FINDING OF NO SIGNIFICANT IMPACTS (FONSI)

GUIDANCE AND ACCOUNTABILITY FORM
KENTUCKY TRANSPORTATION CABINET/DIVISION OF ENVIRONMENTAL ANALYSIS

FONSI Prepared by: Author: Firm:
County: Route: Item No.:
Description:
Prime Consultant:
Due Date: Submittal Date: Submittal Draft #: Approval Date:

Instructions:

FONSI Prepared by: Name of author/firm that prepared the study.
County: Name of county(ies) within which the project is located.
Route: Name of highway for which the project is intended. Include route designation and number as applicable (i.e. US 60, Winchester Rd.)
Item No.: Item number as it appears in the contract and Six Year Plan which corresponds with the project.
Description: Official description of the project as it appears in the Six Year Plan.
Prime Consultant: Name of the Phase I Design and Environmental Consultant (prime contract holder) for the project.
Due Date: Date that the project is due as agreed upon in contract negotiation.
Date of Submittal/Submittal Draft Number: Date of submittal and draft being submitted (1st, 2nd, 3rd) in appropriate sections.
Approval Date: Date EA is approved by DEA (DEA use only).
For "Required" column: X indicates all applicable areas of focus (DEA's responsibility).
For "Completed" column: use Y for yes and NA for not applicable as necessary (Consultant's responsibility).
For "DEA" Column: DEA will use X for all areas that adequately address concerns, and "I" for those that are insufficient in coverage.

Environmental Impacts: Only discuss the impacts associated with the selected alternative. If the selected alternative will have no impact on the resource (i.e., Air, Wetlands, Archaeology, etc.) do not discuss it in this document.

"Comment" page: Discuss supplemental information, guidance or instructions, if any, that required deviation from the checklist. Discuss all categories which contain "NA" in the "Complete" columns of this format. Comments regarding the content and format of this form and/or its applicability may also be submitted in the comments section.

"Commitments to be Implemented" page: Identify any commitments that are documented within the study. Specify the nature of the commitment, to whom it was or should be made, when the commitment should be enacted upon, etc.

"Mitigation and Special Issues" page: Identify mitigation measures that are specified within the report, if any. Also, identify any special issues that are addressed within the document that should be considered by the Project Team as it makes decisions regarding the project.

"Signature" page: Signatures of Prime Consultant and KYTC/DEA Environmental Project Manager/Reviewer will attest that the Environmental Assessment meets the requirements set forth in this checklist. Signatures of KYTC Project Manager and District Environmental Coordinator ensure that the findings of the report, including impacts to the project and mitigation measures have been presented to the project development team and are acceptable.

Completed form is to be delivered to KYTC with the document. Previous checklists for the document, or a copy thereof, shall be attached to the current checklist.


The FONSI serves to document the decisions reached by the KYTC and FHWA regarding the proposed project and delineates the rationale employed in reaching project decisions. All appropriate findings are made, and most of the environmental issues addressed in the EA are summarized with conclusions in the FONSI.

The format of the FONSI is generally in short paragraph form without subheadings with each paragraph addressing a particular issue or group of common issues found in the EA. Addressed each topic in the following order.

Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Title Page

      Identify level of Environmental Documentation (EA)
      Adequate project description
      Project Item Number
      Statement: Submitted Pursuant To 42 U.S.C. 4332 (2)(c) By The U.S. Department of Transportation, Federal Highway Administration and Kentucky Transportation Cabinet, Division of Environmental Analysis
      Identify Cooperating Agency(s)
      Date of Submittal (month and year)
      Date of EA approval.

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Signature

      Identify level of Environmental Documentation (FONSI)
      Include adequate project description
      Project Item Number
      Statement: Submitted Pursuant To 42 U.S.C. 4332 (2)(c) By The U.S. Department of Transportation, Federal Highway Administration and Kentucky Transportation Cabinet, Division of Environmental Analysis
      Identify Cooperating Agency(s)
      Signature line for FHWA and KYTC
 

Project Impact Profile

      Fill out Project Impact Profile Sheet and attach to document
      Identify further work required for unresolved issues
 

Table of Contents

      List areas of focus and appropriate page numbers where the information can be found
      Listing of exhibits, figures, and tables

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Purpose and Need

      Discuss project description and setting
      Description of existing facility
      Reference any planning and scoping documents
      Discuss the Purpose and Need for the project. What is the Transportation problem and why does it need to be solved?
      Provide an Exhibit showing the project area
 

Selected Alternative

      Briefly summarize basis for eliminating other alternative previously considered but rejected during the project development process
      Discuss the attributes of the Selected alternative. Include logical termini points
      Discuss typical sections/design features for selected alternative. Include interchanges, additional collector roads, shoulder and pavement widths, Access, grade, turn lanes, etc.
      Discuss design speeds, anticipated LOS, and traffic data
      Include table to identify the environmental impacts of the selected alternative
      Identify Selected Alternative, and provide justification
      Sufficient (legible, understandable) exhibits showing selected alternative
      Include comparative table of estimated project cost (design, right-of-way, utilities, construction) for the selected alternative

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Environmental Impacts

Air Quality

      If the selected alternative will have no impact on air quality, do not discuss this section
      Discuss Air Quality impacts associated with the selected alternative, if applicable
      Discuss mitigation, minimization, or avoidance options that would minimize environmental impacts to air quality, if applicable
 

Noise

      If the selected alternative will have no impact on noise, do not discuss this section
      Discuss noise impacts associated with the selected alternative, if applicable
      Discuss reasonable and feasible noise abatement measures that would likely be incorporated into the project (i.e., noise barrier walls, berms, truck restrictions, vertical separations, speed limits), if necessary
      If there are noise impacts associated with the selected alternative, provide an exhibit that shows the noise receptors impacted
 

Water Quality and Stream Impacts

      If the selected alternative will have no impact on water quality, do not discuss this section
      Discuss water quality and stream impacts associated with the selected alternative, if applicable
      Discuss efforts to avoid and minimize impacts, and appropriate mitigation, if applicable
      If there are water quality and stream impacts associated with the selected alternative, provide an exhibit which identifies where these impacts occur

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Floodplains

      If the selected alternative will have no impact on floodplains, do not discuss this section
      Discuss floodplain impacts that are associated with the selected alternative, if applicable
      Discuss efforts to avoid and minimize encroachment, if applicable
      If there are floodplain impacts associated with the selected alternative, provide an exhibit which identifies where these impacts occur
 

Wetlands

      If the selected alternative will have no impact on wetlands, do not discuss this section
      Discuss potential wetland impacts associated with the selected alternative, if applicable
      Discuss efforts to avoid and minimize impacts and appropriate mitigation, if applicable
      If there are potential wetland impacts associated with the selected alternative, Include exhibit showing location of wetlands
 

Wild and Scenic Rivers

      If the selected alternative will have no impact on wild and scenic rivers, do not discuss this section
      Discuss involvement with any stream designated as wild and scenic river, if applicable
      Discuss avoidance, minimization and mitigation, if applicable
      If there are impacts to wild and scenic rivers associated with the selected alternative, provide Exhibit showing location and impact of wild and scenic river

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Wetlands

     

Establish baseline conditions (discuss and identify location of jurisdictional wetlands and other waters of the U.S.)

      Discuss field studies that were conducted
      Discuss results of National Wetland Inventory (NWI) maps
      Discuss potential wetland impacts
      Discuss agency coordination and permits that may be required
      Discuss efforts to avoid and minimize impacts and appropriate mitigation
      Include statement that exact determination of impacts to jurisdictional wetlands will be made by DEA after final design
      Discuss cumulative and indirect impacts
      Table identifying wetland type, number of acres, and approximate area of impact for each alternative
      Include exhibit showing location of wetlands for each alternative

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Federally Threatened and Endangered Species

      If the selected alternative will have no impact on federally threatened and endangered species and/or critical habitat, do not discuss this section
      Identify any federally threatened or endangered species and/or designated or proposed critical habitat that may be impacted, if applicable
      Discuss mitigation of impacts to TE species or critical habitat, if applicable
      Include Exhibit showing location and impact of TES critical habitat, if applicable
Insert check mark and page number(s) as appropriate

Section 106

     

Identify consulting parties, including federally recognized Native American tribes

      Discuss efforts to consult with Native American tribes, local governmental agencies, and other interested parties
      Discuss an involvement that other agencies/organizations (public groups, citizens advisory groups, resource agencies, etc.) may have had throughout the project process
 

Historic Structures or Districts

      If the selected alternative will have no impact on Historic structures or districts, do not discuss this section
      Discuss any impacts the selected alternative will have on each historic property (ies), if applicable
      Discuss any minimization and mitigation, if required
      Reference MOA in Appendix, if applicable
      If there are impacts to historic properties associated with the selected alternative, provide exhibit which identifies all Historic Structures and/or Districts

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Section 106

     

Identify consulting parties, including federally recognized Native American tribes

      Discuss efforts to consult with Native American tribes, local governmental agencies, and other interested parties
      Discuss an involvement that other agencies/organizations (public groups, citizens advisory groups, resource agencies, etc.) may have had throughout the project process
 

Historic Structures or Districts

      Discuss studies that were conducted in determining historic characteristics of the area
      Describe Area of Potential Effect [APE]
      Identify properties eligible or determined to be eligible for National Register
      Discuss potential effects on each historic property for each alternative
      Reference coordination with SHPO and FHWA regarding eligibility and effects (include letters in Appendix)
      Discuss any adverse effects and avoidance alternatives or minimization and mitigation, if required
      Reference MOA in Appendix, if applicable
      Discuss cumulative and indirect impacts
      Provide exhibit which identifies APE, and all Historic Structures and/or Districts within the project corridor

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Archaeological Sites

      If the selected alternative will have no impact on archaeological sites, do not discuss this section
      Discuss any impacts the selected alternative will have on each archaeological site(s), if applicable
      Discuss any minimization and/or mitigation, if applicable
      Include MOA in Appendix for any sites that require additional work
 

Land Use

      Discuss changes that the selected alternative will have on current land use
      Provide exhibit, which shows current land use as well as anticipated changes in land use, if applicable.
 

Community Impacts

      Discuss impacts the selected alternative will have on travel patterns, accessibility, community facilities, economic vitality, established business districts, and overall public safety
      Discuss social and cultural loss to the community by those displaced, if applicable
      Discuss impacts on economic vitality in project area and on established business districts

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Relocation Impacts

      If the selected alternative will have no relocation impacts, do not discuss this section
      Identify number & type of relocations (residential, commercial, industrial, non-profit, etc.) for selected alternative, if applicable
      Identify available housing in the area, if relocations are to occur
      Discuss Relocation Assistance Program (Last Resort Housing, if applicable), Title VI of the Civil Rights Act of 1966, if relocations are to occur
      Include statement, if applicable, that the acquisition and relocation program will be conducted in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, if relocations are to occur
 

Farmland

      If the selected alternative will have no impact on farmland, do not discuss this section
      Discuss impacts the selected alternative will have on farmland, if applicable
      Include NRCS LESA Form AD 1006
      If there are impacts to farmland associated with the selected alternative, provide an exhibit that identifies prime farmland.

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Environmental Justice

     

If the selected alternative will have no impact on minority and/or low-income populations, do not discuss this section

      Identify impacts to minority and/or low income population, if applicable
      Include statement that project complies with Executive Order 12898, Environmental Justice guidance
      Discuss avoidance, minimization and mitigation, if applicable
 

Pedestrian and Bicycle Facilities

      Discuss opportunities for providing pedestrian and bicycle facilities
 

UST/Hazardous Materials

      If the selected alternative will have no impact on UST/hazardous materials, do not discuss this section
      Discuss impact the selected alternative will have on UST/hazardous materials, if applicable
      Identify sites recommended for Phase II site assessments and/or remediation, if applicable
      If there are impacts to UST/hazardous materials associated with the selected alternative, provide an exhibit that identifies these sites
 

Visual Impacts

      Discuss current viewshed
      Discuss impacts the selected alternative will have on the current viewshed

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Impacts of Construction Activities

     

Discuss potential adverse impacts (noise, traffic congestion, detours, etc.)

      Discuss waste and borrow sites
      Refer to KYTC Standard Specs for Road and Bridge Construction
 

Public Involvement

     

Attach a copy of the Public Hearing Transcript.

      Discuss public issues, concerns, and KYTC responses
      Identify any changes that occurred as a result of the public hearing process
 

Project Events

     

Discuss any events and/or project influences that have occurred since the approval of the Environmental Assessment

      Include a statement discussing public availability of the FONSI after approval

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Final Section 4f Evaluation (Pages 46-47 of TA)

     

Discuss impacts to all Section 4(f) properties, if applicable

      Included a discussion that the project included all possible planning to minimize harm to the Section 4(f) property. The selected alternative must be alternative with the least harm on the 4(f) properties after considering mitigation.
      If a Section 4(f) property (ies) is impacted by the selected alternative, discuss any minimization and/or mitigation associated with the property.
      Include discussion of any MOA(s) associated with the project, if applicable
      Use of Section 4(f) property cannot proceed until FHWA gives a Section 4(f) approval (49 U.S.C. 303(c)).
 

APPENDICIES

      Summarizes methodologies and results of technical analyses and research
      Include additional correspondence and/or concurrence letters that were not included in the EA
 

Attach a signed copy of the approved Environmental Assessment

      Include any supplements or appendages.

 



Page Number(s) Complete DEA

CATEGORY

Insert check mark and page number(s) as appropriate

Communicating All Promises (CAP) for the Project

     

Identify all mitigation and minimization actions that must be committed to for the project to proceed.

      Include identification of who is responsible for achieving these commitments.
      Include any MOAs
      Include any actions that will be necessary for the permitting process..
      Include any Section 106/4(f) commitments

 


Comments:

Discuss supplemental information, guidance or instructions that required deviation from the checklist. Discuss all categories which contain "NA" in the "Complete" columns of this format. Comments regarding the content and format of this form and/or its applicability may also be submitted through this section.

 
 
 
 
 
 
 
 
 
 
 
 

 


Mitigation and Special Issues:

Identify mitigation measures that are specified within the report, if any. Also, identify any special issues that are addressed within the document that should be considered by the Project Team as it makes decisions regarding the project.

 
 
 
 
 
 
 
 
 
 
 
 

 


SIGNATURE PAGE

I have reviewed the project documentation and attest that those responsible for its preparation are familiar with the requirements set forth in the checklist above and that proper management controls were in effect throughout the course of document development to assure that the document is complete, thorough and addresses all applicable checklist components.

   
Prime Consultant Date

 

Recommended for Approval By:

   
KYTC/DEA Environmental Project Manager/Reviewer Date

 

Team Review of Commitments

The findings of the report, including impacts to the project and project commitments, have been presented to the Project Team and will be considered during the development of this project.

   
KYTC/District Environmental Coordinator Date

   