CMAQ DETAILED PROJECT LISTING REPORT (FY 2000)
Page 8
Page 1 - Alabama | Alaska | Arizona | Arkansas | California | Colorado
Page 2 - Connecticut | Delaware | District of Columbia | Florida | Georgia | Hawaii | Idaho
Page 3 - Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine
Page 4 - Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana
Page 5 - Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota
Page 6 - Ohio | Oklahoma | Oregon | Pennsylvania | Rhode Island
Page 7 - South Carolina | South Dakota | Tennessee | Texas | Utah
Page 8 - Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming
Totals
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Vermont | 1/10/2003 | $7,800,384 | $10,459,164 | 134 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $4,331,518 | STP/CMAQ | Construction | ||||
| $2,775,355 | STP/CMAQ | Bike/Ped | ||||
| $2,342,000 | STP/CMAQ | FTA Tranfer (operating) | ||||
| $670,002 | STP/CMAQ | Miscellaneous | ||||
| $340,289 | STP/CMAQ | Park and Ride Facilities |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Virginia | 1/10/2003 | $34,568,352 | $17,797,147 | 51 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $629,000 | Demand Management | TDM Strategies - Richmond | 7 | 10 | ||
| $342,000 | Demand Management | TDM Marketing Program - GRTC Demand Management Project - Public Information - Marketing - Other |
47 | 66 | ||
| $302,800 | Demand Management | M92: MetroWashington Telework Resource Center - Regionwide | 465 | 1,023 | ||
| $472,200 | Pedestrian/Bicycle | Sidewalk Improvements form Netters Lane to Menchville - Newport News | 3 | 2 | ||
| $400,000 | Pedestrian/Bicycle | Columbia Pike Bicycle and Pedestrian Trail (Holmes Run Segment) - Fairfax | 5 | 7 | ||
| $156,200 | Pedestrian/Bicycle | Install Sidewalks from Route 1 to Carter Street - Ashland | 1 | |||
| $80,000 | Pedestrian/Bicycle | Bicycle and Pedestrian Trail from King Arthur Dr to Wakefield Pk - Fairfax | 6 | 1 | ||
| $64,800 | Pedestrian/Bicycle | J. Clyde Morris Bike Trail from Jefferson Avenue to Museum - Newport News | 5 | 4 | ||
| $40,000 | Pedestrian/Bicycle | Bike Trail and Sidewalk at Oaklawn Industrial Park - Newport News | 8 | 7 | ||
| $28,000 | Pedestrian/Bicycle | Rivermont Bike Trail - Newport News | 18 | 17 | ||
| $27,214 | Pedestrian/Bicycle | Bicycle Parking - Regionwide | 9 | 9 | ||
| $20,000 | Pedestrian/Bicycle | Pedestrian and Bike Path from Route 58 to Route 10/32 - Suffolk | 4 | 5 | ||
| $4,800 | Pedestrian/Bicycle | M70B: Employer Outreach for Bikes - Regionwide | 1 | 1 | ||
| $1,383,600 | Shared Ride | M77B: Vanpool Incentive - Regionwide Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
74 | 177 | ||
| $665,000 | Shared Ride | Commuter Assistance Program - Arlington Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
9 | 9 | ||
| $568,800 | Shared Ride | M47C: Guarenteed Ride Home - Regionwide Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
149 | 265 | ||
| $340,800 | Shared Ride | M47C: Employer Outreach - Regionwide Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
149 | 265 | ||
| $300,000 | Shared Ride | Rideshare Program - PRTC Shared Ride Project - Public Program - Information/Matching - Matching, Marketing |
60 | 150 | ||
| $235,000 | Shared Ride | Enhanced Commuter Assistance Program - Arlington Shared Ride Project - Public Program - Van Pool - Commuter Matching |
1 | |||
| $150,000 | Shared Ride | Commuter Connections Operation Center - Regionwide Shared Ride Project - Public Program - Van Pool - Commuter Matching |
1 | |||
| $131,298 | Shared Ride | Satellite Parking at King Street and Pembroke - Hampton Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
2 | 3 | ||
| $108,000 | Shared Ride | Endzone Regional Public Education Program - Regionwide Shared Ride Project - Public Program - Van Pool - Commuter Matching |
1 | |||
| $100,000 | Shared Ride | Air Pollution Reduction Program - Regionwide Shared Ride Project - Public Program - Information/Matching - Marketing |
215 | 290 | ||
| $79,600 | Shared Ride | M-47: Integrated Rideshare - Regionwide Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
6 | 14 | ||
| $50,000 | Shared Ride | TMS Control Center/VDOT SMART Travel Center - Hampton | 1 | |||
| $8,000 | Shared Ride | Regional Air Pollution Reduction Program - Colonial Heights Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
215 | 290 | ||
| $3,107,974 | Traffic Flow Improvements | Citiwide Signal System Upgrade - Hampton Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
134 | 54 | ||
| $222,290 | Traffic Flow Improvements | Computerized Signal System Expansion Phase I - Norfolk Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
331 | 45 | ||
| $200,693 | Traffic Flow Improvements | Completion of Downtown Signal System - Suffolk | 8 | 1 | ||
| $180,000 | Traffic Flow Improvements | Highway Signalization at Various Locations - Herndon | 438 | 196 | ||
| $176,400 | Traffic Flow Improvements | Intersection Improvements at HCRP/Armistead Avenue - Hampton | 1 | |||
| $175,000 | Traffic Flow Improvements | Citiwide Signal System Phase V/Upgrade Intersections - Newport News | 126 | 26 | ||
| $162,489 | Traffic Flow Improvements | Signalization at Various Locations - Manassas | 438 | 196 | ||
| $150,000 | Traffic Flow Improvements | Citiwide Signal System Retiming - Virginia Beach | 250 | 43 | ||
| $125,140 | Traffic Flow Improvements | Citiwide Signalization - Alexandria | 438 | 196 | ||
| $112,000 | Traffic Flow Improvements | Intersection Improvements at Big Bethel/Michael Woods - Hampton | 1 | 1 | ||
| $83,200 | Traffic Flow Improvements | Turn Lanes and Signal at Route 145/Kingsdale road - Chesterfield County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $80,000 | Traffic Flow Improvements | Interchange Improvements at I-64/Settlers Landing Road - Hampton Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $75,200 | Traffic Flow Improvements | Reconstruct Intersection and Provide Signal at Anoka/Glenside - Henrico County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | |||
| $64,467 | Traffic Flow Improvements | Extend Turn Lane at Route 647/Turner Road - Chesterfield County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $55,769 | Traffic Flow Improvements | Citiwide Signal System Upgrade - Portsmouth | 82 | 20 | ||
| $40,000 | Traffic Flow Improvements | Intersection Improvements at Route 10/Enon Church Road in Chesterfield County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $40,000 | Traffic Flow Improvements | Expanded Cameras Coverage on Mercury Blvd from the WCL to King St - Hampton | 4 | 4 | ||
| $40,000 | Traffic Flow Improvements | Intersection Improvements at Route 10/Allied Road - Chesterfield County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $32,800 | Traffic Flow Improvements | Intersection Improvements at Route 143/Thimber Shoals Road - Newport News Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $25,200 | Traffic Flow Improvements | HOV Marketing and Analysis - Regionwide | 1 | 1 | ||
| $24,000 | Traffic Flow Improvements | Additional Turn Lane at Magruder Blvd/Hardy Cash Drive - Hampton | 10 | 4 | ||
| $10,000 | Traffic Flow Improvements | Signal Coordination Townwide - Leesburg | 438 | 196 | ||
| $9,874 | Traffic Flow Improvements | Right Turn Lane at Route 250/Glenside - Henrico County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | |||
| $8,000 | Traffic Flow Improvements | Intersection Improvements at Fox Hill Road/Woodland Pond - Hampton | 10 | 4 | ||
| $5,600 | Traffic Flow Improvements | Intersection Improvements at Route 17/DiligenceDrive - Newport News Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $4,000 | Traffic Flow Improvements | Right Turn Lane at Oaklawn/Jefferson Park - City of Hopewell Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | |||
| $1,000 | Traffic Flow Improvements | Signal System Retiming at Various Intersections - Hampton | 14 | 6 | ||
| $1,000 | Traffic Flow Improvements | Signal Coordination of Downtown Area - Suffolk | 91 | 23 | ||
| $1,000 | Traffic Flow Improvements | Arterial Signal System Upgrade: Mercury Blvd - Hampton/Newport News | 8 | 3 | ||
| $1,000 | Traffic Flow Improvements | Citiwide Signal System Retiming at Various Intersections - Newport News | 345 | 144 | ||
| $1,656,268 | Transit | Purchase Buses Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
3 | 7 | ||
| $1,000,000 | Transit | GRTC - Demonstration Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
11 | 14 | ||
| $650,000 | Transit | Smart Mover - WMATA Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
QA | QA | QA | QA |
| $564,000 | Transit | Purchase Elect. Buses for Falls Church Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
5 | 4 | ||
| $400,000 | Transit | Rosslyn Metrorail Station Improvements Transit Project - Facilities Improvements - Passenger Facilities - Rail Stations - Access, Amenitities - Improved |
7 | 14 | ||
| $360,000 | Transit | Purchase/Install Bus Shelters - Regionwide Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 3 | ||
| $325,480 | Transit | Rt. 12 & 15 Bus Service - TTDC Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
13 | 16 | ||
| $280,000 | Transit | Jefferson Ave. Transit Service Ext. - PTDC Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
5 | 6 | ||
| $268,000 | Transit | Bus Stop Accessability Improvements - City of Fairfax Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 1 | ||
| $200,000 | Transit | GRTC - Compreh. Operat. Analy Transit Project - Related Demand Management Stategies - Other - Analysis |
||||
| $180,000 | Transit | Purchas/Install Bus Shelters - Prince William County Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase |
1 | 3 | ||
| $38,400 | Transit | Silverleaf HOV Express Bus - TTDC Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
2 | 3 | ||
| $270,000 | Miscellaneous | Hampton Fast Ferry This project does not fit in the existing project categories. |
7 | 10 | ||
| $(296,209) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Washington | 1/10/2003 | $23,807,173 | $20,971,700 | 88 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $875,000 | Demand Management | WSDOT-TDM Project Demand Management Project - New Activity - Planning - Other - unspecified PE |
60 | QA | 31 | |
| $650,000 | Demand Management | Sta. Neigh. TDM Projectt Demand Management Project - New Activity - Planning - Parking Management - Study and Demonstration - Other |
45 | QA | 79 | |
| $500,000 | Demand Management | CTR Enhancement Programt Demand Management Project - Operating Assistance - 1st Year - Other - CTR and Employer grant programs |
960 | |||
| $250,125 | Demand Management | WSDOT-OUM CTR Projectt Demand Management Project - New Activity - Planning - Other - Unspecified PE |
1 | 5 | 1 | |
| $115,768 | Demand Management | CTR Implementation Programt Demand Management Project - Public Information - Marketing - Other |
226 | |||
| $140,000 | I/M and Other TCMs | 2000 Congestion Management Monitoringt I/M or Other TCM Project - Transportation Management - 1st Year - Transportation Management Association |
QA | |||
| $123,500 | I/M and Other TCMs | 3rd 5th 6th Best and Bolivar Rds I/M or Other TCM Project - Other - Pave gravel roads PE and Construction in PM-10 Area |
14 | |||
| $53,600 | I/M and Other TCMs | 9th Ave and Chronicle Rd I/M or Other TCM Project - Other - Pave gravel road in PM-10 area |
4 | |||
| $37,501 | I/M and Other TCMs | Mead Road I/M or Other TCM Project - Other - Pave gravel roads in Pm-10 nonattainment area |
10 | |||
| $20,000 | I/M and Other TCMs | Adams. Progress 36th Best and Sommer Street I/M or Other TCM Project - Other - Prave gravel roads in PM-10 Area |
57 | |||
| $10,000 | I/M and Other TCMs | Center/Oak/Freya/Boston Rds I/M or Other TCM Project - Other - pave gravel roads |
15 | |||
| $7,520 | I/M and Other TCMs | 14th/Vercler/Clinton/Glenn Rd I/M or Other TCM Project - Other - pave gravel roads Pe in PM-10 area |
6 | |||
| $7,120 | I/M and Other TCMs | 10th/13th/Warren/Marigold Street I/M or Other TCM Project - Other - pave roadway |
10 | |||
| $6,000 | I/M and Other TCMs | Vista and Ella Roads I/M or Other TCM Project - Other - Pave gravel roads in PM-10 area |
11 | |||
| $5,000 | I/M and Other TCMs | Woodlawn Sinto Dean Skipworht and Johnson Rds I/M or Other TCM Project - Other - prave gravel roads PE and Construction in PM-10 Area |
5 | |||
| $1,100,000 | Pedestrian/Bicycle | SR 99 Improvements Pedestrian/Bicycle Project - Facilities - Striped Lane |
27 | 136 | 9 | |
| $358,750 | Pedestrian/Bicycle | Interurban Trail Pedestrian/Bicycle Project - Facilities - Separate Path 1.3 miles |
1 | 8 | 1 | |
| $336,000 | Pedestrian/Bicycle | Chief Sealth Trail Pedestrian/Bicycle Project - Facilities - Separate Path includes connections to LINK rail; PE |
1 | 2 | 1 | |
| $300,000 | Pedestrian/Bicycle | Columbia River/Scenic Trail Pedestrian/Bicycle Project - Facilities - Separate Path |
1 | 2 | 1 | |
| $170,000 | Pedestrian/Bicycle | FY 99 Ped. Access Pgm Pedestrian/Bicycle Project - Safety - walkways, ramps, extensions, signals. lighting Also used for training seminar on ped. design issues |
9 | |||
| $166,095 | Pedestrian/Bicycle | So Lake Stevens Rd Walkway Pedestrian/Bicycle Project - Facilities - Separate Path 1800 ft walkway |
9 | 109 | 14 | |
| $160,025 | Pedestrian/Bicycle | Evergreen Bike Lanes Pedestrian/Bicycle Project - Facilities - Striped Lane ramps at intersections, add bus shelters and benches |
1 | 4 | 1 | |
| $569,900 | Traffic Flow Improvements | Mill Plain Adapt. Sig System Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects equipment |
4 | 39 | -9 | |
| $500,000 | Traffic Flow Improvements | Hwy 99/I-5 ITC Traffic Flow Project - Intelligent Transportation Systems - Travel Management Centers - Construction - Freeway Management Systems |
1 | 7 | -2 | |
| $337,185 | Traffic Flow Improvements | Airport Rd HOV Lanes Traffic Flow Project - High Occupancy Vehicle Lanes - Construction Included 5 ft Bike lanes plus widening of turning lane |
31 | 300 | 39 | |
| $200,000 | Traffic Flow Improvements | Bridging the Valley Traffic Flow Project - Congestion Management Systems - Development, Establishment - research, analyze, recommend improvements for rail lines |
1,700 | |||
| $75,000 | Traffic Flow Improvements | Eastern Regional Traffic Eng. Position Traffic Flow Project - Traffic Engineering - Position - Other |
1,196 | |||
| $56,475 | Traffic Flow Improvements | 4th Plain Traffic Sig Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects |
6 | 57 | 1 | |
| $33,580 | Traffic Flow Improvements | Andresen Rd Interconnect Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Interconnects includes bike lanes |
4 | 76 | -7 | |
| $7,000,000 | Transit | FTA Transfer Transit Project - Facilities Improvements - Rail Track - Improved - Light Rail |
QA | QA | QA | |
| $4,000,000 | Transit | FTA Transfer Transit Project - Facilities Improvements - Rail Track - Improved - Light Rail |
QA | QA | QA | |
| $2,121,000 | Transit | FTA Transfer Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New 2 buses |
27 | 227 | 27 | |
| $1,224,557 | Transit | FTA Transfer Transit Project - Transit Management Systems - Signal Prioritization |
27 | 227 | 36 | |
| $(538,001) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| West Virginia | 1/10/2003 | $7,641,892 | $3,656,458 | 48 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $52,000 | Shared Ride | Park and Ride Shared Ride Project - Public Program - Information/Matching - Matching |
5 | 6 | ||
| $110,000 | Traffic Flow Improvements | Signal Timing Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
59 | 953 | ||
| $100,000 | Traffic Flow Improvements | Safety Project Traffic Flow Project - Intelligent Transportation Systems - Traffic Signal Improvements - Coordination/Timing |
1,399 | 21,100 | ||
| $1,197,900 | STP/CMAQ | Unknown This is an STP/CMAQ Project |
4 | |||
| $979,520 | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $412,502 | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $282,000 | STP/CMAQ | Unknown This is an STP/CMAQ Project |
3 | |||
| $217,840 | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $184,000 | STP/CMAQ | Unknown This is an STP/CMAQ Project |
48 | |||
| $136,000 | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $53,840 | STP/CMAQ | Unknown This is an STP/CMAQ Project |
1 | |||
| $6,412 | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $1,141 | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $(2,647) | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $(2,849) | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $(16,041) | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA | |||
| $(55,160) | STP/CMAQ | Revision This is an STP/CMAQ Project |
QA |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Wisconsin | 1/10/2003 | $22,771,253 | $21,208,404 | 93 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $2,854,200 | I/M and Other TCMs | Wisconsin DOT Inspection-Maintenance Program Enhancements TCM or I/M Project - I/M - Capital - 1st Year The emission reduction estimate was taken in another I/M entry and represents the entire I/M program in SE WI |
QA | |||
| $352,000 | I/M and Other TCMs | Wisconsin DNR - Dynamometers for Enhanced Vehicle Inspection TCM or I/M Project - I/M - Capital - 1st Year The emissions reduction estimate represents the entire I/M program in SE WI |
14,273 | 1,545 | ||
| $66,612 | I/M and Other TCMs | Waukesha County Technical Collge-I/M 240 NOx Training TCM or I/M Project - I/M - Operating - 1st Year The emission reduction taken in another I/M entry and the estimate represents the entire I/M program in SE WI |
QA | |||
| $788,240 | Pedestrian/Bicycle | City of Milwaukee Avenue Bicycle and Pedestrian Improvements Bicycle/Pedestrian Project - Facilities - Extending the sections initially constructed in the first program year. - Other |
1 | 1 | ||
| $184,000 | Pedestrian/Bicycle | Racine to Sturtevant Bike Trail Bicycle/Pedestrian Project - Facilities - Bicycle Path - Other |
1 | 1 | ||
| $71,200 | Pedestrian/Bicycle | Mequon-Thiensville Bicycle and Pedestrian Trail Bicycle/Pedestrian Project - Facilities - New Bicycle and Pedestrian Path - Other |
1 | 1 | ||
| $68,000 | Pedestrian/Bicycle | City of Milwaukee-Kinnickinnic Bicycle Trail Bicycle/Pedestrian Project - Facilities - Bicycle Path - Other |
1 | 1 | ||
| $56,000 | Pedestrian/Bicycle | City of Racine - Root River Parkway Bikeway Bicycle/Pedestrian Project - Facilities - Bicycle Path - Other |
1 | 1 | ||
| $34,414 | Pedestrian/Bicycle | Walworth County Memorial Bike Trail Bicycle/Pedestrian Project - Facilities - New Path - Other |
1 | 1 | ||
| $22,400 | Pedestrian/Bicycle | City of Waterford - STHS 20/83 Bicycle & Pedestrian Facility Bicycle/Pedestrian Project - Facilities - Bicycle Path - Other |
1 | 1 | ||
| $12,000 | Pedestrian/Bicycle | City of Milwaukee - Beerline B Bicycle Trail Bicycle/Pedestrian Project - Facilities - Bicycle Path - Other |
1 | 1 | ||
| $9,700 | Pedestrian/Bicycle | City of Milwaukee - Hoyt Park Bikeway Forestry Yard Segment Bicycle/Pedestrian Project - Facilities - Separate Path |
1 | 1 | ||
| $40,000 | Shared Ride | Village of Sturtevant - Amtrak Pasenger Station Shared Ride Project - Public Program - Van Pool - Operation - 1st Year |
3 | 7 | ||
| $24,000 | Shared Ride | Milwaukee County Transit Vanpool Shared Ride Project - Public Program - Van Pool - Capital-Vehicle Purchase - 1st Year |
1 | 1 | ||
| $24,000 | Shared Ride | WISDOT - Lake Geneva Park and Ride Lot Shared Ride Project - Public Program - Van Pool - Operation - 1st Year Park and ride lot that will serve carpools, vanpools and transit services |
2 | 4 | ||
| $24,000 | Shared Ride | WISDOT Root Creek Park and Ride Lot Shared Ride Project - Public Program - Van Pool - Operation - 1st Year Park and Ride lot that will serve carpoolers, vanpoolers and transit services |
2 | 4 | ||
| $6,039,684 | Traffic Flow Improvements | WISDOT Spon. Pass. Rail I-94 N-S Corr. During Highway Recon. Act. Traffic Flow Project - Traffic Engineering - Hiawatha passenger rail transportation services - Other |
157 | 171 | ||
| $232,000 | Traffic Flow Improvements | Milwaukee Summerfest Parking Management Variable Message Signs Traffic Flow Project - Traffic Engineering - Implement an Advanced Traveler Information System (ATIS) todirect motorist to parking facilities located within one block of Summerfest Wisconsin Avenue shuttle Bus Route - Other |
5 | 6 | ||
| $84,480 | Traffic Flow Improvements | Milwaukee - Time of Day No Turn On Red Traffic Flow Project - Traffic Engineering - No Turn On Red Signals - Other |
2 | |||
| $64,000 | Traffic Flow Improvements | City of Milwaukee I-794 Bus Access Improvements Traffic Flow Project - Other - Better bus service to festivals at Henry W. Maier Festival Gounds |
24 | 29 | ||
| $46,000 | Traffic Flow Improvements | Milwaukee-Bradley Road/60th Street Signalization Traffic Flow Project - Congestion Management Systems - Implementation |
7 | |||
| $12,000 | Traffic Flow Improvements | Milwaukee County Signalized Intersections for Express Bus Service Traffic Flow Project - Other - Allow express route buses to recieve priority signalized intersections along express routes |
12 | 14 | ||
| $4,260,000 | Transit | Milwaukee County Transit - Downtown Trolley Transit Project - Purchase or Modification of Conventionally Fueled Vehicles - Bus - New |
2 | 2 | ||
| $1,753,700 | Transit | Milwaukee County Transit System Route Extensions and Service Expansions Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 2nd Year |
14 | 17 | ||
| $1,728,000 | Transit | Southeastern Wisconsin Transit Marketing Partnership Transit Project - Related Demand Management Stategies - Seasonal - Other - Advertising campaign to increase transit ridership |
12 | 15 | ||
| $724,934 | Transit | Washington County Commuter Bus Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year |
3 | 6 | ||
| $575,499 | Transit | City of Kenosha - New Downtown Electric Trolley Service (Capital and Operating) Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
1 | 1 | ||
| $497,225 | Transit | Waukesha County New Berlin Bus Route Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $325,730 | Transit | Racine/Kenosha/Milwaukee Express Bus Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year |
1 | 2 | ||
| $267,190 | Transit | Waukesha County Hartfield-Delafield Route Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $248,810 | Transit | Waukesha County Pewaukee Route Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
1 | 1 | ||
| $157,382 | Transit | City of Racine New Sunday Bus Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year |
3 | 3 | ||
| $156,246 | Transit | City of Waukesha Sunday Bus Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 1st Year |
2 | 2 | ||
| $126,309 | Transit | City of Racine Expanded Saturday Bus Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - New Service - 2nd Year |
2 | 3 | ||
| $122,304 | Transit | Waukesha County Route 9 Extension Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
1 | 1 | ||
| $92,875 | Transit | Waukesha County Bluemound Road Service Transit Project - Operating Assistance (New or Expanded Service) - Bus - Expanded Service - 1st Year |
1 | 1 | ||
| $0 | Transit | City of Kenosha - New Downtown Electric Trolley Service (Capital and Operating) Transit Project - Purchase or Modification of Alternatively Fueled Vehicles - Other - New - Capital |
QA | |||
| $(936,730) | Miscellaneous | Miscellaneous HQ's adjustment - deobligation from previously approved projects |
| STATE | REPORT SUBMIT |
APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % |
|---|---|---|---|---|
| Wyoming | 1/10/2003 | $7,867,487 | $18,599,569 | 236 % |
| $ PROJECT AMOUNT |
PROJECT TYPE |
PROJECT TITLE & DESCRIPTION | VOC (KG/DAY) |
CO (KG/DAY) |
NOx (KG/DAY) |
PM-10 (KG/DAY) |
|---|---|---|---|---|---|---|
| $18,599,569 | STP/CMAQ | Reconstruction Projects |
| APPORTION. AMOUNT |
OBLIGATED AMOUNT |
OBLIG % | |
|---|---|---|---|
| Nationwide Totals | $1,652,593,968 | $1,757,819,034 | 106 % |
* States without ozone or CO Nonattainment or maintenance areas
QA - Qualitative Assessment
PR - Previously Reported
c - Changed benefit from previous year