This table has been been superseded by the Dec 31, 2007 summary table of noise barrier construction by state or jurisdiction. This new data table can be accessed at: 2007 Summary Table Complete.
Alabama | Alaska | Arizona | Arkansas | California | Colorado | Connecticut | Delaware | District of Columbia | Eastern Dir. Fed. | Florida | Georgia | Hawaii | Idaho | Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine | Maryland | Massachusetts | Michigan | Minnesota | Mississippi | Missouri | Montana | Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota | Ohio | Oklahoma | Oregon | Pennsylvania | Puerto Rico | Rhode Island | South Carolina | South Dakota | Tennessee | Texas | Utah | Vermont | Virginia | Washington | West Virginia | Wisconsin | Wyoming | Total
Summary Table Complete
Virginia
| State | City/County | Route | Material | Type | Year | Length (feet) | Height (feet) | Cost ($/sq ft) | Barrier Cost in 2004 $ |
|---|---|---|---|---|---|---|---|---|---|
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 1,359.00 | 8.00 | 33 | 359,948 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 1,717.00 | 9.00 | 33 | 511,613 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 395.00 | 10.00 | 34 | 133,970 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 1,000.00 | 14.00 | 33 | 463,513 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 3,205.00 | 15.00 | 30 | 1,451,329 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 380.00 | 17.00 | 34 | 219,093 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 813.00 | 18.00 | 33 | 484,497 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 758.00 | 19.00 | 34 | 488,453 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 500.00 | 20.00 | 28 | 279,977 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 444.00 | 21.00 | 28 | 261,045 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 736.00 | 21.00 | 34 | 524,198 |
| Virginia | Alexandria | I-95 | Absorptive | I | 2002 | 156.00 | 28.00 | 28 | 122,293 |
| Virginia | Amherst | Rte 29 | Absorptive | I | 2003 | 3,609.00 | 20.00 | 21 | 1,546,061 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 817.00 | 7.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 325.00 | 7.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 436.00 | 7.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 358.00 | 7.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 403.00 | 7.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 351.00 | 10.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 508.00 | 10.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 98.00 | 10.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 528.00 | 10.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 656.00 | 10.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 249.00 | 10.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 640.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 197.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 489.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 800.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 1,269.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 331.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 171.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 413.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 1,200.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 194.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 220.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 358.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 594.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 554.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 272.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 2,555.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 371.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 564.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 180.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 1,092.00 | 13.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 1,519.00 | 16.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 1,204.00 | 16.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 738.00 | 16.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 449.00 | 16.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 279.00 | 16.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 453.00 | 20.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Metal/Unspecified | I | 0 | 2,099.00 | 20.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 2,139.00 | 20.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 259.00 | 23.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 869.00 | 23.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Comb/Wood/Concrete | I | 0 | 190.00 | 23.00 | 0 | 0 |
| Virginia | Arlington | I-66 | Concrete/Unspecified | I | 0 | 1,814.00 | 23.00 | 0 | 0 |
| Virginia | Arlington Co | Rt 50 | Concrete/Precast | I | 1993 | 984.00 | 10.00 | 22 | 215,276 |
| Virginia | Augusta | Rte 262 | Concrete/Unspecified | I | 2002 | 764.00 | 13.00 | 21 | 203,800 |
| Virginia | Augusta | Rte 262 | Concrete/Unspecified | I | 2002 | 1,617.00 | 13.00 | 21 | 431,339 |
| Virginia | Chesapeake | 190 | Concrete/Precast | I | 2001 | 430.00 | 8.00 | 17 | 58,646 |
| Virginia | Chesapeake | 190 | Concrete/Precast | I | 2001 | 260.00 | 9.00 | 17 | 39,453 |
| Virginia | Chesapeake | 190 | Concrete/Precast | I | 2001 | 1,685.00 | 10.00 | 18 | 303,895 |
| Virginia | Chesapeake | I-464 | Comb/Metal/Concrete | I | 1983 | 1,443.00 | 16.00 | 31 | 705,023 |
| Virginia | Chesapeake | I-464 | Comb/Metal/Concrete | I | 1984 | 859.00 | 13.00 | 37 | 416,847 |
| Virginia | Chesapeake | I-64 | Concrete/Precast | I | 1995 | 2,299.00 | 18.00 | 21 | 848,630 |
| Virginia | Chesapeake | I-64 | Concrete/Precast | I | 1995 | 2,598.00 | 19.00 | 20 | 995,557 |
| Virginia | Chesapeake | Rt 168 | Wood/Unspecified | I | 1984 | 2,201.00 | 13.00 | 8 | 220,095 |
| Virginia | Chesapeake | Rt 168 | Wood/Unspecified | I | 1984 | 2,099.00 | 13.00 | 8 | 216,760 |
| Virginia | Chesapeake | VolvoParkway | Absorptive | I | 2004 | 220.00 | 8.00 | 37 | 65,900 |
| Virginia | Chesapeake | VolvoParkway | Absorptive | I | 2004 | 520.00 | 11.00 | 37 | 214,180 |
| Virginia | Chesapeake | VolvoParkway | Absorptive | I | 2004 | 438.00 | 11.00 | 37 | 180,400 |
| Virginia | Chesapeake | VolvoParkway | Absorptive | I | 2004 | 545.00 | 12.00 | 37 | 244,880 |
| Virginia | Chesapeake | VolvoParkway | Absorptive | I | 2004 | 600.00 | 12.00 | 37 | 269,595 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 1,700.00 | 15.00 | 17 | 435,050 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 2,700.00 | 15.00 | 17 | 690,961 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 3,550.00 | 15.00 | 17 | 908,486 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 450.00 | 15.00 | 17 | 115,160 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 700.00 | 15.00 | 17 | 179,138 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 1,900.00 | 15.00 | 17 | 486,232 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 2,600.00 | 15.00 | 17 | 665,370 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 2,800.00 | 15.00 | 17 | 716,552 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 700.00 | 15.00 | 17 | 179,138 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 1,700.00 | 15.00 | 17 | 435,050 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 1,900.00 | 15.00 | 17 | 486,232 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 1,600.00 | 15.00 | 17 | 409,459 |
| Virginia | Chesterfield | 150 | Concrete/Precast | I | 2001 | 4,660.00 | 15.00 | 17 | 1,192,122 |
| Virginia | Chesterfield | Rte 150 | Absorptive | I | 2002 | 1,709.00 | 14.00 | 20 | 478,324 |
| Virginia | Chesterfield Co | I-295 | Concrete/Precast | I | 1991 | 3,664.00 | 20.00 | 15 | 1,110,244 |
| Virginia | Chesterfield Co | Rt 150 | Concrete/Precast | I | 1993 | 987.00 | 14.00 | 22 | 309,370 |
| Virginia | City of Hampton | I-64 | Concrete/Precast | I | 2001 | 800.00 | 14.00 | 28 | 313,492 |
| Virginia | City of Hampton | I-64 | Concrete/Precast | I | 2001 | 1,947.00 | 24.00 | 17 | 797,591 |
| Virginia | City of Suffolk | R000 | Concrete/Precast | I | 2001 | 935.00 | 14.00 | 17 | 225,202 |
| Virginia | City of Suffolk | R000 | Concrete/Precast | I | 2001 | 4,720.00 | 18.00 | 17 | 1,440,569 |
| Virginia | Danville | Rt 265 | Concrete/Unspecified | I | 1976 | 1,351.00 | 13.00 | 3 | 54,026 |
| Virginia | Danville | Rt 265 | Concrete/Unspecified | I | 1976 | 1,000.00 | 13.00 | 1 | 11,732 |
| Virginia | Fairfax | 29 | Concrete/Precast | I | 2001 | 620.00 | 13.00 | 16 | 126,890 |
| Virginia | Fairfax | 29 | Concrete/Precast | I | 2001 | 1,736.00 | 26.00 | 17 | 766,668 |
| Virginia | Fairfax | 29 | Concrete/Precast | I | 2001 | 1,200.00 | 29.00 | 17 | 603,525 |
| Virginia | Fairfax | 6197 | Concrete/Precast | I | 2000 | 660.00 | 14.00 | 18 | 163,308 |
| Virginia | Fairfax | I-495 | Absorptive | I | 2003 | 2,340.00 | 20.00 | 16 | 727,609 |
| Virginia | Fairfax | I-66 | Metal/Unspecified | I | 1989 | 1,978.00 | 16.00 | 23 | 726,841 |
| Virginia | Fairfax | I-66 | Metal/Unspecified | I | 1989 | 1,807.00 | 20.00 | 22 | 788,487 |
| Virginia | Fairfax | I-95 | Concrete/Unspecified | I | 2003 | 2,950.00 | 9.00 | 27 | 712,796 |
| Virginia | Fairfax | I-95 | Absorptive | I | 2003 | 1,595.00 | 28.00 | 23 | 1,016,214 |
| Virginia | Fairfax | I-95/I-495 | Concrete/Precast | I | 2000 | 1,411.00 | 8.00 | 17 | 191,940 |
| Virginia | Fairfax | I-95/I-495 | Concrete/Precast | I | 2000 | 12,949.00 | 10.00 | 17 | 2,226,923 |
| Virginia | Fairfax | I-95/I-495 | Concrete/Precast | I | 2000 | 791.00 | 18.00 | 17 | 244,962 |
| Virginia | Fairfax | Rte 123 | Absorptive | I | 2002 | 462.00 | 8.00 | 19 | 71,307 |
| Virginia | Fairfax | Rte 123 | Absorptive | I | 2002 | 2,800.00 | 12.00 | 19 | 648,230 |
| Virginia | Fairfax | Rte 123 | Absorptive | I | 2002 | 100.00 | 12.00 | 19 | 23,150 |
| Virginia | Fairfax | Rte 123 | Absorptive | I | 2002 | 561.00 | 13.00 | 19 | 140,703 |
| Virginia | Fairfax | Rte 123 | Absorptive | I | 2003 | 788.00 | 8.00 | 19 | 121,995 |
| Virginia | Fairfax | Rte 123 | Absorptive | I | 2003 | 270.00 | 16.00 | 19 | 83,601 |
| Virginia | Fairfax | Rte 267 | Concrete/Unspecified | I | 2003 | 312.00 | 31.00 | 23 | 221,874 |
| Virginia | Fairfax Co | 7100 | Concrete/Precast | I | 2000 | 1,300.00 | 13.00 | 15 | 261,929 |
| Virginia | Fairfax Co | 7100 | Concrete/Precast | I | 2000 | 2,100.00 | 13.00 | 17 | 463,412 |
| Virginia | Fairfax Co | 7100 | Concrete/Precast | I | 2000 | 1,873.00 | 18.00 | 17 | 556,731 |
| Virginia | Fairfax Co | 7100 | Concrete/Precast | I | 2000 | 2,000.00 | 22.00 | 16 | 721,099 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Unspecified | T | 1983 | 1,991.00 | 20.00 | 36 | 1,436,484 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Unspecified | T | 1983 | 2,844.00 | 20.00 | 28 | 1,607,452 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Unspecified | T | 1983 | 3,900.00 | 30.00 | 33 | 3,895,251 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Unspecified | T | 1983 | 2,001.00 | 39.00 | 43 | 3,348,859 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | T | 1992 | 2,601.00 | 16.00 | 26 | 1,088,586 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | T | 1992 | 3,031.00 | 16.00 | 21 | 1,026,885 |
| Virginia | Fairfax Co | Dulles Toll Rd | Comb/Berm/Concrete | I | 1996 | 997.00 | 12.00 | 21 | 250,483 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | I | 1996 | 787.00 | 12.00 | 18 | 174,696 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | I | 1996 | 239.00 | 18.00 | 21 | 88,632 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | I | 1996 | 5,602.00 | 22.00 | 19 | 2,385,365 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | I | 1997 | 2,230.00 | 15.00 | 18 | 617,127 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | I | 1997 | 1,128.00 | 19.00 | 17 | 354,671 |
| Virginia | Fairfax Co | Dulles Toll Rd | Concrete/Precast | I | 1997 | 1,620.00 | 23.00 | 19 | 719,982 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 751.00 | 9.00 | 19 | 131,404 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 669.00 | 11.00 | 19 | 141,138 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 2,142.00 | 11.00 | 20 | 464,782 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 1,145.00 | 12.00 | 20 | 271,325 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 1,266.00 | 16.00 | 20 | 397,863 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 2,099.00 | 17.00 | 17 | 616,870 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 5,218.00 | 17.00 | 19 | 1,694,871 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 2,289.00 | 19.00 | 20 | 852,911 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 2,070.00 | 22.00 | 19 | 857,778 |
| Virginia | Fairfax Co | Fairfax Co Pkwy | Concrete/Precast | I | 1998 | 1,109.00 | 26.00 | 19 | 560,902 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Metal | I | 1978 | 3,287.00 | 13.00 | 31 | 1,342,942 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Metal | I | 1978 | 3,100.00 | 13.00 | 28 | 1,123,578 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Metal | I | 1978 | 1,109.00 | 13.00 | 23 | 336,297 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood | I | 1978 | 1,151.00 | 13.00 | 27 | 406,708 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood | I | 1978 | 1,601.00 | 13.00 | 20 | 408,236 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood/Concrete | I | 1978 | 1,945.00 | 13.00 | 37 | 947,819 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood/Concrete | I | 1978 | 2,299.00 | 13.00 | 33 | 988,184 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood/Concrete | I | 1978 | 3,798.00 | 13.00 | 37 | 1,830,273 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood | I | 1978 | 3,585.00 | 13.00 | 33 | 1,536,887 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Concrete | I | 1978 | 2,840.00 | 16.00 | 11 | 519,448 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Metal | I | 1978 | 2,863.00 | 16.00 | 35 | 1,617,557 |
| Virginia | Fairfax Co | I-495 | Metal/Unspecified | I | 1978 | 1,899.00 | 16.00 | 29 | 868,761 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Concrete | I | 1978 | 2,099.00 | 16.00 | 22 | 755,245 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood/Concrete | I | 1978 | 2,306.00 | 20.00 | 31 | 1,427,696 |
| Virginia | Fairfax Co | I-495 | Comb/Other | I | 1978 | 1,499.00 | 20.00 | 32 | 954,945 |
| Virginia | Fairfax Co | I-495 | Concrete/Unspecified | I | 1978 | 1,899.00 | 20.00 | 16 | 622,459 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood/Concrete | I | 1978 | 2,004.00 | 23.00 | 22 | 1,005,952 |
| Virginia | Fairfax Co | I-495 | Comb/Wood/Concrete | I | 1978 | 3,726.00 | 23.00 | 16 | 1,399,198 |
| Virginia | Fairfax Co | I-495 | Comb/Berm/Wood/Concrete | I | 1978 | 4,002.00 | 23.00 | 16 | 1,463,572 |
| Virginia | Fairfax Co | I-495 | Concrete/Precast | I | 1991 | 4,900.00 | 20.00 | 22 | 2,177,543 |
| Virginia | Fairfax Co | I-66 | Concrete/Unspecified | I | 1980 | 2,939.00 | 7.00 | 12 | 248,622 |
| Virginia | Fairfax Co | I-66 | Metal/Unspecified | I | 1980 | 1,738.00 | 10.00 | 21 | 362,508 |
| Virginia | Fairfax Co | I-66 | Wood/Unspecified | I | 1980 | 3,113.00 | 10.00 | 15 | 461,243 |
| Virginia | Fairfax Co | I-66 | Metal/Unspecified | I | 1980 | 1,171.00 | 13.00 | 11 | 161,524 |
| Virginia | Fairfax Co | I-66 | Concrete/Unspecified | I | 1980 | 531.00 | 16.00 | 12 | 103,361 |
| Virginia | Fairfax Co | I-66 | Metal/Unspecified | I | 1980 | 2,368.00 | 16.00 | 11 | 418,545 |
| Virginia | Fairfax Co | I-66 | Metal/Unspecified | I | 1980 | 1,715.00 | 16.00 | 10 | 286,545 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 2,312.00 | 16.00 | 22 | 812,400 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 1,427.00 | 16.00 | 24 | 545,028 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 2,070.00 | 16.00 | 23 | 755,106 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 2,408.00 | 16.00 | 20 | 762,451 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 2,532.00 | 16.00 | 21 | 841,781 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 859.00 | 16.00 | 25 | 348,171 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 892.00 | 16.00 | 26 | 367,269 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 699.00 | 16.00 | 25 | 277,656 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 6,885.00 | 16.00 | 26 | 2,864,700 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 5,546.00 | 16.00 | 21 | 1,902,455 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 879.00 | 20.00 | 25 | 445,130 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 5,468.00 | 20.00 | 22 | 2,366,683 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | O | 1992 | 1,155.00 | 23.00 | 24 | 641,987 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | I | 1994 | 3,385.00 | 15.00 | 21 | 1,087,910 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | I | 1994 | 1,427.00 | 15.00 | 22 | 472,188 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | I | 1994 | 1,351.00 | 16.00 | 21 | 460,115 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | I | 1994 | 1,112.00 | 21.00 | 21 | 500,358 |
| Virginia | Fairfax Co | I-66 | Concrete/Precast | I | 1994 | 4,195.00 | 26.00 | 21 | 2,301,915 |
| Virginia | Fairfax Co | I-95 | Concrete/Precast | I | 1991 | 2,273.00 | 16.00 | 20 | 742,556 |
| Virginia | Fairfax Co | I-95 | Concrete/Precast | I | 1991 | 3,874.00 | 20.00 | 23 | 1,769,496 |
| Virginia | Fairfax Co | I-95 | Concrete/Precast | I | 1992 | 3,001.00 | 23.00 | 23 | 1,602,763 |
| Virginia | Fairfax Co | I-95 | Comb/Metal/Concrete | I | 1995 | 4,599.00 | 26.00 | 21 | 2,454,694 |
| Virginia | Fairfax Co | I-95 | Concrete/Precast | I | 1996 | 4,661.00 | 26.00 | 21 | 2,489,411 |
| Virginia | Fairfax Co | Rt 123 | Wood/Unspecified | I | 1983 | 1,000.00 | 13.00 | 27 | 351,577 |
| Virginia | Fairfax Co | Rt 123 | Wood/Unspecified | I | 1983 | 581.00 | 13.00 | 27 | 204,030 |
| Virginia | Fairfax Co | Rt 50 | Concrete/Precast | I | 1998 | 1,456.00 | 11.00 | 18 | 292,009 |
| Virginia | Fairfax Co | Rt 50 | Concrete/Precast | I | 1998 | 1,141.00 | 14.00 | 18 | 279,842 |
| Virginia | Fairfax Co | Rt 50 | Concrete/Precast | I | 1998 | 1,358.00 | 15.00 | 19 | 384,479 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 151.00 | 9.00 | 19 | 25,991 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 249.00 | 10.00 | 20 | 49,651 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 351.00 | 10.00 | 21 | 73,147 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 200.00 | 10.00 | 21 | 41,798 |
| Virginia | Fairfax Co | Rt 608 | Comb/Metal/Concrete | I | 1995 | 859.00 | 10.00 | 21 | 178,415 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 689.00 | 10.00 | 21 | 145,914 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 298.00 | 11.00 | 20 | 66,877 |
| Virginia | Fairfax Co | Rt 608 | Concrete/Precast | I | 1995 | 895.00 | 12.00 | 21 | 221,277 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1994 | 672.00 | 11.00 | 21 | 155,607 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 902.00 | 7.00 | 27 | 171,031 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 1,076.00 | 8.00 | 25 | 213,247 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 751.00 | 9.00 | 20 | 136,794 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 1,620.00 | 10.00 | 25 | 397,912 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 499.00 | 10.00 | 25 | 125,851 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 1,663.00 | 11.00 | 24 | 443,017 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 869.00 | 11.00 | 25 | 239,605 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 2,139.00 | 11.00 | 21 | 483,846 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 1,004.00 | 11.00 | 24 | 261,378 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 1,145.00 | 12.00 | 21 | 282,454 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 899.00 | 13.00 | 24 | 281,239 |
| Virginia | Fairfax Co | Rt 7100 | Concrete/Precast | I | 1995 | 2,483.00 | 13.00 | 25 | 822,361 |
| Virginia | Fauquier Co | Rt 17 | Concrete/Precast | I | 1995 | 502.00 | 10.00 | 20 | 101,329 |
| Virginia | Fauquier Co | Rt 17 | Concrete/Precast | I | 1995 | 1,200.00 | 11.00 | 21 | 277,388 |
| Virginia | Fauquier Co | Rt 17 | Concrete/Precast | I | 1995 | 1,978.00 | 22.00 | 20 | 866,363 |
| Virginia | Fredericksburg | Rt 3 | Comb/Wood/Concrete | I | 1992 | 1,079.00 | 12.00 | 23 | 298,223 |
| Virginia | Hampton | Hampton Roads Pkwy | Concrete/Precast | I | 2001 | 6,143.00 | 18.00 | 17 | 1,886,495 |
| Virginia | Hampton | I-64 | Comb/Metal/Concrete | I | 1985 | 2,558.00 | 16.00 | 30 | 1,210,980 |
| Virginia | Hampton | I-64 | Comb/Metal/Concrete | I | 1986 | 2,020.00 | 16.00 | 31 | 992,681 |
| Virginia | Hampton | I-64 | Concrete/Precast | I | 1991 | 1,499.00 | 10.00 | 29 | 432,320 |
| Virginia | Hampton | I-65 | Metal/Unspecified | I | 1976 | 948.00 | 20.00 | 20 | 386,551 |
| Virginia | Hampton | I-664 | Wood/Unspecified | I | 1984 | 2,240.00 | 13.00 | 11 | 315,136 |
| Virginia | Henrico | 295 | Berm Only | O | 1999 | 1,200.00 | 12.00 | 0 | 1 |
| Virginia | Henrico | 295 | Berm Only | O | 1999 | 1,700.00 | 12.00 | 0 | 1 |
| Virginia | Henrico | I-64 | Absorptive | I | 2004 | 2,500.00 | 17.00 | 17 | 721,350 |
| Virginia | Henrico Co | I-295 | Comb/Berm/Wood | I | 1981 | 1,299.00 | 12.00 | 9 | 136,042 |
| Virginia | Henrico Co | Rt 33 | Wood/Unspecified | I | 1977 | 640.00 | 12.00 | 45 | 348,562 |
| Virginia | Henrico Co | Rt 33 | Comb/Wood/Concrete | I | 1977 | 285.00 | 14.00 | 43 | 172,990 |
| Virginia | Henrico Co | Rt 33 | Comb/Wood/Concrete | I | 1977 | 157.00 | 16.00 | 42 | 105,860 |
| Virginia | Henrico Co | Rt 33 | Comb/Metal/Concrete | I | 1992 | 400.00 | 16.00 | 25 | 159,983 |
| Virginia | Henrico Co | Rt 60 | Wood/Unspecified | I | 1988 | 298.00 | 10.00 | 23 | 69,523 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 449.00 | 10.00 | 17 | 74,181 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 151.00 | 10.00 | 17 | 26,358 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 249.00 | 10.00 | 20 | 50,353 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 689.00 | 11.00 | 20 | 147,992 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 298.00 | 11.00 | 21 | 67,810 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 200.00 | 11.00 | 19 | 42,389 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 859.00 | 11.00 | 19 | 180,938 |
| Virginia | Herndon | Herndon Pkwy | Concrete/Precast | I | 1996 | 895.00 | 12.00 | 21 | 224,394 |
| Virginia | James City Co | Rt 199 | Concrete/Precast | I | 1998 | 1,650.00 | 15.00 | 18 | 456,508 |
| Virginia | James City Co | Rt 199 | Concrete/Precast | I | 1998 | 1,843.00 | 17.00 | 21 | 654,831 |
| Virginia | Montgomery | 81 | Concrete/Precast | I | 2000 | 972.00 | 18.00 | 17 | 290,560 |
| Virginia | Montgomery | 81 | Concrete/Precast | I | 2000 | 2,965.00 | 20.00 | 17 | 1,010,599 |
| Virginia | Montgomery | 81 | Concrete/Precast | I | 2000 | 1,359.00 | 20.00 | 17 | 466,593 |
| Virginia | Montgomery | 81 | Concrete/Precast | I | 2000 | 2,778.00 | 23.00 | 17 | 1,084,830 |
| Virginia | Montgomery | 81 | Concrete/Precast | I | 2000 | 2,218.00 | 27.00 | 17 | 999,994 |
| Virginia | Montgomery Co | 460 | Comb/Metal/Concrete | I | 2001 | 990.00 | 13.00 | 18 | 234,586 |
| Virginia | Montgomery Co | 460 | Concrete/Precast | I | 2001 | 1,106.00 | 15.00 | 18 | 291,099 |
| Virginia | Montgomery Co | I-81 | Concrete/Precast | I | 1998 | 2,965.00 | 20.00 | 20 | 1,159,778 |
| Virginia | Montgomery Co | I-81 | Concrete/Precast | I | 1998 | 1,358.00 | 20.00 | 20 | 534,864 |
| Virginia | Montgomery Co | I-81 | Concrete/Precast | I | 1998 | 2,778.00 | 23.00 | 19 | 1,245,055 |
| Virginia | Montgomery Co | I-81 | Concrete/Precast | I | 1998 | 2,217.00 | 27.00 | 19 | 1,134,566 |
| Virginia | Montgomery Co | Rt 460 | Concrete/Precast | I | 1998 | 971.00 | 18.00 | 19 | 332,927 |
| Virginia | Newport News | Hampton Roads Pkwy | Concrete/Precast | I | 2001 | 1,351.00 | 20.00 | 38 | 1,016,609 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1995 | 2,975.00 | 20.00 | 20 | 1,205,815 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1995 | 3,175.00 | 21.00 | 20 | 1,322,343 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 689.00 | 14.00 | 20 | 189,806 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 3,470.00 | 15.00 | 20 | 1,030,550 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 2,401.00 | 16.00 | 20 | 766,525 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 6,957.00 | 16.00 | 19 | 2,121,935 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 1,240.00 | 16.00 | 19 | 377,179 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 4,323.00 | 19.00 | 19 | 1,589,018 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 3,070.00 | 19.00 | 19 | 1,127,887 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 1998 | 3,870.00 | 20.00 | 20 | 1,539,133 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 690.00 | 14.00 | 17 | 165,429 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 3,470.00 | 15.00 | 17 | 903,494 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 5,520.00 | 16.00 | 17 | 1,481,434 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 2,400.00 | 16.00 | 17 | 668,077 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 1,240.00 | 16.00 | 17 | 328,736 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 3,070.00 | 19.00 | 17 | 983,027 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 3,070.00 | 19.00 | 17 | 983,027 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 4,920.00 | 19.00 | 17 | 1,572,632 |
| Virginia | Newport News | I-64 | Concrete/Precast | I | 2000 | 3,870.00 | 20.00 | 17 | 1,341,456 |
| Virginia | Newport News | Rt 143 | Concrete/Precast | I | 1993 | 1,545.00 | 11.00 | 22 | 382,079 |
| Virginia | Newport News | Rt 60 | Concrete/Precast | I | 1986 | 853.00 | 13.00 | 26 | 290,168 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1985 | 699.00 | 13.00 | 33 | 302,745 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1985 | 3,421.00 | 20.00 | 24 | 1,665,098 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1995 | 5,297.00 | 12.00 | 20 | 1,295,744 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1995 | 1,043.00 | 12.00 | 21 | 257,819 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1995 | 2,798.00 | 13.00 | 20 | 730,303 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1995 | 6,160.00 | 13.00 | 21 | 1,682,631 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1995 | 682.00 | 14.00 | 21 | 195,882 |
| Virginia | Norfolk | I-264 | Comb/Metal/Concrete | I | 1995 | 2,949.00 | 15.00 | 20 | 875,355 |
| Virginia | Norfolk | I-264 | Concrete/Precast | I | 1996 | 1,059.00 | 12.00 | 21 | 261,465 |
| Virginia | Norfolk | I-264 | Concrete/Precast | I | 1996 | 5,297.00 | 12.00 | 21 | 1,314,070 |
| Virginia | Norfolk | I-264 | Concrete/Precast | I | 1996 | 6,160.00 | 13.00 | 21 | 1,706,428 |
| Virginia | Norfolk | I-264 | Concrete/Precast | I | 1996 | 2,798.00 | 13.00 | 20 | 740,632 |
| Virginia | Norfolk | I-264 | Concrete/Precast | I | 1996 | 699.00 | 14.00 | 20 | 198,652 |
| Virginia | Norfolk | I-264 | Concrete/Precast | I | 1996 | 2,949.00 | 15.00 | 20 | 887,736 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 1,214.00 | 14.00 | 23 | 383,505 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 4,877.00 | 17.00 | 23 | 1,874,755 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 2,834.00 | 17.00 | 22 | 1,072,103 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 4,530.00 | 18.00 | 22 | 1,824,857 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 4,212.00 | 18.00 | 23 | 1,739,317 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 4,336.00 | 18.00 | 23 | 1,827,708 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 4,979.00 | 19.00 | 22 | 2,124,247 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 3,395.00 | 20.00 | 23 | 1,542,574 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 2,306.00 | 21.00 | 23 | 1,116,299 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1993 | 2,634.00 | 23.00 | 23 | 1,364,366 |
| Virginia | Norfolk | I-64 | Concrete/Precast | I | 1998 | 3,014.00 | 21.00 | 13 | 812,662 |
| Virginia | Norfolk | I-64 | Absorptive | I | 2004 | 2,327.00 | 21.00 | 19 | 925,400 |
| Virginia | Norfolk | I-64 | Absorptive | I | 2004 | 3,282.00 | 23.00 | 19 | 1,429,490 |
| Virginia | Norfolk | I-64 | Absorptive | I | 2004 | 755.00 | 23.00 | 19 | 328,845 |
| Virginia | Norfolk | Rt 17 | Metal/Unspecified | I | 1978 | 456.00 | 13.00 | 11 | 63,088 |
| Virginia | Portsmouth | I-164 | Concrete/Precast | I | 1991 | 4,074.00 | 16.00 | 24 | 1,566,981 |
| Virginia | Portsmouth | I-164 | Concrete/Precast | I | 1991 | 4,189.00 | 16.00 | 23 | 1,572,726 |
| Virginia | Portsmouth | I-164 | Concrete/Precast | I | 1991 | 6,452.00 | 20.00 | 21 | 2,707,386 |
| Virginia | Portsmouth | I-164 | Concrete/Precast | I | 1992 | 1,961.00 | 13.00 | 27 | 675,775 |
| Virginia | Portsmouth | I-164 | Concrete/Precast | I | 1992 | 3,949.00 | 20.00 | 22 | 1,761,423 |
| Virginia | Prince George Co | I-295 | Concrete/Precast | I | 1991 | 5,258.00 | 20.00 | 24 | 2,506,307 |
| Virginia | Prince George Co | I-295 | Concrete/Precast | I | 1991 | 4,441.00 | 23.00 | 22 | 2,229,105 |
| Virginia | Prince George Co | I-295 | Concrete/Precast | I | 1991 | 3,664.00 | 30.00 | 23 | 2,526,702 |
| Virginia | Prince George Co | I-295 | Concrete/Precast | I | 1991 | 2,329.00 | 33.00 | 22 | 1,712,045 |
| Virginia | Prince George Co | I-295 | Concrete/Precast | I | 1993 | 2,526.00 | 23.00 | 23 | 1,313,042 |
| Virginia | Prince William | Rte 123 | Concrete/Unspecified | I | 2003 | 528.00 | 12.00 | 32 | 204,470 |
| Virginia | Prince William | Rte 234 | Absorptive | I | 2002 | 4,350.00 | 19.00 | 16 | 1,332,079 |
| Virginia | Prince William Co | 234 | Concrete/Precast | I | 2000 | 400.00 | 8.00 | 27 | 86,956 |
| Virginia | Prince William Co | 234 | Concrete/Precast | I | 2000 | 1,690.00 | 18.00 | 22 | 662,775 |
| Virginia | Prince William Co | I-95 | Concrete/Precast | I | 1995 | 6,465.00 | 12.00 | 21 | 1,635,196 |
| Virginia | Prince William Co | I-95 | Concrete/Precast | I | 1995 | 1,397.00 | 16.00 | 20 | 450,914 |
| Virginia | Prince William Co | I-95 | Concrete/Precast | I | 1995 | 4,267.00 | 16.00 | 20 | 1,383,140 |
| Virginia | Prince William Co | Rt 123 | Concrete/Precast | I | 1995 | 220.00 | 7.00 | 21 | 31,665 |
| Virginia | Richmond | I-95 | Comb/Berm/Wood | I | 1980 | 800.00 | 10.00 | 9 | 72,017 |
| Virginia | Richmond | I-95 | Comb/Berm/Wood | I | 1980 | 751.00 | 13.00 | 10 | 93,493 |
| Virginia | Richmond | I-95 | Metal/Unspecified | I | 1980 | 3,300.00 | 20.00 | 7 | 444,497 |
| Virginia | Richmond | Rt 33 | Wood/Unspecified | I | 1976 | 1,584.00 | 13.00 | 10 | 205,212 |
| Virginia | Roanoke | Rt 117 | Concrete/Precast | I | 1997 | 2,827.00 | 12.00 | 21 | 706,977 |
| Virginia | Salem | Rt 117 | Comb/Metal/Concrete | I | 1995 | 2,998.00 | 12.00 | 21 | 757,434 |
| Virginia | Spottsylvania Co | Rt 620 | Concrete/Precast | I | 1995 | 459.00 | 7.00 | 20 | 65,864 |
| Virginia | Spottsylvania Co | Rt 620 | Concrete/Precast | I | 1995 | 341.00 | 9.00 | 20 | 62,064 |
| Virginia | Stafford | I-95 | Absorptive | I | 2002 | 495.00 | 10.00 | 16 | 76,819 |
| Virginia | Stafford | I-95 | Absorptive | I | 2002 | 1,118.00 | 10.00 | 16 | 173,499 |
| Virginia | Virginia Beach | 190 | Concrete/Precast | I | 2000 | 2,170.00 | 9.00 | 15 | 299,044 |
| Virginia | Virginia Beach | 190 | Concrete/Precast | I | 2000 | 900.00 | 9.00 | 17 | 137,857 |
| Virginia | Virginia Beach | 190 | Concrete/Precast | I | 2000 | 560.00 | 9.00 | 17 | 86,956 |
| Virginia | Virginia Beach | I-64 | Concrete/Precast | I | 1993 | 5,514.00 | 17.00 | 23 | 2,154,186 |
| Virginia | Virginia Beach | I-64 | Concrete/Precast | I | 1993 | 6,668.00 | 18.00 | 22 | 2,673,130 |
| Virginia | Virginia Beach | I-64 | Concrete/Precast | I | 1993 | 3,319.00 | 19.00 | 23 | 1,457,034 |
| Virginia | Virginia Beach | Rt 44 | Concrete/Precast | I | 1995 | 2,722.00 | 17.00 | 21 | 960,092 |
| Virginia | Virginia Beach | Virginia Beach Blvd | Wood/Unspecified | I | 1979 | 5,353.00 | 7.00 | 3 | 129,091 |
| Virginia | Virginia Beach | Virginia Beach Blvd | Wood/Unspecified | I | 1979 | 981.00 | 7.00 | 3 | 23,651 |
| Virginia | Washington Co | I-81 | Concrete/Precast | I | 1998 | 3,073.00 | 19.00 | 19 | 1,113,134 |
| Virginia | Washington Co | I-81 | Concrete/Precast | I | 1998 | 2,306.00 | 21.00 | 19 | 929,456 |
| Virginia | Washington Co | I-81 | Concrete/Precast | I | 1998 | 3,460.00 | 21.00 | 18 | 1,286,129 |
| Virginia | Wythe Co | Rt 71 | Comb/Berm/Wood | I | 1976 | 748.00 | 10.00 | 4 | 31,892 |
| Virginia | York Co | Rt 17 | Comb/Other | I | 1995 | 771.00 | 14.00 | 21 | 225,457 |
| Subtotal | 673,006.00 | 225,274,287 |