Project Management Plans

 

US 36 Project - Colorado (Public Private Partnership Method) - 2013
The US 36 Toll Concession Project was developed by the Colorado High Performance Transportation Enterprise (HPTE), the TIFIA sponsor, in partnership with the Colorado Department of Transportation (CDOT) and the Regional Transportation District (RTD). The US 36 Toll Concession Project will be combined with the US 36 Managed Lane/BRT Project, the construction of which will proceed and be concurrent with construction of the Concession project. Upon completion and acceptance of the project, the Concessionaire will assume responsibilities for the maintenance and operation of infrastructure and tolling and for the TIFIA loan associated with the project.

Louisville-Southern Indiana Ohio River Bridges (Bi State Management Teams) - 2013
The selected alternative provides for construction of a new six lane I-65 Bridge to accommodate the I-65 northbound movement. The existing I-65 Bridge will be reconfigured to accommodate the six lane I-65 southbound movement. This alternative also provides for a four lane freeway from I-71 in Kentucky to SR 62 in Indiana, connecting the Gene Snyder Freeway (KY 841) in Kentucky with the Lee Hamilton Highway (SR 265) in Indiana. Lastly, the selected alternative provides for the reconstruction of the Kennedy Interchange primarily within its current right-of-way- footprint. The PMP is a comprehensive, living document including the latest information available to assist the Bi-State Management Team (BSMT) comprised of members from the Federal Highway Administration (FHWA), Indiana Department of Transportation (INDOT), and Kentucky Transportation Cabinet (KYTC). The Downtown Crossing procurement and contract will be executed by KYTC using alternative delivery procedures, as defined in the downtown RFP . KYTC and INDOT will use standard consultant selection processes for selecting their respective Technical Teams. The P3 procurement for the East End will be through IFA, as per Indiana's P3 enabling legislation.

Zoo Interchange Project - Wisconsin (Design Bid Build) - 2012 (PDF)
This is a traditionally-procured project (Design-Bid-Build). The project is also traditionally-funded (Federal and State transportation funding). The project is a large urban Interstate interchange reconstruction project. Construction is scheduled to be completed during a 5-year time frame. It is being managed by a project team that has experience on two other major projects.

I-95 Betsy Ross Interchange (BRI) & Bridge Street Ramps (BSR) Project - Project Management Plan (Design Bid Build) - February 17, 2011
This 2011 Project Management Plan (PMP) [revised in 2012] establishes the framework for administering the reconstruction of I-95, being undertaken by the Pennsylvania Department of Transportation (PennDOT) and the Federal Highway Administration (FHWA), from detail design through construction and project closure. The PMP formulates the project's management methodology and organization while providing guidance for the orderly interaction of multiple parties that are involved for the successful completion of the project. This PMP will be updated annually through the life of the project; significant changes in the project limits, delivery schedule or budget will trigger an update of this document.

Downtown Tunnel/Midtown Tunnel/ MLK Extension Project (Public Private Partnership) - Virginia - 2011
The proposed Midtown Tunnel consists of a new tunnel under the Elizabeth River running parallel and westward of the existing Midtown Tunnel and modifications to the existing tunnel to provide increased capacity for east-west travel linking Route 58 and I-264 in Portsmouth to the interchange at Brambleton Avenue/Hampton Boulevard in Norfolk. The Design-Build phase of the Project will be defined in development and implementation of the design-build schedule agreed to pursuant to contract documents and Project Agreements. VDOT is administering the procurement of the Project under the Virginia PPTA process and FHWA is monitoring and has formally concurred in the use of the PPTA procurement process.

SR 520 Pontoon Construction Project: Project Management Plan Part 1 (Design Build) - July 2009
SR 520 Pontoon Construction Project: Project Management Plan Part 2 (Design Build). - August 2010
These documents are the recently approved Project Management Plan (PMP) for the SR 520 Pontoon Construction Project being undertaken by the Washington State Department of Transportation. This project will involve the construction of pontoons needed to replace the existing traffic capacity on the Evergreen Point (SR 520 Floating) Bridge across Lake Washington near Seattle. Part 1 of the PMP described preliminary engineering activities during the preconstruction period. Part 2 describes project management during the design-build phase of the project, including final design and construction.

LBJ-IH 635 Managed Lanes - Texas (Public Private Partnership) - 2010
The IH 635 Managed Lanes project consists of five project sections, totaling approximately 17 miles of the IH 635 and IH 35E corridors in Dallas County, Texas. The Project was jointly proposed by the TxDOT Dallas District, City of Dallas, Dallas County, and City of Farmers Branch. TxDOT and the Developer, with oversight from FHWA, have organized into one group known as the Project Team. The Developer has the obligation under the CDA to finance, develop, design and construct the project in accordance with the CDA documents, applicable law and good industry practice.

I-595 (Design-Build-Finance-Operate Maintain) - 2009 (PDF)
The I-595 Corridor Roadway Improvements project in Broward County, Florida involves the reconstruction and widening of a 9.3 mile section of I-595, together with frontage road improvements and new interchanges with the I-75/Sawgrass Expressway and SR 7. The project includes the addition of three at-grade reversible express toll lanes (595Express) in the median of I-595 accommodating high occupancy vehicles (HOVs), bus rapid transit, and paying single-occupancy vehicles (SOVs). The project is being implemented as a public-private partnership between the Florida Department of Transportation (FDOT) and I-595 Express LLC. The concessionaire will design, build, finance, operate, and maintain the roadway over a 35-year period. FDOT will make final acceptance and availability payments to the concessionaire based on quality and performance requirements stipulated in the contract.