Arrow North Dakota Demonstration Project: Whitetopping on U.S. 2 West of Rugby

Appendix

Appendix A: User Satisfaction Survey

On a scale of 1–5, please rate your satisfaction level with the following. (1 meaning strongly disagree and 5 meaning strongly agree).
1 2 3 4 5 Average Response
Count
Approach used to construct the new road in terms of minimizing disruption (surveyed during construction) 0.0% (0) 0.0% (0) 0.0% (0) 54.5% (6) 45.5% (5) 4.45 11
The condition of the new roadway compared to its previous condition (surveyed after construction) 0.0% (0) 0.0% (0) 0.0% (0) 40.0% (4) 60.0% (6) 4.60 10
Average Response 4.53

Appendix B: Workshop Agenda

US 2 - Concrete Overlay Open House Schedule

Showcase Speaker List

Francis Ziegler
Director for Engineering
North Dakota Department of Transportation
608 East Boulevard Ave.
Bismarck, ND 58505-0700
Telephone: 701-328-2500
E-mail: dot@nd.gov

Wendall Meyer
Division Administrator
Federal Highway Administration
1471 Interstate Loop
Bismarck, ND 58503-0567
Telephone: 701-250-4343, ext. 102
E-mail: wendall.meyer@dot.gov

Ahmad Ardani
Principal Engineer
Applied Research Associates
10720 Bradford Rd., Suite 100
Littleton, CO 80127
Telephone: 303-795-8106
E-mail: aardani@ara.com

David Sethre
Regional Executive Director
American Concrete Pavement Association
PO Box 10922
Fargo, ND 58106
Telephone: 701-371-4497
E-mail: dsethre@arvig.net

Steve Gerster
Progressive Contractors, Inc.
4123 42nd St.
Saint Michael, MN 55376-9564
Telephone: 763-497-6100

More Information

Events

Contact

Mary Huie
Highways for LIFE
202-366-3039
mary.huie@dot.gov

Updated: 06/07/2011

FHWA
United States Department of Transportation - Federal Highway Administration