CMAQ DETAILED PROJECT LISTING REPORT (FY 2000)
Page 7
Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| South Carolina | 1/10/2003 | $9,128,018 | $5,708,392 | 63 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $5,708,392 | STP/CMAQ | CMAQ/STP This is an STP/CMAQ Project |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| South Dakota | 1/10/2003 | $8,148,463 | $9,014,829 | 111 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $9,014,829 | STP/CMAQ | STP projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Tennessee | 1/10/2003 | $15,221,273 | $17,414,155 | 114 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $(21,436) | Pedestrian/Bicycle | Imperial Boulevard to Executive Park Drive Gallatin Pike extend Sidewalk Pedestrian/Bicycle Project - Other - extend sidewalk cost underrun |
1 | |||
| $611,000 | Shared Ride | Regional Rideshare Program FY00/01 Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
97 | |||
| $480,000 | Shared Ride | Regional Rideshare Program FY99/00 Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
97 | |||
| $265,000 | Shared Ride | Regional Rideshare Program FY98/99 Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
97 | |||
| $197,000 | Shared Ride | Knoxville Vanpool Program Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase 9 vans |
6 | 10 | ||
| $122,000 | Shared Ride | Franklin Vanpool Shared Ride Project - Public Program - Van Pool - Operation - 1st Year expand van service |
1 | 1 | ||
| $100,000 | Shared Ride | Bus and Vanpool Seat Guarantee Program Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
48 | |||
| $15,000 | Shared Ride | Air Quality Benefits for Van Transportation Services Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
QA | |||
| $10,000 | Shared Ride | Park and Ride Lot @ I-56 @Long Lane Shared Ride Project - Public Program - Van Pool - Operation - 1st Year 100 space lot at Goose Creek interchange |
1 | 1 | ||
| $(270) | Shared Ride | Van Aquisition Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase cost underrun |
QA | |||
| $(1,000) | Shared Ride | Carpool/Vanpool Program Shared Ride Project - Public Program - Van Pool - Operation - 1st Year cost underrun |
97 | |||
| $(22,381) | Shared Ride | Hendersonville Park and Ride Lot Shared Ride Project - Public Program - Van Pool - Operation - 1st Year cost underrun for construction of lot |
1 | 1 | ||
| $(103,123) | Shared Ride | Smyrna Park and Ride Lot @ Ridley Parkway Shared Ride Project - Public Program - Van Pool - Operation - 1st Year cost underrun |
1 | 1 | ||
| $(113,185) | Shared Ride | LaVergne Park and Ride Lot @ Waldron Road Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
1 | 1 | ||
| $1,513,417 | Traffic Flow Improvements | SR-11(Nolanesville Pike) @ SR-255 (Harding Place) Traffic Flow Project - Traffic Engineering - Turn Lanes |
15 | 255 | 5 | |
| $1,442,800 | Traffic Flow Improvements | Nashville Parking and Traffic Guidance System Traffic Flow Project - Congestion Management Systems - Development - Nashville Parking and Traffic Guidance System |
1 | 7 | 1 | |
| $930,770 | Traffic Flow Improvements | Clarksville Highway @ Kings Lane Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 3 | 1 | |
| $900,000 | Traffic Flow Improvements | Countywide incident detection and response enchancement Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 1st Year |
1 | 7 | 1 | |
| $800,000 | Traffic Flow Improvements | MATA Fare Box Traffic Flow Project - Intelligent Transportation Systems - Electronic Fare Payment Systems for buses. |
QA | |||
| $750,000 | Traffic Flow Improvements | Countywide signal system optimization Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects Optimize traffic signals at approximately 150 intersections |
1 | 7 | 1 | |
| $621,071 | Traffic Flow Improvements | Dickerson Pike @trinity Lane Traffic Flow Project - Traffic Engineering - Turn Lanes |
230 | 4 | ||
| $616,240 | Traffic Flow Improvements | Whitetopping at Various Intersections in Knoxville Traffic Flow Project - Intelligent Transportation Systems - Signalization - Other 17 locations |
105 | 97 | ||
| $460,000 | Traffic Flow Improvements | West End/Charlotte/Church Streets signal pre-emption Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | |||
| $450,000 | Traffic Flow Improvements | West Street @ Poplar/North Street Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
5 | 10 | 3 | |
| $411,950 | Traffic Flow Improvements | Shakle Island Road @ Long Hollow Pike Traffic Flow Project - Traffic Engineering - Turn Lanes |
15 | 255 | 5 | |
| $397,270 | Traffic Flow Improvements | I-24 @ SR-10/US 231 Traffic Flow Project - Traffic Engineering - Turn Lanes |
55 | 1 | ||
| $335,200 | Traffic Flow Improvements | Franklin Traffic Operations Center Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
4 | 35 | 1 | |
| $308,397 | Traffic Flow Improvements | SR-258 Old Shackle Road to SR-386 Traffic Flow Project - Other previously reported in 95 |
1 | |||
| $237,441 | Traffic Flow Improvements | Gallatin Pike CCTV Traffic Flow Project - Intelligent Transportation Systems - Other - closed circuit TV - Incident Management Systems |
1 | 7 | 1 | |
| $192,000 | Traffic Flow Improvements | SR-26 @Maddox-Simpson Parkway in Lebanon Traffic Flow Project - Traffic Engineering - realign - Other previously reported in 98 |
1 | 14 | 1 | |
| $141,669 | Traffic Flow Improvements | West End Avenue I-440 to Acklen Park Drive Traffic Flow Project - Traffic Engineering - Turn Lanes |
33 | 550 | 10 | |
| $94,729 | Traffic Flow Improvements | Freeway Service Patrol/reference Markers Traffic Flow Project - Intelligent Transportation Systems - Other - markers for patrol service - Freeway Management Systems |
55 | 598 | 144 | |
| $85,037 | Traffic Flow Improvements | Hacks Cross Road @ Poplar Pike Traffic Flow Project - Other - replace 4 way stop with signal completed in 1996 |
20 | 45 | 8 | |
| $80,000 | Traffic Flow Improvements | Whitetopping at Various Intersections in Knox County Traffic Flow Project - Intelligent Transportation Systems - Signalization - Other 4 locations |
25 | 23 | ||
| $71,500 | Traffic Flow Improvements | Intelligent transportation Systems Communication Plan Traffic Flow Project - Intelligent Transportation Systems - Study - Other |
QA | |||
| $65,000 | Traffic Flow Improvements | Traffic Signal Computer Upgrade Project Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing computer/software |
QA | |||
| $39,952 | Traffic Flow Improvements | Farmington Road and Brierbrook Rd Traffic Flow Project - Other - replace 4 way stop with signal and add turn lanes |
15 | 30 | 6 | |
| $35,000 | Traffic Flow Improvements | SR-41/US-31W @ SR-76/SR-258 Traffic Flow Project - Traffic Engineering - realign intersection - Other |
QA | |||
| $15,000 | Traffic Flow Improvements | SR-10/US 231 Phase I Signal System on Cumberland Street Lebanon Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects upgrade 9 singals |
1 | 14 | 1 | |
| $1,500 | Traffic Flow Improvements | SR-177 Popular Pike/Germantown/Arthur Traffic Flow Project - Other - replace 4 way with signal |
10 | 20 | 4 | |
| $(13,417) | Traffic Flow Improvements | Saunders Ferry Road @ Gallatin Pike Traffic Flow Project - Traffic Engineering - intersection improvement - Other cost underrun/previously reported in 99 |
4 | 31 | 1 | |
| $1,200,000 | Transit | Six Replacement Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - Replacement |
26 | 99 | ||
| $800,100 | Transit | Transit Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New FTA Transfer - for various transit projects |
QA | QA | ||
| $448,000 | Transit | MATA Suburban transit Centers Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - New construction of 2 stations |
QA | |||
| $250,000 | Transit | Regional Rail Study Transit Project - Facilities Improvements - Other - fixed guideway system study |
QA | |||
| $56,000 | Transit | Operating Expenses for Express Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $2,138,924 | Miscellaneous | Miscellaneous HQ's adjustment - obligation to previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Texas | 1/10/2003 | $108,952,514 | $103,150,135 | 95 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $3,226,252 | Demand Management | FY 99 Clean Air Act Tran Fare Subsidy Demand Management Project - Operating Assistance - 1st Year - Road Pricing - By Area Various locations in Harris,Galveston, Montgomery, Lib Co. |
15 | QA | 23 | QA |
| $2,751,232 | Demand Management | FY 2000 Reg Commute Alternatives Imp Demand Management Project - Public Information - Public Education - Other - FY 2000 Reg Commute Alternatives Imp |
QA | |||
| $1,367,000 | Demand Management | FY 2000 Regional Commute Alternative Program Demand Management Project - Public Information - Public Education - Other - FY 2000 Regional Commute Alternative Program |
QA | |||
| $780,000 | Demand Management | Intelligent Transportation System/Lone Star Park Traffic Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation System |
QA | |||
| $440,000 | Demand Management | FY 2000 Clean Air Act Public Outreach Program Demand Management Project - Public Information - Public Education - Other - FY 2000 Clean Air Act Public Outreach Program |
QA | |||
| $420,000 | Demand Management | Intelligent Transportation System Lone Star Park Traffic Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation System |
QA | |||
| $400,000 | Demand Management | Intermodal Congestion Quick Response Team Demand Management Project - Operating Assistance - 1st Year - Other - Intermodal Congestion Quick Response Team |
QA | |||
| $350,000 | Demand Management | FY 2000 Reg Comm Alternatives Program MRKT Demand Management Project - Public Information - Marketing - Other - FY 2000 Reg Comm Alternatives Program MRKT |
QA | |||
| $350,000 | Demand Management | FY 2000 Reg Comm Alternatives Program MRKT Demand Management Project - Public Information - Marketing - Other - FY 2000 Reg Comm Alternatives Program MRKT |
QA | |||
| $160,000 | Demand Management | Intelligent Transportation System/US 75 South of IH 635 Demand Management Project - Operating Assistance - 1st Year - Other - Intelligent Transportation Systems Inter-Dist Comm. Motorist Info Sys. |
QA | |||
| $116,000 | Demand Management | Air Quality Outreach Prg-Ozone Day Demand Management Project - Public Information - Public Education - Other - Air Quality Outreach Prg-Ozone Day |
1 | 3 | 1 | |
| $2,751,232 | I/M and Other TCMs | FY 2000 Reg Commute Alternatives Imp I/M or Other TCM Project - Other - FY 2000 Reg Commute Alternatives Imp |
143 | QA | 374 | QA |
| $1,802,220 | I/M and Other TCMs | FY 2000 Alternative Fleet Fueled Vehicle Program I/M or Other TCM Project - Non Transit Alternative Fuels - Public Fleet - New - Other - Vehicles - Operation - 1st Year |
75 | QA | 1 | QA |
| $440,000 | I/M and Other TCMs | FY 2000 Clean Air Act Public Outreach Program I/M or Other TCM Project - Other - Clean Air Act Public Outreach Program 8 County Non-Attainment Area |
QA | |||
| $400,000 | I/M and Other TCMs | Intermodal Congestion Quick Response Team I/M or Other TCM Project - Other - Intermodal Congestion Quick Response Team |
QA | |||
| $345,807 | I/M and Other TCMs | Major Investment Study SUP by H-GAC I/M or Other TCM Project - Other - Major Investment Study SUP by H-GAC Major Investment Study |
QA | |||
| $340,600 | I/M and Other TCMs | Incident Detection & Response System I-35E from SH183 to I-30 I/M or Other TCM Project - Other - Incident, Detection and Response System |
QA | |||
| $150,000 | I/M and Other TCMs | Project SVCS Contract & NTWK Transfer at Houston Transfer I/M or Other TCM Project - Other - Project SVCS Contract & NTWK Transfer |
QA | |||
| $1,741,082 | Pedestrian/Bicycle | Bike/Pedestrian Clear Fork/Bendbrk Bike Trail Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 7 | 2 | |
| $1,492,525 | Pedestrian/Bicycle | Bike/Ped Trail North Houston on Street Bikeway Network Pedestrian/Bicycle Project - Facilities - Separate Path North Houston on Street Bikeway Network |
2 | QA | 3 | QA |
| $1,025,222 | Pedestrian/Bicycle | Bikeway Phase 1 On Street Network W.Houston & Bikeways Katy Road Pedestrian/Bicycle Project - Facilities - Separate Path |
2 | QA | 3 | QA |
| $300,000 | Pedestrian/Bicycle | Bike/Hike Trail thru Herman Park Pedestrian/Bicycle Project - Facilities - Separate Path Herman Brow Park-HB Trail-Dunvegan WY @ I-10 |
1 | QA | 1 | QA |
| $108,954 | Pedestrian/Bicycle | Construct Hike and Bike Trail/Goose CRK TRL from WTX Ave to Garth Road Pedestrian/Bicycle Project - Facilities - Separate Path Goose CRK TRL from WTX AVE to Garth Road |
1 | QA | 1 | QA |
| $85,692 | Pedestrian/Bicycle | Bike/Pedestrian Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 7 | 2 | |
| $64,500 | Pedestrian/Bicycle | Construct Hike and Bike Trail/Goose CRK TRL Pedestrian/Bicycle Project - Facilities - Separate Path Goose CRK TRL from S of W TX AVE-W TX AVE PHII |
1 | QA | 1 | QA |
| $25,040 | Pedestrian/Bicycle | Bikeway Network Phase 2 on STR Bikeway Network Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | QA | 1 | QA |
| $1,367,000 | Shared Ride | FY 2000 Regional Commute Alternative Program Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
87 | QA | 160 | QA |
| $1,110,000 | Shared Ride | FY 2000 REG Vanpool Program Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
32 | QA | 78 | QA |
| $1,110,000 | Shared Ride | FY 2000 REG Vanpool Program Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
QA | |||
| $10,285,399 | Traffic Flow Improvements | IH-10 Construct Turnarounds @McRae Sumac Yarbrough Lomaland Traffic Flow Project - Traffic Engineering - Construct Turnarounds - Other |
8 | 64 | 1 | |
| $8,973,164 | Traffic Flow Improvements | Install Computerized Traffic Mgmt. System IH-610 Traffic Flow Project - Congestion Management Systems - Establishment, Implementation - Conmputerized Traffic Mgmt. System From US 59 to SH 288 |
72 | QA | 19 | QA |
| $7,791,808 | Traffic Flow Improvements | Construct Direct Connector US 59 @ BW 8 Traffic Flow Project - Traffic Engineering - Construct direct connector - Other |
1 | QA | 1 | QA |
| $6,723,151 | Traffic Flow Improvements | Construct Grade Separation US 290 at Mason Road Traffic Flow Project - Traffic Engineering - Construct Grade Separation - Other |
1 | QA | 1 | QA |
| $6,084,714 | Traffic Flow Improvements | Install CTMS I-45 from 61st street from Harris County Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS |
9 | QA | 2 | QA |
| $5,120,000 | Traffic Flow Improvements | STrGRBS & Pave on IH-10 @SH62 Traffic Flow Project - Traffic Engineering - STR,GR,BS & Pave - Other |
2 | 18 | 1 | |
| $3,540,135 | Traffic Flow Improvements | Construct Direct Connector BW 8 @ Hardy Toll Road Traffic Flow Project - Traffic Engineering - Construct EB to NB Direct Connector - Other |
7 | QA | 2 | QA |
| $2,496,000 | Traffic Flow Improvements | Reconstruct 2lns w/cont. Left Turn Lane Little Cypress Dr. FM 3247 Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 14 | 1 | |
| $2,406,099 | Traffic Flow Improvements | Intersection Improvements Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
78 | 1,301 | 10 | |
| $1,697,600 | Traffic Flow Improvements | TRF Light Synchronization Phase I Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
33 | 263 | 11 | |
| $1,566,314 | Traffic Flow Improvements | ATMS I-20 from US 287 Traffic Flow Project - Congestion Management Systems - Implementation - ATMS |
QA | |||
| $1,469,097 | Traffic Flow Improvements | US 62 Traffic Signal Expansion Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 24 | 1 | |
| $1,224,807 | Traffic Flow Improvements | Installation of Changeable Message Sign Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Installation of Changeable Message Sign |
12 | 113 | 1 | |
| $1,160,606 | Traffic Flow Improvements | Install CTMS SH 225 - SH 134 to Strang Rd. Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS |
2 | QA | 1 | QA |
| $1,030,426 | Traffic Flow Improvements | Provide Far Turn Lanes At Beltline Road and Midway Road Traffic Flow Project - Traffic Engineering - Turn Lanes Widen Intersection to provide lanes |
10 | 87 | 3 | |
| $1,002,714 | Traffic Flow Improvements | Install Video Detectors I-635 to US 75 to I-35E Traffic Flow Project - Congestion Management Systems - Implementation - Install Video Detectors |
QA | |||
| $970,290 | Traffic Flow Improvements | Traffic Signal Upgrades Citywide Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $846,713 | Traffic Flow Improvements | Traffic Signal Improvements/Grand Prairie Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | |||
| $835,416 | Traffic Flow Improvements | Intergrate Alternative Detection Communication Traffic Flow Project - Congestion Management Systems - Establishment - Alternative Detection Communication |
QA | |||
| $800,000 | Traffic Flow Improvements | Intersection and Traffic Signal Improvements 572 Locations in Dallas Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1,192 | 10,243 | 2,221 | |
| $755,390 | Traffic Flow Improvements | Intersection Improvements Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
3 | 25 | 4 | |
| $748,495 | Traffic Flow Improvements | Install Traffic Mgmt. System NASA 1 to E.Space Center Traffic Flow Project - Congestion Management Systems - Implementation - Traffic Mgmt. System .38 miles E FM270 to .63 miles E Space Center |
1 | QA | 1 | QA |
| $745,614 | Traffic Flow Improvements | Provide Far Turn Lanes Belt Line Road and Midway Road Traffic Flow Project - Traffic Engineering - Turn Lanes |
QA | |||
| $730,913 | Traffic Flow Improvements | Install Changeable Message Sign I-10 Meadow St. to Spur 330 Traffic Flow Project - Congestion Management Systems - Implementation - Changeable Message Sign |
8 | QA | 2 | QA |
| $686,375 | Traffic Flow Improvements | Reconstruct 2Lns w/cont. Left Turn Lane FR SP 380 to Neches Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | 1 | ||
| $604,272 | Traffic Flow Improvements | Traffic Signal Improvements Associated with ITS Program/Pleasant Grove Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
QA | |||
| $581,433 | Traffic Flow Improvements | Traffic Signal Improvements/Duncanville and Lancaster Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
35 | 312 | 32 | |
| $486,037 | Traffic Flow Improvements | Traffic Signal Upgrade Various Intersections in Grand Prairie Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
24 | 212 | 6 | |
| $457,150 | Traffic Flow Improvements | Traffic Signals Various Intersections Grand Prairie Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
10 | 87 | 9 | |
| $413,064 | Traffic Flow Improvements | Intersection Improvements SP 474 (Rufe Snow Road) Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 8 | 1 | |
| $400,000 | Traffic Flow Improvements | Intersection Improvements IH 820 at Beach St. N Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 11 | 2 | |
| $359,912 | Traffic Flow Improvements | Signal Improvements in Grand Prairie for various intersections Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $348,000 | Traffic Flow Improvements | System Signal Interconnect Airway Blvd. from Edgemere to Airport Rd. Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
2 | 13 | 1 | |
| $339,197 | Traffic Flow Improvements | Signal System Interconnection Project Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 26 | 1 | |
| $324,960 | Traffic Flow Improvements | Intersection Improvements Keller Springs at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
2 | 18 | 4 | |
| $324,000 | Traffic Flow Improvements | Intersection Improvements SH 161 to Spur 348 Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
17 | 148 | 4 | |
| $300,000 | Traffic Flow Improvements | Add U Turns IH-610 @ Ella Blvd. N. Durham and N.Shepherd Traffic Flow Project - Traffic Engineering - Add U-Turns - Other |
1 | QA | 1 | QA |
| $300,000 | Traffic Flow Improvements | Intersection Improvement from 114 to SH 26 Traffic Flow Project - Traffic Engineering - Intersection improvements - Other |
6 | 55 | 10 | |
| $285,536 | Traffic Flow Improvements | Intersection Improvements Midway Road at Spring Valley Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
4 | 32 | 7 | |
| $267,398 | Traffic Flow Improvements | Traffic Signal Upgrade LP12 @ 4 Intersections Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $246,428 | Traffic Flow Improvements | Intersection Improvements SH 121 on Central Bedford Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 12 | 2 | |
| $216,000 | Traffic Flow Improvements | Intersection Improvements IH-820 @ Randoll Mill RD Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition |
1 | 4 | 1 | |
| $200,000 | Traffic Flow Improvements | Intersection Improvements Camp Bowie/7th Street@University Drive Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
2 | 16 | 3 | |
| $190,848 | Traffic Flow Improvements | Intersection Improvements SH356 at Mockingbird Ln. Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 10 | 2 | |
| $181,711 | Traffic Flow Improvements | US 54 IH10 Traffic Mgmt. System Signal Communication Link Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
2 | 17 | 1 | |
| $181,114 | Traffic Flow Improvements | Intersection Improvements Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
6 | 55 | 10 | |
| $151,513 | Traffic Flow Improvements | Arterial Traffic Mgmt. System SH 6 from FM 2004 to FM 519 Traffic Flow Project - Congestion Management Systems - Establishment - Arterial Traffic Mgmt. System |
1 | QA | 8 | QA |
| $150,000 | Traffic Flow Improvements | Install CTMS IH-610 from Old Katy Road to S. Braeswood Traffic Flow Project - Congestion Management Systems - Implementation - Install CTMS |
55 | QA | 14 | QA |
| $150,000 | Traffic Flow Improvements | PE for Incident Detection and Response Various Locations Traffic Flow Project - Congestion Management Systems - Implementation - Intelligent Transportation System |
QA | |||
| $150,000 | Traffic Flow Improvements | PE for Incident Detection and Response various locations Traffic Flow Project - Congestion Management Systems - Implementation - Intelligent Transportation System |
QA | |||
| $130,000 | Traffic Flow Improvements | Computerized Mgmt. System IH-10 from SH6 to Fort Bend County Line Traffic Flow Project - Congestion Management Systems - Establishment - Computerized Mgmt. System |
23 | QA | 6 | QA |
| $125,135 | Traffic Flow Improvements | Intersection Improvements Cockrell Hill Road @ Camp Wisdom Road Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition & Relocation |
2 | 16 | 3 | |
| $119,632 | Traffic Flow Improvements | Intersection Improvements Midway at Sojourn Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition & Relocation |
1 | 9 | 2 | |
| $106,000 | Traffic Flow Improvements | Signalization on Williams Trace Blvd. @ US 59 to SH 6 Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | QA | 1 | QA |
| $97,467 | Traffic Flow Improvements | Construct Right Turn Lane on FM 1764 @ SH 146 Traffic Flow Project - Traffic Engineering - Turn Lanes |
1 | QA | 1 | QA |
| $91,088 | Traffic Flow Improvements | Intersection Improvements FM 1382 @ Duncanville Road Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 7 | 1 | |
| $90,000 | Traffic Flow Improvements | Traffic Signal Improvements US77 @SycamoreMcKinneyOakHickory Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
3 | 24 | 1 | |
| $88,589 | Traffic Flow Improvements | Intersection Improvements on Central Dr. @ Bedford Rd. Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 9 | 2 | |
| $75,708 | Traffic Flow Improvements | Intersection Improvements 8th at Pennsylvania Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 7 | 2 | |
| $68,928 | Traffic Flow Improvements | Signal Synchronization on Woodlands Pkwy @ I-45 to Cochrans Xing Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | QA | 1 | QA |
| $68,800 | Traffic Flow Improvements | Signalization On Williams Trace BLVD @ SH 6 to Austin Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
1 | QA | 1 | QA |
| $68,732 | Traffic Flow Improvements | Traffic Signal Improvements Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 8 | 1 | |
| $63,739 | Traffic Flow Improvements | SH 289 @ MaCallum Blvd Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 10 | 1 | |
| $60,550 | Traffic Flow Improvements | Intersection Improvements Grand at Oakland Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition and relocation |
2 | 17 | 4 | |
| $53,440 | Traffic Flow Improvements | Signal Synchronization on Research Road @ I-45 to Kuyendahl Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | QA | 1 | QA |
| $52,000 | Traffic Flow Improvements | Traffic Signal Upgrades In Pleasant Grove Area in Dallas Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $46,832 | Traffic Flow Improvements | Intersection Improvements McEwen at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
3 | 22 | 5 | |
| $41,826 | Traffic Flow Improvements | Intersection Improvements Central Dr at L.Don Dodson Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
2 | 17 | 3 | |
| $35,872 | Traffic Flow Improvements | Intersection Improvements Beltway at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
3 | 22 | 5 | |
| $31,407 | Traffic Flow Improvements | Intersection Improvements 7th Street/Commerce at Calhoun Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 7 | 2 | |
| $29,812 | Traffic Flow Improvements | Installation of Changeable Message Sign Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Installation of Changeable Message Signs |
1 | 3 | 1 | |
| $27,012 | Traffic Flow Improvements | Intersection Improvements Live Oak at Washington Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $24,486 | Traffic Flow Improvements | ATMS-Traffic Signal Improvement Phase/Lewisville Regional Wide Signals Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $22,970 | Traffic Flow Improvements | Traffic Signal Improvements Inwood at Walnut Hill Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $22,586 | Traffic Flow Improvements | Intersection Improvements Inwood at Spring Valley Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Utilities |
2 | 16 | 3 | |
| $21,248 | Traffic Flow Improvements | Intersection Improvements Midway at Proton Traffic Flow Project - Traffic Engineering - Intersection Improvements Midway at Proton - Other Acquisition, Relocation |
2 | 21 | 5 | |
| $20,232 | Traffic Flow Improvements | Intersection Improvements Fitzhugh at Live Oak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $17,400 | Traffic Flow Improvements | Intersection Improvements SP 580 @ Las Vegas Trail Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 11 | 2 | |
| $17,232 | Traffic Flow Improvements | Intersection Improvements Live Oak at Peak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $16,000 | Traffic Flow Improvements | Intersection Improvements Live Oak at Munger Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $15,218 | Traffic Flow Improvements | Intersection Improvements Inwood at Park Lane Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition & Relocation |
2 | 17 | 4 | |
| $15,000 | Traffic Flow Improvements | Intersection Improvements Live Oak at Texas Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
3 | 23 | 4 | |
| $13,756 | Traffic Flow Improvements | Intersection Improvements Inwood at Walnut Hill Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $13,370 | Traffic Flow Improvements | Intersection Improvements Rufe Snow Dr. at Glenview Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other |
1 | 6 | 1 | |
| $12,800 | Traffic Flow Improvements | Eight Ave/Pennsylvania Intersection Improvements Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 10 | 2 | |
| $8,162 | Traffic Flow Improvements | ATMS-Traffic Signal Improvement Phase/Lewisville Regional Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $7,952 | Traffic Flow Improvements | Intersection Improvements Lindberg at Midway Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other Acquisition, Relocation |
2 | 21 | 5 | |
| $7,502 | Traffic Flow Improvements | Intersection improvment 7th Street/Commerce Street @ Calhoun Street in Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1 | 5 | 1 | |
| $4,028 | Traffic Flow Improvements | Intersection Improvements Hall at Live Oak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition and Relocation |
2 | 17 | 4 | |
| $3,380 | Traffic Flow Improvements | Intersection Improvements Haskell at Live Oak Traffic Flow Project - Traffic Engineering - Intersection Improvements - Other ROW Acquisition & Relocation |
2 | 17 | 4 | |
| $200,000 | Transit | Alternative Fuel Vehicle Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
1 | 2 | 1 | |
| $1,802,220 | STP/CMAQ | FY 2000 Alternative Fleet Fueled Vehicle Program This is an STP/CMAQ Project FY 2000 Alternative Fleet Fueled Vehicle Program |
QA | |||
| $969,534 | STP/CMAQ | Construction of Non-Freeway Facility/Skillman St to W. of Audelia This is an STP/CMAQ Project Construction of non-freeway facility |
3 | 26 | 4 | |
| $345,807 | STP/CMAQ | MAJOR Investment Study This is an STP/CMAQ Project Major Investment Study (various locations) |
QA | |||
| $240,000 | STP/CMAQ | Vehicle Detector Replacement Program This is an STP/CMAQ Project Vehicle Detector Replacement Program |
4 | 33 | 1 | |
| $41,826 | STP/CMAQ | Row Acquisition & Utilities This is an STP/CMAQ Project ROW Acquisition & Utilities |
QA | |||
| $24,000 | STP/CMAQ | Vehicle Detector Repl. Program This is an STP/CMAQ Project Vehicle Detector Repl. Program |
4 | 33 | 1 | |
| $16,000 | STP/CMAQ | AQUIS Utility & Relocation Intersection of 27th street & Helena Ave. This is an STP/CMAQ Project AQUIS. Utility and Relocation |
QA | |||
| $(4,645,314) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Utah | 1/10/2003 | $10,782,626 | $18,130,123 | 168 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $94,163 | I/M and Other TCMs | Utah County Remote Sensing Network I/M or Other TCM Project - Other - Remote sensing to detect gross emitters leading to repair of these vehicles. |
10,224 | 103 | ||
| $(704) | I/M and Other TCMs | I/M Technician Training Materials I/M or Other TCM Project - I/M - Operating - 1st Year |
||||
| $20,000 | Pedestrian/Bicycle | Light Rail Trail and Porter Rockwell trail Pedestrian/Bicycle Project - Facilities - Separate Path 3 segments Project (121) Project (122) |
4 | 45 | 4 | |
| $10,000 | Pedestrian/Bicycle | 1300 West: 6200 South to 4700 South Pedestrian/Bicycle Project - Facilities - Striped Lane |
1 | 13 | 1 | |
| $10,000 | Pedestrian/Bicycle | Beck Street Bikeway Pedestrian/Bicycle Project - Facilities - Separate Path Funds will be deobligated in the future to help finance ligh rail vehicles since no emission reductions |
QA | |||
| $4,661 | Pedestrian/Bicycle | American Fork River Trail Pedestrian/Bicycle Project - Facilities - multi-use trail - Other 1.13 miles |
8 | 1 | ||
| $0 | Pedestrian/Bicycle | Moutainland Non-motorized transportation Program Ped/Bike Planner I Pedestrian/Bicycle Project - Other - planner position emission rates are ton/day |
1 | 1 | ||
| $1,600,000 | Shared Ride | Park and Ride Lots `Salt Lake County Park and Ride N/S Corridor` Shared Ride Project - Public Program - Van Pool - Operation - 1st Year new lots |
11 | 122 | 13 | |
| $1,283,528 | Shared Ride | Park and Ride Lots US89 @ Weber Canyon & 24th and Wall Shared Ride Project - Public Program - Van Pool - Operation - 1st Year $1000000 was transferred to FTA |
7 | 91 | 10 | |
| $543,750 | Shared Ride | UTA RideShare TDM Shared Ride Project - Public Program - Information/Matching - Matching, Marketing 75/25 SPLIT PROJECT WITH OGDEN |
58 | 529 | 58 | |
| $317,250 | Shared Ride | Expansion of UTA Vanpool Leasing Program Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase 20 vans; 75/25 split with Ogden |
8 | 91 | 10 | |
| $181,250 | Shared Ride | UTA Rideshare TDM Shared Ride Project - Public Program - Information/Matching - Matching, Marketing 75/25 split project with Salt lake |
16 | 177 | 20 | |
| $105,750 | Shared Ride | Expansion of UTA Van Pool Leasing Program Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase 75/25 split with Salt lake |
4 | 46 | 5 | |
| $102,000 | Shared Ride | UTA Rideshare Program Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
153 | 15 | ||
| $82,000 | Shared Ride | UTA Rideshare-Van Acquisition Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase 4 vans |
15 | 2 | ||
| $(69,286) | Shared Ride | Old Mill Park and Ride Lot Shared Ride Project - Public Program - Van Pool - Operation - 1st Year projects withdrawn to accommodate N/S Corridor Park and Ride Lots |
2 | 32 | 2 | |
| $(95,028) | Shared Ride | Park and Ride Lots Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
42 | 474 | 52 | |
| $4,902,599 | Traffic Flow Improvements | Commuterlink Advanced Traffic Management System and Regional Signal Coordination Traffic Flow Project - Congestion Management Systems - Development, Establishment - 3 Control centers, 550 traffic signals, CCTV, and message signs part of I-15 reconstruction |
2 | 68 | 8 | |
| $2,055,901 | Traffic Flow Improvements | Signal Coordination for the Roy Area Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects SR-126 to SR 26, I-15 South |
3 | 31 | 1 | |
| $460,768 | Traffic Flow Improvements | traffic Signal Modernization- Downtown Provo Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing 4 locations on Center st, 2 loctions on 100 north, 1 location on 100 South |
58 | 1 | ||
| $376,000 | Traffic Flow Improvements | Incident Management Expansion Traffic Flow Project - Intelligent Transportation Systems - Operating Assistance - Incident Management Systems - 2nd Year |
5 | 141 | 16 | |
| $250,000 | Traffic Flow Improvements | Automated bus locating/passenger counters Traffic Flow Project - Intelligent Transportation Systems - Traveler Information Systems - Advanced Public Transit System ITS technology |
QA | |||
| $57,467 | Traffic Flow Improvements | Signal Coordination for Layton Area Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
3 | 26 | 1 | |
| $18,646 | Traffic Flow Improvements | Fiber Optic and Wide Area Network-various locations Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
QA | |||
| $10,000 | Traffic Flow Improvements | Intersection Improvement: 9400 South and 1300 East Traffic Flow Project - Traffic Engineering - Turn Lanes |
7 | 65 | 2 | |
| $10,000 | Traffic Flow Improvements | Intersection Improvment: Bengal Blvd Traffic Flow Project - Traffic Engineering - Turn Lanes includes restriping, new loops, signal modification, interconnect |
1 | 5 | 1 | |
| $10,000 | Traffic Flow Improvements | Intersection Improvement: Fort Union Traffic Flow Project - Traffic Engineering - Turn Lanes includes restriping, new loops, signal modification, interconnect |
1 | 11 | 1 | |
| $9,323 | Traffic Flow Improvements | Traffic Signal Modernization- 7 locations Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing 1230 North 200 West, 940 North 200 West, 800 North 200 West, 500 north 200 west, University Parkway and Canyon Road, 700 north 700 East, 1230 north 300 west |
58 | 1 | ||
| $4,661 | Traffic Flow Improvements | American Fork Signal Coordination Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
36 | 1 | ||
| $0 | Traffic Flow Improvements | Antelope Drive & I-15 Ramp Intersection Traffic Flow Project - Traffic Engineering - Other This project will improve the intersection geometry at the east side ramp at the interchange of I-15 and Antelope Drive. It will provide dual left turn lanes for the northbound to westbound and for the eastbound to northbound turning movements, with the necessary widening to accommodate the lane shifts. Some right of way will need to be acquired to added the extra turn lanes. |
1 | 8 | 1 | |
| $(10,000) | Traffic Flow Improvements | Intersection Improvement: Fort Union Blvd. Traffic Flow Project - Traffic Engineering - Other |
1 | 5 | 1 | |
| $4,000,000 | Transit | Light Rail Vehicles Transit Project - Operating Assistance (New or Expanded Service) - Rail - Expanded Service - 1st Year |
27 | 303 | 33 | |
| $1,000,000 | Transit | ITS/APTS Deployment Transit Project - Transit Management Systems - Purchase of global positioning units and automated passenger counters Ogden and Salt Lake benefits combined |
64 | 7 | 8 | |
| $408,000 | Transit | 2 New Buses for the Provo Orem Shuttle Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
QA | |||
| $250,000 | Transit | New Bus Service West Valley City to SLC International Airport Transit Project - Facilities Improvements - Passenger Facilities - Intermodal Stations - Improved |
9 | 95 | 12 | |
| $237,000 | Transit | New Bus Service Provo Orem Shuttle Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
298 | 30 | ||
| $0 | Transit | US-89 & 200 North Park & Ride Lot Transit Project - Facilities Improvements - Passenger Facilities - Bus Stop - New This is a Park and Ride Lot, but the description process would not let me select Park & Ride. The park and ride lot would be approximately two acres and would have around 100-150 parking stalls. |
7 | 82 | 9 | |
| $106,605 | Miscellaneous | Miscellaneous HQ, adjustment - obligation to previously approved projects |
||||
| $(20,000) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
||||
| $(196,181) | Miscellaneous | Miscellaneous This project does not fit in the existing project categories. |
* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year