USDOT Federal Highway Administration USDOT Home | FHWA Home | Feedback
Skip to main content
2012 TIFIA Letters of Interest (LOI) Summary
($Millions)
Project Applicant Project Name Location Project Type Estimated Project Cost TIFIA Credit Request Percent of Total Credit Instrument Type
Pod Train Superhighway LLC Pod Train Superhighway San Diego, CA Intermodal $2,950 $2,950 100% Direct Loan
Port of Long Beach Port of Long Beach Long Beach, CA Intermodal $960 $200 21% Direct Loan
San Diego Association of Governments Otay Mesa San Diego, CA Intermodal $755 $250 33% Direct Loan
Washington State Department of Transportation (WSDOT) Columbia River Corridor Vancouver, WA Intermodal $3,245 $1,000 31% Direct Loan
Alamo Regional Mobility Authority (Alamo RMA) Loop 1604 San Antonio, TX Highway $469 $155 33% Direct Loan
Loan Guarantee
Cameron County Regional Mobility Authority SH 550 Cameron County, TX Highway $100 $20 20% Direct Loan
Central Texas Regional Mobility Authority (CTRMA) MoPac Austin, TX Highway $222 $72 32% Direct Loan
City of Chesapeake Dominion Boulevard Chesapeake, VA Highway $468 $155 33% Direct Loan
Colorado High Performance Transportation Enterprise (HPTE) US 36 Phase 2 Denver/Boulder, CO Highway $140 $94 67% Direct Loan
Delaware Transportation Authority (DTA) US 301 Delaware Highway $622 $154 25% Direct Loan
Florida Department of Transportation (FDOT) I-75 Managed Lanes Broward County, FL Highway $470 $155 33% Direct Loan
Kentucky Transportation Cabinet, Indiana Department of Transportation and the Louisville and Southern Indiana Bridges Authority Ohio River Bridges Louisville, KY Highway $2,900 $1,000 34% Direct Loan
Knik Arm Bridge and Toll Authority (KABATA) Knik Arm Crossing Anchorage and Mat-Su, AK Highway $1,086 $308 28% Direct Loan
New York State Thruway Authority Tappan Zee Bridge New York, NY Highway $6,000 $2,000 33% Direct Loan
North Carolina DOT and North Carolina Turnpike Authority (NCTA) Garden Parkway (Gaston Connector) Gaston County, NC Highway $901 $287 32% Direct Loan
North Carolina DOT and North Carolina Turnpike Authority (NCTA) Mid Currituck Bridge Currituck County, NC Highway $778 $120 15% Direct Loan
North Central Texas Council of Governments IH 35E Denton/Dallas County, TX Highway $2,273 $2,002 9% Direct Loan
Ohio Department of Transportation (ODOT) Portsmouth Bypass Portsmouth, OH Highway $605 $200 33% Direct Loan
Riverside County Transportation Commission (RCTC) SR 91 Riverside County, CA Highway $1,345 $444 33% Direct Loan
Santa Clara Valley Transportation Authority SR 85 Santa Clara County, CA Highway $201 $43 21% Direct Loan
Texas Department of Transportation (TxDOT) Interstate 35W: NTE Segments 3A & 3B Tarrant County, TX Highway $1,499 $537 36% Direct Loan
Transurban Fluor Special Purpose Vehicle I-95 HOT Lanes Northern Virginia Highway $927 $350 38% Direct Loan
City of Kansas City, Missouri Kansas City Streetcars Kansas City, MO Transit $100 $33 33% Direct Loan
Dallas Area Rapid Transit (DART) DART Orange Line Dallas, TX Transit $334 $130 39% Direct Loan
Foothill Extension Construction Authority Metro Gold Line Foothill Extension Los Angeles, CA Transit $600 $200 33% Direct Loan
Metropolitan Washington Airports Authority with Fairfax and Loudon Counties Dulles Metrorail Northern Virginia Transit $5,894 $1,950 33% Direct Loan
      Totals $35,844 $13,007