FEDERAL-AID POLICY GUIDE
January 31, 2002, Transmittal 30
23 CFR 630G
  OPI: HIF

SUBCHAPTER G - ENGINEERING AND TRAFFIC OPERATIONS

PART 630 - PRECONSTRUCTION PROCEDURES

Subpart G - Advance Construction of Federal-Aid Projects

Sec.

630.701 Purpose.
630.703 Eligibility.
630.705 Procedures.
630.707 Limitation.
630.709 Conversion to a regular Federal-aid project.
630.711 Payment of bond interest.

Authority: 23 U.S.C. 106, 109, 115, 315, 320, and 402(a); 23 CFR 1.32 and 49 CFR 1.48(b).

Source: 55 FR 11903, March. 30, 1990, and 64 FR 71284, December 21, 1999

Sec. 630.701 Purpose.

The purpose of this subpart is to prescribe procedures for advancing the construction of Federal-aid highway projects without obligating Federal funds apportioned or allocated to the State.

Sec. 630.703 Eligibility.

(a) The State highway agency (SHA) may proceed with a highway substitute, congestion mitigation and air quality improvement program, surface transportation program, bridge replacement and rehabilitation, or planning and research project in accordance with this subpart, provided the SHA:

(1) Has obligated all funds apportioned or allocated to it under 23 U.S.C. 103(e)(4)(H), 104(b)(2), 104(b)(3), 104(f), 144, or 307, as the case may be for the proposed project, or

(2) Has used all obligation authority distributed to it, or

(3) Demonstrates that it will use all obligation authority distributed to it.

(b) The SHA may proceed with a National Highway System (NHS) or Interstate project in accordance with this subpart without regard to apportionment or obligation authority balances. Interstate projects include Interstate construction and Interstate maintenance.

Sec. 630.705 Procedures.

(a) An advance construction project shall meet the same requirements and be processed in the same manner as a regular Federal-aid project, except,

(1) FHWA authorization does not constitute any commitment of Federal funds on the project, and

(2) FHWA shall not reimburse the State until the project is converted under Sec. 630.709.

(b) Project numbers shall be identified by the letters "AC" preceding the regular project number prefix.

(c) If the SHA plans to claim bond interest costs under Sec. 630.711, it shall include in its request for authorization the estimated federally participating bond interest cost.

(d) The SHA shall submit a final voucher to the FHWA upon completion of the project even though the project has not been converted. If the SHA is claiming bond interest costs under Sec.630.711, it shall certify on the final voucher that the bond proceeds were expended in the construction of the project and shall include a computation of the eligible interest costs.

Sec. 630.707 Limitation.

A request to approve an advance construction project is limited to a State's expected apportionment of authorized funds which are eligible to finance the project.

Sec. 630.709 Conversion to a regular Federal-aid project.

(a) The SHA may submit a written request to the FHWA that a project be converted to a regular Federal-aid project at any time provided that sufficient Federal-aid funds and obligation authority are available.

(b) Subsequent to FHWA approval the SHA may claim reimbursement for the Federal share of project costs incurred, provided the project agreement has been executed. If the SHA has previously submitted a final voucher, the FHWA will process the voucher for payment.

Sec. 630.711 Payment of bond interest.

(a) For Interstate projects authorized by the FHWA after January 6, 1983, and for Interstate 4R, Interstate maintenance, primary and NHS projects authorized by the FHWA after April 2, 1987, interest earned and payable on bonds issued by a State is an eligible cost of construction as follows:

(1) Participating interest cost is based on the actual expenditure of bond proceeds on the Federal-aid project. The interest on the bonds is applied to the amount of bond proceeds expended on the project from the date of expenditure.

(2) The amount of interest determined in paragraph (a)(1) of this section shall not exceed the estimated increase in the physical construction cost of the project which would have occurred had the project been authorized on the date of conversion. The estimated increase in the physical construction cost is determined by applying the increase, if any, in the national construction cost index in effect on the date of conversion over the index in effect on the date of the FHWA authorization, to the actual cost of physical construction.

(b) For Interstate projects under physical construction on January 1, 1983, and converted to a regular Federal-aid project after January 1, 1983, bond interest is eligible in accordance with paragraph (a)(1) of this section. The restriction in paragraph (a)(2) of this section does not apply.