Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Highways for LIFE

Fully Precast Bridge Bents for Use in Seismic Regions

Fully Precast Bridge Bents for Use in Seismic Regions. (Berger/Abam Engineers) Prefabricated bridges bents, also known as piers, have not been used in seismic regions because methods of making connections that are both structurally robust and quick to assemble were relatively unknown and not addressed in design specifications. This project will demonstrate a totally precast concrete bridge bent system that can be used in seismic regions. The new technology, to be used on a bridge in Washington State, allows bridge bents to be prefabricated off site, and the segments moved into place, and assembled onto the bridge, greatly reducing construction time and traffic delays. Award amount of $400,397.

More Information

Events

View all Upcoming HfL Events

Contact

Julie Zirlin
Highways for LIFE
202-366-9105
julie.zirlin@fhwa.dot.gov

 
This page last modified on 08/21/09
 

FHWA
United States Department of Transportation - Federal Highway Administration