
April 19, 2013
« Previous | Table of Contents | Next »
| Term | Description |
|---|---|
| AC Heavy Maintenance Post | Periodic Maintenance costs post construction completion |
| AC Heavy Maintenance Pre | Periodic Maintenance costs before construction completion |
| AC Light Maintenance Post | Routine Maintenance costs post construction completion |
| AC Light Maintenance Pre | Routine Maintenance costs before construction completion |
| AC Operations Post | Operation Costs post construction completion |
| AC Operations Pre | Operation Costs before construction completion |
| Base Date | The Base Date is commonly referred to as the estimated date of financial/contract close for a project. |
| Concession Period | Concession Period (Total construction and operation periods). |
| Construction Delay Day Cost | Construction delay per day. |
| Construction End | End date of construction period. |
| Construction Period | Number of years in construction period. |
| Construction Phase | The Construction phase involves the actual construction of the physical asset. This phase is often the most sensitive to risks which could result in change orders, schedule delays, and contract disputes. By identifying potential risks before the start of construction phase, it may be possible for the project team to better anticipate and manage construction risks before they occur. |
| Construction Start | Start date of construction period. |
| Construction Year Index | Count for construction periods |
| DSCR | Debt Service Cover Ratio. |
| Design Cost Total | Total cost associated with the design and construction of the project |
| Design Cost | Design and construction cost associated with a design element |
| Design Cost Calculation | Option to include design build cost assumptions |
| Design Cost Profile | Percentage of an element's cost that is recognized per year |
| Design Type | Asset Type in reference to the 'Assumptions' sheet of the Shadow Bid Tool. |
| DCF | Discounted Cash Flow. |
| Discount Rate Nominal | Discount rate factoring in the inflation rate. |
| Discount Rate Nominal, Choice | Option to manually input specific nominal interest rate or a specified project IRR |
| Discount Rate Nominal, Manual | Input of a discrete nominal interest rate |
| Discount Rate Real | Discount rate that does not account for inflation. |
| Discount Rate Real, Choice | Option to manually input specific real interest rate or specified project IRR |
| Discount Rate Real, Manual | Input a discrete real interest rate |
| Non Agency Subsidy | Percentage of construction costs provided by non-agency government subsidy |
| Non Agency Subsidy, Dollars | Dollar amount of non-agency government subsidy |
| Heavy Maintenance Cost | Cost of Periodic Maintenance as a percentage of total construction costs |
| Heavy Maintenance Cost, Dollar | Dollar cost of Periodic Maintenance |
| Heavy Maintenance Cost, Period | Period between Periodic Maintenance works |
| Heavy Maintenance Cost Index | Flag indicating the cash flow periods where Periodic Maintenance occurs |
| Inflation Consumer Price Index | Inflation Consumer Price Index used as a base rate for inflation assumptions. |
| Inflation CPI Index | An index of CPI factors |
| Light Maintenance Cost | Cost of Routine Maintenance as a percentage of construction cost |
| Light Maintenance Cost, Dollar | Dollar cost of Routine Maintenance |
| Light Maintenance Cost, Period | Period that Routine Maintenance occurs |
| Light Maintenance Cost Index | Flag indicating the cash flow periods where Routine Maintenance occurs |
| Maintenance Calculation | Option to include maintenance assumptions |
| NPC | Net Present Cost. |
| NPC Base | Net Present Cost of the base project (excluding risk). |
| NPC P10 | Net Present Cost of the project at the 10th risk percentile. |
| NPC P70 | Net Present Cost of the project at the 70th risk percentile. |
| NPC P90 | Net Present Cost of the project at the 90th risk percentile. |
| Operations Year | Year of operations |
| Operations Calculation | Option to include operations assumptions |
| Operations Cost Index | Flag indicating the period of cash flow periods where operations occur |
| Operations Cost of Delay | Cost per day of risks associated with delaying operations |
| Operations End | End of the operation period |
| Operations Cost | Cost of operations as a percent of total construction cost |
| Operations Dollar | Dollar costs of operations |
| Operations Cost Period | Period where operation costs are incurred |
| Operations Period | Project operations period |
| Operations Start | Start date of operations |
| PC Land/ROW | Project costs associated with Land/ROW |
| PC Land/ROW End | End of period where Land/ROW costs occur |
| PC Land/ROW Index | Flag indicating the periods where Land/Row costs are incurred |
| PC Land/ROW Start | Start of period for Land/ROW costs |
| PC Other | Other project Costs |
| PC Other End | End of period where PC other costs occur |
| PC Other Index | Flag indicating the periods where PC Other Costs are incurred |
| PC Other Start | Start of period for which other costs are incurred |
| PC Other Miscellaneous | Misc. Project Costs |
| PC Other Miscellaneous End | End of period where other miscellaneous costs occur |
| PC Other Miscellaneous Start | Start of period for which other miscellaneous costs are incurred |
| PC Owner | Owner Costs |
| PC Procurement | Procurement Costs |
| PC Procurement End | End of period where Procurement costs occur |
| PC Procurement Index | Flag indicating the periods where Procurement costs are incurred |
| PC Procurement Start | Start of period for Procurement costs |
| PC QA | Quality Assurance Costs |
| PC QA End | End of period where QA costs occur |
| PC QA Index | Flag indicating the periods where QA costs are incurred |
| PC QA Start | Start of period for QA costs |
| PC Related Works | Project Related Works Costs |
| PC Related Works End | End of period where related works costs occur |
| PC Related Works Index | Flag indicating the periods where related works costs are incurred |
| PC Related Works Start | Start of period for related works costs |
| Period per CF | Number of months in each cash flow period |
| Project IRR P70 | Internal Rate of Return of the project at the 50th risk percentile |
| Revenue Leakage | Assumed annual revenue losses for a tolling facility. |
| Revenue 2/3/4 Axle or Motorcycle | Toll revenue collected from 2 axle vehicles, 3 axle vehicles, 4 axles vehicles, or motorcycles |
| Revenue Non Road | Non-road pricing revenues |
| Revenue Ramp-up Period | Months in each revenue ramp-up period |
| Revenue Ramp-up | Tolling periods in which revenues are reduced while demand grows |
| Revenue Yearly | Calculated total yearly revenue from all vehicle tolls |
| Risk Design Cost Impact P10 | Costs associated with construction phase risks at the 10th risk percentile |
| Risk Design Cost Impact P70 | Costs associated with construction phase risks at the 70th risk percentile |
| Risk Design Cost Impact P90 | Costs associated with construction phase risks at the 90th risk percentile |
| Risk Design Day Cost Percentage | Percentage of daily construction costs incurred during a construction delay (indirect costs) |
| Risk Design Day Finance Percentage | Percentage of daily financing costs incurred during a construction delay |
| Risk Design Day Impact P10 | Schedule delay at the 10th risk percentile |
| Risk Design Day Impact P70 | Schedule delay at the 70th risk percentile |
| Risk Design Day Impact P90 | Schedule delay at the 90th risk percentile |
| Risk Design Day Operation Cost Percentage | Percentage of daily operation costs incurred as a result of a construction delay |
| Risk Design Day Revenue Percentage | Percentage of daily revenue loss as a result of a construction delay |
| Risk Operation Cost Impact P10 | Costs associated with operations phase risks at the 10th risk percentile |
| Risk Operation Cost Impact P70 | Costs associated with operations phase risks at the 70th risk percentile |
| Risk Operation Cost P90 | Costs associated with operations phase risks at the 90th risk percentile |
| Risk Operation Day, Construction Percentage | Percentage of daily construction costs incurred as a result of an operations delay |
| Risk Operation Day, Finance Percentage | Percentage of daily financing costs incurred during an operations delay |
| Risk Operation Day, Impact P10 | Number of days associated with operations phase risks at the 10th risk percentile |
| Risk Operation Day, Impact P70 | Number of days associated with operations phase risks at the 50th risk percentile |
| Risk Operation Day, Impact P90 | Number of days associated with operations phase risks at the 90th risk percentile |
| Risk Operation Day, OM Percentage | Percentage of daily operation costs incurred as a result of an operations delay (indirect costs) |
| Risk Operation Day, Revenue Percentage | Percentage of daily revenue loss as a result of an operations delay |
| Subsidy Profile | Disbursement schedule of non-agency funding as a percentage of total funding |
| Toll Year | Flag for toll collection period |
| Toll Collection Cal | Option to include toll revenues |
| Tolling End | End of tolling period |
| Tolling Period | Total time (years) that toll revenues are generated |
| Tolling Start | Tolling start date |
| Total Cost | Total Construction Cost |
| Total Cost Profile | The total allocation of costs over the construction period for an asset type |
| T&R | Traffic and revenue |
| Traffic Scenario | Option to select the traffic scenario |
| Traffic Scenario 1 | Simple Toll Example Scenario |
| Traffic Scenario 2 | Toll Scenario Template |
| Traffic Scenario 3 | Variable Toll Example Scenario |
| Valid Construction Period | A flag that indicates whether the period is a valid construction period |
| Valid Finance Period | A flag that indicates whether the period is a valid finance period |
| Valid Maintenance Period | A flag that indicates whether the period is a valid maintenance period |
| Valid Operation Period | A flag that indicates whether the period is a valid operation period |
| Valid Period | A flag that indicates whether the period is a valid project period |
| Valid Toll Period | A flag that indicates whether the period is a valid tolling period |
| Volume 2/3/4 Axle or Motorcycle | Total yearly volume of 2 axle vehicle, 3 axle vehicle, 4 axle vehicle, or motorcycle traffic |
| Volume Yearly | Total yearly volume of all vehicles |
| Revenue Other | Other revenue source |
| Find Project IRR | A macro that will find the IRR that makes the project cash flows at the 50th risk percentile equal to 0. |
| Run Sensitivity | A macro that illustrates the sensitivity of the project NPV at the selected risk percentile to changes in key assumptions |
| Non Agency Subsidy | Other Government Funding provided as a percentage of project cost |
| Non Agency Subsidy, Dollar | Dollar amount of funding provided by Other Government Funding |
| Subsidy Profile | Disbursement schedule as a percentage of Total Other Government Funding |
