U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Illinois Division
The Illinois Division Required Actions List includes all the activities that the Division Office is required to perform throughout the year(s).
| ACTIVITY | DUE | FREQUENCY | REFERENCE | DO Review | DO Approval | State Contact |
HQ Contact |
REMARKS |
|---|---|---|---|---|---|---|---|---|
| STATEWIDE PLANNING AND PROGRAMMING | ||||||||
| State Planning & Research (SPR) Program | ||||||||
| SPR-PL Work Program | Jul 1 | Annually | 23 CFR 420.115 (a) | Tr Pln Spec | PPD Mgr | ND | I: HEPP-10 | Fwd to HQs; Draft due to Division by May 15 |
| State PL Funds Formula | As needed | 23 CFR 420.109 (a) | Tr Pln Spec | PPD Mgr | RB | I: HRPD-1 | ||
| Annual Performance & Expenditure Report | Sep 30 | Annually | 23 CFR 420.117 (b) (1) & (c) | Tr Pln Spec | ND | I: HEP-2 | ||
| Statewide Transportation Improvement Program (STIP) | ||||||||
| STIP Approval | Jul 1 | Every 2 years | 23 CFR 450.220 (a), (c) 23 CFR 450.216 |
Tr Pln Spec | PPD Mgr | JS | Approval in Consultation with FTA | |
| STIP Amendments | As requested by State | 23 CFR 450.220 (a), (c) 23 CFR 450.216 |
Tr Pln Spec | PPD Mgr | JS | |||
| Federal Statewide Planning Finding | Sep 30 | Annually | 23 CFR 450.220 (b) | Tr Pln Spec | PPD Mgr | Issued in Consultation with FTA as part of STIP Approval | ||
| System Actions | ||||||||
| Interstate Additions & Revisions | As requested by State | 23 CFR 470.111, 115 (a) | Tr Pln Spec | KS | A: HEPI-1 | Approval by HQ - Office Director | ||
| Federal-Aid Urban Area Boundaries | As revised by State | 23 CFR 470.105 (a) | Tr Pln Spec | RB | I: HEPI-20 | |||
| Functional Classification | As requested by State | 23 CFR 470.105 (b) | Tr Pln Spec | Tr Pln Spec | KS | I: HEPI-20 | "Highway Functional Classification, Concepts, Criteria and Procedures" www.fhwa.dot.gov/planning/fctoc.htm | |
| National Highway System (NHS) revisions | As requested by State | 23 CFR 470.113, 115 (a) | Tr Pln Spec | KS | A: HEPI-1 | Approval by HQ - Office Director | ||
| Other Statewide Planning Responsibilities | ||||||||
| Statewide Transportation Plan | As needed | 23 CFR 450.214 | Tr Pln Spec | KS | I: HEPP-10 I: HEPP-20 |
Evaluated and Periodically Updated | ||
| State Self Certification on Planning Process | Every 2 years | 23 CFR 450.220 (a) | Tr Pln Spec | KS | Received with STIP | |||
| Public Involvement Procedures for Statewide Planning | As needed | 23CFR 450.212 (f) | Tr Pln Spec | KS | I: HEPP-10 | State shall publish and allow 45 days for public review and written comments before the procedures are adopted. | ||
| Non Metropolitan Public Involvement Procedures | Every 5 years | 23 CFR 450.214 | Tr Pln Spec | KS | Within 2 years of initial document completion, the State must provide at least 60 days for comment and process modification; thereafter, such a comment and modification process must be completed at least every 5 years. | |||
| METROPOLITAN PLANNING AND PROGRAMMING | ||||||||
| Unified Planning Work Program (UPWP) | ||||||||
| Approval in Transportation Management Areas (TMAs) | Jul 1 | Annually | 23 CFR 450.314 | Tr Pln Spec & CMO Pln | PPD Mgr | RB | I: HEPP-10 | Annual Approval in Conjunction with SPR-PL Program Approval |
| Approval in Non TMAs | Jul 1 | Annually | 23 CFR 450.314 (d) | Tr Pln Spec, PE & R TL, & CMO Pln | PPD Mgr | RB | I: HEPP-10 | Annual Approval by Incorporation into SPR-PL Program |
| Revisions/Amendments | As needed | 23 CFR 420.115 | Tr Pln Spec, PE & R TL, & CMO Pln | RB | ||||
| Performance and Expenditures Reports | Annually | 23 CFR 420.117 (b) | Tr Pln Spec, PE & R TL, & CMO Pln | RB | I: HEP-2 | Annual, not more frequently than quarterly. Includes final reports | ||
| Long Range Transportation Plan (LRTP) | ||||||||
| Air Quality Conformity Determination on LRTP | Concurrent with LRTP update | 23 CFR 450.322 (d) | Tr Pln Spec & CMO Pln | CM | R: HEPN-40 | Non-attainment areas only: After receipt of MPO determination, FHWA determination in consultation with FTA | ||
| LRTP Updates | Every 4 or 5 years | 23 CFR 450.322 | Every 4 years for nonattainment areas and 5 years for attainment area. | |||||
| Beloit WI-IL | Dec 4, 2005 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | CM | I: HEPP-10 I: HEPP-20 | Wisconsin Division serves as Lead | |
| Bloomington-Normal | Oct 12, 2004 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | SD | I: HEPP-10 I: HEPP-20 | ||
| Champaign-Urbana | Dec 9, 2004 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | BT | I: HEPP-10 I: HEPP-20 | ||
| Chicago | Oct 20, 2006 | Every 4 years | 23 CFR 450.322 | CMO Pln | GS | I: HEPP-10 I: HEPP-20 | ||
| Danville | Oct 1, 2005 | Every 5 years | 23 CFR 450.322 New MPO Rules |
Tr Pln Spec | BT | I: HEPP-10 I: HEPP-20 | MPO designated by Governor on 12/16/2003 | |
| Davenport, IA-IL | Mar 29, 2006 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | SD | I: HEPP-10 I: HEPP-20 | Iowa Division serves as Lead | |
| Decatur (DUATS) | Dec 15, 2004 | Every 5 years | 23 CFR 450.322 | PE & R TL | BT | I: HEPP-10 I: HEPP-20 | ||
| DeKalb-Sycamore | Oct 1, 2005 | Every 5 years | 23 CFR 450.322 New MPO Rules |
Tr Pln Spec | SD | I: HEPP-10 I: HEPP-20 | MPO designated by Governor on 04/08/2003 | |
| Dubuque, IA-IL | Oct 11, 2005 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | SD | I: HEPP-10 I: HEPP-20 | Iowa Division serves as Lead | |
| Kankakee | Oct 22, 2004 | Every 5 years | 23 CFR 450.322 | CMO Pln | SD | I: HEPP-10 I: HEPP-20 | ||
| Peoria | Feb 2, 2005 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | LN | I: HEPP-10 I: HEPP-20 | ||
| Rockford | Jul 27, 2005 | Every 5 years | 23 CFR 450.322 | Tr Pln Spec | SD | I: HEPP-10 I: HEPP-20 | ||
| Springfield | Apr 4, 2005 | Every 5 years | 23 CFR 450.322 | PE & R TL | BT | I: HEPP-10 I: HEPP-20 | ||
| St. Louis, MO-IL | Apr 22, 2005 | Every 4 years | 23 CFR 450.322 | Tr Pln Spec | LN | I: HEPP-10 I: HEPP-20 | Missouri Division serves as Lead | |
| Certification | ||||||||
| State/MPO Self-Certification | Annually | 23 CFR 450.334 (a) | Tr Pln Spec, PE & R TL, & CMO Pln | RB | I: HEPP-10 | |||
| FHWA/FTA TMA Planning Certification Reviews |
Joint approval with FTA Regional Administrator Coordination w/Civil Rights Specialist & Finance and Administration |
|||||||
| Chicago | Jun 2005 | Every 4 years | 23 CFR 450.334 | CMO Pln | Division Administrator | GS | R: HEPP-10 | |
| Davenport | Apr 2007 | Every 4 years | 23 CFR 450.334 | Tr Pln Spec | Division Administrator | SD | R: HEPP-10 | Iowa Division serves as Lead |
| Peoria | Jul 2005 | Every 4 years | 23 CFR 450.334 | Tr Pln Spec | Division Administrator | LN | R: HEPP-10 | |
| Rockford | Jan 2007 | Every 4 years | 23 CFR 450.334 | Tr Pln Spec | Division Administrator | SD | R: HEPP-10 | |
| St. Louis | Nov 2007 | Every 4 years | 23 CFR 450.334 | Tr Pln Spec | Division Administrator | LN | R: HEPP-10 | Missouri Division serves as Lead |
| Transportation Improvement Program (TIP) | ||||||||
| TIP Approvals | Jul 1 | Every 4 years | 23 CFR 450.312 (b) 23 CFR 450.324 (b) 23 CFR 450.328 (a) |
Tr Pln Spec, PE & R TL, & CMO Pln | RB | TIPs are approved into the STIP without modification; Requires FTA consultation | ||
| TIP/STIP Amendments for Non-attainment Areas | As requested | 23 CFR 450.324-330 | Tr Pln Spec & CMO Pln | RB | May require consultation with FTA | |||
| TIP/STIP Amendments for Attainment Areas | As requested | 23 CFR 450.324-330 | Tr Pln Spec, PE & R TL, & CMO Pln | RB | May require consultation with FTA | |||
| Air Quality Conformity Determination on TIP | Concurrent with TIP approval/modification (unless exempt projects) | 23 CFR 450.324 (b) 23 CFR 450.328 (a) |
Tr Pln Spec & CMO Pln | CM | R: HEPN-40 | Non-attainment areas only: After receipt of MPO determination, FHWA determination in consultation with FTA | ||
| Metropolitan Planning Organization | ||||||||
| Metropolitan Planning Area Boundary changes | When revised | 23 CFR 450.308 | Tr Pln Spec, PE & R TL, & CMO Pln | RB | I: HEPI-20 | Approval by Governor, shapefiles forwarded to HQ | ||
| Designation/Redesignation of MPOs | When revised | 23 CFR 450.306 | Tr Pln Spec, PE & R TL, & CMO Pln | RB | I: HEPP-10 | Approved by the Governor | ||
| Cooperative Planning Agreements in Attainment/Maintenance areas | When revised | 23 CFR 450.310 | Tr Pln Spec, PE & R TL, & CMO Pln | RB | ||||
| Cooperative Planning Agreements in Non-attainment Areas | ||||||||
| MPA Covers Entire Non-attainment Area | 23 CFR 450.310 (d) | Tr Pln Spec, PE & R TL, & CMO Pln | CM | Between MPO/State/Transit or in UPWP or Prospectus [23 CFR 450.314 (c)] | ||||
| MPA Covers Part of Non-attainment Area | 23 CFR 450.310 (f) | Tr Pln Spec, PE & R TL, & CMO Pln | CM | Between MPO/State DOT/State AQ | ||||
| Other Metropolitan Planning Responsibilities | ||||||||
| CMAQ Eligibility Determination | When requested | 04/28/99 HQ CMAQ Guidance Memo | Tr Pln Spec & CMO Pln | Tr Pln Spec & CMO Pln | CM | Non-attainment or maintenance areas | ||
| CMAQ Annual Report | Feb 1 | Annually | July 13, 1995 CMAQ Guidelines |
Tr Pln Spec | CM | I: HEPN-10 | IDOT completes through UPACS | |
| Congestion Management Systems | 23 CFR 450.320; 500.109 | Tr Pln Spec & CMO Pln | RB | Must be established and implemented in TMAs.Update as needed. | ||||
| Intelligent Transportation System Architecture & Standards | Regional Architectures by April 8, 2005 or within 4 years of first ITS project advancing to final design | 23 CFR 940 | Tr Pln Spec, PER TL, CMO Pln, Mbty Eng | DZ | ||||
| Public Involvement Procedures for Metropolitan Areas | As needed | 23 CFR 450.316(b)(1) | Tr Pln Spec, PE & R TL, & CMO Pln | RB | Must be developed and published. Update as needed. | |||
| HIGHWAY INFORMATION | ||||||||
| Highway Performance Monitoring System | ||||||||
| Data Submittal | Jun 15 | Annually | HPMS Field Manual | Tr Pln Spec | RR | HPPI-20 | IDOT sends directly to HQ, Division formally requests copy of data | |
| Certified Public Roads Miles | Jun 1 | Annually | 23 CFR 460.3 (b) | Tr Pln Spec | RR | HPPI-20 | To HQ with DO Review/Concurrence; approval by governor or delegated authority | |
| Annual CPI Review | Nov 1 | Annually | HMPS Field Review Guidelines; June 2000 | Tr Pln Spec | Tr Pln Spec | RR | HPPI-20 | Annual Review consists of High Priority Subject Areas, Field Inventory Review, and Data and Trend Analysis. |
| Vehicle Classification Data | Jun 15 | Annually | HPMS Field Manual | Tr Pln Spec | RR | R: HPPI-30 | Part of annual HPMS Submittal | |
| Highway Statistics Reports | State sends directly to HQ, copy to Division | |||||||
| Motor Fuel-551 M | 90 days after end of each reporting month. | Monthly | Chapter 2 | Tr Pln Spec | DE | HPPI-10 | ||
| Finance- 531, 532, 541, 542, & 543.(optional) | Apr 1 | Annually | Chapters 8 and 9 | Tr Pln Spec | DE | HPPI-10 | ||
| Motor Fuel-556 | Apr 1 | Annually | Chapter 2 | Tr Pln Spec | DE | HPPI-10 | ||
| Vehicles & Drivers - 561, 562, 566, & 571 | Apr 1 | Annually | Chapters 3,4,5 & 6 | Tr Pln Spec | DE | HPPI-40 | ||
| Finance-534 | Jun 15 | Annually | Chapter 12 | Tr Pln Spec | DE | HPPI-10 | Annually for State, Biennially for Local. | |
| Finance-536 | Sep 30 | Annually | Chapter 11 | Tr Pln Spec | DE | HPPI-10 | Biennial and on odd-numbered years. Due 9 months after end of reporting year. | |
| DOT/Toll Authority Audits and Published Annual Reports + 539 (Optional) | Annually | Chapter 10 | Tr Pln Spec | CS | HPPI-10 | Annual - Due as soon as available. | ||
| DOT Budgets and Published Annual Reports | Annually | Chapter 13 | Tr Pln Spec, PE & R TL, & CMO Pln | CS | HPPI-10 | |||
| Transportation Bond Referendums | Annually | Chapter 9 | Tr Pln Spec, PE & R TL, & CMO Pln | CS | HPPI-10 | |||
| Highway Finance and Tax Legislation | Annually | Chapter 13 | Tr Pln Spec, PE & R TL, & CMO Pln | CS | HPPI-10 | |||
| Permanent AutomaticTraffic Recorder Data | Monthly - DOT may forward it directly to HPPI-30 | Annually | Chapter 13 | Tr Pln Spec | RR | R: HPPI-30 | Monthly within 20 days of the second month following the data collection month | |
| Annual Truck Weight Data | June 15 | Annually | Chapter 13 | Tr Pln Spec | RR | R: HPPI-30 | ||
| Other Highway Information Responsibilities | ||||||||
| Motor Fuel Review | Sep 2005 | Every 3 years | 1989 HQ Memo | Tr Pln Spec | Tr Pln Spec | DE | R: HPPI-13 | |
| Heavy Vehicle Use Tax (HVUT) | Principal Contact: Mick Ramirez, Sec of St | |||||||
| Proof of Payment Certification | Jul 1 | Annually | 23 CFR 669.7 | Tr Pln Spec | Tr Pln Spec | MR | R: HPPI-10 | Governor approval delegated to Sec of St |
| Compliance Review | Dec 2006 | Every 3 years | 23 CFR 669.21 | Tr Pln Spec | Tr Pln Spec | MR | R: HPPI-10 | |
| Transportation, Community and System Preservation (TCSP) Evaluation Report | Jun 30 | Annually | TEA-21, Section 1221 | PE & R TL | I: HEPP-10 | |||
| MFT Evasion Project Funds Request | When requested | HQ Memo soliciting appl. | PPD Mgr | PPD Mgr | KS | |||
| MOBILITY / ITS | ||||||||
| Congestion Management Systems | As needed | 23 CFR 500.109 | Mobility Engineer | As revised by MPO/State & during Certification Reivew | ||||
| Conformity with Regional ITS Architecture | As needed | 23 CFR 940.11 | TE's & Mobility Engineer | See ITS Checklist | ||||
| ITS Deployment Program (Project Descriptions) | As requested by State | TEA-21, Section 5208 and 5209 | Mobility Engineer | Mobility Engineer | Earmarks | |||
| ITS Deployment Program (Work Orders) | As requested by State | ITS Partnership Agreements | Mobility Engineer | Mobility Engineer | Earmarks | |||
| ITS Life Cycle Cost (>$3M and ITS Financing and Operations Plan | As needed | TEA-21 Section 5210 | Mobility Engineer | |||||
| Operations Support Program | Summary Report Oct 1 Program Approval Aug 1 |
Annually | Annual Memo from HQ | Mobility Engineer | Eligibility determination made by HQ | |||
| Vehicle Size & Weight Enforcement Certification | Jan 1 | Annually | 23 CFR 657.13 | Mobility Engineer | ||||
| Vehicle Size & Weight Enforcement Plan | Oct 1 | Annually | 23 CFR 657.11 | Mobility Engineer | Mobility Engineer | |||
| National Truck Network Modifications | As requested by State | 23 CFR 658.11 | Mobility Engineer | Mobility Engineer | Recommend actions to HQ Must go through Federal Register Process. |
|||
| Traffic Incident Management Self Assessment | Aug 1 | Annually | Annual Memo from HQ | Mobility Engineer | Complete with partners and forward to HQ | |||
| Work Zone Self Assessment | Aug 1 | Annually | Annual Memo from HQ | Mobility Engineer Safety Engineer |
Complete with partners and forward to HQ | |||
| Congestion Partnerships Assessment | Jul 1 | Annually | Annual Memo from HQ | Mobility Engineer | Complete with partners and forward to HQ | |||
| AIR QUALITY | ||||||||
| Transportation Plan Conformity Determination for Non-attainment Areas | Concurrent with LRTP update | As needed (NTE 4 years) | 23 CFR 450.322(d) | Tr Pln Spec, CMO Pln | Tr Pln Spec, CMO Pln | Non-attainment areas only: After receipt of MPO determination, FHWA determination in consultation with FTA. Per FTA/FHWA Planning Collaboration Agreement | ||
| TIP Conformity Determination for Non-attainment | Concurrent with TIP approval/modification (unless exempt projects) | As needed (NTE 2 years) | 23 CFR 450.330(b) | Tr Pln Spec, CMO Pln | Tr Pln Spec, CMO Pln | CM | R: HEPN-40 | Non-attainment areas only: After receipt of MPO determination, FHWA determination in consultation with FTA. Per FTA/FHWA Planning Collaboration Agreement |
| Project Level Conformity Determination for Non-attainment | As needed | 23 CFR 450.332 | Tr Pln Spec, CMO Pln | Tr Pln Spec, CMO Pln | Needed when a TIP is amended. FTA/FHWA Planning Collaboration Agreement |
|||
| CMAQ Funds Report | Feb 1 | Annually | HQ CMAQ guidance memo dated 04/28/99 | PE & R TL | CM | Urban program planning responsible for using UPACS to input data for report. | ||
| CMAQ Funds Eligibility Determination | As requested by State | HQ CMAQ guidance memo dated 04/28/99 | Tr Pln Spec, CMO Pln | Tr Pln Spec, CMO Pln | GS & LN | Coordination w/FTA. Refer to FTA/FHWA Planning Collaboration Agreement TE will coordinate with Planner |
||
| MPO/State Air Quality Agency Agreements | As needed or revised by MPO/State | 23 CFR 450.310c | Tr Pln Spec, CMO Pln | Tr Pln Spec, CMO Pln | Only required when MPO is not designated for air quality planning. | |||
| Environment last update 6/5/2007 | ||||||||
| Notice of Intent (NOI) | As requested by State | 23 CFR 771.123(a), TA6640.8A | TEs Envr Engr Env Prog Engr |
Division Administrator | ||||
| Draft Environmental Impact Statement (DEIS) | As submitted by State | 23 CFR 771.123, TA6640.8A | TEs Civil Rights Specialist ROW Mgr Env Engr Env Prog Engr |
ETL Env Prog Engr |
||||
| Final EIS | No sooner than 45 days after publishing the Draft EIS | As submitted by State | 23 CFR 771.125, TA6640.8A | TEs Civil Rights Specialist ROW Mgr Envr Engr Env Prog Engr |
ETL Env Prog Engr |
FEIS Legal Sufficiency review must be obtained from FHWA Legal Counsel prior to FEIS approval. | ||
| Record of Decision (ROD) | No sooner than 30 days after publishing Final EIS | As required | 23 CFR 771.127, TA6640.8A | TEs Env Prog Engr |
Division Administrator | |||
| 180-day Statute of Limitation Notice for Environmental Documents | As requested by State or by FHWA | SAFETEA-LU Section 6002(a), 23 USC 139(l) | Env Engr Env Prog Engr |
Division Administrator | ||||
| EIS Written Re-evaluations | If no action is taken within 3 years after Final EIS | As submitted by State | 23 CFR 771.129, TA6640.8A | TEs Civil Rights Specialist ROW Mgr Envr Engr Env Prog Engr |
ETL Env Prog Engr |
|||
| Environmental Assessment | As submitted by State | 23 CFR 771.119, TA6640.8A | TEs Civil Rights Specialist ROW Mgr Envr Engr Env Prog Engr |
ETL Env Prog Engr |
||||
| Finding of No Significant Impact (FONSI) | As applicable | 23 CFR 771.121, TA6640.8A | TEs Envr Engr Env Prog Engr |
ETL Env Prog Engr |
||||
| Timeframes Agreement for EAs and EISs | As submitted by State | SIA for Establishment of Timeframes for EISs and EAs /s/ by Stoner 3/3/05 | TEs Envr Engr Env Prog Engr |
TEs Envr Engr Env Prog Engr |
||||
| Environmental Document Determination (CE-I Projects) |
As requested by State | 23 CFR 771.117 and 771 .111(a)/(b), TA6640.8A | TEs, at IDOTs request | N/A | ||||
| Environmental Document Determination (CE-II Projects) |
As submitted by State | 23 CFR 771.117 and 771.111(a)/(b), TA6640.8A | TEs | TEs | ||||
| ECADs | As submitted by State | 23 CFR 771.117, TA6640.8A | TEs ROW Mgr Civil Rights Specialist |
TEs Envr Engr Env Prog Engr |
||||
| Section 4(f) De MinimisFinding | As submitted by State | SAFETEA-LU Secttion 6009, 23 USC 138(b) | TEs Env Engr Env Prog Engr |
TEs | ||||
| Section 4(f) Programmatic | As submitted by State | 23 CFR 771.135, TA6640.8A | TEs | TEs | ||||
| Section 4(f) Individual | As submitted by State | 23 CFR 771.135, TA6640.8A | TEs Envr Engr Env Prog Engr |
ETL Env Prog Engr |
Legal sufficiency review must be obtained from FHWA Legal Counsel prior to Section 4(f) approval. | |||
| Coordination with Native American Tribes | As requested by State | 36 CFR 800 | Env Engr Env Prog Engr |
Division Administrator | ||||
| Project Level Agreements (e.g., Section 106 MOAs, Section 106 Project Level Programmatic Agreements) | As submitted by State | 36 CFR 800 | TEs | TEs | ||||
| Certification of Public Hearings Review | As needed on projects | 23 CFR 771.111(h)(2)(vi) | TEs | N/A | ||||
| Statewide Agreements (e.g., NEPA/404 Merger, CE Agreement, Section 106 Programmatic Agreements) | As submitted by State | Various | Env Engr Env Prog Engr |
Division Administrator | ||||
| NEPA/404 Merger Meetings | As needed or requested by State | NEPA/ 404 Merger Agreement July 1, 2000 | TEs Env Engr Env Prog Engr |
N/A | ||||
| Statewide Public Involvement Program Approval | When policy is revised | 23 CFR 771.111(h) | TEs Civil Rights Specialist Envr Engr Env Prog Engr |
Env Prog Engr | ||||
| Civil Rights | ||||||||
| Title VI Plan Accomplishments and Next Year's Goals | Oct 1 | Annually | 23 CFR 200.9 | Civil Rights Specialist | Civil Rights Specialist | Courtesy copy to HQ | ||
| Title VI Plan Update | As needed or requested by State | 23 CFR 200.9 | Civil Rights Specialist | Civil Rights Specialist | Courtesy copy to HQ | |||
| State Internal EEO Affirmative Action Plan (Title VII) Accomplishments and Goals | Oct 1 | Annually | 23 CFR 230.311 | Civil Rights Specialist | Civil Rights Specialist | Courtesy copy to HQ | ||
| State Internal EEO (Title VII) Plan Update | Oct 1 | Annually | 23 CFR 230.311 | Civil Rights Specialist | Civil Rights Specialist | Courtesy copy to HQ | ||
| EEO Contract Compliance Review Reports (Form FHWA 86) | As submitted by State | 23 CFR 230.409 23 CFR 230.413 |
Civil Rights Specialist | Civil Rights Specialist | If contractor is found non-compliant, a courtesy copy is sent to EEO Specialist, Resource Center Midwest | |||
| State Employment Practices Report (EEO-4) | Aug 1 | Annually | 23 CFR 230.311 | Civil Rights Specialist | Report sent to HQ quarterly for informational purposes and recommendation sent to HQ annually for approval | |||
| Disadvantaged Business Enterprise (DBE) Awards & Commitment | Jul 15 / Jan 15 | Semiannually | 49 CFR 26 Appendix B | Civil Rights Specialist | Recommendation sent to HQ for approval | |||
| Disadvantaged Business Enterprise (DBE) Program Revisions | As needed or requested by State | 49 CFR 26.21(b) Annual Procedures Memo from HQ |
Civil Rights Specialist | Civil Rights Specialist | When litigation is pending or there are significant changes, recommendations sent to HQ for approval.If no litigation pending or significant changes, approval is at Div Office level. | |||
| State's DBEPprogram Goals | Aug 1 | Annually | 49 CFR 26.41 Annual Procedures Memo from HQ |
Civil Rights Specialist | Civil Rights Specialist | When litigation is pending or there are significant changes, recommendations sent to HQ for approval.If no litigation pending or significant changes, approval is at Div Office level. | ||
| Supportive Services Funds Requests | As requested by State | 23 CFR 230.113 | Civil Rights Specialist | Recommendation sent to HQ for approval | ||||
| Annual Contractor Employment Report (Construction Summary of Employment Data (Fform PR-1392) | Sep 25 | Annually | 23 CFR 230.121(a) | Civil Rights Specialist | Recommendation sent to HQ for approval | |||
| Report onSupportive Services (On-the-Job-Training (OJT) & DBE) | Apr 15/Jul 15/Oct 15/Jan 15 | Quarterly | 23 CFR 230.121(e) 23 CFR 230.111, 113 |
Civil Rights Specialist | Recommendation sent to HQ for approval | |||
| OJT Goals & Accomplishments | Jan 30 | Annually | 23 CFR 230.111(b) | Civil Rights Specialist | Civil Rights Specialist | |||
| Minority Institutes of Higher Education Planned Awards Report | Quarterly | Pres. Exec. Orders 13021 / 13230 | Prepared by Civil Rights Specialist and submitted to HQ | |||||
| Minority Institutes of Higher Education Peformance Awards Report | Nov 1 | Annually | Pres. Exec. Orders 13021 / 13230 | Prepared by Civil Rights Specialist and submitted to HQ | ||||
| Americans with Disabilities Act Complaint Reviews | As requested by HQ | Pres. Exec. Order 11246 | Civil Rights Specialist | Conduct evaluation & mediate for correction If no resolution reached, remand to HQ w/report |
||||
| Americans with Disabilities Act Complaint Review Report | Oct 1 | Annually | Pres. Exec. Order 11246 | Civil Rights Specialist | ||||
| Civil Rights Activity Report (Title VI, Limited English Proficiency, Title IX, Persons with Disabilities) | Apr 15/ Jul 15/ Oct 15/ Jan 15 | Quarterly | Pres. Exec. Order 12250 | Prepared by Civil Rights Specialist and submitted to HQ | ||||
| DBE On-site Verification and Interviews | As needed | 23 CFR 230.409(e) | TEs | Coordinate findings with Civil Rights Specialist | ||||
| Right of Way (ROW) | ||||||||
| State ROW Manual Recertification | Jan 1 | Every 5 years | 23 CFR 710.201(c) | ROW Mgr | ROW Mgr | Last recertification 12/00 | ||
| Uniform Relocation Assistance & Real Property Acquisition Report -(OMB Form 2125-0030) | NLT Nov 15 | Annually | 49 CFR 24.9c & Appendix B | ROW Mgr | (Required every 3 years per regulation) | |||
| Requests for Waivers | As submitted by State | 49 CFR 24.204(b) | ROW Mgr | ROW Mgr | ||||
| Real Property Acquisition Statistical Report | Nov 15 | Annually | FHWA Order 6540.1 | ROW Mgr | Prepare and submit to HQ | |||
| Use of ROW Air Space Authorization Request (on Interstate System) | As needed on projects | 23 CFR 710.405 | ROW Mgr, TEs, Bridge Engr | ROW Mgr | ||||
| Use of ROW Air Space Authorization Request (off Interstate System) | As needed | 23 CFR 710.405 | ROW Mgr, TEs, Bridge Engr | State takes action. | ||||
| ROW Disposal Authorization Request (if on Interstate System) | As needed on projects | 23 CFR 710.409 | ROW Mgr | TEs review for Environmental Clearance | ||||
| ROW Disposal Authorization Request or Air Space Rentals (if not on Interstate System at less than Fair Market Value) | As needed | 23 CFR 710.409 | ROW Mgr | State takes action | ||||
| ROW Relinquishment Requests | As needed | 23 CFR 620 (b) 23 CFR 710.401 23 CFR 710.403 |
ROW Mgr, TEs | ROW Mgr, TEs | ||||
| Functional Replacement | As needed | 23 CFR 710.509 | ROW Mgr | State takes action | ||||
| Outdoor Advertising Policies and Procedures Revisions | As needed or submitted by State | 23 CFR 750.304 | ROW Mgr | ROW Mgr | ||||
| Outdoor Advertising Sign Removal Projects | As needed on projects | 23 CFR 750.307 | ROW Mgr | ROW Mgr | ||||
| Lead Agency Uniform Act Monitoring Activities | As needed | 49 CFR 24.603 | ROW Mgr | Submit to HQ | ||||
| ROW Oversight Agreement | As needed | 23 CFR 710.201(I) | ROW Mgr | ROW Mgr | ||||
| Scenic Byways Designation Requests | Every 2 years | HQ Memo soliciting appl. | ROW Mgr | Recommend action to HQs | ||||
| Authorization of Advanced Acquisition (Hardship or Protective Buying) | As requested by State | 23 CFR 710.307, 503, 509 | ROW Mgr | ROW Mgr | ||||
| Request for Direct Federal Acquisition | As requested by State | 23 CFR 710.603 | ROW Mgr | ROW Mgr | ||||
| Request for Federal Land Transfer | As requested by State | 23 CFR 710.601 | ROW Mgr | ROW Mgr | ||||
| ROW Certifications as part of Construction PS&E Submittal | As required | 23 CFR 635 | ROW Mgr, TEs | ROW Mgr, TEs | ||||
| Request for Credits | As requested | 23 CFR 710.501 | ROW Mgr | ROW Mgr | ||||
| Withholding of Payments | As required | 23 CFR 710.203(c) 23 CFR 1.36 |
ROW Mgr | ROW Mgr | Coordinate with Division Administrator | |||
| Safety | ||||||||
| Highway Safety Improvement Program (including HEP Program - 10% STP set aside for Safety Eligibility Determinations) | Aug 31 | Annually | 23 CFR 924.15 | Mob & Saf Team Ldr | ||||
| 402 Highway Safety Program Plan | Sep 1 | Annually | 12/22/99 Guidelines | Safety Specialist | NHTSA has lead. | |||
| Work Zone Safety Process Review of Effectiveness | Annually | 23 CFR 630.1010 | Mob & Saf Team Ldr TE's |
Division Administrator | ||||
| Safety Belt Compliance | Annually (each FY) | 23 CFR 1215.6 | Mob & Saf Team Ldr | NHTSA will take lead. | ||||
| Drug Offender Driver's License Suspension Law & Enforcement Certification | Jan 1 | Annually | 23 USC 159 23 CFR 192.5 |
Safety Specialist | Submit to HQs | |||
| State-Prepared Traffic Control Manuals | Within 2 years of MUTCD Issuance | As needed | 23 CFR 655.603 | Mob & Saf Team Ldr | Mob & Saf Team Ldr | |||
| Traffic Safety in Highway & Street Work Zones | As needed | 23 CFR 630.1008 | Mob & Saf Team Ldr | Division Administrator | ||||
| Highway Safety Improvement Program Project Approval | As needed | 23 CFR 924.15 | Mob & Saf Team Ldr TE's |
TE's | ||||
| Discretionary Funds | ||||||||
| Scenic Byways Discretionary Funds Application | Annually | HQ Memo Soliciting Applications | ROW Mgr | ROW Mgr | ||||
| Public Lands Highways (PLH) | As needed | HQ Memo Soliciting Applications | PE & R TL | Recommend action to HQ | ||||
| National Corridor Planning and Development Program (NCPD) | As needed | HQ Memo Soliciting Applications | PE & R TL | Recommend action to HQ | ||||
| Transportation and Community and System Preservation (TCSP) | As needed | HQ Memo Soliciting Applications | PE & R TL | Recommend action to HQ | ||||
| Ferry Boat Discretionary (FBD) | As needed | HQ Memo Soliciting Applications | PE & R TL | Recommend action to HQ | ||||
| Innovative Bridge Research and Construction Program Administration | As requested | Annually | 23 USC 503(b), Annual Memo from HQ | Bridge Engineer | Bridge Engineer | Submit to HQ | ||
| Forest Highways Discretionary Funds | Annually | 23 CFR 660.101 | TL Team B | Joint approval with IDOT, FLHD, Forest Service and TL Team B | ||||
| National Covered Historic Bridge Program | Annually | HQ Memo Soliciting Applications | Bridge Engineer | Recommend action to HQ | ||||
| Interstate Maintenance Discretionary Funding Applications | Annually | HQ Memo Soliciting Applications | Fin & Logistics Tm Ldr | Recommend action to HQ | ||||
| ITS Deployment Program | Annually | TEA 21, Section 5208 and 5209 23 CFR 940 |
Mobility Engineer | Recommend action to HQ | ||||
| Value Pricing Pilot Program | Mar 15 | Annually | TEA 21, Section 1216(a) | Mobility Engineer | Recommend action to HQ | |||
| Design & Construction (Field Engineering) | ||||||||
| Authorization to Advertise and Approve Project Agreements | As needed | 23 CFR 635.309 & 23 CFR 630 subpart A | TEs, Financial Mgr, ROW, Safety Tm Ldr, Mobility Engr, Fiscal Clerk | TEs, Financial Mgr, ROW, Safety Tm Ldr, Mobility Engr | ||||
| Construction Inspections | As needed on Full Oversight Projects | Full Oversight Agreement, 23 CFR 635 | TE | |||||
| Changes and Extra Work | As needed on Full Oversight Projects | 23 CFR 635.109, 635.120 | TE | TE | Covers change orders, force accounts, time extensions, and prior approval for major changes | |||
| Claims | As needed on Full Oversight Projects | 23 CFR 635.124 | TE | TE | ||||
| Material Certification | As needed on Full Oversight Projects | 23 CFR 637.207(a)(3) | TE | Pavement Engineer | Only required on full oversight projects. Collected by the Materials Engineer. | |||
| Plans Specifications & Estimates Review | As needed on Full Oversight Projects | 23 CFR 630.205, 23 USC 106 | TE | TE | When TE authorizes project in FMIS it constitutes PS&E approval | |||
| Warranties | As needed | 23 CFR 635.413 | TE | Division Administrator | Does not include general manufacturers warranties. | |||
| Concurrence in Award | As needed on Full Oversight Projects | 23 CFR 635.114 | TE | Engr TL | ||||
| Bridge - Type, Size & Location | As needed on Full Oversight Projects | FHWA Order 5520.1 | TE, Bridge Engineer | Bridge Engineer | Only required on major or unusual stractures; otherwise included with design review process. | |||
| ADA Design Standards Compliance | As needed | 23 CFR 652 | TE/CR Spec | |||||
| Access Justification Reports | As needed | February 1998, Federal Register, Vol. 63, #28 | TE | Division Administrator | coord w/headquarters as needed | |||
| Locked Gate (Interstate) | As needed | February 1998, Federal Register, Vol. 63, #28 | TE | FE Mgr | ||||
| Design Exceptions | As needed on all Full Oversight Projects and Interstate | 23 CFR 625.3 | TE | FE Mgr | Vertical clearance on the Interstate needs to be coordinated with SDDCTEA | |||
| Coordination of Projects near Airports | As needed | 23 CFR 620.103 | TE | |||||
| Value Engineering | As needed | 23 CFR 627 | TE | |||||
| Value Engineering Report | End of Nov | Annually | FAPG G 6011.9 | VE Coordinator | Submitted to HQs | |||
| Innovating Contracting Requirements | As needed | SEP 14 & 15 | TE, TLm Ldr, FE Mgr | Submitted to HQs SEP-15 [(Federal Register: 10/6/2004 (Vol 69, #193)] SEP-14 [FHWA Briefing 7/9/2002] | ||||
| Federal Aid Program Eligibility Determinations | As needed | USC 23 | TE | TE | ||||
| Termination of Contract | As needed | 23 CFR 635.125 | TE | FE Mgr | ||||
| Statement of Materials & Labor Used by Contractors on Hwy Constr. Involving Fed Funds (Form FHWA-47) | As needed | 23 CFR 635.126 | ETL-B | Transmitted directly to HQs from IDOT. Subject to review by coordinator if returned. | ||||
| Bid Price Data (Form FHWA-45) | As needed at Project Completion | 23 CFR 635.113 FAPG CH 6 G 6011.10 |
ETL-B | Transmitted directly to HQs from IDOT. Subject to review by coordinator if returned. | ||||
| Buy America Waiver | As needed | 23 CFR 635.410 | TE | Division Administrator | Submit to HQs if over $50K | |||
| Force Account Project | As needed on Full Oversight Projects | 23 CFR 635B | TE | FE Mgr | ||||
| Procedures for Consultant Selection | As needed | 23 CFR 172.9 | TE | Division Administrator | ||||
| Design Standards | As needed | 23 CFR 625 | Engineers and Specialists | FE Mgr | Approval determined at Spec Cmte meetings | |||
| Standard Specifications | As needed | 23 CFR 625 | Engineers and Specialists | FHWA Spec Cmte Representative | Approval determined at Spec Cmte meetings | |||
| Local Public Agency Oversight Policies and Procedures | As needed | 23 CFR 635.105 | Local Agency Coordinator | |||||
| Subcontracting Requirements | As needed | 23 CFR 635.116(b) | FE Mgr | FE Mgr | ||||
| Incentive/Disincentive Amount Justification | As needed | 23 CFR 635.127 | TE | TE | ||||
| Approving Liquidated Damage Rate | Every 2 years | 23 CFR 635.127 | ETL | FHWA Spec Cmte Representative | ||||
| Research | ||||||||
| State Planning & Research (SPR) Work Program | Prior to Jul 1 | Annually | 23 CFR 420.115 23 CFR 420.209 |
Res & T2 Engr | Res & T2 Engr | |||
| Management Process for Research, Development & Technology Transfer | Jun 30 | Annually | 23 CFR 420.115 23 CFR 420.209 |
Res & T2 Engr | Res & T2 Engr | |||
| Experimental Features | Project by Project | FAPG Ch 6, Sect G 6042.4 | Res & T2 Engr, TEs | Res & T2 Engr | ||||
| LTAP Centers Work Plan and Funding | Annually | FHWA LTAP Field Manual | Res & T2 Engr | Res & T2 Engr | ||||
| Technology & Innovation Funding Program | Annually | Memo from Resource Center, 11-18-2004 | Technology & Innovation Deployment Team | Management Council | ||||
| Pooled Fund Study | As needed | Memo from HQ | ||||||
| Research Results Reports | As needed | 23 CFR 420.117 | Res & T2 Engr | Division Administrator | ||||
| Pavement & Materials | ||||||||
| Materials Certification | As needed | 23 CFR 637.207 | Pavement Engr | Must be submitted for Full Oversight Projects ONLY | ||||
| Quality Assurance Program | As needed | 23 CFR 637.205 | Pavement Engr | Pavement Engineer | ||||
| Bridge | ||||||||
| NBIS Review Statewide Report | Jan 1 | Annually | 23 CFR 650 Subpart C July 1, 2003 HQ memo | Bridge Engineer | HIBT | Submit to HQ | ||
| NBI Data Submittal | Apr 1 | Annually | 23 CFR 650 Subpart C & D,AnnualMemo from HQ | Bridge Engineer | HIBT | Submit to HQ | ||
| Bridge Construction Unit Cost Submittal | Apr 1 | Annually | 23 CFR 650 Subpart D Annual Memo from HQ | Bridge Engineer | Bridge Engineer | HIBT | Submit to HQ | |
| HBRRP Eligibility Determinations | Project by Project | 23 CFR 650 Subpart D | Bridge Engineer | Transportation Engineer | ||||
| TS&L Approval of Unusual Bridges and Structures on the Interstate | Project by Project | 23 CFR 630 Subpart B HQ Memo 11/13/98 |
Bridge Engineer | HIBT | HQ must approve | |||
| Bridges Exempt from Coast Guard Permits | Project by Project | 23 CFR 650 Subpart H | Bridge Engineer | Division Administrator | ||||
| Financial Management | ||||||||
| Federal-aid Billing Reimbursement of Eligible Expenditures | Weekly | 23 CFR 140 23 CFR 635.122 |
Financial Specialist Fin & Logistics Tm Ldr |
Financial Specialist Fin & Logistics Tm Ldr |
||||
| Transfer of Funds | As needed | 23 USC 104 [c], (g), (k) 23 USC 119 (b) |
Financial Specialist Fin & Logistics Tm Ldr |
Financial Specialist Fin & Logistics Tm Ldr |
||||
| Financial Integrity Review and Evaluation | Oct 31 | Annually | FHWA Order 4560.1 | Fin & Logistics Team | Division Administrator | |||
| Transit Benefit Program | Monthly | DOT H4410.4 | Admin Program Ass't | Submit to HAIM, HQs | ||||
| Delphi Reconciliations | Month End Cutoff | Monthly | OBF Policy 04-08 | Admin Program Ass't | Fin & Logistics Tm Ldr Division Administrator |
|||
| Federal Aid Project Modifications | As needed | 23 CFR 630.110 | Fiscal Technician, Financial Specialist, Fin & Logistics Tm Ldr | Financial Specialist Fin & Logistics Tm Ldr |
||||
| Emergency | ||||||||
| Emergency Preparedness | ||||||||
| Appoint two Emergency Coordinators (Principal and Alternate Points of Contact) for Managing Field Office Emergency Preparedness Programs. | As needed | FHWA Order 1910.2c | Division Administrator | |||||
| Emergency Communications | ||||||||
| Identify Points of Contact at State and Local Levels | As needed | FHWA Order 1910.2c | Emergency Coordinator | Develop and maintain. E-mail to HQs as requested. | ||||
| Emergency Incident Reporting using the DOT's AIM System | As needed | FHWA Orders 1910.2c & 5181.1 | Emergency Coordinator | Submit to HQs | ||||
| Testing of Emergency Communications Equipment | Monthly | FHWA Order 1910.2c | Emergency Coordinator | |||||
| Continuity of Operations | ||||||||
| Develop and Maintain a COOP Plan | As needed | FHWA Order 1910.2c | COOP Coordinator | Assistant Division Administrator | ||||
| Conduct Training Exercise | Annually | FHWA Order 1910.2c | COOP Coordinator | Assistant Division Administrator | ||||
| National Security | ||||||||
| Emergency Highway Transporation Meeting | As needed | FHWA Order 1910.2c | Emergency Coordinator | Conducted on an annual basis at the discretion of the Division Administrator | ||||
| Documented Coordination Procedures between Military and Civilian Authorities | As needed | FHWA Order 1910.2c | Emergency Coordinator | |||||
| Federal Response Plan (FRP) | As needed | FHWA Order 1910.2c | Emergency Coordinator | Division Administrator | ||||
| Occupant Emergency Program | FHWA Orders M1100.1A and 3902.5A, DOT Orders 1100.63B41 and 3900.8A, 41 CFR 101-20.102.4 | OEP Coordinator | FHWA Division Administrator, FMCSA Division Administrator | |||||
| Prepare and Manage the Occupany Emergency Plan (OEP) | Continuously | FHWA Orders M1100.1A and 3902.5A, DOT Orders 1100.63B41 and 3900.8A, 41 CFR 101-20.102.4 | OEP Coordinator | Division Administrator | ||||
| OEP Certification | Annually | FHWA Orders M1100.1A and 3902.5A, DOT Orders 1100.63B41 and 3900.8A, 41 CFR 101-20.102.4 | Division Administrator | |||||
| Emergency Relief (ER) Damage Assessments and Reports | As needed | 23 CFR 668 23 USC 120 and 125 |
Engineers and Specialists | Division Administrator | Perform with State | |||