Skip to contentUnited States Department of Transportation - Federal Highway AdministrationFHWA HomeFeedback
The Office of Federal Lands Highway header Illustration of Coniferous trees
About Us button Partners & Programs button Strategic Plans buttton SAFETEA-LU button Educational Outreach button
Illustration of a Federal Highway

U.S. Department
of Transportation

Federal Highway
Administration

Associate Administrator
John Baxter
202-366-9494
john.baxter@dot.gov
www.fhwa.dot.gov/flh/

Federal Lands Highway
provides planning,
design, and engineering
services to support the
highways and bridges
that provide access to
and within federally
owned lands.

Federal Lands Divisions

Central
Federal Lands

Central Federal Lands

Division Engineer
Ricardo Suarez
720-963-3448
ricardo.suarez@fhwa.
dot.gov

www.cflhd.gov

September 2007
See FLH website for sources

Bar Graphic

Fact Sheet

 

Utah FLHP

UT FLHP road miles: 2,900
Funding Authorized FY 98 – 07: $126,610,000
Federal land acreage as percentage of total state area: 96.9%*
UT population: 2,550,063

Utah State

  • National Park Service (17 units)

  • U.S. Forest Service (6)

  • Bureau of Indian Affairs/ Tribal Governments (7)

  • U.S. Fish and Wildlife Service (3)

  • This percentage includes Federal lands that are not part of the FLHP core program and not depicted on the map


A Photo of Zion Canyon Scenic Drive The Federal Lands Highway Program in Utah. Zion Canyon Scenic Drive, located in Zion National Park, provides access to marquee attractions like the Emerald Pools, Great White Throne, the Grotto, Angels Landing, Weeping Rock and the Temple of Sinawava. In May 2000, the park began shuttle bus access to these attractions during high visitation season. Using shuttles accelerated pavement failures, since the existing pavement was not designed for continuous shuttle bus use.

In 2002, Central Federal Lands Highway Division (CFLHD), in partnership with the National Park Service, began working on repair of the 7.7-mile segment. The existing pavement section was recycled and stabilized with asphalt to form a base for a new structural section. The process minimized the costs of reconstruction and the impact to the environment. The project also included safety enhancements such as rumble strips, minor road widening, relocating crosswalks, and eliminating hazardous unplanned pullouts. The segment was completed in 2005 with $3.8 million in Federal Lands Highway Program funds.

Download the Utah State FLHP Fact Sheet

Download the free adobe acrobat reader to view PDFs You will need the Adobe Acrobat Reader to view the PDFs on this page.

 


 

Back to Top

Home | About Us | Programs & Partners | Strategic Plans | SAFETEA-LU | Education & Outreach

FLHP | EFLHD | CFLHD | WFLHD


FHWA Home | Feedback
FHWA