| Planning |
Update Procedures for the NHS Mainline and NHS Intermodal ConnectorsThe guidance for principal connectors to major intermodal terminals and for other NHS routes is located in 23 CFR 470A, Federal-aid Highway Systems, and its Appendix D to Suppart A, "Guidance Criteria for Evaluating Requests for Modifications to the NHS". Additional criteria for connectors and terminals are in Paragraph 9 of Appendix D. Basically, any routes to be added should meet the criteria, be coordinated with responsible local officials, and be submitted by the State to your office for review, recommendation and transmittal to the FHWA Office of Intermodal and Statewide Programs (HEPS-1) [see note]. Any connectors to be added should also be coordinated with the terminal operators. Updates and corrections of errors for existing connectors and main NHS routes need not include full justification nor coordination. Specifically, in 23 CFR 470.113 (a), "proposals for system actions on the National Highway System shall include a route description, a statement of justification, and statements of coordination with adjoining States on State-line connections, with responsible local officials, and with officials of areas under Federal jurisdiction." NHS MainlineCompare the official NHS maps to the State' s records making note of the type of update, whether a "correction" or an "addition/deletion".
Contact Mike Neathery at (202) 366-1257 for clarification on whether formal justification and coordination is needed before transmittal to FHWA. NHS Intermodal ConnectorsReview the hard copy maps and the official NHS intermodal connectors listing and compare against the State' s records to evaluate the accuracy and currency of the information. Examine all connectors to both passenger and freight terminals. If adding new connectors, refer to 23CFR 470, Subpart A, Appendix D, "Primary Criteria", to determine eligible intermodal terminals. In particular address the following:
In general modifications affecting the connector description or correction to connector mileages do not necessitate formal NHS approval process. Adding or deleting connectors require interagency coordination and official signatured approval by FHWA Office of Intermodal & Statewide Programs as outlined below:
ContactMike Neathery, mike.neathery@dot.gov, (202)366-1257 |