spencer to Lone Pine Road (26 Locations) - Other
69   9  
$(448,575) Traffic Flow Improvements Signal Modernization and Interconnect
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
59      
$2,000,000 Transit SMART 11 routes
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
41   41  
$1,800,000 Transit DDOT construct alt. fuel facility
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
111      
$1,142,074 Transit SMART - New Service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year
249      
$749,484 Transit SMART - 16 Paratransit bues purch.
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Para-transit - New
1      
$670,000 Transit COD-People Mover
Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year
27      
$600,000 Transit Purchase ROW for Additonal Parking for AMTRAK Station in the City of Holland Transit Project
Facilities Improvements - Passenger Facilities - Rail Stations - Access - Improved
2      
$508,442 Transit SMART - 11 Expansion Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Modified
1      
$480,000 Transit Purchase 2 buses extension
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
6   8  
$480,000 Transit Construct CNG fueling station
Transit Project - Facilities Improvements - Alternative Fuel Infrastructure - Equipment Purchase/Installation
QA   QA  
$343,200 Transit Replace 2 Diesel Buses with CNG Buses
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
6   43  
$240,000 Transit GRATA-pilot bus route extension
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
6   7  
$200,000 Transit Replace Diesel Bus with CNG Bus
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Compressed Natural Gas (CNG) - New - Capital
1   1  
$200,000 Transit Monroe County
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
    4  
$192,000 Transit Pilot bus route extension
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
4   48  
$174,720 Transit Regional Operating Assistance
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year
2   2  
$165,762 Transit SMART - 2 replacemetn buses/Monroe
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
3      
$65,520 Transit Go BUS
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year
1      
$64,000 Transit Purchase medium bus replacement
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
2   9  
$48,000 Transit Small Bus replacement
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
2   9  
$(1,109,703) Miscellaneous Miscellaneous
HQ's adjustment - deobligation from previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Minnesota 1/10/2003 $21,198,900 $10,268,388 48 %
Minnesota
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$357,254 Demand Management Metropolitan Council Travel Demand Management Program
Demand Management Project - Public Information - Marketing - Other - Vanpool, bike, transit, and other alternatives
  4,923    
$183,700 Demand Management I-494 Travel Demand Management Program
Demand Management Project - New Activity - Planning - Other - 7 city effort of techniques
  319    
$10,813,788 Traffic Flow Improvements Regional Traffic Management Center
Traffic Flow Project - Other - construction of new facility to manage roadways
CMAQ amount includes advance construction.
Will be charged in 01/02
  7,736    
$353,703 Traffic Flow Improvements HOV Ramp Meter Bypasses I-35E at Yankee Doodle and Lone Oak Rd in Eagan
Traffic Flow Project - Intelligent Transportation Systems - Ramp Meters - Freeway Management Systems
  48    
$5,448,150 Transit Metro Transit-Purchase of 26 Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New Buses are 40 ft in length
  29    
$1,083,013 Transit Southwest Metro Transit Reverse Commute Management Team
Transit Project - Transit Management Systems - coordinating sub-regional transit services, match jobs with employees, greater efficiency of current routes
  485    
$(7,971,220) Miscellaneous Miscellaneous
HQ's adjustment - deobligations from previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Mississippi 1/10/2003 $7,861,832 $10,721,573 136 %
Mississippi
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$6,000,000 STP/CMAQ US 82 from Montgomery County line to Europa bypass        
$4,700,000 STP/CMAQ SR 25 Relocation South of Starkville from Winston County        
$21,573 STP/CMAQ Miscellaneous        

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Missouri 1/10/2003 $22,131,276 $9,221,710 42 %
Missouri
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$336,484 Demand Management Reduced fare ozone red alert program
Demand Management Project - Public Information - Promotion - Marketing - Telecommuting
57      
$2,000,000 I/M and Other TCMs Low income emission repair program
TCM or I/M Project - I/M - Capital
701      
$459,024 I/M and Other TCMs Alternate Fuel Vehicle Purchases
I/M or Other TCM Project - I/M - Capital
QA      
$198,000 I/M and Other TCMs Alternative Fuel Program
I/M or Other TCM Project - Other - Alternate Fuel Program
QA      
$130,215 Pedestrian/Bicycle Bike and breathe easy outreach program
Pedestrian/Bicycle Project - Education/Promotion - Bike and Breathe Easy Outreach Program
1      
$923,060 Traffic Flow Improvements Citywide traffic signal control 72      
$480,000 Traffic Flow Improvements Traffic signal modification-Sappington & Seibert
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1      
$400,000 Traffic Flow Improvements Traffic signal modification-ERB & Sappington
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1      
$287,441 Traffic Flow Improvements ITS field Equipment and systems plan
Traffic Flow Project - Intelligent Transportation Systems - Other - Field Equipment and Sytems Plan - Freeway Management Systems
30      
$90,000 Traffic Flow Improvements Signal controller & geometrics (Mid Rivers Dr & Mexico Rd)
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
4      
$89,140 Traffic Flow Improvements Signals and geometrics (Brentwood Blvd d/Clayton Rd)
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1      
$80,000 Traffic Flow Improvements Fiber Optic Signal Loop (RT JJ to Boop Road)
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
  15    
$35,614 Traffic Flow Improvements Geometric improvements at Northbound 366 & Watson Rd
Traffic Flow Project - Traffic Engineering - Turn Lanes
1      
$8,584 Traffic Flow Improvements Windsor harbor traffic signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
Jefferson County
1      
$7,000 Traffic Flow Improvements Traffic signal modification-Lackland & Woodson
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1      
$690,994 Transit New transit service
Transit Project - Operating Assistance (New or Expanded Service) - Rail - New Service - 1st Year
43      
$525,638 Transit New shuttle bus service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
5      
$450,862 Transit Peak hour commuter bus service 5      
$439,070 Transit Peak hour commuter bus service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year
7      
$396,036 Transit Peak hour commuter bus service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year
8      
$369,440 Transit Public transportation outreach program
Transit Project - Related Demand Management Stategies - Other - Transportation Outreach Program
31      
$284,340 Transit Peak hour commuter bus service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year
5      
$60,768 Transit Midday & evening bus service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year
5      
$480,000 Miscellaneous Miscellaneous
HQ's adjustment - obligation to previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Montana 1/10/2003 $9,635,871 $9,870,357 102 %
Montana
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$108,225 Demand Management Missoula TDM planning
Demand Management Project - New Activity - Planning - Other
  QA    
$503,896 I/M and Other TCMs Air quality equipment
TCM or I/M Project - Other - Acquisition of new sweepers, flush trucks, liquid de-icer equipment for at-risk PM10 areas.
      1,561
$159,381 I/M and Other TCMs Air quality equipment
TCM or I/M Project - Other - new sweapers, flush trucks, de-icing equipment for PM-10 nonattainment or "risk" areas.
    QA  
$28,545 I/M and Other TCMs Missoula City paving of alleys to reduce amount of re-entrained road dust (PM10)
I/M or Other TCM Project - Other - Paving as a dust control measure.
      294
$3,718,153 Pedestrian/Bicycle Clark Fork River Bike Ped Bridge
Bicycle/Pedestrian Project - Other - Clark Fork River bike ped bridge, vehicle bridge. Qualitative emissions benefits (1998).
  QA    
$1,632,055 Pedestrian/Bicycle Primary sidewalk newtwork-Missoula
Bicycle/Pedestrian Project - Facilities - Construct sidewalks along primary system at various locations in Missoula. - Sidewalks. - Other
       
$20,463 Pedestrian/Bicycle Missoula Bike/Ped Program
Bicycle/Pedestrian Project - Other - Funding of bike/ped coordinator position in Missoula.
QA QA QA  
$13,026 Pedestrian/Bicycle Bike/ped facilities improvement-Great Falls
Bicycle/Pedestrian Project - Facilities - Bike racks, lockers; public awareness campaign. - Other
  6    
$(14,977) Pedestrian/Bicycle South Avenue bike/ped path
Bicycle/Pedestrian Project - Other - De-obligating funds away from this project, for which emission benefits were reported in 1995.
       
$(15,926) Pedestrian/Bicycle Bicycle commuter network
Bicycle/Pedestrian Project - Other - Money deobligated from bike path project. Benefits of initial project reported in 1995.
       
$1,366,275 Traffic Flow Improvements Main Street-Kalispelli
Traffic Flow Project - Traffic Engineering - Turning lanes. - Turn Lanes
  13    
$315,242 Traffic Flow Improvements Custer Ave signal synch & intersection realignment
Traffic Flow Project - Traffic Engineering - Reconfiguring intersection and upgrading 5 signals to provide signal synchronization within the corridor. Emission benefits reported in 1999. - Turn Lanes Project in Helena attainment area
       
$212,121 Traffic Flow Improvements Brooks/South/Russell intersection
Traffic Flow Project - Other - Intersection Improvement. Estimated benefits first reported in 1993.
       
$105,522 Traffic Flow Improvements Signal Upgrade-Butte
Traffic Flow Project - Traffic Engineering - Upgrade of signals, signal-interconnection. - Other
  25    
$91,866 Traffic Flow Improvements 19th & Main-Bozeman
Traffic Flow Project - Traffic Engineering - Turning lanes. - Turn Lanes
  23    
$21,475 Traffic Flow Improvements Signal Operation Improvement - Missoula
Traffic Flow Project - Other - Upgrade signals and surface at 50 intersections.
       
$(22,352) Traffic Flow Improvements Idaho/LaSalle & N 93 signals Kalispell Montana
Traffic Flow Project - Other - De-obligation of money from this project.
benefits previously reported for CO as 44.2 kg/day
       
$618,402 Transit Bike shelter new buses fare incentives
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
QA QA QA  
$500,000 Transit Transit center rehabilitation
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - Rehabilitation of a transit center in Great Falls. - Improved
  4   1
$405,314 STP/CMAQ Signal - N. 19th and Baxter Bozeman
This is an STP/CMAQ Project
Intersection improvement and signal.
       
$125,816 STP/CMAQ Signal - N. 7th & Griffin - Bozeman
This is an STP/CMAQ Project
Install signal
       
$6,927 STP/CMAQ Whitefish Stage Rd-Kalispell
This is an STP/CMAQ Project
       
$6,927 STP/CMAQ Bridge Street - Miles City
This is an STP/CMAQ Project
Plant mix surfacing - overlay, seal and cover
       
$4,329 STP/CMAQ County Road 350 - Sidney
This is an STP/CMAQ Project
Level, plant mix surfacing - overlay, seal and cover
       
$(40,348) Miscellaneous Miscellaneous
HQ's adjustment - deobligation from previously approved projects
       

* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year