USDOT Federal Highway Administration USDOT Home | FHWA Home | Feedback
Skip to main content

Projects & Project Profiles

TIFIA Portfolio
($Millions)

TIFIA Number Project Project Project Instrument Credit Primary Revenue
Type Cost Type Amount Pledge
Active Credit Agreements
19991002B Miami Intermodal Center Intermodal 2,043 Direct Loan270.000 User Charges
20011001 Central Texas Turnpike System Highway 3,250 Direct Loan900.000 User Charges
20031002 a South Bay Expressway (formerly SR 125 South) Highway 658 Direct Loan 140.000 User Charges
20051002 LA 1 Improvements Highway 372 Direct Loan66.000 User Charges
20061001 Interlink (formerly Warwick Intermodal Station) Intermodal 280 Direct Loan40.060 User Charges
20061003A Pocahontas Parkway / Richmond Airport Connector Highway 597 Direct Loan150.000 User Charges
20071004A I-495 Capital Beltway HOT Lanes Highway 1,938 Direct Loan588.923 User Charges
20071002A SH 130 (Segments 5-6) Highway 1,328 Direct Loan430.000 User Charges
20061002A Intercounty Connector Highway 2,566 Direct Loan516.000 User Charges
20081002A I-595 Corridor Roadway Improvements Highway 1,834 Direct Loan603.441 Availability Payments
20081004A Triangle Expressway Highway 1,172 Direct Loan386.662 User Charges
20081008A Port of Miami Tunnel Highway 1,073 Direct Loan341.038 Availability Payments
20081001A North Tarrant Express Highway 2,047 Direct Loan650.000 User Charges
20081007A Transbay Transit Center Transit 1,189 Direct Loan171.000 Real Estate Tax Increment
20071006A IH 635 Managed Lanes Highway 2,615 Direct Loan850.000 User Charges
20101001A Denver Union Station Project Intermodal 519 Direct Loan145.600 Sales Tax/Real Estate Tax Increment
20091001A President George Bush Turnpike Western Extension (SH 161) Highway1,268 Direct Loan418.405 User Charges
20111001A U.S. 36 Managed Lane Project: Segments 1 and 2 Highway307 Direct Loan54.000 User Charges
20111003A Eagle Project Transit2,047 Direct Loan280.000 Tax Revenues
20111004A Midtown Tunnel Project Highway 2,089 Direct Loan422.000 User Charges
20111002A Presidio Parkway Projectb Highway 852 Direct Loan150.000 Availability Payments
20111005A Crenshaw/LAX Transit Corridor  Transit 1,749 Direct Loan 545.900 Sales Tax Revenues
20121001A SR 520 Floating Bridge  and Eastside Plus West Approach Project Highway 2,736 Direct Loan 300.000 User Charges
20121002A I-95 HOV/Hot Lanes Project Highway 923 Direct Loan 300.000 User Charges
20121003A Dallas Area Rapid Transit Project Orange Line Extension (I-3) Transit 397 Direct Loan 120.000 Sales Tax Revenues
20131004A Riverwalk Expansion/Wacker Drive Reconstruction Project Highway419 Direct Loan98.660 Motor Fuel Tax and Project Revenues
Subtotal    $36,267  $8,937.689  
Retired Credit Agreements
20051001 183-A Turnpike Highway 305 Direct Loan66.000 User Charges
19991005 Washington Metro Capital Improvement Program  Transit 2,324 Guarantee600.000 Interjurisdictional Funding Agreements
19991006 Tren Urbano (PR) Transit2,250 Direct Loan300.000 Tax Revenues
20001003 Cooper River Bridge Replacement Highway675 Direct Loan215.000 Infrastructure Bank Loan Repayments
20001004 Staten Island Ferries and Terminals Transit482 Direct Loan159.225 Tobacco Settlement Revenues
20011002A Reno Transportation Rail Access Corridor (ReTRAC) Intermodal280 Direct Loan50.500 Room and Sales Tax
19991002A Miami Intermodal Center Intermodalc Direct Loan269.000 Tax Revenues
Subtotal    $6,316  $1,659.725  
Total Approved  $42,583  $10,597.414  

As of 06/14/13

Footnotes
a SBX is in three notes:  Tranche A in the amount of $59,100,809.63, Tranche B in the amount of $32,341,804.28, and Tranche D in the amount of $2,740,895.56
b Presidio project costs ($852 million) include Phases 1 and 2 and credit amount is based on two tranches of TIFIA debt
c Project Cost included in TIFIA Number 19991002b