CMAQ DETAILED PROJECT LISTING REPORT (FY 2000)

Page 7

Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
South Carolina 1/10/2003 $9,128,018 $5,708,392 63 %
South Carolina
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$5,708,392 STP/CMAQ CMAQ/STP
This is an STP/CMAQ Project
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
South Dakota 1/10/2003 $8,148,463 $9,014,829 111 %
South Dakota
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$9,014,829 STP/CMAQ STP projects        

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Tennessee 1/10/2003 $15,221,273 $17,414,155 114 %
Tennessee
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$(21,436) Pedestrian/Bicycle Imperial Boulevard to Executive Park Drive Gallatin Pike extend Sidewalk
Pedestrian/Bicycle Project - Other - extend sidewalk cost underrun
1      
$611,000 Shared Ride Regional Rideshare Program FY00/01
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
97      
$480,000 Shared Ride Regional Rideshare Program FY99/00
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
97      
$265,000 Shared Ride Regional Rideshare Program FY98/99
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
97      
$197,000 Shared Ride Knoxville Vanpool Program
Shared Ride Project - Public Program - Van Pool - Capital-Vehicle
Purchase 9 vans
6   10  
$122,000 Shared Ride Franklin Vanpool
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
expand van service
1   1  
$100,000 Shared Ride Bus and Vanpool Seat Guarantee Program
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
48      
$15,000 Shared Ride Air Quality Benefits for Van Transportation Services
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
QA      
$10,000 Shared Ride Park and Ride Lot @ I-56 @Long Lane
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
100 space lot at Goose Creek interchange
  1 1  
$(270) Shared Ride Van Aquisition
Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase
cost underrun
QA      
$(1,000) Shared Ride Carpool/Vanpool Program
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
cost underrun
97      
$(22,381) Shared Ride Hendersonville Park and Ride Lot
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
cost underrun for construction of lot
  1 1  
$(103,123) Shared Ride Smyrna Park and Ride Lot @ Ridley Parkway
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
cost underrun
  1 1  
$(113,185) Shared Ride LaVergne Park and Ride Lot @ Waldron Road
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
  1 1  
$1,513,417 Traffic Flow Improvements SR-11(Nolanesville Pike) @ SR-255 (Harding Place)
Traffic Flow Project - Traffic Engineering - Turn Lanes
15 255 5  
$1,442,800 Traffic Flow Improvements Nashville Parking and Traffic Guidance System
Traffic Flow Project - Congestion Management Systems - Development - Nashville Parking and Traffic Guidance System
1 7 1  
$930,770 Traffic Flow Improvements Clarksville Highway @ Kings Lane
Traffic Flow Project - Traffic Engineering - Turn Lanes
1 3 1  
$900,000 Traffic Flow Improvements Countywide incident detection and response enchancement
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year
1 7 1  
$800,000 Traffic Flow Improvements MATA Fare Box
Traffic Flow Project - Intelligent Transportation Systems - Electronic Fare Payment Systems for buses.
QA      
$750,000 Traffic Flow Improvements Countywide signal system optimization
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
Optimize traffic signals at approximately 150 intersections
1 7 1  
$621,071 Traffic Flow Improvements Dickerson Pike @trinity Lane
Traffic Flow Project - Traffic Engineering - Turn Lanes
  230 4  
$616,240 Traffic Flow Improvements Whitetopping at Various Intersections in Knoxville
Traffic Flow Project - Intelligent Transportation Systems - Signalization - Other
17 locations
105   97  
$460,000 Traffic Flow Improvements West End/Charlotte/Church Streets signal pre-emption
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA      
$450,000 Traffic Flow Improvements West Street @ Poplar/North Street
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
5 10 3  
$411,950 Traffic Flow Improvements Shakle Island Road @ Long Hollow Pike
Traffic Flow Project - Traffic Engineering - Turn Lanes
15 255 5  
$397,270 Traffic Flow Improvements I-24 @ SR-10/US 231
Traffic Flow Project - Traffic Engineering - Turn Lanes
  55 1  
$335,200 Traffic Flow Improvements Franklin Traffic Operations Center
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
4 35 1  
$308,397 Traffic Flow Improvements SR-258 Old Shackle Road to SR-386
Traffic Flow Project - Other
previously reported in 95
1      
$237,441 Traffic Flow Improvements Gallatin Pike CCTV
Traffic Flow Project - Intelligent Transportation Systems - Other - closed circuit TV - Incident Management Systems
1 7 1  
$192,000 Traffic Flow Improvements SR-26 @Maddox-Simpson Parkway in Lebanon
Traffic Flow Project - Traffic Engineering - realign - Other
previously reported in 98
1 14 1  
$141,669 Traffic Flow Improvements West End Avenue I-440 to Acklen Park Drive
Traffic Flow Project - Traffic Engineering - Turn Lanes
33 550 10  
$94,729 Traffic Flow Improvements Freeway Service Patrol/reference Markers
Traffic Flow Project - Intelligent Transportation Systems - Other - markers for patrol service - Freeway Management Systems
55 598 144  
$85,037 Traffic Flow Improvements Hacks Cross Road @ Poplar Pike
Traffic Flow Project - Other - replace 4 way stop with signal
completed in 1996
20 45 8  
$80,000 Traffic Flow Improvements Whitetopping at Various Intersections in Knox County
Traffic Flow Project - Intelligent Transportation Systems - Signalization - Other
4 locations
25   23  
$71,500 Traffic Flow Improvements Intelligent transportation Systems Communication Plan
Traffic Flow Project - Intelligent Transportation Systems - Study - Other
QA      
$65,000 Traffic Flow Improvements Traffic Signal Computer Upgrade Project
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
computer/software
QA      
$39,952 Traffic Flow Improvements Farmington Road and Brierbrook Rd
Traffic Flow Project - Other - replace 4 way stop with signal and add turn lanes
15 30 6  
$35,000 Traffic Flow Improvements SR-41/US-31W @ SR-76/SR-258
Traffic Flow Project - Traffic Engineering - realign intersection - Other
QA      
$15,000 Traffic Flow Improvements SR-10/US 231 Phase I Signal System on Cumberland Street Lebanon
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
upgrade 9 singals
1 14 1  
$1,500 Traffic Flow Improvements SR-177 Popular Pike/Germantown/Arthur
Traffic Flow Project - Other - replace 4 way with signal
10 20 4  
$(13,417) Traffic Flow Improvements Saunders Ferry Road @ Gallatin Pike
Traffic Flow Project - Traffic Engineering - intersection improvement - Other
cost underrun/previously reported in 99
4 31 1  
$1,200,000 Transit Six Replacement Buses
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement
26   99  
$800,100 Transit Transit
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New
FTA Transfer - for various transit projects
QA   QA  
$448,000 Transit MATA Suburban transit Centers
Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - New
construction of 2 stations
QA      
$250,000 Transit Regional Rail Study
Transit Project - Facilities Improvements - Other - fixed guideway system study
QA      
$56,000 Transit Operating Expenses for Express Service
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
1   1  
$2,138,924 Miscellaneous Miscellaneous
HQ's adjustment - obligation to previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Texas 1/10/2003 $108,952,514 $103,150,135 95 %
Texas
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$3,226,252 Demand Management FY 99 Clean Air Act Tran Fare Subsidy
Demand Management Project - Operating Assistance - 1st Year - Road Pricing - By Area
Various locations in Harris,Galveston, Montgomery, Lib Co.
15 QA 23 QA
$2,751,232 Demand Management FY 2000 Reg Commute Alternatives Imp
Demand Management Project - Public Information - Public Education - Other - FY 2000 Reg Commute Alternatives Imp
QA      
$1,367,000 Demand Management FY 2000 Regional Commute Alternative Program
Demand Management Project - Public Information - Public Education - Other - FY 2000 Regional Commute Alternative Program
QA      
$780,000 Demand Management Intelligent Transportation System/Lone Star Park Traffic
Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation System
QA      
$440,000 Demand Management FY 2000 Clean Air Act Public Outreach Program
Demand Management Project - Public Information - Public Education - Other - FY 2000 Clean Air Act Public Outreach Program
QA      
$420,000 Demand Management Intelligent Transportation System Lone Star Park Traffic
Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation System
QA      
$400,000 Demand Management Intermodal Congestion Quick Response Team
Demand Management Project - Operating Assistance - 1st Year - Other - Intermodal
Congestion Quick Response Team
QA      
$350,000 Demand Management FY 2000 Reg Comm Alternatives Program MRKT
Demand Management Project - Public Information - Marketing - Other - FY 2000 Reg
Comm Alternatives Program MRKT
QA      
$350,000 Demand Management FY 2000 Reg Comm Alternatives Program MRKT
Demand Management Project - Public Information - Marketing - Other - FY 2000 Reg
Comm Alternatives Program MRKT
QA      
$160,000 Demand Management Intelligent Transportation System/US 75 South of IH 635
Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation Systems
Inter-Dist Comm. Motorist Info Sys.
QA      
$116,000 Demand Management Air Quality Outreach Prg-Ozone Day
Demand Management Project - Public Information - Public Education - Other - Air Quality Outreach Prg-Ozone Day
1 3 1  
$2,751,232 I/M and Other TCMs FY 2000 Reg Commute Alternatives Imp
I/M or Other TCM Project - Other - FY 2000 Reg
Commute Alternatives Imp
143 QA 374 QA
$1,802,220 I/M and Other TCMs FY 2000 Alternative Fleet Fueled Vehicle Program
I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - Other - Vehicles - Operation - 1st Year
75 QA 1 QA
$440,000 I/M and Other TCMs FY 2000 Clean Air Act Public Outreach Program
I/M or Other TCM Project - Other - Clean Air Act Public Outreach Program
8 County Non-Attainment Area
QA      
$400,000 I/M and Other TCMs Intermodal Congestion Quick Response Team
I/M or Other TCM Project - Other - Intermodal
Congestion Quick Response Team
QA      
$345,807 I/M and Other TCMs Major Investment Study SUP by H-GAC
I/M or Other TCM Project - Other - Major Investment Study SUP by H-GAC
Major Investment Study
QA      
$340,600 I/M and Other TCMs Incident Detection & Response System I-35E from SH183 to I-30
I/M or Other TCM Project - Other - Incident, Detection and Response System
QA      
$150,000 I/M and Other TCMs Project SVCS Contract & NTWK Transfer at Houston Transfer
I/M or Other TCM Project - Other - Project
SVCS Contract & NTWK Transfer
QA      
$1,741,082 Pedestrian/Bicycle Bike/Pedestrian Clear Fork/Bendbrk Bike Trail
Pedestrian/Bicycle Project - Facilities - Separate Path
1 7 2  
$1,492,525 Pedestrian/Bicycle Bike/Ped Trail North Houston on Street Bikeway Network
Pedestrian/Bicycle Project - Facilities - Separate Path
North Houston on Street Bikeway Network
2 QA 3 QA
$1,025,222 Pedestrian/Bicycle Bikeway Phase 1 On Street Network W.Houston & Bikeways Katy Road
Pedestrian/Bicycle Project - Facilities - Separate Path
2 QA 3 QA
$300,000 Pedestrian/Bicycle Bike/Hike Trail thru Herman Park
Pedestrian/Bicycle Project - Facilities - Separate Path
Herman Brow Park-HB Trail-Dunvegan WY @ I-10
1 QA 1 QA
$108,954 Pedestrian/Bicycle Construct Hike and Bike Trail/Goose CRK TRL from WTX Ave to Garth Road
Pedestrian/Bicycle Project - Facilities - Separate Path
Goose CRK TRL from WTX AVE to Garth Road
1 QA 1 QA
$85,692 Pedestrian/Bicycle Bike/Pedestrian
Pedestrian/Bicycle Project - Facilities - Separate Path
1 7 2  
$64,500 Pedestrian/Bicycle Construct Hike and Bike Trail/Goose CRK TRL
Pedestrian/Bicycle Project - Facilities - Separate Path
Goose CRK TRL from S of W TX AVE-W TX AVE PHII
1 QA 1 QA
$25,040 Pedestrian/Bicycle Bikeway Network Phase 2 on STR Bikeway Network
Pedestrian/Bicycle Project - Facilities - Separate Path
1 QA 1 QA
$1,367,000 Shared Ride FY 2000 Regional Commute Alternative Program
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
87 QA 160 QA
$1,110,000 Shared Ride FY 2000 REG Vanpool Program
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
32 QA 78 QA
$1,110,000 Shared Ride FY 2000 REG Vanpool Program
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
QA      
$10,285,399 Traffic Flow Improvements IH-10 Construct Turnarounds @McRae Sumac
Yarbrough Lomaland Traffic Flow Project - Traffic Engineering - Construct Turnarounds - Other
8 64 1  
$8,973,164 Traffic Flow Improvements Install Computerized Traffic Mgmt. System IH-610
Traffic Flow Project - Congestion Management Systems - Establishment, Implementation - Conmputerized Traffic Mgmt. System
From US 59 to SH 288
72 QA 19 QA
$7,791,808 Traffic Flow Improvements Construct Direct Connector US 59 @ BW 8
Traffic Flow Project - Traffic Engineering - Construct direct connector - Other
1 QA 1 QA
$6,723,151 Traffic Flow Improvements Construct Grade Separation US 290 at Mason Road
Traffic Flow Project - Traffic Engineering - Construct Grade Separation - Other
1 QA 1 QA
$6,084,714 Traffic Flow Improvements Install CTMS I-45 from 61st street from Harris County
Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS
9 QA 2 QA
$5,120,000 Traffic Flow Improvements STrGRBS & Pave on IH-10 @SH62
Traffic Flow Project - Traffic Engineering - STR,GR,BS & Pave - Other
2 18 1  
$3,540,135 Traffic Flow Improvements Construct Direct Connector BW 8 @ Hardy Toll Road
Traffic Flow Project - Traffic Engineering - Construct EB to NB Direct Connector - Other
7 QA 2 QA
$2,496,000 Traffic Flow Improvements Reconstruct 2lns w/cont. Left Turn Lane Little Cypress Dr. FM 3247
Traffic Flow Project - Traffic Engineering - Turn Lanes
1 14 1  
$2,406,099 Traffic Flow Improvements Intersection Improvements
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
78 1,301 10  
$1,697,600 Traffic Flow Improvements TRF Light Synchronization Phase I
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
33 263 11  
$1,566,314 Traffic Flow Improvements ATMS I-20 from US 287
Traffic Flow Project - Congestion Management Systems - Implementation - ATMS
QA      
$1,469,097 Traffic Flow Improvements US 62 Traffic Signal Expansion
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
3 24 1  
$1,224,807 Traffic Flow Improvements Installation of Changeable Message Sign
Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Installation of Changeable Message Sign
12 113 1  
$1,160,606 Traffic Flow Improvements Install CTMS SH 225 - SH 134 to Strang Rd.
Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS
2 QA 1 QA
$1,030,426 Traffic Flow Improvements Provide Far Turn Lanes At Beltline Road and Midway Road
Traffic Flow Project - Traffic Engineering - Turn Lanes
Widen Intersection to provide lanes
10 87 3  
$1,002,714 Traffic Flow Improvements Install Video Detectors I-635 to US 75 to I-35E
Traffic Flow Project - Congestion Management Systems - Implementation - Install Video Detectors
QA      
$970,290 Traffic Flow Improvements Traffic Signal Upgrades Citywide
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$846,713 Traffic Flow Improvements Traffic Signal Improvements/Grand Prairie
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA      
$835,416 Traffic Flow Improvements Intergrate Alternative Detection Communication
Traffic Flow Project - Congestion Management Systems - Establishment - Alternative Detection Communication
QA      
$800,000 Traffic Flow Improvements Intersection and Traffic Signal Improvements
572 Locations in Dallas
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1,192 10,243 2,221  
$755,390 Traffic Flow Improvements Intersection Improvements
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
3 25 4  
$748,495 Traffic Flow Improvements Install Traffic Mgmt. System NASA 1 to E.Space Center
Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Mgmt. System
.38 miles E FM270 to .63 miles E Space Center
1 QA 1 QA
$745,614 Traffic Flow Improvements Provide Far Turn Lanes Belt Line Road and Midway Road
Traffic Flow Project - Traffic Engineering - Turn Lanes
QA      
$730,913 Traffic Flow Improvements Install Changeable Message Sign I-10 Meadow St. to Spur 330
Traffic Flow Project - Congestion Management Systems - Implementation - Changeable Message Sign
8 QA 2 QA
$686,375 Traffic Flow Improvements Reconstruct 2Lns w/cont. Left Turn Lane FR SP 380 to Neches
Traffic Flow Project - Traffic Engineering - Turn Lanes
1 1    
$604,272 Traffic Flow Improvements Traffic Signal Improvements Associated with ITS Program/Pleasant Grove
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
QA      
$581,433 Traffic Flow Improvements Traffic Signal Improvements/Duncanville and Lancaster
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
35 312 32  
$486,037 Traffic Flow Improvements Traffic Signal Upgrade Various Intersections in Grand Prairie
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
24 212 6  
$457,150 Traffic Flow Improvements Traffic Signals Various Intersections Grand Prairie
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
10 87 9  
$413,064 Traffic Flow Improvements Intersection Improvements SP 474 (Rufe Snow Road)
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 8 1  
$400,000 Traffic Flow Improvements Intersection Improvements IH 820 at Beach St. N
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 11 2  
$359,912 Traffic Flow Improvements Signal Improvements in Grand Prairie for various intersections
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$348,000 Traffic Flow Improvements System Signal Interconnect Airway Blvd. from Edgemere to Airport Rd.
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
2 13 1  
$339,197 Traffic Flow Improvements Signal System Interconnection Project
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
3 26 1  
$324,960 Traffic Flow Improvements Intersection Improvements Keller Springs at Midway
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition, Relocation
2 18 4  
$324,000 Traffic Flow Improvements Intersection Improvements SH 161 to Spur 348
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
17 148 4  
$300,000 Traffic Flow Improvements Add U Turns IH-610 @ Ella Blvd. N. Durham and N.Shepherd
Traffic Flow Project - Traffic Engineering - Add U-Turns - Other
1 QA 1 QA
$300,000 Traffic Flow Improvements Intersection Improvement from 114 to SH 26
Traffic Flow Project - Traffic Engineering - Intersection improvements - Other
6 55 10  
$285,536 Traffic Flow Improvements Intersection Improvements Midway Road at Spring Valley
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition, Relocation
4 32 7  
$267,398 Traffic Flow Improvements Traffic Signal Upgrade LP12 @ 4 Intersections
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$246,428 Traffic Flow Improvements Intersection Improvements SH 121 on Central Bedford
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 12 2  
$216,000 Traffic Flow Improvements Intersection Improvements IH-820 @ Randoll Mill RD
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition
1 4 1  
$200,000 Traffic Flow Improvements Intersection Improvements Camp Bowie/7th Street@University Drive
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
2 16 3  
$190,848 Traffic Flow Improvements Intersection Improvements SH356 at Mockingbird Ln.
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 10 2  
$181,711 Traffic Flow Improvements US 54 IH10 Traffic Mgmt. System Signal Communication Link
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
2 17 1  
$181,114 Traffic Flow Improvements Intersection Improvements
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
6 55 10  
$151,513 Traffic Flow Improvements Arterial Traffic Mgmt. System SH 6 from FM 2004 to FM 519
Traffic Flow Project - Congestion Management Systems - Establishment - Arterial Traffic Mgmt. System
1 QA 8 QA
$150,000 Traffic Flow Improvements Install CTMS IH-610 from Old Katy Road to S. Braeswood
Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS
55 QA 14 QA
$150,000 Traffic Flow Improvements PE for Incident Detection and Response Various Locations
Traffic Flow Project - Congestion Management Systems - Implementation - Intelligent Transportation System
QA      
$150,000 Traffic Flow Improvements PE for Incident Detection and Response various locations
Traffic Flow Project - Congestion Management Systems - Implementation - Intelligent Transportation System
QA      
$130,000 Traffic Flow Improvements Computerized Mgmt. System IH-10 from SH6 to Fort Bend County Line
Traffic Flow Project - Congestion Management Systems - Establishment - Computerized Mgmt. System
23 QA 6 QA
$125,135 Traffic Flow Improvements Intersection Improvements Cockrell Hill Road @ Camp Wisdom Road
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition & Relocation
2 16 3  
$119,632 Traffic Flow Improvements Intersection Improvements Midway at Sojourn
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition & Relocation
1 9 2  
$106,000 Traffic Flow Improvements Signalization on Williams Trace Blvd. @ US 59 to SH 6
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 QA 1 QA
$97,467 Traffic Flow Improvements Construct Right Turn Lane on FM 1764 @ SH 146
Traffic Flow Project - Traffic Engineering - Turn Lanes
1 QA 1 QA
$91,088 Traffic Flow Improvements Intersection Improvements FM 1382 @ Duncanville Road
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 7 1  
$90,000 Traffic Flow Improvements Traffic Signal Improvements US77 @SycamoreMcKinneyOakHickory
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
3 24 1  
$88,589 Traffic Flow Improvements Intersection Improvements on Central Dr. @ Bedford Rd.
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 9 2  
$75,708 Traffic Flow Improvements Intersection Improvements 8th at Pennsylvania
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 7 2  
$68,928 Traffic Flow Improvements Signal Synchronization on Woodlands Pkwy @ I-45 to Cochrans Xing
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 QA 1 QA
$68,800 Traffic Flow Improvements Signalization On Williams Trace BLVD @ SH 6 to Austin
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
1 QA 1 QA
$68,732 Traffic Flow Improvements Traffic Signal Improvements
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 8 1  
$63,739 Traffic Flow Improvements SH 289 @ MaCallum Blvd
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 10 1  
$60,550 Traffic Flow Improvements Intersection Improvements Grand at Oakland
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition and relocation
2 17 4  
$53,440 Traffic Flow Improvements Signal Synchronization on Research Road @ I-45 to Kuyendahl
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 QA 1 QA
$52,000 Traffic Flow Improvements Traffic Signal Upgrades In Pleasant Grove Area in Dallas
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$46,832 Traffic Flow Improvements Intersection Improvements McEwen at Midway
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition, Relocation
3 22 5  
$41,826 Traffic Flow Improvements Intersection Improvements Central Dr at L.Don Dodson
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
2 17 3  
$35,872 Traffic Flow Improvements Intersection Improvements Beltway at Midway
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition, Relocation
3 22 5  
$31,407 Traffic Flow Improvements Intersection Improvements 7th Street/Commerce at Calhoun
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 7 2  
$29,812 Traffic Flow Improvements Installation of Changeable Message Sign
Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Installation of Changeable Message Signs
1 3 1  
$27,012 Traffic Flow Improvements Intersection Improvements Live Oak at Washington
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
2 17 4  
$24,486 Traffic Flow Improvements ATMS-Traffic Signal Improvement Phase/Lewisville Regional Wide Signals
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$22,970 Traffic Flow Improvements Traffic Signal Improvements Inwood at Walnut Hill
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$22,586 Traffic Flow Improvements Intersection Improvements Inwood at Spring Valley
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Utilities
2 16 3  
$21,248 Traffic Flow Improvements Intersection Improvements Midway at Proton
Traffic Flow Project - Traffic Engineering - Intersection Improvements Midway at Proton - Other
Acquisition, Relocation
2 21 5  
$20,232 Traffic Flow Improvements Intersection Improvements Fitzhugh at Live Oak
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
2 17 4  
$17,400 Traffic Flow Improvements Intersection Improvements SP 580 @ Las Vegas Trail
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 11 2  
$17,232 Traffic Flow Improvements Intersection Improvements Live Oak at Peak
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
2 17 4  
$16,000 Traffic Flow Improvements Intersection Improvements Live Oak at Munger
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
2 17 4  
$15,218 Traffic Flow Improvements Intersection Improvements Inwood at Park Lane
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition & Relocation
2 17 4  
$15,000 Traffic Flow Improvements Intersection Improvements Live Oak at Texas
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
3 23 4  
$13,756 Traffic Flow Improvements Intersection Improvements Inwood at Walnut Hill
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
2 17 4  
$13,370 Traffic Flow Improvements Intersection Improvements Rufe Snow Dr. at Glenview
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
1 6 1  
$12,800 Traffic Flow Improvements Eight Ave/Pennsylvania Intersection Improvements
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 10 2  
$8,162 Traffic Flow Improvements ATMS-Traffic Signal Improvement Phase/Lewisville Regional
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$7,952 Traffic Flow Improvements Intersection Improvements Lindberg at Midway
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
Acquisition, Relocation
2 21 5  
$7,502 Traffic Flow Improvements Intersection improvment 7th Street/Commerce
Street @ Calhoun Street in Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1 5 1  
$4,028 Traffic Flow Improvements Intersection Improvements Hall at Live Oak
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition and Relocation
2 17 4  
$3,380 Traffic Flow Improvements Intersection Improvements Haskell at Live Oak
Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other
ROW Acquisition & Relocation
2 17 4  
$200,000 Transit Alternative Fuel Vehicle
Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital
1 2 1  
$1,802,220 STP/CMAQ FY 2000 Alternative Fleet Fueled Vehicle Program
This is an STP/CMAQ Project
FY 2000 Alternative Fleet Fueled Vehicle Program
QA      
$969,534 STP/CMAQ Construction of Non-Freeway Facility/Skillman St to W. of Audelia
This is an STP/CMAQ Project
Construction of non-freeway facility
3 26 4  
$345,807 STP/CMAQ MAJOR Investment Study
This is an STP/CMAQ Project
Major Investment Study (various locations)
QA      
$240,000 STP/CMAQ Vehicle Detector Replacement Program
This is an STP/CMAQ Project
Vehicle Detector Replacement Program
4 33 1  
$41,826 STP/CMAQ Row Acquisition & Utilities
This is an STP/CMAQ Project
ROW Acquisition & Utilities
QA      
$24,000 STP/CMAQ Vehicle Detector Repl. Program
This is an STP/CMAQ Project
Vehicle Detector Repl. Program
4 33 1  
$16,000 STP/CMAQ AQUIS Utility & Relocation Intersection of 27th street & Helena Ave.
This is an STP/CMAQ Project
AQUIS. Utility and Relocation
QA      
$(4,645,314) Miscellaneous Miscellaneous
HQ's adjustment - deobligation from previously approved projects
       

STATE REPORT
SUBMIT
APPORTION.
AMOUNT
OBLIGATED
AMOUNT
OBLIG %
Utah 1/10/2003 $10,782,626 $18,130,123 168 %
Utah
$ PROJECT
AMOUNT
PROJECT
TYPE
PROJECT TITLE & DESCRIPTION VOC
(KG/DAY)
CO
(KG/DAY)
NOx
(KG/DAY)
PM-10
(KG/DAY)
$94,163 I/M and Other TCMs Utah County Remote Sensing Network
I/M or Other TCM Project - Other - Remote sensing to detect gross emitters leading to repair of these vehicles.
  10,224 103  
$(704) I/M and Other TCMs I/M Technician Training Materials
I/M or Other TCM Project - I/M - Operating - 1st Year
       
$20,000 Pedestrian/Bicycle Light Rail Trail and Porter Rockwell trail
Pedestrian/Bicycle Project - Facilities - Separate Path
3 segments
Project (121)
Project (122)
4 45 4  
$10,000 Pedestrian/Bicycle 1300 West: 6200 South to 4700 South
Pedestrian/Bicycle Project - Facilities - Striped Lane
1 13 1  
$10,000 Pedestrian/Bicycle Beck Street Bikeway
Pedestrian/Bicycle Project - Facilities - Separate Path
Funds will be deobligated in the future to help finance ligh rail vehicles since no emission reductions
QA      
$4,661 Pedestrian/Bicycle American Fork River Trail
Pedestrian/Bicycle Project - Facilities - multi-use trail - Other
1.13 miles
  8 1  
$0 Pedestrian/Bicycle Moutainland Non-motorized transportation Program Ped/Bike Planner I
Pedestrian/Bicycle Project - Other - planner position
emission rates are ton/day
  1 1  
$1,600,000 Shared Ride Park and Ride Lots `Salt Lake County Park and Ride N/S Corridor`
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
new lots
11 122 13  
$1,283,528 Shared Ride Park and Ride Lots US89 @ Weber Canyon & 24th and Wall
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
$1000000 was transferred to FTA
7 91 10  
$543,750 Shared Ride UTA RideShare TDM
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
75/25 SPLIT PROJECT WITH OGDEN
58 529 58  
$317,250 Shared Ride Expansion of UTA Vanpool Leasing Program
Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase
20 vans; 75/25 split with Ogden
8 91 10  
$181,250 Shared Ride UTA Rideshare TDM
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
75/25 split project with Salt lake
16 177 20  
$105,750 Shared Ride Expansion of UTA Van Pool Leasing Program
Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase
75/25 split with Salt lake
4 46 5  
$102,000 Shared Ride UTA Rideshare Program
Shared Ride Project - Public Program - Information/Matching - Matching, Marketing
  153 15  
$82,000 Shared Ride UTA Rideshare-Van Acquisition
Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase
4 vans
  15 2  
$(69,286) Shared Ride Old Mill Park and Ride Lot
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
projects withdrawn to accommodate N/S Corridor Park and Ride Lots
2 32 2  
$(95,028) Shared Ride Park and Ride Lots
Shared Ride Project - Public Program - Van Pool - Operation - 1st Year
42 474 52  
$4,902,599 Traffic Flow Improvements Commuterlink Advanced Traffic Management System and Regional Signal Coordination
Traffic Flow Project - Congestion Management Systems - Development, Establishment - 3 Control centers, 550 traffic signals, CCTV, and message signs part of I-15 reconstruction
2 68 8  
$2,055,901 Traffic Flow Improvements Signal Coordination for the Roy Area
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
SR-126 to SR 26, I-15 South
3 31 1  
$460,768 Traffic Flow Improvements traffic Signal Modernization- Downtown Provo
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
4 locations on Center st, 2 loctions on 100 north, 1 location on 100 South
  58 1  
$376,000 Traffic Flow Improvements Incident Management Expansion
Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 2nd Year
5 141 16  
$250,000 Traffic Flow Improvements Automated bus locating/passenger counters
Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Advanced Public Transit System ITS technology
QA      
$57,467 Traffic Flow Improvements Signal Coordination for Layton Area
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects
3 26 1  
$18,646 Traffic Flow Improvements Fiber Optic and Wide Area Network-various locations
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
QA      
$10,000 Traffic Flow Improvements Intersection Improvement: 9400 South and 1300 East
Traffic Flow Project - Traffic Engineering - Turn Lanes
7 65 2  
$10,000 Traffic Flow Improvements Intersection Improvment: Bengal Blvd
Traffic Flow Project - Traffic Engineering - Turn Lanes
includes restriping, new loops, signal modification, interconnect
1 5 1  
$10,000 Traffic Flow Improvements Intersection Improvement: Fort Union
Traffic Flow Project - Traffic Engineering - Turn Lanes
includes restriping, new loops, signal modification, interconnect
1 11 1  
$9,323 Traffic Flow Improvements Traffic Signal Modernization- 7 locations
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
1230 North 200 West, 940 North 200 West, 800 North 200 West, 500 north 200 west, University Parkway and Canyon Road, 700 north 700 East, 1230 north 300 west
  58 1  
$4,661 Traffic Flow Improvements American Fork Signal Coordination
Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing
  36 1  
$0 Traffic Flow Improvements Antelope Drive & I-15 Ramp Intersection
Traffic Flow Project - Traffic Engineering - Other
This project will improve the intersection geometry at the east side ramp at the interchange of I-15 and Antelope Drive. It will provide dual left turn lanes for the northbound to westbound and for the eastbound to northbound turning movements, with the necessary widening to accommodate the lane shifts. Some right of way will need to be acquired to added the extra turn lanes.
1 8 1  
$(10,000) Traffic Flow Improvements Intersection Improvement: Fort Union Blvd.
Traffic Flow Project - Traffic Engineering - Other
1 5 1  
$4,000,000 Transit Light Rail Vehicles
Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year
27 303 33  
$1,000,000 Transit ITS/APTS Deployment
Transit Project - Transit Management Systems - Purchase of global positioning units and automated passenger counters
Ogden and Salt Lake benefits combined
64 7 8  
$408,000 Transit 2 New Buses for the Provo Orem Shuttle
Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New
QA      
$250,000 Transit New Bus Service West Valley City to SLC International Airport
Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - Improved
9 95 12  
$237,000 Transit New Bus Service Provo Orem Shuttle
Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year
  298 30  
$0 Transit US-89 & 200 North Park & Ride Lot
Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New
This is a Park and Ride Lot, but the description process would not let me select Park & Ride. The park and ride lot would be approximately two acres and would have around 100-150 parking stalls.
7 82 9  
$106,605 Miscellaneous Miscellaneous
HQ, adjustment - obligation to previously approved projects
       
$(20,000) Miscellaneous Miscellaneous
HQ's adjustment - deobligation from previously approved projects
       
$(196,181) Miscellaneous Miscellaneous
This project does not fit in the existing project categories.
       

* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year