TABLE OF CONTENTS
- Introduction
- Background
- The RCNM
- Results
- Calculations in the RCNM
- References
- Appendix A: Best Practices for Calculating Estimated Shielding for Use in the RCNM
- Endnotes
List of Figures
- The RCNM main page
- File Menu 5
- Edit Menu
- View Menu
- Options menu
- Equipment list modification dialogue box
- Units modification pull-down menu
- Equipment dialogue box, with pull-down menu shown
- Noise Metric pull-down menu 10
- Noise Limit Criteria pop-up dialogue box 11
- The Noise Limit Criteria "Clear" command button 12
- Noise Limit Criteria pull-down menu
- Noise Limit Criteria "Value" dialogue box
- Noise Limit Criteria "Maximum" dialogue box
- Noise Limit Criteria "Baseline +" dialogue box
- Noise Limit Criteria "Conditional" dialogue box
- L10 Adjustment dialogue box
- Noise Limits display window
- The RCNM main-page Results display
List of Tables
| Previous | Next |