
| TIFIA Number | Project | Project | Project | Instrument | Credit | Primary Revenue |
|---|---|---|---|---|---|---|
| Type | Cost | Type | Amount | Pledge | ||
| Active Credit Agreements | ||||||
| 19991002B | Miami Intermodal Center | Intermodal | 2,043 | Direct Loan | 270.000 | User Charges |
| 20011001 | Central Texas Turnpike System | Highway | 3,250 | Direct Loan | 900.000 | User Charges |
| 20031002 a | South Bay Expressway (formerly SR 125 South) | Highway | 658 | Direct Loan | 140.000 | User Charges |
| 20051001 | 183-A Turnpike | Highway | 305 | Direct Loan | 66.000 | User Charges |
| 20051002 | LA 1 Improvements | Highway | 372 | Direct Loan | 66.000 | User Charges |
| 20061001 | Interlink (formerly Warwick Intermodal Station) | Intermodal | 280 | Direct Loan | 40.060 | User Charges |
| 20061003A | Pocahontas Parkway / Richmond Airport Connector | Highway | 597 | Direct Loan | 150.000 | User Charges |
| 20071004A | I-495 Capital Beltway HOT Lanes | Highway | 1,938 | Direct Loan | 588.923 | User Charges |
| 20071002A | SH 130 (Segments 5-6) | Highway | 1,328 | Direct Loan | 430.000 | User Charges |
| 20061002A | Intercounty Connector | Highway | 2,566 | Direct Loan | 516.000 | User Charges |
| 20081002A | I-595 Corridor Roadway Improvements | Highway | 1,834 | Direct Loan | 603.441 | Availability Payments |
| 20081004A | Triangle Expressway | Highway | 1,172 | Direct Loan | 386.662 | User Charges |
| 20081008A | Port of Miami Tunnel | Highway | 1,073 | Direct Loan | 341.038 | Availability Payments |
| 20081001A | North Tarrant Express | Highway | 2,047 | Direct Loan | 650.000 | User Charges |
| 20081007A | Transbay Transit Center | Transit | 1,189 | Direct Loan | 171.000 | Real Estate Tax Increment |
| 20071006A | IH 635 Managed Lanes | Highway | 2,615 | Direct Loan | 850.000 | User Charges |
| 20101001A | Denver Union Station Project | Intermodal | 519 | Direct Loan | 145.600 | Sales Tax/Real Estate Tax Increment |
| 20091001A | President George Bush Turnpike Western Extension (SH 161) | Highway | 1,268 | Direct Loan | 418.405 | User Charges |
| 20111001A | U.S. 36 Managed Lane Project: Segments 1 and 2 | Highway | 307 | Direct Loan | 54.000 | User Charges |
| 20111003A | Eagle Project | Transit | 2,047 | Direct Loan | 280.000 | Tax Revenues |
| 20111004A | Midtown Tunnel Project | Highway | 2,089 | Direct Loan | 422.000 | User Charges |
| 20111002A | Presidio Parkway Projectb | Highway | 852 | Direct Loan | 150.000 | Availability Payments |
| 20111005A | Crenshaw/LAX Transit Corridor | Transit | 1,749 | Direct Loan | 545.900 | Sales Tax Revenues |
| 20121001A | SR 520 Floating Bridge and Eastside Plus West Approach Project | Highway | 2,736 | Direct Loan | 300.000 | User Charges |
| 20121002A | I-95 HOV/Hot Lanes Project | Highway | 923 | Direct Loan | 300.000 | User Charges |
| 20121003A | Dallas Area Rapid Transit Project Orange Line Extension (I-3) | Transit | 397 | Direct Loan | 120.000 | Sales Tax Revenues |
| Subtotal | $36,153 | $8,905.029 | ||||
| Retired Credit Agreements | ||||||
| 19991005 | Washington Metro Capital Improvement Program | Transit | 2,324 | Guarantee | 600.000 | Interjurisdictional Funding Agreements |
| 19991006 | Tren Urbano (PR) | Transit | 2,250 | Direct Loan | 300.000 | Tax Revenues |
| 20001003 | Cooper River Bridge Replacement | Highway | 675 | Direct Loan | 215.000 | Infrastructure Bank Loan Repayments |
| 20001004 | Staten Island Ferries and Terminals | Transit | 482 | Direct Loan | 159.225 | Tobacco Settlement Revenues |
| 20011002A | Reno Transportation Rail Access Corridor (ReTRAC) | Intermodal | 280 | Direct Loan | 50.500 | Room and Sales Tax |
| 19991002A | Miami Intermodal Center | Intermodal | c | Direct Loan | 269.000 | Tax Revenues |
| Subtotal | $6,011 | $1,593.725 | ||||
| Total Approved | $42,164 | $10,498.754 | ||||
As of 12/14/12
Footnotes
a SBX is in three notes: Tranche A in the amount of $59,100,809.63, Tranche B in the amount of $32,341,804.28, and Tranche D in the amount of $2,740,895.56
b Presidio project costs ($852 million) include Phases 1 and 2 and credit amount is based on two tranches of TIFIA debt
c Project Cost included in TIFIA Number 19991002b
