This table has been been superseded by the Dec 31, 2007 summary table of noise barrier construction by state or jurisdiction. This new data table can be accessed at: 2007 Summary Table Complete.
Alabama | Alaska | Arizona | Arkansas | California | Colorado | Connecticut | Delaware | District of Columbia | Eastern Dir. Fed. | Florida | Georgia | Hawaii | Idaho | Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine | Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana | Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota | Ohio | Oklahoma | Oregon | Pennsylvania | Puerto Rico | Rhode Island | South Carolina | South Dakota | Tennessee | Texas | Utah | Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming | Total
Summary Table Complete
Puerto Rico
For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2004 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2004 $ column indicates the barrier was constructed of excess material.
| State |
City/County |
Route |
Material |
Type |
Year |
Length (feet) |
Height (feet) |
Cost ($/sq ft) |
Barrier Cost in 2004 $ |
| Puerto Rico |
Aguadillo | PR 2 | Block | I |
1980 | 298.00 |
20.00 |
11 |
65,620 |
| Puerto Rico |
Aguadillo | PR 2 | Block | I |
1980 | 144.00 |
20.00 |
11 |
32,273 |
| Puerto Rico |
Bayamon | PR-199 | Concrete/Precast | I |
2002 | 1,574.00 |
10.00 |
51 |
795,489 |
| Puerto Rico |
Bayamon | PR-199 | Comb/Metal/Concrete | S |
2002 | 1,214.00 |
16.00 |
0 |
0 |
| Puerto Rico |
Bayamon, River Park | 8855 | Concrete/Precast | S |
1997 | 879.00 |
12.00 |
38 |
398,308 |
| Puerto Rico |
Bayamon, Riverside Park | 8855 | Concrete/Precast | S |
1997 | 1,007.00 |
12.00 |
38 |
456,271 |
| Puerto Rico |
Caguas | PR 30 | Concrete/Precast | I |
2000 | 2,460.00 |
13.00 |
27 |
848,352 |
| Puerto Rico |
Caguas | PR-30 | Concrete/Unspecified | II |
2002 | 2,624.00 |
13.00 |
24 |
835,159 |
| Puerto Rico |
Caguas | PR-52 | Concrete/Unspecified | II |
2004 | 984.00 |
10.00 |
53 |
523,000 |
| Puerto Rico |
Caguas, Idamaris Gardens | 52 | Concrete/Unspecified | S |
1995 | 2,063.00 |
13.00 |
35 |
944,095 |
| Puerto Rico |
Carolina | PR 26 | Concrete/Precast | S |
2001 | 3,936.00 |
10.00 |
27 |
1,066,298 |
| Puerto Rico |
Carolina | PR-26 | Concrete/Unspecified | II |
2001 | 2,624.00 |
13.00 |
35 |
1,195,320 |
| Puerto Rico |
Cupey | PR-199 | Concrete/Unspecified | I |
2004 | 623.00 |
10.00 |
37 |
228,000 |
| Puerto Rico |
Guaynabo | PR 177 | Comb/Concrete/Block | I |
1986 | 1,528.00 |
14.00 |
13 |
274,297 |
| Puerto Rico |
Guaynabo | PR 177 | Concrete/Unspecified | I |
1991 | 1,092.00 |
13.00 |
33 |
461,907 |
| Puerto Rico |
Guaynabo | PR 177 | Concrete/Unspecified | I |
1991 | 656.00 |
16.00 |
29 |
303,342 |
| Puerto Rico |
Guaynabo | PR 177 | Concrete/Unspecified | I |
1992 | 850.00 |
13.00 |
33 |
365,271 |
| Puerto Rico |
Guaynabo | PR 20 | Concrete/Precast | I |
1986 | 813.00 |
12.00 |
12 |
118,830 |
| Puerto Rico |
Guaynabo | PR-177 | Concrete/Unspecified | II |
2002 | 1,640.00 |
10.00 |
42 |
696,314 |
| Puerto Rico |
Guaynabo | PR-177 | Concrete/Precast | S |
2002 | 1,542.00 |
10.00 |
41 |
628,457 |
| Puerto Rico |
Guaynabo, Prado Alto | 177 | Comb/Metal/Concrete | S |
1995 | 554.00 |
10.00 |
42 |
233,038 |
| Puerto Rico |
Ponce | PR-10 | Concrete/Unspecified | I |
2003 | 656.00 |
10.00 |
66 |
432,897 |
| Puerto Rico |
San Juan | PR 17 | Comb/Concrete/Block | S |
1995 | 853.00 |
13.00 |
47 |
522,983 |
| Puerto Rico |
San Juan | PR 177 | Metal/Unspecified | S |
1995 | 522.00 |
10.00 |
37 |
194,947 |
| Puerto Rico |
San Juan | PR 18 | Comb/Concrete/Block | I |
1989 | 2,985.00 |
13.00 |
32 |
1,252,403 |
| Puerto Rico |
San Juan | PR 18 | Concrete/Precast | S |
2000 | 2,362.00 |
10.00 |
54 |
1,272,527 |
| Puerto Rico |
San Juan | PR-17 | Concrete/Unspecified | I |
2000 | 1,017.00 |
12.00 |
72 |
882,444 |
| Puerto Rico |
San Juan | PR-18 | Concrete/Unspecified | II |
2000 | 2,460.00 |
12.00 |
59 |
1,728,252 |
| Puerto Rico |
San Juan | PR-199 | Concrete/Unspecified | II |
2003 | 1,443.00 |
15.00 |
53 |
1,147,178 |
| Puerto Rico |
San Juan | PR-199 | Concrete/Unspecified | I |
2004 | 1,640.00 |
10.00 |
37 |
600,000 |
| Puerto Rico |
San Juan | PR-199 | Concrete/Unspecified | I |
2004 | 623.00 |
10.00 |
34 |
209,000 |
| Puerto Rico |
San Juan | PR-199 | Concrete/Unspecified | I |
2004 | 328.00 |
10.00 |
37 |
120,000 |
| Puerto Rico |
San Juan | PR-26 | Concrete/Unspecified | II |
1998 | 328.00 |
13.00 |
176 |
751,698 |
| Puerto Rico |
San Juan | PR-52 | Concrete/Unspecified | II |
1999 | 2,427.00 |
12.00 |
53 |
1,543,665 |
| Puerto Rico |
San Juan | PR-52 | Concrete/Unspecified | II |
2002 | 2,296.00 |
10.00 |
28 |
652,468 |
| Puerto Rico |
San Juan | PR-52 | Concrete/Precast | S |
2002 | 1,115.00 |
10.00 |
71 |
794,445 |
| Puerto Rico |
San Juan | PR-52/PR-199 | Concrete/Unspecified | II |
2003 | 1,640.00 |
10.00 |
37 |
601,077 |
| Puerto Rico |
San Juan | Zafiro Avenue | Concrete/Unspecified | S |
1994 | 1,509.00 |
10.00 |
42 |
629,405 |
| Puerto Rico |
San Juan, Dos Pinos | 17 | Comb/Concrete/Block | S |
1996 | 872.00 |
11.00 |
53 |
505,808 |
| Puerto Rico |
San Juan, Estrella St | 22/26 | Concrete/Precast | S |
1998 | 833.00 |
13.00 |
44 |
475,462 |
| Puerto Rico |
San Juan, Rio Piedras | PR 18 | Concrete/Precast | S |
1999 | 2,427.00 |
10.00 |
42 |
1,018,022 |
| Puerto Rico |
San Juan, Villa Nevarez-West | 18 | Concrete/Precast | S |
1998 | 1,968.00 |
18.00 |
46 |
1,618,701 |
| Puerto Rico |
Toa Baja | PR 22 | Concrete/Precast | S |
2000 | 1,968.00 |
10.00 |
22 |
425,236 |
| Puerto Rico |
Toa Baja | PR-22 | Concrete/Unspecified | II |
2000 | 2,460.00 |
10.00 |
34 |
848,352 |
| Puerto Rico |
Trujillo Alto | PR-199 | Concrete/Unspecified | I |
2004 | 1,378.00 |
10.00 |
60 |
832,000 |
| Puerto Rico |
Trujillo Alto | PR-199 | Concrete/Unspecified | I |
2004 | 1,394.00 |
10.00 |
29 |
401,000 |
| Subtotal |
|
|
|
|
|
66,609.00 |
|
|
29,929,611 |
Page Top
Rhode Island
For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2001 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2001 $ column indicates the barrier was constructed of excess material.
| State |
City/County |
Route |
Material |
Type |
Year |
Length (feet) |
Height (feet) |
Cost ($/sq ft) |
Barrier Cost in 2004 $ |
| Rhode Island |
No Barriers | | | |
0 | 0.00 |
0.00 |
|
|
Page Top
South Carolina
For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2001 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2001 $ column indicates the barrier was constructed of excess material.
| State |
City/County |
Route |
Material |
Type |
Year |
Length (feet) |
Height (feet) |
Cost ($/sq ft) |
Barrier Cost in 2004 $ |
| South Carolina |
Charleston | Route 61 Connector | Comb/Berm/Metal | I |
1995 | 991.00 |
10.00 |
17 |
167,421 |
| South Carolina |
Myrtle Beach/Horry | Robert Grissom29th Ave. - 48th Ave. |
Brick | C |
2002 | 500.00 |
8.00 |
39 |
156,592 |
| South Carolina |
Myrtle Beach/Horry | Robert Grissom29th Ave. - 48th Ave. |
Brick | C |
2002 | 600.00 |
8.00 |
39 |
187,911 |
| South Carolina |
Myrtle Beach/Horry | Robert Grissom501 to Harrelson. |
Concrete/Unspecified | C |
2002 | 650.00 |
8.00 |
40 |
208,790 |
| South Carolina |
Richland County | I-77 | Comb/Berm/Metal | I |
1992 | 7,751.00 |
20.00 |
12 |
1,917,561 |
| Subtotal |
|
|
|
|
|
10,492.00 |
|
|
2,638,275 |
Page Top
South Dakota
For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2001 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2001 $ column indicates the barrier was constructed of excess material.
| State |
City/County |
Route |
Material |
Type |
Year |
Length (feet) |
Height (feet) |
Cost ($/sq ft) |
Barrier Cost in 2004 $ |
| South Dakota | No Barriers | | | |
0 | 0.00 |
0.00 |
|
|
Page Top
Tennessee
For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2001 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2001 $ column indicates the barrier was constructed of excess material.
| State |
City/County |
Route |
Material |
Type |
Year |
Length (feet) |
Height (feet) |
Cost ($/sq ft) |
Barrier Cost in 2004 $ |
| Tennessee |
Chattagoona, Hamilton | SR 153 | Comb/Metal/Concrete | I |
2002 | 1,480.00 |
16.00 |
11 |
268,070 |
| Tennessee |
Johnson City | US 23 | Metal/Unspecified | I |
1981 | 1,640.00 |
10.00 |
19 |
309,438 |
| Tennessee |
Johnson City | US 23 | Metal/Unspecified | I |
1981 | 1,968.00 |
20.00 |
16 |
627,992 |
| Tennessee |
Kingsport | US 23 | Metal/Unspecified | I |
1980 | 1,181.00 |
10.00 |
14 |
170,517 |
| Tennessee |
Kingsport | US 23 | Metal/Unspecified | I |
1980 | 7,380.00 |
16.00 |
19 |
2,278,601 |
| Tennessee |
Kingsport | US 23 | Metal/Unspecified | I |
1980 | 2,608.00 |
26.00 |
19 |
1,301,095 |
| Tennessee |
Knoxville | I-40 | Metal/Unspecified | I |
1981 | 656.00 |
16.00 |
23 |
240,536 |
| Tennessee |
Knoxville | I-40 | Concrete/Precast | I |
1981 | 394.00 |
26.00 |
28 |
286,120 |
| Tennessee |
Knoxville | I-40 | Metal/Unspecified | I |
1981 | 289.00 |
26.00 |
34 |
252,557 |
| Tennessee |
Memphis, Shelby | I-240 | Concrete/Precast | I |
2003 | 5,498.00 |
18.00 |
15 |
1,515,187 |
| Tennessee |
Memphis, Shelby Co | Nonconnah Pkwy | Metal/Unspecified | I |
1992 | 1,200.00 |
10.00 |
65 |
785,956 |
| Tennessee |
Memphis, Shelby Co | Nonconnah Pkwy | Concrete/Unspecified | I |
1992 | 14,501.00 |
16.00 |
14 |
3,158,516 |
| Tennessee |
Monterey | I-40 | Metal/Unspecified | I |
1981 | 1,968.00 |
10.00 |
17 |
329,247 |
| Tennessee |
Monterey | I-40 | Metal/Unspecified | I |
1981 | 2,624.00 |
16.00 |
22 |
913,058 |
| Tennessee |
Nashville | I-440 | Metal/Unspecified | I |
1983 | 141.00 |
7.00 |
38 |
37,014 |
| Tennessee |
Nashville | I-440 | Concrete/Precast | I |
1983 | 1,046.00 |
10.00 |
32 |
329,598 |
| Tennessee |
Nashville | I-440 | Comb/Concrete/Brick | I |
1983 | 15,291.00 |
13.00 |
21 |
4,112,046 |
| Tennessee |
Nashville | I-440 | Comb/Concrete/Brick | I |
1983 | 2,014.00 |
13.00 |
25 |
643,333 |
| Tennessee |
Nashville | I-440 | Metal/Unspecified | I |
1984 | 459.00 |
7.00 |
49 |
158,402 |
| Tennessee |
Nashville | I-440 | Concrete/Precast | I |
1984 | 33,856.00 |
11.00 |
21 |
7,913,417 |
| Tennessee |
Nashville | SR-155 | Concrete/Unspecified | I |
1996 | 5,399.00 |
17.00 |
13 |
1,185,617 |
| Tennessee |
Nashville, Davidson | SR 155 | Concrete/Precast | I |
2003 | 4,960.00 |
14.00 |
18 |
1,270,611 |
| Subtotal |
|
|
|
|
|
106,553.00 |
|
|
28,086,928 |
Page Top
Texas
For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2001 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2001 $ column indicates the barrier was constructed of excess material.
| State |
City/County |
Route |
Material |
Type |
Year |
Length (feet) |
Height (feet) |
Cost ($/sq ft) |
Barrier Cost in 2004 $ |
| Texas |
Austin/Travis | FM 734 | Concrete/Precast | I |
1991 | 7,886.00 |
13.00 |
16 |
1,642,445 |
| Texas |
Austin/Travis | FM 734 | Comb/Concrete/Block | I |
1993 | 1,535.00 |
11.00 |
27 |
464,041 |
| Texas |
Carrollton/Dallas | SH 121 | Concrete/Precast | I |
2004 | 2,157.00 |
12.00 |
18 |
465,912 |
| Texas |
Carrollton/Denton | SH 121 | Concrete/Precast | I |
1998 | 2,096.00 |
14.00 |
24 |
696,209 |
| Texas |
College Station/Brazos | BS 6 | Concrete/Precast | I |
1998 | 600.00 |
8.00 |
14 |
65,615 |
| Texas |
Corpus Christi/Nueces | SH 286 | Concrete/Precast | 1 |
2002 | 2,009.00 |
10.00 |
16 |
330,723 |
| Texas |
Corpus Christi/Nueces | Spur 3 | Block | 1 |
2003 | 2,136.00 |
8.00 |
43 |
742,397 |
| Texas |
Dallas/Dallas | IH 30 | Concrete/Unspecified | I |
1991 | 1,635.00 |
11.00 |
28 |
500,377 |
| Texas |
Dallas/Dallas | IH 635 | Concrete/Precast | I |
1984 | 3,034.00 |
10.00 |
30 |
910,655 |
| Texas |
Dallas/Dallas | SH 161 | Concrete/Precast | I |
1999 | 2,205.00 |
12.00 |
20 |
539,552 |
| Texas |
Dallas/Dallas | SH 161 | Concrete/Precast | I |
1999 | 900.00 |
14.00 |
20 |
256,768 |
| Texas |
Dallas/Dallas | US 75 | Concrete/Unspecified | I |
1993 | 1,206.00 |
10.00 |
46 |
550,194 |
| Texas |
Dallas/Dallas | US 75 | Concrete/Unspecified | I |
1993 | 6,738.00 |
11.00 |
45 |
3,310,846 |
| Texas |
Denton/Denton | Loop 288 | Concrete/Precast | I |
1993 | 1,153.00 |
9.00 |
43 |
446,510 |
| Texas |
Dickinson/Galveston | FM 517 | Concrete/Precast | I |
1994 | 271.00 |
8.00 |
18 |
38,499 |
| Texas |
El Paso/El Paso | Rt 34 | Concrete/Precast | I |
1978 | 1,118.00 |
7.00 |
38 |
300,294 |
| Texas |
Fort Worth/Tarrant | IH 20 | Concrete/Precast | I |
1989 | 10,066.00 |
8.00 |
12 |
975,488 |
| Texas |
Fort Worth/Tarrant | IH 20 | Concrete/Precast | I |
1991 | 8,059.00 |
7.00 |
22 |
1,232,293 |
| Texas |
Fort Worth/Tarrant | IH 20 | Berm Only | I |
1991 | 700.00 |
10.00 |
16 |
115,145 |
| Texas |
Fort Worth/Tarrant | IH 20 | Berm Only | I |
1995 | 6,593.00 |
10.00 |
20 |
1,329,113 |
| Texas |
Fort Worth/Tarrant | IH 20 | Concrete/Precast | I |
1995 | 5,097.00 |
12.00 |
20 |
1,244,320 |
| Texas |
Fort Worth/Tarrant | IH 30 | Concrete/Precast | I |
1989 | 3,631.00 |
5.00 |
16 |
293,892 |
| Texas |
Fort Worth/Tarrant | IH 30 | Concrete/Precast | I |
1989 | 1,663.00 |
7.00 |
20 |
235,150 |
| Texas |
Fort Worth/Tarrant | IH 35W | Concrete/Precast | I |
1984 | 1,565.00 |
6.00 |
23 |
219,195 |
| Texas |
Fort Worth/Tarrant | IH 35W | Concrete/Precast | I |
1987 | 1,080.00 |
3.00 |
21 |
69,409 |
| Texas |
Fort Worth/Tarrant | Rosedale | Concrete/Precast | I |
1978 | 440.00 |
8.00 |
43 |
150,277 |
| Texas |
Friendswood/Galveston | FM 2351 | Concrete/Precast | I |
1993 | 1,280.00 |
12.00 |
26 |
394,169 |
| Texas |
Friendswood/Galveston | FM 528 | Concrete/Precast | I |
1995 | 561.00 |
10.00 |
15 |
81,570 |
| Texas |
Friendswood/Galveston | FM 528 | Concrete/Precast | I |
1995 | 1,354.00 |
12.00 |
15 |
246,989 |
| Texas |
Friendswood/Galveston | FM 528 | Concrete/Precast | I |
1995 | 1,153.00 |
12.00 |
15 |
210,258 |
| Texas |
Friendswood/Galveston | FM 528 | Concrete/Precast | I |
1996 | 1,647.00 |
12.00 |
15 |
294,156 |
| Texas |
Garland/Dallas | SH 78 | Comb/Concrete/Block | I |
1997 | 3,491.00 |
8.00 |
18 |
510,690 |
| Texas |
Houston/Harris | BW 8N | Concrete/Precast | I |
1995 | 10,070.00 |
16.00 |
20 |
3,265,326 |
| Texas |
Houston/Harris | BW 8S | Concrete/Precast | I |
1992 | 3,239.00 |
14.00 |
21 |
932,864 |
| Texas |
Houston/Harris | BW 8S | Concrete/Precast | I |
1997 | 7,651.00 |
14.00 |
13 |
1,372,812 |
| Texas |
Houston/Harris | BW 8S | Concrete/Precast | I |
1999 | 1,824.00 |
12.00 |
13 |
293,982 |
| Texas |
Houston/Harris | BW 8S | Concrete/Precast | I |
1999 | 10,862.00 |
15.00 |
14 |
2,237,952 |
| Texas |
Houston/Harris | BW 8W | Concrete/Precast | I |
1991 | 4,752.00 |
14.00 |
28 |
1,829,963 |
| Texas |
Houston/Harris | BW 8W | Concrete/Precast | I |
1992 | 1,332.00 |
14.00 |
73 |
1,362,422 |
| Texas |
Houston/Harris | Dairy Ashford | Concrete/Precast | I |
1998 | 5,476.00 |
8.00 |
15 |
652,884 |
| Texas |
Houston/Harris | FM 1093 | Concrete/Precast | I |
1991 | 2,640.00 |
10.00 |
20 |
524,960 |
| Texas |
Houston/Harris | FM 1876 | Concrete/Precast | I |
1999 | 1,519.00 |
8.00 |
16 |
189,126 |
| Texas |
Houston/Harris | FM 1876 | Concrete/Precast | I |
1999 | 4,429.00 |
10.00 |
14 |
626,423 |
| Texas |
Houston/Harris | FM 1960 | Concrete/Precast | I |
1990 | 2,540.00 |
12.00 |
17 |
520,122 |
| Texas |
Houston/Harris | FM 1960 | Concrete/Precast | I |
1994 | 2,073.00 |
17.00 |
22 |
778,037 |
| Texas |
Houston/Harris | FM 525 | Concrete/Precast | I |
1995 | 3,789.00 |
12.00 |
18 |
809,872 |
| Texas |
Houston/Harris | IH 45 | Concrete/Precast | I |
2002 | 564.00 |
18.00 |
27 |
277,899 |
| Texas |
Houston/Harris | IH 45S | Concrete/Precast | I |
1983 | 400.00 |
8.00 |
14 |
45,121 |
| Texas |
Houston/Harris | IH 45S | Concrete/Precast | I |
1996 | 341.00 |
14.00 |
31 |
146,307 |
| Texas |
Houston/Harris | IH 610N | Concrete/Precast | I |
1996 | 3,209.00 |
18.00 |
12 |
720,105 |
| Texas |
Houston/Harris | IH 610N | Concrete/Precast | I |
2001 | 8,170.00 |
12.00 |
19 |
1,881,718 |
| Texas |
Houston/Harris | IH 610S | Concrete/Precast | I |
1995 | 8,829.00 |
18.00 |
29 |
4,677,091 |
| Texas |
Houston/Harris | Post Oak | Concrete/Precast | I |
1984 | 1,150.00 |
8.00 |
13 |
122,720 |
| Texas |
Houston/Harris | SH 249 | Concrete/Precast | I |
1991 | 3,589.00 |
12.00 |
15 |
662,843 |
| Texas |
Houston/Harris | SH 249 | Concrete/Precast | I |
1997 | 1,290.00 |
15.00 |
22 |
428,915 |
| Texas |
Houston/Harris | SH 6 | Concrete/Precast | I |
1992 | 1,640.00 |
12.00 |
31 |
607,507 |
| Texas |
Houston/Harris | SH 6 | Concrete/Precast | I |
1992 | 1,100.00 |
12.00 |
31 |
408,183 |
| Texas |
Houston/Harris | US 290 | Concrete/Precast | I |
1994 | 1,358.00 |
10.00 |
37 |
502,504 |
| Texas |
Houston/Harris | US 59S | Concrete/Precast | I |
1988 | 2,000.00 |
16.00 |
31 |
976,774 |
| Texas |
Houston/Harris | US 59S | Concrete/Precast | I |
1988 | 3,582.00 |
20.00 |
30 |
2,182,871 |
| Texas |
Houston/Harris | US 59S | Concrete/Precast | I |
1989 | 2,500.00 |
14.00 |
20 |
702,470 |
| Texas |
Houston/Harris | US 59S | Concrete/Precast | I |
1989 | 3,100.00 |
16.00 |
23 |
1,137,714 |
| Texas |
Houston/Harris | US 59S | Concrete/Precast | I |
1989 | 4,162.00 |
20.00 |
29 |
2,386,677 |
| Texas |
Houston/Harris | US 59S | Concrete/Precast | I |
1989 | 2,600.00 |
22.00 |
32 |
1,803,484 |
| Texas |
Houston/Harris | W Airport | Concrete/Precast | I |
1998 | 5,069.00 |
8.00 |
14 |
570,635 |
| Texas |
Houston/Harris | W Airport | Concrete/Precast | I |
1998 | 633.00 |
10.00 |
16 |
100,500 |
| Texas |
Jersey Village/Harris | BW 8W | Concrete/Precast | I |
1991 | 7,200.00 |
16.00 |
18 |
2,098,404 |
| Texas |
Lake Jackson/Brazoria | SH 288 | Concrete/Precast | I |
1991 | 3,199.00 |
14.00 |
20 |
900,834 |
| Texas |
League City/Galveston | FM 518 | Concrete/Precast | I |
1994 | 2,385.00 |
10.00 |
39 |
936,863 |
| Texas |
Longview/Gregg | SPUR 63 | Block | I |
1995 | 443.00 |
8.00 |
19 |
67,898 |
| Texas |
Missouri City/Fort Bend | FM 3345 | Concrete/Precast | I |
1992 | 6,290.00 |
14.00 |
10 |
924,050 |
| Texas |
Missouri City/Fort Bend | SH 6 | Concrete/Precast | I |
1994 | 1,050.00 |
8.00 |
11 |
90,145 |
| Texas |
N. Hills Estates/Harris | IH 45N | Concrete/Precast | I |
1997 | 1,348.00 |
16.00 |
18 |
396,877 |
| Texas |
Nassau Bay/Harris | NASA 1 | Concrete/Precast | I |
1997 | 1,102.00 |
12.00 |
16 |
211,857 |
| Texas |
Richardson/Colin | SH 190 | Concrete/Precast | I |
1992 | 2,765.00 |
11.00 |
27 |
808,705 |
| Texas |
Schertz/Guadalupe | FM 3009 | Comb/Concrete/Block | I |
1995 | 2,486.00 |
15.00 |
28 |
1,050,669 |
| Texas |
Sugar Land/Fort Bend | US 59(S) | Concrete/Precast | I |
2003 | 4,168.00 |
18.00 |
19 |
1,392,030 |
| Texas |
Trophy Club/Denton | SH 114 | Concrete/Precast | I |
1992 | 4,337.00 |
12.00 |
27 |
1,385,277 |
| Texas |
Tyler/Smith | FM 2493 | Concrete/Unspecified | I |
1999 | 342.00 |
11.00 |
20 |
76,596 |
| Texas |
Wichita Falls/Wichita | I 447 | Wood/Unspecified | I |
1979 | 361.00 |
7.00 |
15 |
38,598 |
| Subtotal |
|
|
|
|
|
240,017.00 |
|
|
64,980,737 |
Page Top | < Previous | Next >