United States Department of Transportation - Federal Highway Administration FHWA HomeFeedback

Flag of the United States FHWA North Carolina Division Flag of North Carolina

Main Page About Us How to Contact Us Division Directory Library Useful Information and Links FHWA Home Privacy Policy Site Map
Buckle Up America


Text Version

North Carolina Division Organization Chart

  • Division Administrator
  • Assistant Division Administrator
  • Quality Coordinator
  • Civil Rights Program Manager
  • Major Projects Engineer
  • Engineering Coordinator
  • Structural Engineer
  • Financial Manager
  • Financial Specialist
  • Comuter Specialist
  • Financial Assistant
  • Program Assistant
  • Planning & Program Development
  • Transportation Planner
  • Transportation Planner
  • Transportation Planner
  • Air Quality Specialist
  • Congestion / ITS Management Specialist
  • Preconstruction & Environment
  • Environmental Specialist
  • Environmental Specialist
  • Environmental Specialist
  • Right of Way Officer
  • Environmental Program Specialist
  • Operations
  • Transportation Engineer
  • Transportation Engineer
  • Transportation / Safety Engineer
  • Pavement & Materials Engineer
  • Asset Management Program Manager

Back to the Organization Chart


Decision Flowchart of Wild & Scenic River's Act

  1. Is the project federally funded or assisted?
    1. If yes, go to #2.
    2. If no, go to #14.

  2. Is the project a "water resources project"?
    1. If yes, go to #3.
    2. If no, go to #14.

  3. Determine river status and project location.
    1. Effect on listed river, go to #4.
    2. No effect on listed river, go to #14.

  4. Determine affected river
    1. On the NRI, go to #5.
    2. Within a designated WSR corridor, go to #9.
    3. Within a congressionally authorized WSR study list corridor, go to #9.
    4. Outside a designated WSR corridor, go to #10.
    5. Outside a congressionally authorized WSR study list corridor, go to #11.

  5. Could project affect an NRI river?
    1. If yes, go to #6.
    2. If no, go to #14.

  6. Could project have an adverse effect?
    1. If yes, go to #7.
    2. If no, go to #14.

  7. Could project foreclose options to classify any portion as a WSR?
    1. If yes, go to #8.
    2. If no, go to #14.

  8. Incorporate avoidance/mitigation measures to maximum extent. Go to #14.

  9. Section 7 evaluation under "direct and adverse" standard. Go to #12.

  10. Section 7 evaluation under "invade the area or unreasonably diminish" standard. Go to #12.

  11. Section 7 evaluation under "invade the area or diminish" standard. Go to #12.

  12. Objection?
    1. If yes, go to #13.
    2. If no, go to #14.

  13. Revise plans?
    1. If yes, go to #12.
    2. If no, go to #15.

  14. Compliance satisfied.

  15. Project cannot be accomplished.

Back to the Decision Flowchart


Highway Life Cycle "Wheel"

  1. Planning (3-5 years)
  2. Project Developement (1-12 years)
  3. Construction (1-4 years)
  4. Operations & Maintenance (20-50 years)
  5. Return to begining