Specific Agency Policy Statements
- Agency Wide
- Office of the Chief Financial Officer
- Office of Civil Rights
- Contact Data Regarding Minority Institutions of Higher Education (MIHEs) and Historically Black Colleges and Universities (HBCUs)
- Guidance on Use of Joint Checks Under the DBE Program
- Key SAFETEA-LU Provisions Related to Civil Rights
- Lease or Use of Prime Contractor's Equipment by Disadvantaged Enterprise (DBE) Firms
- Recall Policy and Contractors' EEO Policy Obligations
- Office of Civil Rights and Office of Infrastructure
- Office of Civil Rights: Policy and Program Development Team
- Office of Civil Rights: Program Operations Team
- Office of Innovative Program Delivery: Project Delivery
- Cost Estimating Guidance, January 2007
- Final Major Project Guidance, January 2007
- Project Management Plan Guidance, January 2009
- Project Management Plan Guidance Questions
- Guidance: Operational Independence and Non-Concurrent Construction
- Operational Independence and Non-Concurrent Construction - Memorandum
- Final Major Project Guidance Memorandum, 2007
- Final Major Project Guidance, January 2007
- Risk Management Tool for Managing the Planning / Environmental Phases of Prospective Major Projects
- Office of Innovative Program Delivery: Project Finance (Innovative Finance)
- Advance Construction and Partial Conversion of Advance Construction
- Legislation: Advance Construction and Partial Conversion of Advance Construction (Advance construction is codified in 23 U.S.C 115)
- FHWA Order 5020.1 - Repayment of Preliminary Engineering Costs
- Guidance on Section 308 of the NHS Act Advance Construction of Federal-Aid Projects (May 1996)
- Chapter 2 (Section 2.1) of FHWA's Innovative Finance Primer published in April 2002 discusses AC and PCAC
- Federal-aid Matching Strategies - Flexible Match
- Legislation: Flexible Match
- Guidance on Section 322 of the NHS Act Third Party Donations of Funds, Materials, or Services for Federally Assisted Projects (May 1996)
- Federal-aid Matching Strategies - Tapper Match
- Legislation: Tapper Match
- Tapered Match on Federal-aid Projects Memorandum
- Federal-aid Matching Strategies - Toll Credits
- Legislation: Toll Credits
- Toll Credit for Non-Federal Share, Section 1905 of SAFETEA-LU Memorandum
- FHWA memo (TEA-21 implementing guidance) provides guidance on toll credit calculations based on expenditures prior to enactment of SAFETEA-LU
- FHWA memo titled "Retroactive Use of Toll Credits"
- Non-Federal Matching Requirements Memorandum
- Federal-Aid Guidance Non-Federal Matching Requirements
- Questions & Answers on TEA-21 Section 1301 that amended 23 U.S.C. 108 Advance Acquisition of Real Property
- Questions & Answers on TEA-21 Section 1303 that amended 23 U.S.C. 156 Proceeds from the Sale or Lease of Real Property
- GARVEEs - GARVEE Bond Guidance
- Private Activity Bonds (PABs)
- PABs - SAFETEA-LU Fact Sheets, Guidance, and Regulations
- State Infrastructure Bank (SIB) Guidance - Transportation Equity Act for the 21st Century (TEA-21)
- Federal Legislation State Infrastructure Banks (SIBs)
- State Infrastructure Banks - SAFETEA-LU Fact Sheet
- State Infrastructure Banks - TEA-21 Fact Sheet
- SIB - NHS Chapter 4 (Section 4.2) of FHWA's Innovative Finance Primer
- FHWA Guidance for Administering the SIB Pilot Program
- Section 129 Loans
- Section 129(a)(7) of Title 23 codifies the provisions for a Section 129 loan
- Guidance on Section 313(a) of the NHS Act Toll Facilities under Section 129(a) of Title 23
- Guidance on Section 313(b) of the NHS Act Loan Provisions under Section 129(a)(7) of Title 23
- Office of Innovative Program Delivery: Public-Private Partnerships
-
Office of Innovative Program Delivery: TIFIA Federal Credit Assistance Program
- TIFIA Program Overview
- TIFIA Program Guide
- TIFIA Oversight and Credit Monitoring Guidelines
- TIFIA Letter of Interest Form
- Executive Summary Forms
- TIFIA Loan Term Sheet Sample Template
- TIFIA Loan Agreement Sample Template
- TIGER TIFIA Payments Letter of Interest
- TIGER TIFIA Payments Application and Executive Summary Forms
- Office of Innovative Program Delivery: Revenue-Road Pricing Revenue
- Road Pricing Revenue Overview
- Federal Programs
- Federal Register Notice: Solicitation for Participation in the Value Pricing Pilot Program, Fiscal Years 2010 and 2011
- Instructions for Submitting an Expression of Interest
- Non-Road Pricing Revenue Overview
- Non-Road Pricing Revenue: Federal Excise Taxes on Highway Motor Fuel
- Office of Planning, Environment, and Realty: Byways, TCSP and Delta Programs Team
- Office of Planning, Environment, and Realty: Office of Project Development and Environmental Review
- Categorical Exclusion (CE) Documentation and Approval
- DOT Order 5611.1A, U.S. Department of Transportation National Procedures for Elevating Highway and Transit Environmental Disputes
- Environmental Guidebook
- Environment and Planning Linkage Processes Legal Guidance
- Guidance for Applying the 4(f) Exemption for the Interstate Highway System
- Guidance for Determining De Minimis Impacts to Section 4(f) Resources
- Guidance on the State Assumption of Responsibility for Categorical Exclusions (CE)
- A Guide to Measuring Progress in Linking Transportation Planning and Environmental Analysis
- Improving the Quality of Environmental Documents
- Interagency Guidance: Transportation Funding for Federal Agency Coordination Associated with Environmental Streamlining Activities
- Interim Guidance on Travel and Land Use Forcasting in NEPA
- Interim Guidance: Questions and Answers Regarding Indirect and Cumulative Impact Considerations in the NEPA Process
- SAFETEA-LU Environmental Review Process (Pub. Law 109-59) FINAL GUIDANCE
- Section 4(f) Policy Paper
- The State Transportation Funded Liaison Positions Study
- Office of Planning, Environment, and Realty: Office of Interstate and Border Planning
- Office of Planning, Environment, and Realty: Office of Natural and Human Environment: Air Quality and Transportation Conformity Team
- Clarification to the Transportation Conformity Guidance for Qualitative Hot-spot Analysis in PM2.5 and PM10 Nonattainment and Maintenance Areas
- Clarification of Transportation Conformity Requirements for FHWA/FTA Projects Requiring Environmental Impact Statements
- Court Decision on Transportation Conformity Rule
- Guidance for the Use of Latest Planning Assumptions in Transportation Conformity Determinations - December 2008
- Guidance for Qualitative Project Level "Hot-Spot" Analysis in PM10 Nonattainment and Maintenance Areas
- Guidance on the Implementation of the March 2, 1999 Court Decision
- Information: Limited Maintenance Plans
- Interim Guidance for Implementing the Transportation Conformity Provisions in the SAFETEA-LU
- Interim Guidance Update on Mobil Source Air Toxic Analysis in NEPA Documents
- Memorandum of Understanding between DOT and EPA on Transportation Conformity
- PM2.5 Project-Level Conformity and Hot-Spot Analyses
- Final Guidance on the Congestion Mitigation and Air Quality (CMAQ) Improvement Program under the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users
- SAFETEA-LU 1808: CMAQ Evaluation and Assessment October 2008
- Transportation Conformity Alert to FHWA Divisions on PM2.5 Project-Level Conformity
- Transportation Conformity and the New Air Quality Standards
- Transportation Conformity Guidance for Qualitative Hot-spot Analysis in PM2.5 and PM10 Nonattainment and Maintenance Areas
- Transportation Conformity in Multi-jurisdictional (Complex) Nonattainment and Maintenance Areas
- Use of Latest Planning Assumptions in Conformity Determinations
- Office of Planning, Environment, and Realty: Office of Natural and Human Environment: Noise Team
- Federal Highway Administration's Traffic Noise Model (FHWA TNM®), User's Guide (Version 2.5 Addendum)
- FHWA Highway Construction Noise Handbook
- FHWA Highway Noise Barrier Design Handbook
- FHWA Roadway Construction Noise Model User's Guide
- FHWA TNM Version 2.5 Look-Up Tables User's Guide
- FHWA Traffic Noise Model FAQs
- Guidance on Quiet Pavement Pilot Programs and Tire/Pavement Noise Research
- Highway Construction Noise: Measurement, Prediction, and Mitigation
- Highway Traffic Noise in the United States: Problem and Response
- Highway Traffic Noise Prediction Vehicle Emission Levels
- Highway Traffic Noise--Type I Projects
- Office of Planning, Environment, and Realty: Office of Natural and Human Environment: Project Mitigation Team
- Endangered Species Act Legal Analysis
- EPA Toxic Determination of Compound in Road Salt
- Federal Aid Eligibility of Wetland and Habitat Mitigation
- Federal Guidance on the Use of the TEA-21 Preference for Mitigation Banking to fulfill Mitigation Requirements under Section 404 of the Clean Water Act
- Federal-aid Eligibility for Long-Term Management Activities in Wetland and Natural Habitat Mitigation
- Guidance Implementing Executive Order on Invasive Species
- Guidance on 23 U.S.C. §328 Environmental Restoration and Pollution Abatement
- Information and additional guidance on the language in TEA-21 that established the preference for using wetland mitigation banks
- Information and Guidance on Jurisdictional Coverage of Isolated, Non-navigable Intrastate Waters
- Information and Guidance on the Migratory Bird Treaty Act and Executive Order 13186
- Information and Guidance on the Wetlands Mitigation Action Plan and the revised Corps Regulatory Guidance Letter
- Management of the Endangered Species Act (ESA) Environmental Analysis and Consultation Process
- Memo on U.S. Army Corps of Engineers Regulatory Guidance Letter 08-02 on Jurisdictional Determinations
- Removal of the Bald Eagle from the Threatened and Endangered Species List
- SAFETEA LU 6006 Guidance on Control of Noxious Weeds and Aquatic Noxious Weeds and Establishment of Native Plants
- Office of Planning, Environment, and Realty: Office of Natural and Human Environment: Sustainable Transport and Climate Change Team
- Office of Planning, Environment, and Realty: Office of Natural and Human Environment: Livability Team
- Accommodating Bicycle and Pedestrian Travel: A Recommended Approach: A US DOT Policy Statement Integrating Bicycling and Walking into Transportation Infrastructure
- Bicycle and Pedestrian Guidance
- Bicycle and Pedestrian Provisions of Federal Transportation Legislation
- Bicycle and Pedestrian Transportation Planning Guidance
- Designing Sidewalks and Trails for Access, Part II, Best Practices Design Guide
- RTP Federal Share and Matching Requirements
- Equestrian and Other Nonmotorized Use on Bicycle and Pedestrian Facilities (revised)
- Framework for Considering Motorized Use on Nonmotorized Trails and Pedestrian Walkways under 23 U.S.C. § 217
- Guiding Principles and Questions for Transportation Enhancement Activities
- Manuals and Guides for Trail Design, Construction, Maintenance, and Operation, and for Signs
- Recreational Trails Program Guidance
- Recreational Trails Program Guidance
- RTP Trail Assessments, Education and Training, and State Administrative Costs
- Shared Use Paths Along or Near Freeways and Bicycles on Freeways
- Transportation Enhancement Activities Guidance
- Transportation Enhancement Activities Guidance
- United States Department of Transportation Policy Statement on Bicycle and Pedestrian Accommodation Regulations and Recommendations
- Office of Planning, Environment, and Realty: Office of Planning
- Census Geography Issues
- Certification Checklist for Travel Forecasting Methods
- Considering Safety in the Transportation Planning Process
- Context Sensitive Solutions in the Transportation Planning Process
- FHWA Actions To Address Environmental Justice In Minority Populations And Low-Income Populations
- Flexible Funding for Highways & Transit and Funding for Bicycle & Pedestrian Programs
- Frequently Asked Questions Applying 2000 Census Data to Urbanized and Urban Areas
- Guidance on Financial Planning and Fiscal Constraint for Transportation Plans and Programs
- Induced Travel: Frequently Asked Questions
- Integration of Context Sensitive Solutions in the Transportation Planning Process
- Issuance Major Project Guidance
- MPO and TMA Definitions Based On Census 2000 Urbanized Area Criteria - Census
- Planning and Environment Linkages
- Procedural Guidelines for Highway Feasibility Studies
- Strategic Highway Safety Plans: A Champion's Guide to Saving Lives
- Transportation Planning Excellence Awards
- Treatment of Management Systems Cost
- Office of Planning, Environment, and Realty: Office of Real Estate Services
- 23 CFR Part 710 Questions And Answers
- A Guide For Developing A Right-Of-Way Service Contract
- A History and Overview of the Federal Outdoor Advertising Control Program
- Acquiring Real Property for Federal and Federal-aid Programs and Projects
- Administration of ROW Service Contracts
- Airspace Guidelines to 23 CFR 710.405 - 710.407
- An Outdoor Advertising Control Language Guide
- Conflict Assessment: Federal Outdoor Advertising Control Program
- Design / Build Contracts and Right-of-Way
- Design / Build Contracts and Right-of-Way Activities
- Effectiveness and Impacts of FHWA's Implementation of the 49 CFR 24.102(c)(2) Appraisal Waiver
- European right-of-way and utilities best practices.
- Federal-Aid Policy Guide NS 23 CFR 750B
- Federal-Aid Policy Guide NS 23 CFR 750D
- Federal-Aid Policy Guide NS 23 CFR 750Da
- Federal-Aid Policy Guide NS 23 CFR 750Db
- Federal-Aid Policy Guide NS 23 CFR 750Dc
- Federal-Aid Policy Guide NS 23 CFR 750Dd
- Federal-Aid Policy Guide NS 23 CFR 750Ga
- Federal-Aid Policy Guide NS 23 CFR 750Gb
- Federal-Aid Policy Guide NS 23 CFR 750Gc
- Federal-Aid Policy Guide NS 23 CFR 750Gd
- Federal-Aid Policy Guide NS 23 CFR 751
- Federal-Aid Policy Guide NS 23 CFR 751a
- Federal-Aid Policy Guide, NS 49 CFR 24A
- Federal-Aid Policy Guide, NS 49 CFR 24B 101
- Federal-Aid Policy Guide, NS 49 CFR 24B 102
- Federal-Aid Policy Guide, NS 49 CFR 24B 104
- Federal-Aid Policy Guide, NS 49 CFR 24B 105
- Federal-Aid Policy Guide, NS 49 CFR 24B 106
- Federal-Aid Policy Guide, NS 49 CFR 24B 108
- Federal-Aid Policy Guide, NS 49 CFR 24C
- Federal-Aid Policy Guide, NS 49 CFR 24D
- Federal-Aid Policy Guide, NS 49 CFR 24E
- Federal-Aid Policy Guide, NS 49 CFR 24F
- Final Rule Side-by-Side Comparisons
- Guidance on Adjustment of Non-conforming Outdoor Advertising Signs
- Guidance on Eminent Domain Provision of Department of Transportation Appropriations Act, 2006
- Guidance on Hardship Acquisition and Condemnation
- Guidance on New Iowa Regulations Relating to Bonus Act Control Areas
- Guidance on Off-Premise Changeable Message Signs
- Guidance on the Approval Process For Outdoor Advertising Control Pilots
- Guidance on Utilization of Highway Right-of-Way
- Guide for Preparing An Appraisal Scope of Work
- Illegal Aliens and the Uniform Act Questions and Answers on Public Law 105-117
- Local Public Agency Program - Best Management Practices
- Mortgage Interest Differential Payment (MIDP) Calculators
- Outdoor Advertising - National Study
- Policy and Guidance for Acquisition and/or Relocation Incentive Programs-Voluntary
- Policy and Guidance Supercompensation Payments Incurred for Acquisition of Real Property on Projects Eligible for Federal Funding
- Proceeds from the Sale or Lease of Real Property
- Project Development Guide
- Real Estate Acquisition Guide For Local Public Agencies
- Right of Way Quality Management System - The Journey of Five States
- Side-by-side Comparisons of Changes to the Uniform Act FAQ
- Supplement to January 28, 2008 Transportation Planning Requirements and their Relationship to NEPA Process Completion (2/9/2011) Distribution Memo
- Synthesize Division Interagency Real Estate Agreements and Identify Practices for Improved Interagency Support
- Temporary Programmatic Waiver: Waiver of 49 CFR 24.401(b)(1)--Calculation of Replacement Housing Payment for Negative Equity
- The Acquisition of Easements over Native American Lands For Transportation Project
- Transportation Equity Act for the 21st Century Provisions for Greater Flexibility in Acquiring and Managing Real Property
- Uniform Act Eligibility In Areas Impacted by Hurricane Katrina
- Uniform Act Final Rule Implementation - Video, Informational Guide, and Slide Show
- Uniform Act Frequently Asked Questions (FAQs)
- Uniform Act Tutorial
- Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Uniform Act or URA) - Low Income Calculations
- Uniform Relocation Assistance and Real Property Acquisition Policies Act, as amended, Fixed Residential Moving Cost Schedule
- Your Rights and Benefits as a Displaced Person under the Federal Relocation Assistance Program
- Office of Federal Lands Highway
- Office of Infrastructure: Office of Asset Management: Construction and System Preservation Team
- Office of Infrastructure: Office of Bridge Technology
- Agreement for the Implementation of Scour Countermeasures to Protect Foundations of Scour Critical Bridges
- Bridge Load Ratings for the National Bridge Inventory
- Compliance with the National Bridge Inspection Standards - Background/Plan of Action for Scour Critical Bridges/Scour Focus States/Item 113 Coding Issues/Unknown Foundations/Tidal Bridges
- Compliance with the National Bridge Inspection Standards - Plan of Action for Scour Critical Bridges
- Compliance with the National Bridge Inspection Standards -- Scour Evaluations
- Compliance with the National Bridge Inspection Standards; Scour Evaluation of Bridges over Waterways
- Evaluation of Fendering Systems - Policy & Memos - Hydraulics Engineering - FHWA
- Funding for Bridge Inspection Equipment and Access Features
- Interpretation of Title 23, Section 144(o) Reasonable Costs Associated With the Demolition of Historic Bridges
- Interpretation of Title 23, Section 144(o) Reasonable Costs Associated With the Demolition of Historic Bridges
- Narrow-Gap Electroslag Welding for Bridges
- Project Oversight Unusual Bridges and Structures
- Revision of Coding Guide, Item 113 - Scour Critical Bridges
- Revisions to Items 63-66 to Support Load Reporting by Rating Factor
- Vertical Clearance, Interstate System Coordination of Design Exceptions
- Office of Infrastructure: Office of Pavement Technology
- Office of Infrastructure: Office of Program Administration: Federal-aid Program
- 23 U.S.C. Section 129 Toll Agreements – Annual Certification and Audit Requirement
- Interstate Construction Funds and Availability of Unobligated Balances of Interstate Substitute (Funds, Section 1106(b) of TEA-21), Implementing Guidance
- Interstate Highway Reconstruction/Rehabilitation Pilot Program Section 1216(b) of TEA-21 Solicitation for Candidate Proposals (Reply Due: March 31, 1999)
- Interstate Highway Reconstruction/Rehabilitation Pilot Program, Section 1216(b) of TEA-21 Open Solicitation for Candidate Proposals
- Interstate Highway Reconstruction/Rehabilitation Pilot Program, Section 1216(b) of TEA-21 Solicitation for Candidate Proposals
- Interstate Maintenance Discretionary Program Revised Request for 2007 Applications
- Interstate Maintenance Program TEA-21 Provisions, Implementing Guidance
- Responsible Charge
- Section 1934 of SAFETEA-LU Revised Transportation Improvements Implementing Guidance
- Sections 1701 and 1702-SAFETEA-LU High Priority Projects Program Implementation Guidance
- Surface Transportation Program (STP), Section 1113 of SAFETEA-LU - Implementing Guidance
- The Discontinuance of the FHWA-45, FHWA-47 * FHWA-810
- Toll Credit for Non-Federal Share, Section 1111(c) of TEA-21, Implementing Guidance
- Toll Credit for Non-Federal Share, Section 1905 of SAFETEA-LU
- Office of Infrastructure: Office of Program Administration: Preconstruction
- Awarding Engineering and Design Services Contracts Based on the Brooks Act Requirements
- Awarding Engineering and Design Services Contracts Based on the Brooks Act Requirements
- CFR Section 625 Supplement (Application of Design Standards, Uniform Federal Accessability Standards, and Bridges)
- CFR Section 627 Non-Regulatory Supplement (Value Engineering Program Requirements)
- Federal Jurisdiction on the Massachusetts Turnpike
- Implementation of Section 321 of the 1995 NHS Designation Act - Utilization of the Private Sector for Surveying and Mapping Services
- Procurement, Management, and Administration of Engineering and Design Related Services - Questions and Answers
- Proposed Utility Installations on the Mass. Turnpike ROW
- Office of Infrastructure: Office of Program Administration: Stewardship and Otersight
- Office of Infrastructure: Office of Program Administration: Contract Administration
- Applicability of Davis-Bacon Wage Rates to non-Federally funded highway construction projects
- Buy America Interpretation
- Buy America Policy Response
- Contract Administration Core Curriculum Manual
- Culvert Selection
- FHWA's Buy America Q and A for Federal-aid Program
- Guidance for Department of Labor Semi-annual Enforcement Reports
- Guidance on Patented and Proprietary Product Approvals
- Internet Bidding for Highway Construction Projects
- Owner Controlled Insurance Program Policy
- Questions and Answers Regarding Title 23 CFR 635.411
- Strengthening Suspension/Debarment Actions
- Suspension and debarment
- Wrap-up or Owner Controlled Insurance Program Guide
- Office of Operations: Office of Freight Management and Operations
- Questions and Answers about Vehicle Size and Weight
- SAFETEA-LU Section 1301, 1302, & 1306 Frequently Asked Questions
- SAFETEA-LU Section 1301: Grant Recipient Project Description Submission Guidance
- SAFETEA-LU Section 1302: Grant Recipient Project Description Submission Guidance
- SAFETEA-LU Section 1306: Grant Recipient Project Description Submission Guidance
- Office of Operations: Office of Transportation Management
- AMBER Alert Use of Changeable Message Sign (CMS)
- FHWA's Final Rule and FTA's Final Policy for Applying the National ITS Architecture at the Regional Level brochure (PDF, 2001)
- Guidance on Federal-aid Eligibility of Operating Costs for Transportation Management Systems
- Statewide Opportunities For Linking Planning and Operations: A Primer (2008)
- Use of Changeable Message Sign (CMS)
- Use of Changeable Message Sign (CMS) for Emergency Security Purposes
- Office of Operations: Office of Transportation Operations
- Developing and Implementing Transportation Management Plans for Work Zones
- Frequently Asked Questions for the Temporary Traffic Control Devices Rule (23 CFR 630 Subpart K)
- Frequently Asked Questions for the Work Zone Safety and Mobility Rule
- Implementing the Rule on Work Zone Safety and Mobility (23 CFR 630 Subpart J)
- Incident Management Programs Funding Eligibility
- Information: Guidance for Use of YIELD or STOP Signs with the Crossbuck Sign at Passive Highway-Rail Grade Crossings
- Information: Optional Use of Acknowledgment Signs on Highway Rights-of-Way
- Information: Safety Issues Related to Use of Acknowledgement and Advertising Signs on Toll Facilities Memo
- Information: Traffic Control Strategies for Toll Plazas
- Memorandum: Click It Or Ticket Signs
- Safety Message Signs Interpretation 2-488(1)("Click it or Ticket" Signs)
- Termination of all Experimentations with the use of Yellow-Green Colored Pavement Markings for Crosswalks
- Work Zone Impacts Assessment - An Approach to Assess and Manage Work Zone Safety and Mobility Impacts of Road Projects
- Work Zone Public Information and Outreach Strategies
- Work Zone Process Review Guidance
- Work Zone Process Reviews - Frequently Asked Questions
- Office of Policy and Governmental Affairs: Office of Highway Policy Information
- Office of Safety
- FHWA Guidance on Bicycle and Pedestrian Provisions of Federal Transportation Legislation
- High Risk Rural Roads Program Guidance (Provides guidance on the new High Risk Rural Roads Program, a set-aside from the Highway Safety Improvement Program)
- HSIP Five Percent Report-Guidance (Attachment to HSIP Five Percent Report--Memorandum)
- HSIP Five Percent Report-Memorandum (Provides guidance for preparing the "Five Percent Reports" on the States' most severe locations)
- HSIP Funds for Safety Engineering Assistance to Locals (This memorandum confirms the eligibility of HSIP funds for engineering assistance to localities)
- HSIP Reporting Requirements-Guidance (Attachment to HSIP Reporting Requirements--Memorandum)
- HSIP Reporting Requirements-Memorandum (Provides guidance for preparing the required Highway Safety Improvement Program reports)
- Local and Rural Road Safety Program, Funding, Policy and Guidance
- Maintenance of Signs and Sign Supports for Local Roads & Streets
- Manual on Uniform Traffic Control Devices
- Motorcyclist Advisory Council (MAC-FHWA)
- Pedestrian & Bicycle Safety Legislation and Guidelines
- Public Interest Findings and Certifications for Retroreflective Sign Sheeting
- Railway-Highway Grade Crossing Guidance and Solutions
- Railway-Highway Crossings Report-Guidance (Attachment to Railway-Highway Crossings Report--Memorandum)
- Railway-Highway Crossings Report-Memorandum (Provide guidance for preparing reports on the Railway-Highway Crossings Program)
- Roadside Hardware Policy and Guidance
- Roadway Departure Policy/Guidance
- Road Safety Audit (RSA) Guidance
- Safe Routes to School - Guidance
- SHSP Guidance Document
- SHSP Guidance Memo
- Strategic Highway Safety Plan (SHSP)
- Training, Tools, Guidance and Countermeasures for Locals
- USDOT
PDF files can be viewed with the Acrobat® Reader®
