Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback
Highways for LIFE
<< Previous Contents  

Rapid Removal and Replacement of the 4500 South Bridge over I-215 in Salt Lake City

Appendix B: Workshop Agenda

Utah Department of Transportation/Federal Highway Administration
Showcase–Workshop
October 27, 2007

  1. Welcome to Utah—John Njord, Executive Director, Utah Department of Transportation (UDOT)
  2. Welcome—King Gee, Associate Administrator, Federal Highway Administration (FHWA)
  3. National Perspective of Accelerated Bridge Construction (ABC)—Vasant Mistry, Office of Bridge Technology, FHWA
  4. Accelerated Bridge Construction Overview— Jim McMinimee, Director of Project Development, UDOT

Break

  1. Project Challenges:
    1. Project Team—Randy Park, Region Director, UDOT
    2. Management—Lisa Wilson, Project Manager, UDOT
    3. Design—Michael Arens, Structural Engineer, Baker Inc.
    4. Construction—Kip Wadsworth, Ralph Wadsworth Construction
    5. Self-Propelled Modular Transporter (SPMT)—Bill Halsband, Vice President, Mammoet

Break

  1. Project Panel Discussion
    1. Region—Randy Park
    2. Project Manager—Lisa Wilson
    3. Project Designers—Michael Arens
    4. Contractor—Kip Wadsworth
    5. SPMT Operations—Bill Halsband

Break

  1. ABC Panel Discussion: What is your plan after the workshop?
    1. Administration—Jim McMinimee
    2. Research—Shana Lindsey
    3. FHWA—Vasant Mistry

Moderator—Shana Lindsey, Director of Research, UDOT

<< Previous Contents  

More Information

Events

Contact

Mary Huie
Highways for LIFE
202-366-3039
mary.huie@dot.gov

This page last modified on 04/04/11
 

FHWA
United States Department of Transportation - Federal Highway Administration