Skip to contentU.S. Department of Transportation Federal Highway Administration FHWA HomeFeedback
Environment
Previous Contents Next

Appendix D: Action Plan

Action Long or short term Assigned to Source of needed resources
Establish a pooled fund through Washington state with 4 subgroups
  • Construction/materials (A)
  • Testing and research (B)
  • Education and public involvement (C)
  • Policy (D)
short Washington State DOT Pooled fund
List of acronyms (environmental and materials)
  • list of words
  • definitions
short Consultant to pooled fund study Pooled fund study or
Ordering/use/storage of SRTT tire short Manufacturer manufacturer
Define acoustic durability short    
Finish the OBSI standard short ETG FHWA
Document for OBSI & wayside Short ETG FHWA
DLPA Short INDOT/NCAT ?
Synthesis on Cost/Benefit & recommendation Short Pooled fund or NCHRP  
Synthesis of global practice Short Pooled Fund A. & WSDOT  
Clearinghouse items on other list Short ETG Volunteer plus some funded
Mechanistic/experimental hybrids models and connection to testing long Federal agencies with international cooperation Federal plus state DOT (possible piggyback on European efforts)
Discuss turning on “pavement type” in TNM Short US DOT  
Policy issues on other list Short US DOT  
General public education issues Short ETG Pooled fund study
Distribution of short term findings on public education Long State DOT’s State DOT’s
Get public response to different pavements Long State DOT’s State DOT’s
Previous Contents Next

To provide Feedback, Suggestions or Comments for this page contact Mark Ferroni at Mark.Ferroni@dot.gov.


FHWA Home | HEP Home | Feedback
FHWA