Nebraska Division

Home / About / Field Offices / Nebraska Division

Programs

Environment

Project Status/Delivery

To search this page, use your browser's Find feature (Ctrl+F).


FHWA Nebraska Division Environmental Document Review Delivery
February 10, 2010 through August 16, 2012

Number of Submittals = 1,546
Average Review Time, Calendar Days = 6.59

INFORMATION: The typical environmental submittals that are prepared/approved by NDOR and submitted to FHWA for Categorical Exclusions (CE's) are: DR 53*, Biology review, Section 106 package, and the Categorical Exclusion (CE). If a project fits the stipulations of the 2008 Programmatic Agreement between FHWA-NE and NDOR, NDOR has the authority to approve the NEPA document without FHWA approval. These are referred to as PCE's. Likewise, FHWA has also provided programmatic approval authority to NDOR for certain actions under the Endangered Species Act(ESA) and Section 106 (historic preservation). Since there is no FHWA project-level approval for the projects and actions that are covered by these programmatic agreements, that project level documentation is not recorded on this list.

BASIC NEPA STEPS FOR PROJECTS: 1) NDOR approves and submits the DR53 to FHWA; NDOR/local sign program agreements and procure consultant (for local fed-aid projects); 2) NDOR/local govt. start NEPA; 3) NDOR/local complete tech reviews (ex, wetland, bio, and cultural resource); 4)NDOR submit bio and cultural tech docs to FHWA for agency consultation, when needed; 5) NDOR/local prepare NEPA doc; 6) NDOR review/approve NEPA doc; 7) NDOR submit NEPA doc to FHWA for review/acceptance (except for PCE's)

Project Name Subject Control No Project No Date Received Date Completed Action Time * Comments Responsible party/pending action ***
Tracy Creek BankMonitoring Report713STWD-104407-Mar-1121-Mar-1114 FHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
STWD Intersection Signage ProjectBio doc00772STWD-868/9/20128/16/20127sent back to clarify the affect determination and rationale behind itNDOR / address FHWA comments and resubmit
Horizontal Curved Signing Project - Phase IIIBio doc review00787STWD-908/6/20128/16/201210comment to clarify affect determination and add the justificationNDOR / address FHWA comments and resubmit
Statewide rural traf control devDR 53850STWD-10816-Feb-1128-Feb-1112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Centerline Rumble StripsDR 53865HSIP-STWD-11231-Aug-1103-Sep-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Statewide Centerline Rumble StripsBio doc version 1865STWD-1121/18/20121/25/20127approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
NE Hwy Hist MarkersDR 5300875STWD-1197/3/20127/12/20129approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Nebr Hwy Historical Markers - StatewideSHPO concur req00875STWD-1197/13/20127/24/201211SHPO & THPO letters sentFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Crab Orchard SouthwestDR 53114737049-1119-May-1127-May-118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Barneston WestSHPO concur req1167886-10628-Mar-1131-Mar-113letter sent to SHPOFHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
Barneston WestBio doc version 11167886-10610/27/201110/28/20111letters sent to NGPC for concurrence and USFWS for their infoFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Barneston WestCE1167886-1061/26/20122/7/201212sent comments back to NDORNDOR / address FHWA comments and resubmit
Barneston WestCE - revised1167886-1062/27/20123/6/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Adams NorthwestDR 53117767034-181/12/20121/16/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Seward SouthDR 53117817080-2712-Sep-1116-Sep-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wahoo BypassCat Ex proposal request11801772-10255/8/20126/27/201250emailed comments to NDORNDOR / address FHWA comments and resubmit
Cordova NorthT&E Consultation Memo120023045-512-Jul-1026-Jul-1014approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Beaver Cross SWBio doc vers 1120127080-4008-Oct-1013-Oct-105rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Beaver Crossing SWDR 53120127080-4006-Dec-1014-Dec-108approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Beaver Crossing SWSHPO concur req120127080-4027-Jun-1128-Jun-111mm: reviewed and gave letter to front office for submittalFHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
Beaver Crossing SouthwestCE120127080-4014-Oct-1117-Oct-113comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Beaver Crossing SWCE120127080-4011/9/201112/7/201128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
South & East BeltwayNDOR draft letter for review121533300-112/6/20111/6/201231sent comments back to NDORNDOR / address FHWA comments and resubmit
Crete NorthDR 53122221031-10807-Apr-1107-Apr-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crete NorthBio doc vers 1122221031-10807-Apr-1107-Apr-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In WymoreBio doc vers 1122993265-514-Dec-1017-Dec-103approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In WymoreDR 53122993265-524-Jan-1131-Jan-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In Wymore106 letter122993265-509-May-1113-May-114letter sent to SHPOFHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
In WymoreCE122993265-509-Sep-1113-Sep-114mm approved CE, had some minor QC issues, sent heads-up to NDOR separate, but approved the docNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
In WymoreDesign change Memo122993265-56/4/20126/11/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Filley NorthBio doc vers 1123003285-507-Jan-1107-Jan-110sent comments to Alllison and Zach, need DR53 firstNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Filley NorthDR 53123003285-524-Jan-1131-Jan-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Filley North, Gage Co.SHPO concur req123003285-513-Jun-1123-Jun-1110mm reviewed and to AB for formatting/mailingFHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
Filley NorthCat Ex123003285-52/2/20122/17/201215approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
I-80 Upgradebio doc12312809-87220-May-1021-May-10110/21 mm reviewed and signed doc. With Sue to format letter and send to agenciesthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
-80 Upgrade Lincoln - OmahaReeval12312809-87220-Aug-1024-Aug-104comments addressed. Rb approved.NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Mahoney Park Intrch rampsSHPO concur req12312809-87228-Mar-1131-Mar-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
I-80 UpgradeBio doc reeval12312809-87225-Mar-1101-Apr-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Nebraska City NorthwestDR 53123477066-291/12/20121/16/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Rouleau St, Rulo BridgeReeval Memo T&E change123811597-10605-Apr-1107-Apr-112comments sent to EricNDOR / address FHWA comments and resubmit
Rouleau Street, RuloT&E Reeval123811597-10513-Apr-1119-Apr-116comments sent back to EricNDOR / address FHWA comments and resubmit
Waverly - GreenwoodCO 2212457809-8421/17/20121/20/20123Original on your desk. approvedNone
US-77 - 56th St Interch to Waverly InterchScope Change memo12477809-8508/8/20128/15/20127approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
14th St Bridge, LincolnSHPO concur req12482809-85521-Mar-1129-Mar-118commenets sent back to Steve.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
14th St Bridge, LincolnSHPO concur req12482809-85505-Apr-1107-Apr-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
NW 56th to US-77 SouthSHPO concur req12489809-8627/17/20127/26/20129sent comments to NDORNDOR / address FHWA comments and resubmit
Syracuse SoutheastDR 53125107066-321/12/20121/16/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Syracuse SESHPO and THPO concur req125107066-326/25/20126/27/20122Letters sent to SHPO & THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dorchester SEBio doc vers 1125197076-1620-Sep-1029-Sep-109rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Dorechester SoutheastSHPO concur req125197076-1601-Nov-1008-Nov-107letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dorchester SEDR 53125197076-1610-Nov-1012-Nov-102rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Denton EastSHPO concur req125413305-907-Dec-1010-Dec-103letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Denton EastBio doc vers 1125413305-910-Dec-1010-Dec-100approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Denton EastCE125413305-922-Aug-1106-Sep-1115approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
In FriendDR 53125772982-114-Jul-1115-Jul-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In FriendBio doc version 1125772982-111/4/201111/9/20115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In FriendSHPO concur request125772982-111/8/201111/14/20116"
letter sent to SHPO"FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In FriendCE125772982-11/30/20122/9/201210approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Greenwood NortheastDR 53126587013-1012/22/201112/23/20111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Greenwood NortheastSHPO concur request126587013-105/14/20125/25/201211letter sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Greenwood NortheastTHPO concur req126587013-106/21/20126/26/20125letter sent to THPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Verdon NWSHPO concur req126667074-237/6/20127/16/201210SHPO and THPO letters sent outFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Pawee City SWDR 53126777067-161/3/20121/16/201213approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N Columbia Ave, SewardDR 53126936759-227-Dec-1007-Jan-1111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Columbia Ave, SewardSHPO concur request126936759-212/1/201112/8/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Columbia Ave, SewardBio doc version 1126936759-21/23/20122/1/20129approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N. Columbia AveCat Ex126936759-26/27/20127/13/201216comments sent back to NDORNDOR / address FHWA comments and resubmit
N Columbia Ave, SewardCat Ex126936759-28/9/20128/14/20125approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
SW 40th St, LincolnReeval127445267-120-Sep-1029-Sep-109rb approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Southwest 40th StreetReevaluation Memo127445267-13/20/20124/5/201216 NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Brock SouthwestDR 53127467064-1324-Jan-1131-Jan-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Weeping Water SEBio Assessment127647013-1212-Jul-1026-Jul-1014approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Weeping Water SEDR53127647013(12)06-Dec-1015-Dec-109approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Weeping Water SESHPO concur req127647013-1225-Apr-1125-Apr-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Weeping Water SoutheastCE127647013-1210/21/201110/28/20117approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Burchard SouthBio doc vers 11277387-11314-Apr-1119-Apr-115letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Burchard SouthSHPO concur req1277387-11328-Apr-1102-May-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Burchard SouthCE1277387-11316-Sep-1120-Sep-114approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Haymarket Ball Park TrailMemo1278155-15109-Jun-1009-Jun-100 NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Syracuse SouthwestDR 53127857066-431/12/20121/16/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sprague EastBio doc vers 1127863280-421-Sep-1029-Sep-108rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Sprague EastSHPO concur req127863280-417-Nov-1023-Nov-106letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sprague EastDR 53127863280-417-Dec-1023-Dec-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sprague EastCE127863280-422-Jul-1103-Aug-1112comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Sprague EastCE - vers 2127863280-409-Aug-1109-Aug-110approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Ithaca - AshlandDR 5312831666-10412-Aug-1117-Aug-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ithaca - AshlandSHPO concur req12831666-10417-Aug-1117-Aug-110letter sent to SHPO todayFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Table Rock SoutheastSHPO concur req128357067-226/26/20126/28/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Friend SouthDR 53128507076-1815-Dec-1017-Dec-102approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Friend SouthBio doc vers 1128507076-1820-Jan-1131-Jan-1111approved no affect bio mmthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Friend SouthSHPO concur req128507076-1818-Apr-1122-Apr-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Friend SouthCE128507076-1816-Sep-1120-Sep-114approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Table Rock SEDR 53128537067-221/3/20121/16/201213approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Stella SEDR 53128557074-2412/20/201112/23/20113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Stella SESHPO concur req128557074-247/10/20127/16/20126letters sent to SHPO and THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hickman NorthDR 53128593265-925-Feb-1101-Mar-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hickman NorthSHPO concur req128593265-921-Mar-1121-Mar-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hickman NorthBio doc vers 1128593265-913-May-1118-May-115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Sterling SoutheastDR 53128607049-2220-May-1127-May-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sterling SoutheastSHPO concur request128607049-2211/3/201111/14/201111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sterling SoutheastBio doc version 1128607049-2212/7/201112/14/20117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Sterling SoutheastCat Ex128607049-224/17/20125/8/201221comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Sterling SE Bridge, Johnson CountyCongr inq - Noise Analysis128607049-226/29/20127/6/20127mm req for info to NDOR on 6/29/12; jaw draft to HQ on 7/6/12.None
Malcolm SouteastNEPA128647055-10215-Sep-1023-Sep-108rb approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
In SewardBio doc vers 112876346-13605-Jan-1107-Jan-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In SewardSHPO concur req12876346-13624-May-1127-May-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In SewardSHPO concur req for 4(f)12876346-1366/12/20126/25/201213letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jamacia trail4(f) exemp req1287955-16022-Apr-1028-Apr-106mm- Raegan asking Allison to check and see if rail line is historic before approvalNDOR / address FHWA comments and resubmit
Yutan Trail, Phase 1DR 531288178-2706-Oct-1107-Oct-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Yutan TrailSHPO concur req1288178-278/2/20128/16/201214sent email to NDOR requesting verification that scope has not changed since March 2010 consultation. If it hasn't changed, no need to re-consult. mm 8/16/12NDOR / address FHWA comments and resubmit
Yutan Trail System - Phase 1Bio doc version 11288178-277/17/20127/26/20129approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Blue Rvr Br, CreteDR 53128867076-2206-Dec-1015-Dec-109approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
13th St./Blue River Bridge, CreteSHPO concur req128867076-226/15/20126/26/201211letter sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Utica - GoehnerDR 5312907808-14514-Mar-1115-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Super St, I-180 E RampBio doc vers 1129285254-812-Nov-1012-Nov-100rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Superior St, I-180 E Ramp SafetyDR 53129285254-824-Jan-1131-Jan-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Superior at I-180, LincolnSHPO concur req129285254-829-Mar-1131-Mar-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Superior Street - I-180 East ramp4(f) exception concur request129285254-81/23/20122/1/20129approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Superior Street & I-80 East Ramp SafetyCat Ex129285254-83/7/20123/15/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Humboldt East & WestBio Doc1293647-10526-Apr-1127-Apr-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Humbolt East & WestSHPO concur req1293647-10519-Jul-1120-Jul-111ltr to SHPO on 7/21/11.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
4th and Corso OverlayDR5312938 06-Dec-1014-Dec-108approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
4th Corso OverlayBio doc vers 1129386217-324-Jan-1131-Jan-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
4th Corso, Nebr CityProject Scope Change129386217-38/2/20128/9/20127comments sent to NDORNDOR / address FHWA comments and resubmit
N 14th St, EB On-ramp to US-6DR 53129445227-72/24/20123/7/201212approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln Rosa Parks Way TrailNEPA Determ1294555-16423-Aug-1002-Sep-1010 NDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln West O HistoricDR 53129465266-225-Oct-1026-Oct-101rb approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln West O Hist HwyBio doc vers 1129465266-223-Dec-1027-Dec-104approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Lincoln West O St Hist HwySHPO concur req129465266-205-Jan-1107-Jan-112comments sent to AllisonFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lincoln West O StreetSHPO concur req129465266-210-Feb-1116-Feb-116original materials were sent for review. Waiting on revised attachments.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
West O, LincolnSHPO concur req129465266-222-Feb-1122-Feb-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lincoln West O StreetCE129465266-21/24/20122/6/201213comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Lincoln West O StreetCat Ex129465266-22/8/20122/17/20129approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
us6/n103 roundaboutconcur req1295366-15916-Sep-1001-Oct-1015letter to shpoFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-6/N-103 intersectionNEPA determ 1st subm1295366-15901-Oct-1004-Oct-103rb approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
US-6, N-103 intersectionBio doc vers 11295366-15929-Oct-1002-Nov-104rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US-6/N-103 intersec improCE1295366-15909-Dec-1016-Dec-107comments sent back to SaraNDOR / address FHWA comments and resubmit
US-6/N-103 intersectionNEPA determ 1st subm w Add Info1295366-15912-Jan-1127-Jan-1115comments sent to NDORNDOR / address FHWA comments and resubmit
Jct US-6/N-103 intersectSum of Alt & Citizn com V-21295366-15901-Feb-1102-Feb-111approved to be incorporated into CEthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US-6/N-103 inters imprCE - revised1295366-15907-Feb-1107-Feb-110approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Otoe Creek BridgeSHPO Concur req12957772-15916-Mar-1116-Mar-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Oak Creek BridgeBio doc vers 112957772-15916-May-1118-May-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Otoe Creek Bridge NCE12957772-15919-Jul-1120-Jul-111comments sent back to NDORNDOR / address FHWA comments and resubmit
Otoe Creek Bridge N, Jct N-64CE subm 212957772-15926-Jul-1101-Aug-116approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Goehner - MilfordDR 5312961808-14703-Feb-1103-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Goehner to MilfordBio doc vers 112961808-14707-Mar-1108-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Goehner - MilfordReeval Scope Change12961808-14719-May-1127-May-118approved, also sent comment to Carin to re-evaluate PCE based on scope changeNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Lincoln EastDR 5312975346-14111/29/201112/5/20116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N-63 to N-50DR 5312987347-12511/25/201112/5/201110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wilber WestBio doc version 112990416-11310/25/201110/28/20113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Auburn EastSHPO concur req129941366-11911-Oct-1113-Oct-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dwight to N-79Bio Assessment13018666-10512-Jul-1023-Jul-1011approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-64 to SchuylerDR 5313019152-12214-Mar-1115-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Brock NWDR 53130247064-1912-Jul-1119-Jul-117mm signed dr53NDOR (or LPA) / Must prepare technical and NEPA documentation
Brock NorthwestBio doc version 1130247064-1911/4/201111/10/20116document signed, letters to go to agencies on Monday 11/14/11.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Brock NWSHPO concur req130247064-197/9/20127/16/20127letters sent to THPO and SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ulysses SpurDR 5313029S12C-10512/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Preston North & SouthDR 53130313615-829-Aug-1106-Sep-118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Preston North & SouthSHPO concur request130313615-81/30/20122/3/20124letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Preston North & South106 Tribal Coord130313615-81/30/20122/3/20124letters sent to TribesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Preston North and SouthCE130313615-83/29/20124/23/201225approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
N-112 - BeatriceDR 5313034771-13011/15/201111/23/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N-112 - BeatriceSHPO concur req13034771-1307/9/20127/16/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sterling EastDR 5313045417-10211/15/201111/17/20112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sterling EastSHPO concur request13045417-1025/18/20125/25/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Nebr. City Steinhart Park TrlDR 531305566-3413-Oct-1013-Oct-100rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Steinhart Park TrailBio Doc vers 11305566-3420-Dec-1027-Dec-107approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Steinhart Park Trail Phase IISHPO Concur req1305566-3416-Mar-1116-Mar-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Steinhart Park Trail Phase IISHPO concur request1305566-345/23/20126/8/201216comments sent to NDORNDOR / address FHWA comments and resubmit
Steinhart Park Trail Phase IISHPO rev; NPS coordination1305566-348/6/20128/16/201210letters sent to NPS and SHPO todayFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Steinhart Trail Phs IISHPO concur req1305566-347/11/20127/24/201213comments sent back to NDOR to revise NPS letter to be a 106 consultation letter rather than a 4(f) coordination letter.NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Beatrice Homestead TrailNEPA det form1305934-3815-Sep-1023-Sep-108sent back, completed incorrectlyNDOR to address FHWA comments and resubmit
Beatrice Homestead TrlNEPA Determ form1305934-3827-Sep-1001-Oct-104rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Seward West TrailSHPO concur req1306080-324/5/20124/25/201220sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In AuburnSHPO concur req130621367-12324-May-1127-May-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wyuka Stables RestorationBio doc vers 11306355-17004-Aug-1105-Aug-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Wyuka Stable RestorationSHPO concur req1306355-17013-Sep-1116-Sep-113comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Wyuka Stable RestorationSHPO concur request1306355-17010/24/201111/14/201121comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Wyuka Stable RestorationWyuka MOA1306355-17012/21/20111/17/201227Review complete, however waiting on signatures from proejct sponsor and NDOR on the MOA before sending consultation package to SHPO. NDOR / address FHWA comments and resubmit
Wyuka Stables RenovationCat Ex1306355-1704/10/20124/27/201217comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Wyuka StablesCat Ex - revised1306355-1706/12/20126/14/20122approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Cavett Connector TrailDR 531307955-17210-Jun-1116-Jun-116concurred with CE.mmNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln Cavett Connector TrailSHPO concur req1307955-1726/11/20126/26/201215letter sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Beatrice Main St SignageDR 531308034-3923-Nov-1024-Nov-101approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bio doc vers 1Beatrice Main Histor Byway Sign1308034-3928-Feb-1101-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Beatrice Main St Hist Byway SignSHPO concur req1308034-3925-Mar-1131-Mar-116comments sent back to AllisonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Beatrice Main St Hist Byway SignSHPO concur req1308034-3918-Apr-1121-Apr-113comments sent to AllisonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Beatrice Main Street Historic Byway Signage106 Concur1308034-3926-Apr-1127-Apr-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kansas Line - W Jct N-8DR 53130831121-10311/15/201111/17/20112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Furnas St - Silver St, AshlandDR 5313084666-10711/28/201112/5/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Furnas St - Silver St, AshlandSHPO concur req13084666-1077/2/20127/13/201211letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Beatrice Wide Resurf.DR 53130866108-106-Dec-1015-Dec-109sent comments back to AllisonNDOR (or LPA) / Must prepare technical and NEPA documentation
Beatrice Citywide resurfDR 53130866108-118-Jan-1131-Jan-1113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Beatrice City Wide ResurfacingBio doc vers 1130866108-110/27/201110/28/20111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Beatrice City Wide ResurfacingSHPO concur request130866108-111/30/201111/30/20110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N-15 westbio doc1308786(114)16-Sep-1023-Sep-107 NDOR / address FHWA comments and resubmit
S. Jct. N-15 WestBio doc1308786-11417-Sep-1023-Sep-106approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
BNSF/Middle CreekSHPO Concur Req13089772-16111-Jul-1111-Jul-110mm asked for a fix to scope of work, got it and sent out todayNDOR / address FHWA comments and resubmit
BNSF-Middle Creek, LincolnBio doc version 113089772-1612/3/20122/17/201214letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-6/SW 40th StreetSHPO Concur Req1309366-16112-Jan-1131-Jan-1119letter sent to shpoFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Nemaha - E. Jct. US-136DR 5313094671-11712/15/201112/20/20115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
W. Jct. US-136 - Peru SpurDR 5313095671-1184/5/20124/26/201221approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln Citywide DurableBio doc version 1130965239-816-Jun-1021-Jun-105BA approved, letters to USFWS and NGPC to go out for concurrenceFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
OA 50 Challenge projBio doc version 1130975221-318-Jun-1021-Jun-103bio doc approved, letters going to NGPC and USFWS for concurrenceFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Seward NorthDR 5313099152-12118-Apr-1121-Apr-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Goehner WestBio doc vers 113107808-14902-Nov-1002-Nov-100rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Milford to AirparkDR 5313108808-51504-Apr-1111-Apr-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Milford - Air ParkBio doc vers 113108808-51508-Apr-1112-Apr-114approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Airpark W-Jct, US-77 LincolnPCA13113809-5802-Feb-1102-Feb-110approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Airpark W, Jct US-77Bio doc vers 113113809-5801-Mar-1102-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Nebraska City NorthDR 5313123752-17128-Jul-1103-Aug-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Beatrice Museum and 2nd St Historical PreservationDR-53131276105-615-Sep-1022-Sep-107sent back, missing suggested level of NEPANDOR (or LPA) / Must prepare technical and NEPA documentation
2nd St-Court to Ella, BeatriceSHPO concur req131276105-626-Aug-1114-Sep-1119letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
2nd St, Court to Ella, BeatriceBio doc version 1131276105-610/31/201111/2/20112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Court to Ella, Beatrice4(f)131276105-62/1/20122/14/201213comments sent back to NDORNDOR / address FHWA comments and resubmit
2nd St, Court - Ella4(f) exception comments131276105-62/29/20123/8/201284(f) exception approved, no addtional 4(f) coordination needed.this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
2nd Street, Court - EllaCat Ex131276105-66/27/20127/2/20125comments sent back to NDOR; change in scope, need to reconsult with SHPONDOR / address FHWA comments and resubmit
Alvo - I-80Bio doc vers 113131632-11528-Sep-1001-Oct-103rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hickman Road Trl ConnectDR 531313455-17418-Jan-1131-Jan-1113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Seward East BridgesDR 5313136808-15306-Jul-1111-Jul-115concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
27th & Leighton Viad.DR 53131375231-1311-Nov-1012-Nov-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
27th & Leighton Viad RehabBio doc vers 1131375231-1317-Oct-1118-Oct-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
27th & Leighton Viaduct RehabilitationSHPO concur request131375231-1312/7/201112/9/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lincoln Citywd resurf.DR 53131385228-411-Nov-1012-Nov-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln Citywide ResurfacingSHPO concur request131385228-41/6/20121/17/201211letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lincoln City Street ResurfacingBio doc version 1131385228-42/22/20123/8/201215letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lincoln Citywide ResurfacingCat Ex131385228-46/7/20126/12/20125comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Lincoln Citywide ResurfacingCat Ex - version 2131385228-48/3/20128/3/20120approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Lincoln MicrosurfacingDR 53131395249-709-Nov-1012-Nov-103rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln Streets MicrosurfBio doc vers 1131395249-705-Jan-1106-Jan-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Lincoln Downtown ResurfDR 53131405230-204-Nov-1008-Nov-104rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lincoln Dwntwn Str ResurfBio doc vers 1131405230-205-Jan-1106-Jan-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
56th, Shadow Pines - Old CheneyNEPA memo131415241-525-Mar-1128-Mar-113mm-the request to FHWA didn't make sense, sent questions back to NDOR concluding the reviewNDOR / address FHWA comments and resubmit
South 56th, Shadow Pines to Old CheneySHPO concur request131415241-55/4/20125/9/20125comments sent back to NDORNDOR / address FHWA comments and resubmit
South 56th, Shadow Pines to Old CheneySHPO concur req - revised131415241-56/28/20127/2/20124letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wahoo NorthwestDR 531314378-3009-Jun-1116-Jun-117mm sent back- not enough info to understand what the proposal isNDOR (or LPA) / Must prepare technical and NEPA documentation
Brock N Brdg RepairDR 5313145ER 3675-727-Dec-1006-Jan-1110signed by Nemaha Co representative 10/28/10. Approved by NDOR 12/27/10 and emailed to FHWA. 1/6/11, FHWA approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
NE Butler Co Brg RepairDR 5313146ER 3020-127-Dec-1006-Jan-1110signed by Butler Co 12/6/10, approved by NDOR 12/27/10. approved by FHWA 1/6/10NDOR (or LPA) / Must prepare technical and NEPA documentation
S. Coddington Ave. W. Van Dorn St.DR 53131475205-112-Jan-1127-Jan-1115approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Diller/Odell Elem Sch SRTSDR 531315348-2409-Jun-1116-Jun-117mm approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
3 Sites in Otoe CountyDR 5313154ER 3680-730-Sep-1130-Sep-110when submitted by NDOR 1st time, sent back because 2008 event not an accepted event yet, hadn't hit cost thresholds. In Sept, FHWA pulled up old doc and approved, to save NDOR step of re-submittingNDOR (or LPA) / Must prepare technical and NEPA documentation
4th Corso Viad, NE CityDR 53131596217-409-Jun-1116-Jun-117proponent needs to hold early scoping so we can determine NEPA level.mmNDOR (or LPA) / Must prepare technical and NEPA documentation
Seward West TrailDR 531316080-3218-Jan-1131-Jan-1113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Karol Kay Blvd ExtensionDR 53131616763-111/30/201112/5/20115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N-2, 56th - 84thBio Doc V11316426-12221-Jul-1129-Jul-118approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-2, 56th - 84th, LincolnDR 531316426-12203-Aug-1105-Aug-112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Jct N-15 WestDR 5313166416-11405-May-1111-May-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Jct N-15 WestBio Doc V113166416-11421-Jul-1129-Jul-118approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-4 to WilberDR 53131681031-11030-Aug-1106-Sep-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N-4 - WilberBio doc vers 1131681031-11011/18/201111/23/20115sent comment back to NDOR. NDOR / address FHWA comments and resubmit
N-4 - WilberBio doc vers 2131681031-11012/2/201112/6/20114approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Cornhusker - S Jct US-34DR 53131731809-211/15/201111/23/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Prague SouthDR 531317578-3118-Jul-1120-Jul-112approved.NDOR (or LPA) / Must prepare technical and NEPA documentation
Crete Elem BOLTAGE PrgmDR 531317676-4702-Sep-1108-Sep-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lets All Pedal to Prescott, LincolnDR 531318755-17610/18/201110/28/201110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Salt Creek Bridge, LincolnDR 5313194L55X-1032/9/20122/17/20128approved NDOR (or LPA) / Must prepare technical and NEPA documentation
Salt Creek Bridge, LincolnSHPO concur request13194L55X-1034/25/20124/27/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bruno Spur BridgesDR 5313197S12B-1068/2/20128/16/201214 NDOR (or LPA) / Must prepare technical and NEPA documentation
Water Park to Hannibal Park Trail, BeatriceDR 531321234-423/8/20124/5/201228 NDOR (or LPA) / Must prepare technical and NEPA documentation
Beatrice Water Park to Hannibal Park TrailSHPO concur req1321234-427/12/20127/24/201212letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lincoln Stonebridge TrailDR 531321355-1773/26/20124/6/201211approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Tecumseh Historic SquareDR 531321449-463/29/20124/6/20128approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Swan Creek Bridge, South of WesternDR 5313221151-1167/27/20128/14/201218approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Seward TrailDR 531325580-338/6/20128/16/201210 NDOR (or LPA) / Must prepare technical and NEPA documentation
N-36 North, OmahaBio doc vers 1217911333-10214-Jan-1131-Jan-1117mmapproved bio contingent on NEPA questions answeredthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US-75, Plattsmouth - Bellevuere-eval ESA21849752-15528-May-1001-Jun-104Sent out to USFWS and NGPC for concurrenceFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-75, Plattsmouth to BellevueRe-evaluation21849752-15521-Jul-1023-Jul-102approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
US 275 StockyardsDR 53218532757-18017-Oct-1118-Oct-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
US-275/Stockyards, OmahaSHPO concur request218532757-1801/11/20121/17/20126letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-275/Stockyards, OmahaBio doc version 1218532757-1801/13/20121/17/20124approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US 275 Omaha Stock YardsHazmat review218532757-1807/5/20127/11/20126emailed comments to NDORNDOR / address FHWA comments and resubmit
US-275/Stockyards, OmahaCat Ex218532757-1808/8/20128/13/20125sent comments back to NDORNDOR / address FHWA comments and resubmit
US-275/Omaha StockyardsHazMat Review - update218532757-1808/2/20128/7/20125sent comments back to NDOR. Need to obtain EPA and NDEQ concurrence.NDOR / address FHWA comments and resubmit
US-275, Omaha Stock YardsHazmat memo review218532757-1807/16/20127/18/20122NDOR has decided to conduct testing for this project. A revised report will be sent once testing is completed.NDOR (or LPA) / Must prepare technical and NEPA documentation
Elkhorn NorthDR 5321911312-1106/15/20126/26/201211approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Elkhorn NorthSHPO and THPO concur req21911312-1106/26/20126/27/20121letter sent to SHPO & THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bell St Viad, FremontReeval Form219535625-223-Sep-1001-Oct-108rb approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Blair WestDR 53220267089-2315-Dec-1017-Dec-102approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Blair WestBio doc vers 1220267089-2315-Apr-1121-Apr-116approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Blair WestSHPO concur req220267089-2325-Apr-1125-Apr-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Blair WestCE220267089-2319-Aug-1103-Sep-1115approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Hooper NorthDR 53220523495-323-Sep-1126-Sep-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hooper NorthSHPO concur request220523495-21/26/20122/3/20128letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hooper NorthBio doc version 1220523495-32/15/20122/17/20122approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hooper NorthCE 1st review220523495(3)5/18/20126/1/201214 NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Blair BypassP/N Chapter2207589(17)27-Jun-1129-Jun-112mm told Blair would take a prelim review. Sent back commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Blair BypassBio doc version 12207589-174/12/20124/23/201211BA missed a few species listed in the county, didn't properly assess indirect water quality impacts to the Missouri (fish spp), and needed committment to survey for ginseng (previous survey over 6 yrs old and construction for some phases won't occur for yNDOR / address FHWA comments and resubmit
Blair BypassSHPO concur request2207589-174/12/20125/7/201225comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Blair BypassBio doc - version 22207589-176/7/20126/12/20125comment sent back to NDORNDOR / address FHWA comments and resubmit
Blair BypassSHPO THPO concur req revised2207589-176/22/20126/25/20123letters sent to NDOR to send to SHPO and THPOs (attachments were too large to print from FHWA).FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Blair BypassBio doc - version 32207589-176/25/20127/2/20127comments sent back to NDORNDOR / address FHWA comments and resubmit
Blair BypassBio doc - version 42207589-177/3/20127/13/201210sent letters to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Blair Bypass106 Non-Conur Resp Req2207589-178/15/20128/15/20120Hardcopy to Raegan. noted that additional consultation will be required in the future for the project, once access is granted to survey Cargill. review finished.mmNone
Blair Bypassdraft EIS2207589-176/29/20127/27/201228Comments to Raegan by 7/27. You have this doc on your desk.None
Fremont WestBio doc vers 1220973460-401-Dec-1010-Dec-109letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fremont WestDR 53220973460-415-Dec-1017-Dec-102approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Westbound I-80 ExpansionSHPO Concur22143809-89713-Sep-1013-Sep-100mm 9/13/10 sent email to NDOR asking status of NEPA - we've never been coordinated with regarding this interstate widening in Omaha, but they're asking us to consult under 106 right nowNDOR (or LPA) / Must prepare technical and NEPA documentation
Westbound I-80 expansionSHPO concur req22143809-89720-Sep-1126-Sep-116comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
WB I-80 ExpansionSHPO concur req22143809-89726-Sep-1126-Sep-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
I-80, OmahaDR 5322150809-90119-Apr-1126-Apr-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
#NAME?DR 53221626809-91027-Jul-1103-Aug-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
I-680 NB LanesSHPO concur req221626809-91015-Sep-1116-Sep-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fremont viaductsDraft EA221775616-104-Jan-1128-Jan-1124comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
23rd Street Viaduct, FremontSHPO concur req221775616-16/18/20127/13/201225comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Ruff Road to MillardDR 5322201809-6327-Jul-1103-Aug-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ruff Road - MillardBio doc version 122201809-6312/29/20111/3/20125letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
144th St West Dodge, OmahaERRATA FONSI Approval Req222025001-1521-Dec-1021-Dec-100comment sent back to AllisonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
144th W Dodge to Eagle RunERRATA doc222025001-1522-Dec-1011-Jan-1120sent back comments to AllisonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
144th, et al, Omaha404 b 1 analysis222025001-1510-Feb-1115-Feb-115needs to be included in FEA submittalNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
144th & Blondo, OmahaErrata222025001-1503-Mar-1108-Mar-115Discussed comments with Jon B. Consultant revising mitigaiton measures and 2035 LRTP wording.NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
144th & BlondoErrata Doc - final222025001-1509-Mar-1109-Mar-110FEA signed; FONSI issued.NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
144th & BlondoWetland Mit memo222025001-1513-Oct-1117-Oct-114approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Bennington SouthDR 53222213805-416-Jun-1123-Jun-117signed, added comment to talk w TE eligibility/need for added gradingNDOR (or LPA) / Must prepare technical and NEPA documentation
Bennington SouthSHPO concur request222213805-412/1/201112/8/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
WDCT - Valley to YMCA, Ph 1DR 532222728-8709-Jun-1110-Jun-111approved, to be combined with 28-102NDOR (or LPA) / Must prepare technical and NEPA documentation
Western Douglas County TrailSect 4(f) Eval2222728-876/6/20126/14/20128approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
156th St ImprovementsPurpose and Need review222333805-58/6/20128/16/201210provided comments that the radii issue needs a bit more work but to carry forward with the processNone
N 96th St. BridgeDR 53222357028-473/28/20124/6/20129approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
144th - Pierce Pl to Burke StBio doc vers 1222365011-801-Feb-1102-Feb-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Pierce Plaza - Burke StSHPO concur req222365011-821-Mar-1121-Mar-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
114th St, Pierce Plaza to Burke St.two 4(f) except requests222365011-816-Jun-1123-Jun-117accepted one, rejected other, QA/QC problem led to inconsistent statements in doc. MmNDOR / address FHWA comments and resubmit
Pierce Plaza to Burke Street4f exception request222365011-811-Jul-1120-Jul-119comments sent back to NDORNDOR / address FHWA comments and resubmit
108th, Madison to QNEPA Action Memo222375011-910-Nov-1012-Nov-102rb sent comments to Alllison ZachNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
108th, Madison - Q4(f) and NEPA action222375011-929-Dec-1010-Jan-11124(f) letter ok to go to City parks dept. Can't concur with rest of request until all pieces requested on DR53 are completed and submitted. Comments regarding this sent to Allison.this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
108th, Madison - Q, Omaha4(f) and CE Memo req222375011-922-Feb-1101-Mar-1174(f) memo approved, NEPA Det still an EAthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Missouri River Trailletter to ACHP with MOA2225228(89)16-Aug-1019-Aug-103need to send the ACHP copy of executed MOAFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Mo River Trail phs 2Data revovery plan2225228-8919-Aug-1026-Aug-107requested meeting to discuss commentsNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Missouri River Trail Phase 2NEPA CE2225228-8925-Aug-1027-Aug-102sent email requesting meeting to discuss comments. Meeting on 9/1 at NDOR.NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Missouri Rvr Trl, Phase 2Section 106 doc2225228-8926-Oct-1027-Oct-101letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fremont - WinslowDR 5322256773-13006-Apr-1112-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Frermont - WinslowBio doc version one22256773-13012/19/201112/22/20113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Bennington SEBio doc vers 1222583806-120-Sep-1029-Sep-109rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Fort Street - Missouori RiverDR 53222646809-2911/22/201111/28/20116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Fort Street - Missouri RiverSHPO concur request222646809-292/9/20122/14/20125"
letter sent to SHPO"FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fremont South BridgeTemp Occ Monnich Letter22265773-12811-Mar-1011-Mar-100 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Fremont Bridge1st draft DEA22265773-12809-Mar-1016-Mar-107 NDOR / address FHWA comments and resubmit
Freemont South BridgeEff Determ Pkg v222265773-12825-Mar-1025-Mar-100sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fremont Southadditl info; bio memo22265 24-Apr-1001-May-107 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE,
Fremont BridgeFEA-Errata, DEA22265773-12820-Jul-1021-Jul-101sent comments to NDORNDOR / address FHWA comments and resubmit
Fremont South BridgeFEA/Errata - FONSI Rec22265773-12827-Jul-1011-Aug-1015approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Fremont South BridgeFinal EA Approval22265773-12830-Jul-1011-Aug-1012approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Rumsey Station SRTSBio doc vers 12227077-5323-Nov-1023-Nov-100approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Rumsey Station SRTSDR 532227077-5323-Nov-1024-Nov-101approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Papillion-Rumsey Sta SchoolSHPO concur req2227077-5307-Dec-1010-Dec-103letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
36th Street ImprovementsP&N review222765061-501-Apr-1104-Apr-113no commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
36th ST BellevueNEPA Merge concurrence point 2 package222765061(5)5/2/20125/10/20128letters will go out to agencies tomorrowFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
120th St, Stonegate to RoanokeBio doc vers 1222775009-319-Nov-1024-Nov-105approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Stonegate Dr to Roanoke BlvdSHPO concur req222775009-307-Dec-1010-Dec-103comments sent back to AllisonNDOR / address FHWA comments and resubmit
Stonegate Dr -RoanokeSHPO concur req222775099-314-Dec-1017-Dec-103letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
120th, Stonegate to RoanokePurp & Need222775009-328-Dec-1004-Jan-117approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Inters Sorensen Prk & N FrwyDR 53222785114-615-Dec-1017-Dec-102approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Intersect Sorensen Parkwy & N FreewayBio doc vers 1222785114-626-May-1127-May-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Intersection of Sorensen Parkway and North FreewaySHPO Concur Req222785114-622-Jul-1126-Jul-114mm approved letter 7/26, with front office for formatting/submissionFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sorensen Parkway & North FreewayCE222785114-611/29/201112/5/20116approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
42nd & QPurpose & Need222795057-918-Oct-1020-Oct-102comments sent back to AllisonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
42nd & Q, OmahaPurp and Need222795058-922-Oct-1026-Oct-104rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
42nd & Q Brdg & IntersecBio doc vers 1222795057-901-Feb-1102-Feb-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
42nd & Q, OmahaSHPO concur req222795057-919-May-1127-May-118comments sent back to AllisonNDOR / address FHWA comments and resubmit
42nd & Q, OmahaSHPO concur req222795057-918-Jul-1120-Jul-112comments sent back to NDORNDOR / address FHWA comments and resubmit
42nd & QSHPO Concur Req V3222795057-921-Jul-1122-Jul-111Package sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
42nd & Q Intersection, OmahaSection 4(f)222795057-902-Sep-1115-Sep-1113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
42nd and QSHPO effects concurrence letter222795057-912/20/201112/21/20111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
42nd & Q, Omahadraft EA Chapter 1-3 Final222795057-912/30/20111/11/201212Reviewed by 4 Division members; delivered comments to NDOR, City and consultant on 1/12/12 at meetingNDOR / address FHWA comments and resubmit
42nd & Q, Omahadraft EA222795057-93/14/20123/28/201214 NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
42nd & Q Bridge ReplacementHazmat coord letters222795057-94/17/20124/19/20122 NDOR / address FHWA comments and resubmit
42nd & Q Bridge ReplacementHazMat memos review request222795057-94/26/20124/26/20120follow-up questions sent to the City for outstanding items. Need those items before letter can be sent to the agencies.NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
42nd & QDEA - revised222795057-98/7/20128/16/20129ready for official signatures once the hard copies are provided.NDOR / address FHWA comments and resubmit
42nd & Qdraft EA Revisions222795057-97/9/20127/23/201214comments sent to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Intersec 132 & W Giles RdDR 53222835005-111-Nov-1012-Nov-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
F St. BridgeDR 53222845028-43/27/20124/6/201210approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Washington St ReconstrBio doc vers 1222905023-1405-Apr-1107-Apr-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Washington St, PapillionSHPO concur req222905023-1405-Apr-1107-Apr-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Washington St, Caphard to Cedardale RdCE Form concurrent review222905023-1431-May-1106-Jun-116sent comments back to JonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Washington St.CE v2222905023-1420-Jun-1123-Jun-113mm told NDOR to submit the next version, with sigs, for final review/approvalNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Washington St, Capehard to Cedardale RdCE - Version 3222905023-1427-Jun-1128-Jun-111mm approved doc after comparing to rb comments on last versionNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Bennington Papio Creek Bridge and TrailDR 532230728-9023-Sep-1126-Sep-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Papillion Midland Creek TrlSHPO concur req2230977-5502-Sep-1106-Sep-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Papillion Midland Creek TrailBio Doc2230977-5530-Sep-1130-Sep-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Papillion Midland Trail4(f) exemption request2230977-5511/15/201111/15/20110Request came directly to FHWA from the City. Emailed the request to NDOR so document can go through standard review procedures (NDOR reviews and approves prior to submitting to FHWA).NDOR / address FHWA comments and resubmit
Papillion Midland Creek TrailCE2230977-551/6/20121/16/201210approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Springfield Trail Project4(f) PA Memo2231077-5623-Aug-1008-Sep-1016rb sent comments to allisonNDOR / address FHWA comments and resubmit
Springfied Trail4(f) #22231077(56)13-Sep-1023-Sep-1010commentsNDOR / address FHWA comments and resubmit
Springfield Trail4-f Memo2231077-5604-Oct-1012-Oct-108rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Springfield Trail Phase IIISHPO concur request2231077-5604-Nov-1008-Nov-104letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Springfield Trl - Phase IIIBio doc vers 12231077-5618-Nov-1023-Nov-105approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Springfield Trl Phs 3DR 532231077-5615-Dec-1017-Dec-102approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Springfield Trail, Ph 3Reeval Memo2231077-5605-May-1111-May-116approvedNDOR / address FHWA comments and resubmit
Springfield Trail106 reeval2231077-5609-May-1113-May-114comments sent to AllisonNDOR / address FHWA comments and resubmit
Springfield Trail106 Concur Letter2231077-5620-May-1127-May-117sent comments back to AllisonNDOR / address FHWA comments and resubmit
Springfield Trl, Phase 3SHPO concur req2231077-5630-Jun-1101-Jul-111mm approved, gave to front office to format/mail 7/1FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Springfield Trail4(f) reeval memo2231077-5613-Sep-1116-Sep-113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
City of SpringfieldCE2231077-5612/19/201112/23/20114comment sent back to NDOR to address.NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
City of SpringfieldCE - 2nd2231077-561/12/20121/16/20124approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
4th Ave: 16th-HillcrestDR 53223136404-101-Oct-1004-Oct-103rb approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
In Plattsmouth106 Concur Req223136404-14/2/20124/25/201223sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Plattsmouth4(f) exception223136404-17/26/20128/14/201219approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Omaha McMillan Magnet Middle School - infras.DR 532232128-9319-Aug-1103-Sep-1115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Q St Bridge repl, OmahaDR 53223255026-1118-Jan-1131-Jan-1113mm sent back- recommended level of NEPA missing from documentNDOR (or LPA) / Must prepare technical and NEPA documentation
Q St Br repla, 26 - 27th, OmahaDR 53223255026-1102-Feb-1102-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Q St Bridge, 26th - 27thBio doc vers 1223255026-1107-Oct-1107-Oct-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Q Street Bridge ReplacementSHPO THPO concur req223255026-118/9/20128/16/20127 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Inters N-133 & N-64Bio doc vers 1223361332-11222-Sep-1001-Oct-109rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Intersec N-133 & N-64DR 53223361332-11211-Feb-1116-Feb-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Intersection N-133 (90th & Maple)Variance approval223361332-11211/9/201111/10/20111approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Colfax-Dodge Co Line EastDR 5322338306-13425-Oct-1026-Oct-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Fort Calhoun SW - 2 sitesDR 532234189-2516-Feb-1122-Feb-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Fort Calhoun SWSHPO concur request2234189-2510/28/201110/28/20110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fort Calhoun Southwest - 2 sitesBio doc version 12234189-2512/29/20111/3/20125approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Ft. Calhoun SWCat Ex2234189-253/16/20124/20/201235 NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
10th St Brdg, OmahaSHPO concur req223525103-1414-Dec-1017-Dec-103letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
10th St Bridge, OmahaDR 53223535013-410-Nov-1012-Nov-102rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
10th St. Brdg WidenBio doc vers 1223535103-1430-Dec-1006-Jan-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
10th St. Brg. Widening4(f) concur req review223535013-1416-Mar-1116-Mar-110comments sent to Allison.NDOR / address FHWA comments and resubmit
10th St Brg Wide, OmahaSHPO concur req223535103-1423-Mar-1124-Mar-111comments given back to Allison at NEPA workshopNDOR / address FHWA comments and resubmit
10th St Bridge, Omaha4(f) DeMin Form223535103-1406-May-1106-May-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
10th St Bridge, OmahaCE223535103-1413-May-1118-May-115approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
58th Street, OmahaNEPA Determination Form223635086-102-Aug-1020-Aug-1018rb conditionally approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Intersec 58th & NW Radial Hwy, OmahaCE223635086-106-Apr-1107-Apr-111approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Kennedy and Cornhusker Exit RampsDR 53223665006-412/29/20111/4/20126document not signed by NDOR. sent comment back to NDOR.NDOR / address FHWA comments and resubmit
Kennedy and Cornhusker Exit RampsDR 53223665006-41/4/20121/16/201212approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Kennedy Freeway and Cornhusker RoadSHPO concur request223665006-43/7/20123/15/20128letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-275 EastBio doc vers 122368917-10822-Feb-1124-Feb-112letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-275 EastSHPO concur req22368917-10828-Apr-1102-May-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-275 EastCE22368917-10802-Jun-1110-Jun-118approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
US-275 EastScope change memo22368917-1085/31/20126/1/20121 None
Inters F/16th & Spring Lake DrBio doc vers 1223715089-114-Dec-1017-Dec-103comments sent to Allison and Zach, waiting on DR53NDOR / address FHWA comments and resubmit
F/16th & Spring Lake DrDR 53223715089-128-Dec-1007-Jan-1110approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Intersec of F & 16thSHPO Concur Req223715089-122-Jul-1126-Jul-114mm approved letter 7/26, with front office for formatting/submissionFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Intersection of F/16th St and Spring Lake Drive4(f) determ223715089-17/26/20128/14/201219approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
102nd & Maple Improv.DR 53223725015-129-Dec-1018-Jan-1120approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
102nd & Maple, OmahaSHPO concur req223725015-115-Apr-1121-Apr-116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
102nd & Maple Improv, OmahaBio doc vers 1223725015-119-Apr-1121-Apr-112comments sent back to ZachNDOR / address FHWA comments and resubmit
102nd & Maple, OmahaBio doc vers 2223725015-122-Apr-1125-Apr-113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
156Th St - Pepperwood DrP&N223765127-130-Sep-1113-Oct-1113provided comments to NDORNDOR (or LPA) / Must prepare technical and NEPA documentation
156th St, West Dodge - Corby, Phase 2Bio doc version 1223765127-11/10/20121/16/20126approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
156th St, Pepperwood Dr to Corby StreetSHPO concur request223765127-13/8/20123/15/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
108th, L to M, OmahaBio doc vers 1223785011-1222-Sep-1029-Sep-107rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
108th, L-M, OmahaDR 53223785011-1228-Dec-1018-Jan-1121approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
108th, from L to M, OmahaSHPO concur req223785011-1225-Jul-1126-Jul-111mm approved letter 7/26, with front office for formatting/submissionFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
108th, from L to M, OmahaBio reintiation223785011-1202-Sep-1115-Sep-1113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
108th Street, from L to MCE223785011-121/23/20122/3/201211approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Traf Signals 15th & FarnamBio doc vers 1223795097-129-Oct-1002-Nov-104rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
15th & Farnam, OmahaSHPO concur req223795097-121-Apr-1125-Apr-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
52nd & NW Radial Traf Sigs, Medians, curb rampsDR 53223805049-316-Jun-1123-Jun-117mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
52nd & NW RadialBio Doc V1223805049-322-Jul-1129-Jul-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
52nd and NW RadialSHPO concur request223805049-311/10/201111/14/20114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Trfc Sigs - 42nd & DodgeDR 53223815057-1117-Dec-1023-Dec-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf Sigs 42nd & DodgeBio doc vers 1223815057-1103-Jan-1106-Jan-113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf Sigs - 42nd & DodgeSHPO concur223815057-1127-Dec-1007-Jan-1111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Traf Sigs - 13th & Harney, etcSHPO concur223835121-227-Dec-1007-Jan-1111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Traf Sigs 13th & HarneyBio doc vers 1223835121-203-Jan-1107-Jan-114approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf sigs, various OmahaDR 53223835121-222-Feb-1122-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Valley DC West School SidewalkDR 532241128-9710/24/201110/28/20114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
32nd AveDR 532241428-9914-Dec-1017-Dec-103approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
32nd St Streetscape & Bike Trailrevised DR532241428-9923-Sep-1107-Oct-1114approved (scope changed)NDOR (or LPA) / Must prepare technical and NEPA documentation
Fremont Johnson Rd TrailDR 532242727-5508-Apr-1112-Apr-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Johnson Rd Trail - Military Ave to 20th St.Bio doc vers 12242727-5517-Oct-1118-Oct-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Johnson Road TrailSHPO concur request2242727-5511/30/201112/6/20116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Scribner Ped TrailDR 532242827-5602-Sep-1114-Sep-1112sent comments to NDORNDOR (or LPA) / Must prepare technical and NEPA documentation
Scribner Ped TrailDR 532242827-5613-Oct-1117-Oct-114Sent comments back to NDOR.NDOR (or LPA) / Must prepare technical and NEPA documentation
84th & L ImprovementDR 53224295023-1629-Dec-1011-Jan-1113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
84th & L, OmahaSHPO concur req224295023-1615-Apr-1121-Apr-116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
84th & L Improv, OmahaBio doc vers 1224295023-1619-Apr-1121-Apr-112comments sent back to ZachNDOR / address FHWA comments and resubmit
84th & L, OmahaBio doc vers 2224295023-1622-Apr-1125-Apr-113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US-77, 5th-10th, FremontDR 5322434773-12914-Jul-1119-Jul-115mm signed dr53 with a few notesNDOR (or LPA) / Must prepare technical and NEPA documentation
US-77 5th - 10th, FremontSHPO Concur req22434773-12910/18/201110/28/201110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Omaha Traf Signals Pkg 4DR 53224355091-417-Dec-1023-Dec-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf Sigs pkg 4Bio doc vers 1224355091-430-Dec-1006-Jan-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf Sigs - pkg 4SHPO concur224355091-427-Dec-1007-Jan-1111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Traff signals variousSHPO concur req224365089-307-Dec-1010-Dec-103letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Traf Sigs - pkg 5Bio doc vers 1224365089-330-Dec-1006-Jan-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf Signls various - Pkg 6DR 53224375083-617-Dec-1023-Dec-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf Sigs - pkg 6Bio doc vers 1224375083-630-Dec-1006-Jan-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf Sigs - pkg 6SHPO concur224375083-627-Dec-1007-Jan-1111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Adapt Trfc Control Sys 32nd St.DR 53224385003-1017-Dec-1023-Dec-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
132nd St. Adaptive Traffic Control SystemBio Doc V1224385003-1022-Jul-1129-Jul-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Military Avenue ResurfacingDR 53224395610-514-Feb-1116-Feb-112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Military Ave-Broad to Bell, FremontBio doc vers 1224395610-517-Oct-1118-Oct-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Military Ave, Broad to Bell, FremontSHPO concur request224395610-510/26/201110/28/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Military Ave. Broad-Bell106 Concur Req (Resubmission)224395610-53/28/20124/25/201228sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
I-480 & US-75 intrchngeBio doc vers 1224414809-10204-Nov-1008-Nov-104rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Resurfacing, WB W. Center Rd 114 - 120, OmahaEnv Re-Eval Memo224465038-1705-Oct-1107-Oct-112approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Ft Calhoun - BlairDR 5322447753-1164/9/20124/27/201218approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Scribner NorthDR 53224482756-14110/27/201110/28/20111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Scribner NorthBio doc version 1224482756-1411/3/20121/3/20120letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Scribner NorthSHPO concur request224482756-1412/16/20122/17/20121material reviewed and approved. letter will be sent to SHPO Tues 2/21.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Adapt Trafc Contr 144th StDR 53224495001-1720-Dec-1023-Dec-103approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Adapt Traf Contr SystBio doc vers 1224495001-1704-Jan-1106-Jan-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Adaptive Traf Control Sys - 144th St.SHPO concur req224495001-1711-Oct-1112-Oct-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
108th Decatur to N Brdg Rd, OmahaDR 53224505011-1413-Oct-1026-Oct-1013rb approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Blair WestDR 5322454917-1094/16/20124/23/20127 NDOR (or LPA) / Must prepare technical and NEPA documentation
Cedar Creek SpurDR 5322457S13H-10411/7/201111/14/20117ApprovedNDOR (or LPA) / Must prepare technical and NEPA documentation
Cedar Creek SpurSHPO concur request22457S13H-1041/31/20122/3/20123letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N-1 to PlattsmouthDR 5322458347-12827-Jul-1103-Aug-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Plattsmouth NorthDR 5322459752-16913-Jun-1116-Jun-113concurred on CE.mmNDOR (or LPA) / Must prepare technical and NEPA documentation
30th & McKinley, OmahaSHPO concur req22461752-17004-Apr-1107-Apr-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
30th&McKinley, OmahaBio doc vers 122461752-17015-Apr-1119-Apr-114approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Waterloo SouthDR 53224632757-1934/16/20124/23/20127asked NDOR to check with the FHWA engineer regarding the scope and eligiblity, but concurred CE/PCE would be appropriate if a projectNone
Waterloo SouthSHPO and THPO concur req224632757-1937/5/20127/13/20128letters sent to SHPO and THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
84th St InterchangeBio doc vers 122465809-3409-Jun-1110-Jun-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
OA 50 ChallengeBio doc version 1224683795-524-Jun-1002-Jul-108approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf sigs, various OmahaDR 53224755099-122-Feb-1122-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf sigs various, OmahaBio doc vers 1224755099-124-Mar-1129-Mar-115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf sigs Omaha vari locatesSHPO concur req224755099-119-May-1119-May-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Traf Ops & Sigs timing studyDR 532247628-10122-Feb-1122-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Papillion Walnut Creek Connector TrailDR-532247777-5915-Sep-1023-Sep-108 NDOR (or LPA) / Must prepare technical and NEPA documentation
96th St. ResurfacingDR 53224785017-419-Jan-1131-Jan-1112mm concurred CE would be appropriate level of analysisNDOR (or LPA) / Must prepare technical and NEPA documentation
96th, Portal-HarrisonBio doc vers 1224785017-405-Apr-1107-Apr-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
69th - 93rd on DodgeDR 532248267-18019-Jan-1131-Jan-1112mm concurred CE appropriate level of NEPA reviewNDOR (or LPA) / Must prepare technical and NEPA documentation
Dodge St Traf Contr SystemBio doc vers 12248267-18022-Mar-1123-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Dodge St 69th - 93rdSHPO concur req2248267-18025-Apr-1125-Apr-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Mud Crk Culvert - PlattsmouthDR 5322483ER 3720-120-Dec-1027-Dec-107signed by Cass Co 10/26/10 and approved by NDOR 12/20/10. Sent to FHWA via email and approved 12/27/10NDOR (or LPA) / Must prepare technical and NEPA documentation
Bellevue signalsDR 53224845109-824-Jan-1131-Jan-117mm concurred with completing a CE for project. May fit a PANDOR (or LPA) / Must prepare technical and NEPA documentation
Bellevue SignalsBio doc vers 1224845109-805-Apr-1107-Apr-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Giles Road Signal Coord.DR 53224855129-129-Jul-1103-Aug-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Metro Omaha Bicycle Safety EducationDR 532249228-1114/13/20124/23/201210 None
Winslow EastDR 5322493ER 3860-123-Sep-1123-Sep-110Dodge Co signed 1/28/11. NDOR signed 9/23/11 and emailed DR53 to FHWA on 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
North Bend NorthwestDR 5322495ER 3465-523-Sep-1123-Sep-110Dodge Co signed 1/28/11. NDOR signed 9/23/11 and emailed DR53 to FHWA on 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Omaha Concrete Panel ReplacementDR 53224985001-1822-Apr-1126-Apr-114approved with comments - packages 1, 2, 3 need to be combined into one NEPA actionNDOR (or LPA) / Must prepare technical and NEPA documentation
Omaha Major Str concrete panel repairDR 53224995026-1422-Apr-1126-Apr-114approved with comments - packages 1, 2, 3 need to be combined into one NEPA actionNDOR (or LPA) / Must prepare technical and NEPA documentation
Omaha concrete panel replaceDR 53225005009-422-Apr-1126-Apr-114approved with comments - packages 1, 2, 3 need to be combined into one NEPA actionNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf sigs St Marys & Park AveDR 53225015-46-304-Mar-1108-Mar-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf sigs St Marys & Park AveBio doc vers 1225015046-315-Mar-1115-Mar-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traf sigs Inters St Marys Ave & Park AveSHPO concur req225015046-315-Apr-1119-Apr-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
1st St Ext, Luther to Johnson, FremontDR 532250327-6209-Jun-1116-Jun-117mm signed, with stipulations-Uniform Act, check for prime farmland, need public outreach, then will confirm NEPA classNDOR (or LPA) / Must prepare technical and NEPA documentation
Concrete Panel RepairDR 53 and 530225055044-65/16/20125/25/20129approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
24th Street Road Diet, OmahaDR 53225065083-74/12/20124/23/201211 NDOR (or LPA) / Must prepare technical and NEPA documentation
Jackson & Blain Impr, BlairDR 53225076462-109-Jun-1116-Jun-117mm signed, with guidance for use during NEPANDOR (or LPA) / Must prepare technical and NEPA documentation
Platteview Road Corridor StudyDR 53225113770-412-Sep-1112-Sep-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traf signals, OmahaDR 53225195103-1514-Jul-1120-Jul-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Traffic Signals at Various Locations-OmahaBio Doc Vers 1225195103-1511/23/201111/28/20115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Traffic Signals at Various Locations, OmahaSHPO concur request225195103-1512/1/201112/8/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Arlington SRTS projectDR 532252389-2919-Aug-1103-Sep-1115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bancroft - Dewey, OmahaDR 53225254809-1033/8/20124/5/201228 NDOR (or LPA) / Must prepare technical and NEPA documentation
I-80/680 Interch Q to L CD Roads, Omaha (WB)DR 5322526809-658/2/20128/15/201213 None
L St - 50th St, OmahaDR 5322527809-663/8/20124/5/201228 NDOR (or LPA) / Must prepare technical and NEPA documentation
Fort Crook Road StripingDR 53225355145-31/13/20121/17/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Major Street Resurfacing, OmahaDR 53225365103-162/13/20122/17/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Blair Connector TrailsDR 5322549889-304/18/20124/23/20125 NDOR (or LPA) / Must prepare technical and NEPA documentation
Schuyler to Fremontpurpose and need31090305(120)09-May-1127-May-1118sent comments to Allison and LenNDOR / address FHWA comments and resubmit
US-30, Schuyler - FremontCoord Plan31091305-12027-Apr-1127-May-1130comments sent to Allison and LenNDOR / address FHWA comments and resubmit
Primrose EastBio doc version 1311926-Jun12/8/201112/14/20116sent comment back to NDORNDOR / address FHWA comments and resubmit
Stanton NorthDR 53312087084-71/3/20121/16/201213approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Stanton NorthSHPO concur req312087084-77/9/20127/13/20124 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Craig NortheastNEPA determ form312263875-220-Sep-1029-Sep-109rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Craig NortheastSHPO concur req312263875-222-Sep-1029-Sep-107consultation package sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Craig NortheastCE312263875-211/10/201111/14/20114approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Norfolk WestClass 2 Update (CE)314172755-13710-Jun-1017-Jun-107 NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Norfolk - 3 projectsSHPO concur req31442353-10527-Sep-1127-Sep-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hartington SEBio doc vers 1315027014-3118-Nov-1024-Nov-106requested DR53 be submitted prior to signing off on bio docNDOR / address FHWA comments and resubmit
Hartington SoutheastDR 53315027014-3106-Dec-1016-Dec-1010approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Hartington SESHPO letter315027014-3116-Mar-1116-Mar-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hartington SECE Form315027014-3124-May-1101-Jun-118approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
PetersburgDR 53315357638-122-Feb-1122-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Petersburg NortheastSHPO Concur Req315352532-111-Jul-1113-Jul-112mm reviewed, to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Petersburg NortheastBio Doc Vers 1315352532-111/23/201112/1/20118approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Petersburg NortheastCat Ex315352532-12/1/20122/14/201213approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Stanton SoutheastDR 53315977084-1006-Dec-1015-Dec-109approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Stanton SEBio doc vers 1315977084-1005-Apr-1107-Apr-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Stanton SESHPO concur req315977084-1027-Apr-1106-May-119letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Stanton SECat Ex315977084-106/11/20126/14/20123approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
N-12 Niobrara E&WAlt Carried Frwd EIS31674125-101120-Sep-1018-Oct-1028 NDOR / address FHWA comments and resubmit
Richland NWDR 53317027019-1016-Dec-1023-Dec-107approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Richland NWSHPO concur req317027019-1022-Mar-1129-Mar-117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Richland SouthwestBio doc vers 1317027019-1021-Apr-1127-Apr-116sent comments back to ZachNDOR / address FHWA comments and resubmit
Richland NWBio doc vers 2317027019-1027-Apr-1102-May-115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Richland NorthwestCE317027019-1028-Jul-1103-Aug-116approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Concord EastDR 53317233130-515-Dec-1017-Dec-102approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Concord EastSHPO Concur Req317233130-530-Sep-1130-Sep-110 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Concord EastBio doc version 1317233130-510/27/201110/28/20111sent comment back to NDORNDOR / address FHWA comments and resubmit
Concord EastBio doc version 1317233130-510/31/201111/2/20112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Fordyce WestDR 53317617014-3406-Dec-1015-Dec-109approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Fordyce WestSHPO concur req317617014-348/7/20128/16/20129 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wayne trail4(f) exemption req3177790-422-Apr-1028-Apr-106mm-Raegan asking Allison why she feels exemption fitsNDOR / address FHWA comments and resubmit
E Jct N-9 to Dakota CityBio Assessment31784354-12009-Aug-1018-Aug-109rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Laurel NortheastSHPO Letter31786206-10812-Aug-1016-Aug-104 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Laurel NortheastNEPA Determ31786206-10820-Aug-1030-Aug-1010rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Laurel NortheastBio doc31786206-10813-Sep-1023-Sep-1010content of letter to Sue to process.mmFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Laurel NortheastNEPA CE31786206-10829-Oct-1008-Nov-1010comments given to Jon Barber to revise mitigastion measure wording and then resubmitNDOR / address FHWA comments and resubmit
Laurel NERevised CE31786206-10808-Nov-1008-Nov-100rb approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
West Bow and Norwegian Bow BridgesNEPA Determ31788814-11518-Aug-1003-Sep-1016 NDOR to address FHWA comments and resubmit
West Bow & Norw Bow BrdgsNEPA Determ 2nd submittal31788814-11527-Sep-1029-Sep-102rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
West Bow Norw. Bow Crk bridges106 consult SHPO concur31788814-11520-Oct-1022-Oct-102letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
West Bow and Norw Bow Crk brgsCE31788814-11503-Dec-1014-Dec-1011approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Petersburg - ElginSHPO concur request31809143-1125/15/20125/25/201210letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Verdigre NorthDR-53318217054-194/2/20124/26/201224approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bloomfield WestT&E Memo318227054-2012-May-1027-May-1015 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Bloomfield WestSHPO concur req318227054-2021-Mar-1129-Mar-118letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bloomfield WestDR 53318227054-2022-Mar-1129-Mar-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bloomfield WestCE318227054-2001-Aug-1104-Aug-113approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Bloomfield WestWetlands determination318227054-207/25/20128/15/201221 None
Foster Northwest & SoutheastDR 5331825134-1107/10/20127/13/20123approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Albion-PetersburgSHPO Concur Req31826143-11412-Jul-1113-Jul-111mm sent back 106 letter, issues involving affects and the determinationNDOR / address FHWA comments and resubmit
Albion to PetersburgSHPO Concur Req R231826143-11422-Jul-1127-Jul-115mm wrote mitigation for 106 and sent to NDOR for concurrence 7/26. 7/27 sent letter to front office for submission to SHPONDOR / address FHWA comments and resubmit
Albion - PetersburgCE31826143-11412/5/201112/9/20114cpmments sent back to NDORNDOR / address FHWA comments and resubmit
Albion - PetersburgCE - revised31826143-1141/30/20122/7/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
E. Jct N-45 to MadisonDR 5331829325-10702-Aug-1105-Aug-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
E Jct N-45 to MadisonSHPO concur request31829325-1072/14/20122/17/20123letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Albion WwestDR 5331833915-11828-Sep-1004-Oct-106rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Albion WestSHPO concur request31833915-1183/14/20123/15/20121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Albion WestCat Ex31833915-1188/1/20128/15/201214approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Norfok 25th St wideningBio doc vers 1318756001-101-Mar-1102-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Norfolk 25th St.Reeval318756001-116-Mar-1117-Mar-111Asked Allison for documentation of the subsequent coordination with USACE that they are ok with the changes to the wetland impacts and corresponding mitigation site.NDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Norfolk 25th St.Reeval memo318756001-129-Mar-1131-Mar-112Mitigation measures from CE and Re-eval need to be compiled in one location (in mit measures section of re-eval) and NDOR cover letter needs revising - discussed comments with JonNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
25th St, NorfolkReeval Memo318756001-101-Apr-1101-Apr-110approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Martinsburg NEDR 53318807026-2022-Mar-1129-Mar-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Martinsburg NESHPO concur req318807026-206/25/20126/27/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Union Crk to N-57Bio doc vers 131887326-11109-Nov-1012-Nov-103rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Stanton SouthDR 5331889573-10711/7/201111/14/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Stanton SouthSHPO concur request31889573-1075/18/20125/25/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Stanton SouthBio doc version 131889573-1077/10/20127/16/20126letters sent to NGPC and USFWSFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wayne BridgesSHPO Concur Req31893154-11829-Sep-1130-Sep-111 NDOR / address FHWA comments and resubmit
N-32 - PilgerBio doc vers 131894153-11328-Oct-1003-Nov-106letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N-32 to Pilger, Stanton CoSHPO concur req31894153-11306-Jan-1107-Jan-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Tilden and Battle Creek NorthBio doc vers 131897453-11021-Dec-1027-Dec-106letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fordyce East & WestDR 5331912126-11611-Oct-1113-Oct-112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N-13 to OsmondDR 53319171214-11112-Jul-1119-Jul-117 NDOR (or LPA) / Must prepare technical and NEPA documentation
N-13 to OsmondSHPO concur request319171214-1115/17/20126/4/201218letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Santee SpurDR 5331918S54D-10301-Aug-1104-Aug-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Santee SpurSHPO concur request31918S54D-10311/15/201111/22/20117sent comments back to NDORNDOR / address FHWA comments and resubmit
Santee SpurSHPO concur - revised31918S54D-10312/6/201112/8/20112letter sent to SHPO and THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Santee SpurBio doc version 131918S54D-10312/30/20111/3/20124letters sent to Tribe, BIA, USFWS, and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Santee SpurTribal SHPO concur request31918S54D-1031/10/20121/10/20120letter sent to TribeFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
W. Jct N-15 to NewcastleDR 5331919126-11513-Jun-1116-Jun-113concurred on CE.mmNDOR (or LPA) / Must prepare technical and NEPA documentation
Wayne WestDR 5331920354-1212/16/20122/17/20121approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Columbus projectsBio doc vers 1319246065-228-Sep-1001-Oct-103rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Columbus projectsSHPO Concur req319246065-529-Sep-1001-Oct-102letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Columbus ViaductsHazMat Section review319246061-806-Dec-1006-Dec-100comments back to AllisonNDOR / address FHWA comments and resubmit
Columbus viaductsDEA319246065-504-Apr-1105-Apr-111approved for public/agency review and commentNDOR / prepare for public outreach (if document is a DEA, the outreach is a hearing)
UPRR/3rd Ave. & UPRR/12th & 18th Ave., ColumbusPublic Meeting Materials319246065-520-Apr-1125-Apr-115comments provided to City/HDR during monthly conference callNDOR / address FHWA comments and resubmit
Columbus ViaductsFinal EA319246065-520-Jun-1121-Jun-111mm sent comments directly to consultant and NDOR vai emailNDOR / address FHWA comments and resubmit
Columbus Viaductspartial submittal FEA#2319246065(5)01-Jul-1101-Jul-110mm reviewed and sent back a few notesNDOR / address FHWA comments and resubmit
Columbus ViaductsFEA, version 3319246065-508-Jul-1108-Jul-110mm sent back a few minor edits in response to the new text addedNDOR / address FHWA comments and resubmit
N-57 to WisnerBio doc version 1319382756-14011/22/201111/25/20113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-57 to WisnerSHPO concur request319382756-1402/8/20122/17/20129comments sent back to NDORNDOR / address FHWA comments and resubmit
N-57 to Wisner106 Concur Req (2nd Submittal)319382756-1403/28/20124/25/201228sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N-57 to WisnerCat Ex319382756-1406/12/20126/21/20129comments sent back to NDORNDOR / address FHWA comments and resubmit
N57 to WisnerCat Ex v4319382756-1408/14/20128/14/20120approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
N-57 - WisnerCat Ex - 3rd submittal319382756-1408/7/20128/9/20122comments sent back to ndorNDOR / address FHWA comments and resubmit
N-57 to WisnerCat Ex - 2nd submittal319382756-1407/16/20127/23/20127comment regarding hazmat sent to NDORNDOR / address FHWA comments and resubmit
Rogers East & WestDR 5331942306-13225-Oct-1026-Oct-101rb approved with comments - should be combined with 306-134 projectNDOR (or LPA) / Must prepare technical and NEPA documentation
In Madison & EastDR 5331950325-10812-Apr-1115-Apr-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In Madison & EastSHPO concur req31950325-10811-Oct-1112-Oct-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
25th St Improvments Norfolk4(f) De Minimis319756001-112-May-1014-May-102comments sent back to Allison ZachNDOR / address FHWA comments and resubmit
3rd Ave, ColumbusDR 53319906065-612-Aug-1117-Aug-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Windom, E 7 to E 3, WayneDR 53319916709-210-Nov-1012-Nov-102rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Windom St, E 7th - E 3rd, WayneSHPO concur req319916709-202-Sep-1106-Sep-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Windom St, from E. 3rd to E. 7thBio doc version 1319916709-212/22/201112/23/20111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Jct US 75 & US 77, N-35SHPO concur req31995754-11029-Sep-1004-Oct-105letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Winside EastDR 53320113100-124-Jan-1131-Jan-117mm concurred with completing a CENDOR (or LPA) / Must prepare technical and NEPA documentation
Winside EastBio doc vers 1320113100-108-Apr-1108-Apr-110approved bio doc no affectthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Winside EastSHPO concur req320113100-125-Apr-1125-Apr-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Winside EastCE320113100-107-Jul-1108-Jul-111mm approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Howells NorthDR 53320433175-306-Dec-1015-Dec-109approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Howells NorthSHPO concur request320433175-312/1/201112/8/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Howells NorthBio doc version 1320433175-312/7/201112/14/20117sent comment back to NDORNDOR / address FHWA comments and resubmit
Howells NorthBio doc - revised320433175-312/15/201112/20/20115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Howells NorthCE320433175-33/27/20124/23/201227sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Howells NorthCat Ex - revised320433175-36/6/20126/12/20126approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Crofton EastDR 5332061125-11512/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crofton EastSHPO concur request32061125-1156/5/20126/6/20121"comments sent to NDOR
"NDOR / address FHWA comments and resubmit
Norfolk to StantonSHPO concur req32063246-10203-Aug-1104-Aug-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wayne WestDR 53320677090-2011-Apr-1112-Apr-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Autumn Olive Land - Riverview DrDR 53320745314-206-Apr-1112-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Pierce Co SRTSDR 533207670-2002-Mar-1102-Mar-110 NDOR (or LPA) / Must prepare technical and NEPA documentation
Pierce Community SRTSSHPO concur req3207670-2013-Jun-1120-Jun-117mm reviewed, gave to SP to format for sig and send to SHPO 6/16/11FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Santee Community SRTSDR 533207854-177/13/20127/24/201211approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Dakota AveBio doc - version 1320815305-1007-May-1020-May-1013bio approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Cedar Rapids Bridge Renova.DR 53320835-Jun19-Aug-1103-Sep-1115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Dakota City Depot RenovationSHPO concur req3208422-297/26/20128/14/201219sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Distr 3 High Mast TwrBio doc version 1320903-10116-Jun-1021-Jun-105rb approved BAthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Missing Link TrailDR 533210722-3021-Sep-1126-Sep-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
South Sioux City Missing LinkBio doc version 13210722-303/2/20123/8/20126approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
South Sioux City Missing Link Trail106 Concur Req3210722-303/28/20124/25/201228sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-30 NE of SchuylerBio Assessment32109306-13606-Aug-1018-Aug-1012rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US30 NE of SchuylerSHPO concurrence request32109306(106)01-Sep-1023-Sep-1022mm letter to Sue to format 9/23/10FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct N-91 and US-81Bio doc vers 132113915-12326-Oct-1027-Oct-101rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US-77 Intersection ImprovementDR 5332114327-1111/4/20121/16/201212approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Jct N-32/US-77SHPO concur req32114327-1116/7/20126/14/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct Us-20 - Jct N-59Bio doc vers 132117814-11929-Sep-1004-Oct-105rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Decatur SouthDR 5332121753-1173/16/20124/6/201221approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In South Sioux CityDR 5332122774-1261/23/20122/1/20129approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Santee Spur EastDR 5332135125-11611/7/201111/14/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Santee Spur EastSHPO and THPO concur requests32135125-1165/22/20126/6/201215letters sent to SHPO and THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Macy to WinnebagoBio doc vers 132140754-11115-Mar-1116-Mar-111letters sent to BIA and tribal contactsFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Macy - WinnebagoSHPO concur req32140754-11113-Jul-1119-Jul-116mm reviewed, sent to front office to mailFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wayne underpassDR 533215390-607-Dec-1015-Dec-108approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Norfolk Elkhorn River TrailSHPO concur req3215459-228/6/20128/16/201210 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Norfolk Elkhorn River TrailBio doc version 13215459-227/12/20127/26/201214sent comments back to NDORNDOR / address FHWA comments and resubmit
Norfolk Elkhorn River TrailBio doc version 23215459-227/26/20127/26/20120letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
West of ColumbusDR 5332163813-14509-Mar-1110-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Jct US-81/N-22 West of ColumbusSHPO concur request32163813-14512/6/201112/9/20113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct US-81/N-22 West of ColumbusTHPO concur request32163813-1453/5/20123/6/20121Letter sent to Iowa TribeFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Thurston Spur North and SouthDR 533216494-11701-Jun-1110-Jun-119approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Thurston Spur South and NorthBio doc version 13216494-11711/22/201111/28/20116need Tribal contact information filled out on BENDOR / address FHWA comments and resubmit
Thurston Spur South and NorthBio Doc V23216494-11711/30/201112/13/201113bio document approved, coordination package sent to Tribes and BIA on 12/13/11FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Thurston Spur North and SouthSHPO concur request3216494-1172/28/20123/6/20127letters sent to Omaha, Winnebago, BIA (Aberdeen), and SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Thurston Spur North and SouthTHPO concur request - 2nd submittal3216494-1174/23/20125/9/201216Letters sent to Tribes and BIA todayFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Tilden North Bank RepairDR 5332168ER 2580-223-Sep-1123-Sep-110Antelope Co signed 3/1/11. NDOR signed 9/23/11 and emailed to FHWA on 9/23/11. FHWA concurred to proceed as PCE/CE. MmNDOR (or LPA) / Must prepare technical and NEPA documentation
South Sioux City TrailDR 533216922-3212-Sep-1116-Sep-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Emergency Repair ProjectsDR 5332173ER 3-10211/9/201111/10/20111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Temp 2010 ER ProjectsSHPO concur request321733-1021/3/20121/3/20120letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Knox Co Rumble BarsDR 533217654-2022-Feb-1123-Feb-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Knox County Rumble BarsBio doc version 13217654-204/17/20124/23/20126made comments, but told NDOR to incorporate teh comments and finalize with no need to re-send to FHWA.mmNDOR (or LPA) / Must prepare technical and NEPA documentation
Orchard SouthDr5332177ER 2605(4)07-Mar-1107-Mar-110received and approved at meeting. FHWA met with project proponent, NDOR, and resource agencies in the field to provide guidanceNDOR (or LPA) / Must prepare technical and NEPA documentation
Orchard SouthShPO concur request32177ER 2605-412/6/201112/6/20110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Orchard SouthBio doc version 132177ER 2605-412/19/201112/19/20110USFWS and NGPC know the project is coming their way; they've been informed of the project and had tentatively agreed to the affect determination and the conservation conditions. They've also committed to expediting the review.mmFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Orchard SouthCE32177ER 2605-41/10/20121/11/20121comments sent back to NDORNDOR / address FHWA comments and resubmit
Orchard Southdraft CE32177ER 2605-41/13/20121/17/20124approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Wakefield Logan Crk Trl Phse 2DR 533217826-1404-Mar-1108-Mar-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Meadow Grove NDR 5332180ER 2895-223-Sep-1123-Sep-110Madison Co signed 2/23/11. NDOR signed 9/23/11 and emailed to FHWA on 9/23/11. FHWA concurred to proceed as PCE/CE- requested they coordinate with FHWA Engineer soonNDOR (or LPA) / Must prepare technical and NEPA documentation
Battle Creek NorthDR 53 - 132181ER 2915-323-Sep-1123-Sep-110Madison Co signed 2/23/11. NDOR signed 9/23/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CE -requested they coordinate with FHWA Engineer soonNDOR (or LPA) / Must prepare technical and NEPA documentation
Battle Creek North 2??DR 53 - 232181ER 2915-323-Sep-1123-Sep-110Madison Co signed 2/23/11. NDOR signed/approved 9/23/11 and emailed to FHWA 9/23/11. FHWA asked why different scopes for same numbers? Concurred to proceed as PCE/CE requested they coordinate with FHWA Engineer soonNDOR (or LPA) / Must prepare technical and NEPA documentation
Riverview Dr to Foundary Road, Dakota CountyDR 53321845314-311/25/201112/1/20116emailed comments to NDORNDOR / address FHWA comments and resubmit
W 29th, US-77 to Lake AveDR 53321865306-811/25/201112/1/20116sent comments to NDORNDOR / address FHWA comments and resubmit
East 14th Ave, ColumbusDR 53321876067-128-Jun-1130-Jun-112mm sent back -missing required attachment and scope unclearNDOR (or LPA) / Must prepare technical and NEPA documentation
SRTS Clarkson and HowellsDR 533218819-1101-Jun-1110-Jun-119approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Schuyler ResurfacingDR 53321896957-128-Jun-1130-Jun-112mm concurred with some conditions-need early public outreach in NEPA if possible access restrictionsNDOR (or LPA) / Must prepare technical and NEPA documentation
Columbus East ViaductDR 533219071-331/13/20121/17/20124approved with probable class of action an EA.NDOR (or LPA) / Must prepare technical and NEPA documentation
Primrose EastDR 53321926-Jun13-Jul-1120-Jul-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Primrose EastSHPO concur request321926-Jun12/7/201112/9/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Primrose EastCE321926-Jun1/30/20122/3/20124comments sent back to NDORNDOR / address FHWA comments and resubmit
Primrose EastCat Ex321926-Jun2/9/20122/17/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Norfolk-StantonBio doc vers 132603246-10204-Feb-1108-Feb-114sent comment back to EricNDOR / address FHWA comments and resubmit
Norfolk - StantonBio doc vers 232603246-10208-Feb-1108-Feb-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Bloomfield WestSHPO concur req381227054-2021-Apr-1125-Apr-114comments sent to AllisonNDOR / address FHWA comments and resubmit
Red Cloud NorthwestDR-53411497091-54/2/20124/6/20124approved NDOR (or LPA) / Must prepare technical and NEPA documentation
Red Cloud NWSHPO concur request411497091-55/17/20125/31/201214letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Red Cloud WestDR 53413802145-708-Apr-1112-Apr-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In Polk and WestDR 5341526665-10423-Feb-1123-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bradshaw SoutheastDR-53416347093-2321-Oct-1021-Oct-100rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bradshaw SESHPO concur req416347093-2329-Oct-1004-Nov-106letter mailed to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Red Cloud SouthDR 53418772811-11203-Oct-1105-Oct-112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Red Cloud SouthSHPO concur req418772811-11211-Oct-1113-Oct-112comments sent back to NDORNDOR / address FHWA comments and resubmit
Ord NorthDR 5341914704-10630-Nov-1013-Dec-1013approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ord NorthSHPO concur req41914704-10625-Feb-1128-Feb-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Locust St., Grand IslandDR 5341994344-12627-Sep-1004-Oct-107no action - approved in a meetingNDOR (or LPA) / Must prepare technical and NEPA documentation
Locust St, Grand IslandSHPO concur41994344-12613-Oct-1022-Oct-109letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-281 to Locust Sreet, Grand IslandBio doc version 141994344-12612/14/201112/15/20111letters to be sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-281 - Locust Street, Grand IslandSuppl 106 concur request41994344-1262/13/20122/14/20121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Locst St, Grand IslandCat Ex - revised41994344-1266/11/20126/12/20121need commitment added. verbally discussed with NDOR.NDOR / address FHWA comments and resubmit
Central City viaductDR 5342013142-12309-Mar-1110-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wood River WestSHPO concur req42032112-11429-Oct-1008-Nov-1010letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wood River WestBio doc vers 142032112-11430-Nov-1010-Dec-1010approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Wood River WestReevaluation42032112-11425-Apr-1102-May-117comments sent back to JonNDOR / address FHWA comments and resubmit
North Loup to OrdDR 5342089113-11612-Apr-1115-Apr-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Loup to OrdSHPO concur req42089113-11620-Jul-1126-Jul-116mm: reviewed letter, gave to front office to format and sendFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup to OrdPurpose and Need42089113-1165/7/20125/11/20124comments sent back to NDORNDOR / address FHWA comments and resubmit
Kearney BypassDraft final EA42103Oct-5102-Jul-1023-Jul-1021sent comments to NDORNDOR / address FHWA comments and resubmit
KearneyFinal EA42103Oct-5108-Sep-1010-Sep-102comments given verbally to Jon Barber to make sure MBTA, BGEA and TE conservation conditions are consistent in text and mitigation sections of EA.NDOR / address FHWA comments and resubmit
Kearney BypassFinal EA4210310--5127-Sep-1028-Sep-101document signeddocument approved, FHWA to issue decision document
Kearney EastMerge letter42103Oct-5101-Oct-1001-Oct-100 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kearney East BypassDraft Public Responses42103Oct-5109-Dec-1010-Dec-101 NDOR / address FHWA comments and resubmit
Kearney BypassACE P&N com review42103Oct-5117-Dec-1020-Dec-103 NDOR / address FHWA comments and resubmit
Kearney BypassErrata doc42103Oct-5103-Jan-1106-Jan-113contained info needed for incorporation into our decision docdocument approved, FHWA to issue decision document
In SuperiorDR 53421361990-707-Jul-1111-Jul-114mm concurred with CE, but asked why a reeval not consideredNDOR (or LPA) / Must prepare technical and NEPA documentation
In SuperiorBio doc version 1421361990-711/18/201111/23/20115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In SuperiorSHPO concur request421361990-71/30/20122/3/20124comments sent back to NDORNDOR / address FHWA comments and resubmit
In Superior4(f) concurrence421361990-71/31/20122/13/201213approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In SuperiorSHPO concur request421361990-72/8/20122/14/20126letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In SuperiorCat Ex421361990-76/12/20126/12/20120comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
In SuperiorCat Ex421361990-78/9/20128/14/20125comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Jct. N-78 WestDR 53421621364-11230-Mar-1131-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Jct N-78 WestSHPO Concur Req421621364-11207-Jul-1111-Jul-114mm 7/11 gave to front office for mailingFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct N-78 WestBio doc version 1421621364-1122/3/20122/17/201214document reviewed, signed, and ready to go to agencies. will go out either today or Monday.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct N-78 West106 Concur Req421621364-1124/2/20124/25/201223sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct. N-78 WestCat Ex421621364-1126/11/20126/12/20121comments sent back to NDORNDOR / address FHWA comments and resubmit
Jct. N-78 WestCat Ex - revised421621364-1126/18/20126/26/20128sent comments to NDOR concerning culvert locationNDOR / address FHWA comments and resubmit
Jct. N-78 WestCat Ex - 3rd submittal421621364-1126/27/20126/28/20121approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Geneva NorthwestBio doc vers 1422267030-3021-Sep-1029-Sep-108rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Geneva NWDR 53422267030-3024-Jan-1131-Jan-117mm concurred CE appropriate - recommended double-checking to ensure ROW already acquired met Uniform Act requirementsNDOR (or LPA) / Must prepare technical and NEPA documentation
Geneva NWSHPO concur request422267030-302/3/20122/14/201211letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ayr NEDR 53422357001-1124-Jan-1131-Jan-117mm concurred CE for project-recommended checking eligibility of bridge earlyNDOR (or LPA) / Must prepare technical and NEPA documentation
Ayr NortheastSHPO concur request422357001-1112/1/201112/8/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ayr NortheastBio doc version 1422357001-111/23/20121/25/20122approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Ayr NortheastCE and Checklist422357001-113/28/20124/23/201226sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Ayr NortheastCE - revised with comments422357001-115/3/20125/9/20126sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Ayr NortheastCat Ex422357001-115/10/20125/10/20120CE didn't contain NDOR signatures. Verbally told NDOR to review/sign and resubmit.NDOR / address FHWA comments and resubmit
7001-11Cat Ex - version 342235Ayr NE5/11/20125/11/20120approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
12th, Elm Ave - 6th AveDR 53422925516-728-Jan-1131-Jan-113mm concurred a CE should be adequateNDOR (or LPA) / Must prepare technical and NEPA documentation
12th St. Elm to 6th AveSHPO concur request422925516-74/17/20124/27/201210sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
12th St Improvements4(f) exception422925516-76/14/20126/14/20120 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
12th St. Elm to 6th AveSHPO concur req -revised422925516-76/6/20126/25/201219waiting for 4(f) language from NDOR to insert into SHPO letterNone
12th St. ImprovementsSHPO letter422925516-76/28/20127/2/20124letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
12th St Improvements, HastingsCat Ex422925516-78/3/20128/3/20120approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
12th St, Elm - 6th Ave4(f) determ422925516-77/26/20127/26/20120 None
Platte River to US-81DR 5342302925-10711/16/201111/23/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Platte River to US-81SHPO concur req42302925-1078/8/20128/16/20128 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Grand Island NWDR 53423227040-251/11/20121/16/20125approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Palmer NWDR 53423357061-271/23/20122/3/201211approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Archer SouthwestDR 53423687061-281/24/20122/3/201210approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lushton NortheastDR 53423722690-312-Aug-1115-Aug-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lushton NortheastBio doc version 1423722690-32/1/20122/3/20122approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Wood River - Grand IslandDR 5342399304-14911/25/201112/5/201110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wood River - Grand IslandSHPO concur request42399304-1492/22/20123/6/201213letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hampton LinkBio doc vers 142402L41D-10129-Sep-1029-Sep-100letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hampton LinkSHPO concur req42402L41D-10117-Nov-1023-Nov-106comments sent back to NDORNDOR / address FHWA comments and resubmit
Hampton LinkSHPO concur req42402L41D(101)24-Nov-1024-Nov-100letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fullerton SouthCE Determination42403142-12412-Apr-1019-Apr-107 NDOR / address FHWA comments and resubmit
Fullerton SouthDR-5342403142-12422-Nov-1015-Dec-1023approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Fullerton S & in FullertonAltern Analysis memo42403142-12403-Feb-1115-Feb-1112approved as long as USACE comments addressedNDOR (or LPA) / Must prepare technical and NEPA documentation
Fullerton SouthSHPO concur req42403142-12414-Feb-1116-Feb-112letter sent to SHPO todayFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Fullerton South & In Fullerton and SouthCE42403142-12416-Sep-1119-Sep-113comments sent back to NDORNDOR / address FHWA comments and resubmit
Fullerton Southrevised CE - 9/21/1142403142-12421-Sep-1122-Sep-111 NDOR / address FHWA comments and resubmit
Fullerton Southrevised CE - 9/23/1142403142-12423-Sep-1123-Sep-110approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Chapman-Central CityBio doc vers 142405305-13018-Oct-1021-Oct-103rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Chapman - Central CityDR 5342405305-13004-Nov-1008-Nov-104rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Phillips - GiltnerBio doc vers 142415807-15130-Nov-1013-Dec-1013letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Aurora E & WDR 5342416807-15217-Mar-1117-Mar-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Aurora East & WestBio doc vers 142416807-15206-May-1106-May-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Geneva WestDR 53424357030-3219-Aug-1103-Sep-1115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In Blue Hill & SouthSHPO concur req424432811-11431-Mar-1131-Mar-110lettter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Blue Hill & SouthBio doc vers 1424432811-11409-Aug-1109-Aug-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In Blue Hill and SouthCE424432811-11412/5/201112/12/20117comments emailed back to NDORNDOR / address FHWA comments and resubmit
In Blue Hill and SouthCE - revised424432811-1141/27/20122/7/201211need signature page from NDORNDOR / address FHWA comments and resubmit
Hastings NortheastDR 53424452038-114-Oct-1117-Oct-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hastings NortheastBio doc version 1424452038-111/1/201111/2/20111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hastings NortheastSHPO concur request424452038-112/15/201112/21/20116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hastings NortheastCat Ex424452038-15/25/20126/6/201212approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Little Blue River, AyrDR 5342446744-10906-May-1111-May-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Little Blue River AyrSHPO concur req42446744-10912-Aug-1117-Aug-115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Geneva NorthDR 5342453811-12111/15/201111/23/20118approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
In AshtonDR 53424602065-419-Nov-1024-Nov-105approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In AshtonSHPO concur req424602065-422-Feb-1124-Feb-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In AshtonBio doc vers 1424602065-405-Apr-1107-Apr-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Central City NorthDR 5342475142-12729-Jun-1101-Jul-1126/28 orig doc sent 6/16, but was only cover pg. NDOR sent actual doc 6/29NDOR (or LPA) / Must prepare technical and NEPA documentation
Central City NorthSHPO concur request42475142-1272/6/20122/14/20128letter sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Fullerton and SouthBio doc vers 142476142-12421-Apr-1127-Apr-116letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Prosser SpurSHPO concur req42482S40D-10529-Oct-1008-Nov-1010rb sent comments to Sara Porter to address and resubmitNDOR / address FHWA comments and resubmit
Prosser SpurBio doc vers 142482S40D-10509-Nov-1012-Nov-103comments sent back to Eric ZachNDOR / address FHWA comments and resubmit
Prosser SpurRev 106 Concur Request Letter42482S40D-10524-Nov-1010-Dec-1016letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Prosser SpurBio doc vers 242482S40D-10530-Nov-1010-Dec-1010comments sent back to EricNDOR / address FHWA comments and resubmit
Prosser SpurNEPA Determ form42482S40D-10525-Oct-1014-Dec-1050approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Prosser SpurBio doc vers 342482S40D-10514-Dec-1017-Dec-103comments sent to EricNDOR / address FHWA comments and resubmit
Prosser SpurBio doc vers 342482S40D-10517-Dec-1017-Dec-100letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Prosser SpurNDOR Concur Req42482S40D-10519-Jan-1124-Jan-115mtg held on 1/24. Preferred Alt identified among agencies. NDOR to provide Mtg minutes.NDOR / address FHWA comments and resubmit
Prosser SpurDetour memo42482S40D-10525-Jan-1131-Jan-116mm sent back with commentsNDOR / address FHWA comments and resubmit
Prosser SpurSHPO Detour Resurf memo42482S40D-10501-Feb-1102-Feb-111concurrence receivedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Prosser SpurBIO Detour Resurf memo42482S40D-10502-Feb-1102-Feb-110approved mmthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Prosser SpurSHPO Detour Memo R242482S40D-10516-Mar-1117-Mar-111sent comments to Sara.NDOR / address FHWA comments and resubmit
Prosser spurSHPO Detour resurf memo R242482S40D-10525-Mar-1130-Mar-115SHPO signed letter; signed letter provided to NDORthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Prosser SpurCE doc42482S40D-10504-May-1106-May-112sent comments back to SaraNDOR / address FHWA comments and resubmit
Prosser SpurCE submittal 242482S40D-10526-May-1127-May-111approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Nance Co ResurfacingDR 53424872490-405-Oct-1106-Oct-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Nance County ResurfacingBio doc version 1424872490-42/14/20122/17/20123letters sent to the agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Gibbon - SheltonDR 5342511806-10317-Mar-1117-Mar-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Gibbon - SheltonBio Doc42511806-10326-Apr-1127-Apr-111letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Shelton - Wood RiverDR 5342512806-10404-Feb-1107-Feb-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Shelton to Wood RiverBio doc vers 142512806-10407-Mar-1108-Mar-111document missing fed species matrix page. Comment sent to Eric to revise and resubmit.NDOR / address FHWA comments and resubmit
Shelton - Wood RiverBio doc vers 242512806-10411-Mar-1115-Mar-114letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hampton to HendersonDR 5342514807-1551/24/20122/3/201210approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Henderson-WacoDR 5342515807-15611/4/201111/9/20115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Waco - UticaDR 5342516808-14409-Dec-1015-Dec-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Waco to UticaBio doc vers 142516808-14407-Mar-1108-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Minden-GiddonDR-5342517806-1054/2/20124/6/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Walk to Walnut - SRTSDR 534252140-5703-Jan-1111-Jan-118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
SRTS Walk to Walnut4(f) de minimis4252140-5731-Aug-1119-Sep-1119Sent comments to NDORNDOR / address FHWA comments and resubmit
Walk to Walnut SRTSBio doc vers 14252140-5719-Sep-1119-Sep-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Walk to WalnutSHPO concur req4252140-5703-Oct-1105-Oct-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Walk to Walnut4(f) De Minimis4252140-5713-Oct-1117-Oct-114comment sent back to NDORNDOR / address FHWA comments and resubmit
Walk to Walnut SRTS4(f) de minimis4252140-5710/27/201111/2/20116 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Walk to WalnutCE4252140-5712/27/20111/4/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Grand Island Walk to Walnut4(f) reconsideration4252140-578/6/20128/6/20120 None
East Lochland RdTraffic Noise Summary425257552-125-Mar-1025-Mar-100 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Ft Kearney Bridge RehabDR 5342551Oct-6202-Nov-1003-Nov-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Loup City Red Raider SRTSDR 534255882-1412-Sep-1116-Sep-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
York EastDR 5342564345-11418-Apr-1121-Apr-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
York EastBio doc version 142564345-1141/12/20121/17/20125letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hastings EastDR 534256564-12610/26/201110/28/20112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
St. Paul NorthDR-53425672812-1264/2/20124/23/201221comment sent back to NDORNDOR / address FHWA comments and resubmit
Alda LinkDR 5342568L40C-10605-Apr-1111-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Red Cloud EastDR 53425691364-11312/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Buffalo / Dawson County LineSHPO concur req42571304-15520-May-1127-May-117comments sent back to CarinNDOR / address FHWA comments and resubmit
Buffalo-Dawson Co. Line EastSHPO concur req42571304-15513-Jun-1123-Jun-11106/23 mm sent letter to AB for formatting/mailing, went out todayFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Buffalo/Dawson County Line EastBio doc version 142571304-15511/1/201111/2/20111letters sent to agencies.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Buffalo/Dawson County Line EastCat Ex - revised42571304-1558/2/20128/9/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Buffalo/Dawson County Line EastCat Ex42571304-1557/12/20127/23/201211comments sent back to NDORNDOR / address FHWA comments and resubmit
Hastings SouthDR 53425772811-11518-Apr-1121-Apr-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Grafton WestBio doc4257965-11313-Sep-1023-Sep-1010mm letter given to Sue today to formatFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Grafton WestNDF4257965-11322-Sep-1004-Oct-1012rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Grafton WestSHPO concur req4257965-11310-Dec-1017-Dec-107letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Grafton WestCE determ form - V14257965-11331-Jan-1102-Feb-112approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
2nd Av, 25th-31st, KearneySHPO concur req42580304-15623-Nov-1023-Nov-100letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
25th - 31st, KearneyBio Doc vers 142580102-11910/18/201110/28/201110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
2nd Ave, 25th - 31st, KearneySHPO concur request42580102-11912/15/201112/20/20115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
25th - 31st St, KearneyCE42580102-1192/27/20123/8/201210approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
5th Ave, KearneyDR-5342585304-15617-Nov-1023-Nov-106approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
5th Ave, KearneyBio doc vers 142585304-15605-Jan-1107-Jan-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
5th Ave - KearneySHPO concur req42585304-15605-Jan-1107-Jan-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
East Jct US-281 EastDR 5342590744-11014-Dec-1014-Dec-100 NDOR (or LPA) / Must prepare technical and NEPA documentation
E Jct US-281 EastSHPO concur req42590744-11025-Mar-1131-Mar-116comments emailed to Steve.NDOR / address FHWA comments and resubmit
E Jct US-281 EastSHPO concur req - rev42590744-11008-Apr-1113-Apr-115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Geneva & WestDR 5342591415-1075/24/20126/8/201215approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In North Loup and SouthDR 5342593113-12011/15/201111/17/20112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Loup and SouthSHPO concur request42593113-1203/13/20123/15/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In North Loup & SouthBio doc42593113-1206/25/20127/2/20127letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Guide Rock & SouthSHPO concur req42594781-10401-Apr-1107-Apr-116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Guide Rock & SouthDR 5342594781-10406-Apr-1107-Apr-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Jct N-92 NorthBio doc vers 142595112-11818-Oct-1021-Oct-103rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hwy N-11, Jct N-92 N, Howard CountySHPO concur req42595112-11817-Nov-1023-Nov-106letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Phillips EastBio Doc42596345-11508-Nov-1008-Nov-100rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
South Junction N-58 East106 Consultation Letter42597924-10914-Jul-1026-Jul-1012sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N Jct N-14 to GenoaDR-5342600225-1164/2/20124/23/201221approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
E. Jct. US-30 SouthDR 5342601102-12012-Oct-1013-Oct-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
E. Jct. US-30 SouthSHPO concur42601102-12015-Oct-1022-Oct-107letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
East Jct US-30 SouthBio doc vers 142601102-12014-Dec-1020-Dec-106letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Loup City NortheastDR 53426142085-409-Jun-1116-Jun-117mm concurred, added guidance regarding termini and 3R considerationsNDOR (or LPA) / Must prepare technical and NEPA documentation
St. Paul EastDR 5342618924-11211/15/201111/22/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Giltner E & WBio doc vers 142630807-15824-Mar-1101-Apr-118letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Giltner East & WestSHPO concur req42630807-15816-May-1127-May-1111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Multi-location Resurfacing HastingsDR53426315516(8)06-Dec-1014-Dec-108approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hastings resurfacingSHPO concur req426315516-814-Dec-1017-Dec-103letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Resurf Hastings - mult. LocatesBio doc vers 1426315516-805-Jan-1107-Jan-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
GI State & Capitol Av TrlDR 534265040-5903-Feb-1103-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
GI Connector TrailSHPO concur req4265040-5906-Oct-1107-Oct-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
State St & Cap Ave Connect TrailBio doc vers 14265040-5907-Oct-1107-Oct-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
State Street & Capital Ave Connector Trail4(f)4265040-5910/28/201111/2/20115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
State Street to Capital Ave Connector TrailCE4265040-5912/29/20111/10/201212approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
13th & Wheeler Dwntwn lightingDR 534265140-6024-Jan-1131-Jan-117mm approved to proceed as CE. Recommended early SHPO coordinationNDOR (or LPA) / Must prepare technical and NEPA documentation
3rd and Wheeler Downtown Historic LightingBio doc version 14265140-6012/14/201112/20/20116approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
3rd & Wheeler Downtown Historic Lighting ProjectSHPO concur request4265140-603/8/20123/15/20127comments sent back to NDORNDOR / address FHWA comments and resubmit
3rd & Wheeler Downtown Historic LightingRevised SHPO concur request4265140-603/16/20123/22/20126letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kearney E Via removalDR 5342653805-7001-Oct-1001-Oct-100rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Kearney E viad removalBio doc vers 142653805-7030-Nov-1010-Dec-1010letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kearney E viaduct removalCE doc42653805-7008-Apr-1113-Apr-115approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
US-281 - LawrenceSHPO concur req4265444-10824-Jan-1131-Jan-117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-281 - LawrenceDR 534265444-10825-Jan-1131-Jan-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Structures W of AuroraDR 5342661807-16004-Apr-1111-Apr-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
I-80 Structures W of AuroraSHPO concur req42661807-16012-Aug-1117-Aug-115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Rose Creek BridgeBio doc vers 14266385-10901-Oct-1012-Oct-1011letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Rose Creek BridgeNEPA Determ form4266385-10901-Dec-1014-Dec-1013approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Rose Creek NE of HubbellSHPO concur req4266385-10931-Mar-1131-Mar-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Rose Creek BridgeNEPA CE4266385-10911-Jul-1113-Jul-112mm reviewed CE, sent back commentsNDOR / address FHWA comments and resubmit
Rose Creek Bridge NE of HubbellCE form4266385-10929-Aug-1106-Sep-118approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Mormon Island Trl BrDR 534266640-6121-Mar-1123-Mar-112comments sent to AllisonNDOR (or LPA) / Must prepare technical and NEPA documentation
Wood River - Grand IslandDR 5342667806-10911-Feb-1114-Feb-113approved, needs to be combined with 806-110NDOR (or LPA) / Must prepare technical and NEPA documentation
WoodRiver - Grand IslandBio doc vers 142667806-10922-Feb-1124-Feb-112sent comments to Eric - should be combined with 806-110NDOR / address FHWA comments and resubmit
Platte River - PhillipsDR 5342668806-11011-Feb-1114-Feb-113approved, needs to be combined with 806-109NDOR (or LPA) / Must prepare technical and NEPA documentation
Platte Rvr to PhillipsBio doc vers 142668806-11022-Feb-1124-Feb-112sent comments to Eric - should be combined with 806-109NDOR / address FHWA comments and resubmit
Cotesfield N&SDR 5342681112-11914-Apr-1115-Apr-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Waco Interchange BridgeDR 5342687808-15216-Sep-1119-Sep-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Waco Interchange BridgeSHPO concur req42687808-15226-Sep-1126-Sep-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Waco Interchange BridgeBio doc version 142687808-1523/21/20124/20/201230 NDOR / address FHWA comments and resubmit
Waco Interchange BridgeBio doc version 242687808-1525/2/20125/10/20128approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Pioneer Spirit Trail Phase III4(f) exception42688Jan-5012/16/201112/27/201111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Waco InterchangeBio doc vers 142689808-15119-Oct-1021-Oct-102rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
19th St., YorkDR 53426966312-213-Oct-1021-Oct-108rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
19th Street, Blackburn-Delaware, YorkBio doc version 1426966312-210/28/201110/28/20110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
19th Street, Blackburn - Delaware, YorkSHPO concur request426966312-212/21/201112/23/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
19th Street Blackburn to DelawareCat Ex426966312-24/12/20124/30/201218sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Marquis to US 34, YorkDR 53426976303-413-Oct-1021-Oct-108rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Division Ave, Marquis - US 34, YorkSHPO concur req426976303-46/25/20126/27/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Little Blue Rvr Ped TrlDR 534269885-1103-Feb-1103-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In Grand IslandDR 5342699304-15706-Apr-1112-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In Grand IslandBio doc version 142699304-15712/20/201112/23/20113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Baltimore Ave, 12th - 14thDR 53427045505-427-Jun-1130-Jun-113concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
9th St Burlington Ave to Elm, Grand IslandDR 53427055514-430-Jun-1101-Jul-111mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
9th St - Burlington to Elm AveSHPO concur request427055514-411/21/201111/25/20114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
9th St - Burlington to Elm AveBio doc version 1427055514-411/21/201111/25/20114approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
GI Resurf - variousDR 53427065409-206-May-1111-May-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Various Locations in Grand IslandBio doc version 1427065409-21/25/20122/3/20129letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Grand Island Resurfacing - Various LocationsSHPO concur request427065409-23/7/20123/15/20128letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Cap Ave - Webb Road to Broadwell, GIDR 53427075436-506-May-1111-May-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Capital Ave - Webb Rd to Broadwell AveEnv Class Request427075436-55/22/20126/6/201215comments sent to NDORNDOR / address FHWA comments and resubmit
North Loup - Ord resurfacingBio doc version 142708113-12112/19/201112/21/20112NDOR to resubmit once resurfacing vs EA project issue has been resolvedNDOR / address FHWA comments and resubmit
North Loup to OrdDR 5342708113-12112/21/201112/21/20110NDOR to resubmit once resurfacing vs EA project issue is resolved.NDOR / address FHWA comments and resubmit
Superior Schools Safe RoutesDR 534271865-2410/21/201110/28/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Osborne Drive East GuardrailDR 53427335519-56/6/20126/12/20126approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hemingford to BereaSHPO concur req5118221-7708-Dec-1010-Dec-102letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hemingford - BereaBio doc vers 15118221-11729-Dec-1007-Jan-119letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Morril WestCE51216261-15304-Mar-1017-Mar-1013 NDOR / address FHWA comments and resubmit
Morrill West106 Consultation Letter51216261-15315-Jul-1026-Jul-1011sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Morrill WestNEPA CE V251216261-15313-Aug-1013-Aug-100rb approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Dix South & EastDR 5351233301-1345/25/20126/8/201214approved; project comined with Kimball to Dix project (30-1(127)/51395).NDOR (or LPA) / Must prepare technical and NEPA documentation
Scottsbluff West ViaductDR 5351250921-1215/18/20126/5/201218comments sent to NDOR. need more information.NDOR / address FHWA comments and resubmit
Scottsbluff West ViaductDR 53 - revised51250921-1216/19/20126/26/20127Still not enough information to determine if a CE is appropriate. requested additional informaiton regarding previous coordination with agencies and Tribes and also asked about status of existing MOA for arch site.NDOR / address FHWA comments and resubmit
Oshkosh - LewellenDR 5351261261-1574/11/20124/27/201216approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Oshkosh - LewellenSHPO concur request51261261-1575/21/20126/4/201214letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Oshkosh - LewellenSHPO Supplemental51261261-1576/25/20126/27/20122comments sent back to NDORNDOR / address FHWA comments and resubmit
Oshkosh - LewellenSHPO concur req - revised51261261-1576/29/20127/13/201214sent comments back to NDORNDOR / address FHWA comments and resubmit
Oshkosh - LewellenSHPO revised concur req51261261-1577/18/20127/26/20128letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In ChadronDR 5351271201-1355/22/20126/4/201213approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hay Springs SouthDR 5351284874-11625-Mar-1129-Mar-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hay Springs SouthBio doc version 151284874-1163/1/20123/8/20127comment sent back to NDORNDOR / address FHWA comments and resubmit
Rushville to GordonDR 5351289201-1363/13/20124/5/201223sent back unapproved. questionable eligibility, and written statements that proponent trying to avoid ADA requirements. DR53 not approved. Proponent needs to review proposed project in light of ADA requirements and fed-aid eligibility requirements.NDOR / address FHWA comments and resubmit
Harrison WestBio doc vers 151290201-13721-Sep-1029-Sep-108letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Bayard and SouthDR 5351292261-1604/6/20124/26/201220sent comments to NDORNDOR / address FHWA comments and resubmit
In Bayard & SouthDR-53 resubmittal51292261-1606/5/20126/12/20127DR53 to be resubmitted with updated scope.NDOR / address FHWA comments and resubmit
In Bayard & SouthDR 5351292261-1606/14/20126/26/201212approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
BNSF - Bridgeport Viad studyDR 5351299261-16109-Mar-1110-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bushnell to W KimballBio doc vers 151309801-17128-Sep-1001-Oct-103letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bushnell to W KimballBio doc vers 251309801-17107-Dec-1010-Dec-103letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
East Kimball - PotterDR 5351311801-17214-Apr-1115-Apr-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
East Kimball - PotterBio doc version 151311801-17212/9/201112/15/20116letters to go to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
East Kimball - PotterBio doc version 251311801-1721/4/20121/9/20125letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sidney Deadwood TrailBio Doc5132617-2413-Aug-1020-Aug-107concur request to NGPC and fyi to USFWSFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sidney Deadwood Trl - phase 3DR 535132617-2423-Jan-1131-Jan-118concurred CE appropriate level for NEPA mmNDOR (or LPA) / Must prepare technical and NEPA documentation
Sidney Deadwood TrailReeval5132617-2415-Apr-1119-Apr-114letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sidney Deadwood Trl, Phase 3SHPO concur req5132617-2406-Jun-1110-Jun-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sidney Deadwood Trl Ph. IIICE5132617-2403-Aug-1105-Aug-112sent comments back to NDORNDOR / address FHWA comments and resubmit
Sidney Deadwood Trail Ph IIICE - version 25132617-2420-Sep-1126-Sep-116approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
N-88 Jct North & SouthBio doc vers 151335713-12630-Sep-1001-Oct-101letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
South Potash Ave, AllianceDR 53513476263-112-Oct-1013-Oct-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
South Potash AvenueSHPO concur request513476263-112/19/201112/21/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
South Potash Ave, AllianceBio doc version 1513476263-13/8/20123/15/20127approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Agate SouthDR 5351361294-10709-Feb-1109-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Agate SouthBio Doc51361294-10720-Apr-1127-Apr-117letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sioux/Box Butte Co Line to N-2DR 5351373714-1196/14/20126/26/201212approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sunol and Lodgepole LinksDR 5351389L17E-10811/22/201111/28/20116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sunol and Lodgepole LinksSHPO concur request51389L17E-10812/8/201112/9/20111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kimball to DixDR 5351395301-12712/13/201112/20/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Chadron North106 Consultation Letter513973854-13315-Jul-1026-Jul-1011sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Chadron NorthBio doc vers 1513973854-13328-Sep-1001-Oct-103letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Chadron SouthDR-53513983854-1344/2/20124/6/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Chadron SouthArcheological testing plan513983854-1347/12/20127/25/201213comments sent back to NDORNDOR / address FHWA comments and resubmit
Sidney WestDR 5351402301-13007-Jul-1111-Jul-114mm concurred with CENDOR (or LPA) / Must prepare technical and NEPA documentation
Sidney WestBio doc version 151402301-1304/17/20124/23/20126 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Berea NorthDR 53514033854-13625-Jul-1129-Jul-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Berea NorthBio doc version 1514033854-1361/23/20122/1/20129approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Gering NorthfieldDR 535140779-4008-Apr-1112-Apr-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
High Mast TowersEffect Determ Pkg514135-10112-May-1021-May-109approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
L62A/US-385 - AllianceNDOR Review request514323853-11804-Nov-1004-Dec-1030 NDOR / address FHWA comments and resubmit
Jct L62A/US385 - AlliancePurp and Need514323853-11816-Mar-1128-Mar-1112comments sent back to CarinNDOR / address FHWA comments and resubmit
Jct L62A/US-385 - AlliancePurp & Need514323853-11819-Apr-1102-May-1113sent comments back to CarinNDOR / address FHWA comments and resubmit
Heartland Express Alliance SectionSHPO concur req514323853-11801-Jun-1110-Jun-119sent comment to Carin re scenic byway infoNDOR / address FHWA comments and resubmit
Heartland ExpresswayAlternatives letter for agencies review514323853-11812/20/20111/4/201215ok to send outNDOR (or LPA) / Must prepare technical and NEPA documentation
Heartland ExpresswaySHPO concur request514323853-1181/4/20121/17/201213letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Heartland Expr, Jct L62A/US 385 to AllianceTHPO concur req514323853-1187/20/20127/24/20124THPO letters sent outFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Broadway, 14th to 20th, ScottsbluffBio doc version 1514495701-81/12/20121/16/20124approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Broadway, 14th to 20th, ScottsbluffSHPO concur request514495701-83/7/20123/15/20128letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Emerson Ave, AllianceDR 53514506255-312-Oct-1013-Oct-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Emerson Ave- 18th St to 25th StSHPO Concur Req 106514506255-310-Jun-1110-Jun-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
18th St. - 25th St.Bio Doc V1514506255-311-Jul-1120-Jul-119approved.this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Potter - BrownsonDR 5351451801-17802-Sep-1114-Sep-1112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
BoxButte Historic lightingDR 53514536257-201-Mar-1102-Mar-111approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
27th Ave I, to Hwy 26DR 53514545720-118-Oct-1021-Oct-103rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
27th St, Ave I - Hwy 26, ScottsbluffBio doc vers 1514545720-101-Feb-1102-Feb-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
27th, Ave I to Hwy 26, ScottsbluffSHPO concur req514545720-125-Feb-1128-Feb-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
10th Ave, SidneyDR 53514566363-304-Jan-1111-Jan-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
10th Ave - Osage to Illinois, SidneySHPO concur request514566363-34/25/20125/8/201213reviewed today, will go out to SHPO tomorrowFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sunol-ChappellDR-5351459802-974/2/20124/20/201218 None
Wyoming Line - N-71DR 5351460881-10801-Apr-1105-Apr-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wyoming Line - N-71Bio doc version 151460881-10812/14/201112/20/20116 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wyoming Line - N-71Bio doc version 251460881-1081/4/20121/9/20125letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-26 & N-71, ScottsbluffDR 5351464261-16528-Mar-1129-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
US-26 and N-71, ScottsbluffBio doc version one51464261-16512/19/201112/22/20113approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hemingford Non-infraDR 5351478Jul-5808-Apr-1112-Apr-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In MelbetaDR 5351480921-12511/21/201111/25/20114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In MelbetaSHPO concur request51480921-1252/21/20123/6/201214letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In MelbetaSHPO concur request51480915-1183/14/20123/15/20121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Weyerts SouthDR 5351484ER 1140-423-Sep-1123-Sep-110Signed by Cheyenne Co 11/12/10. Signed by NDOR 9/23/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Ft Sidney Rd - Hwy 30 to 11th Ave, SidneyDR 53514866359-130-Jun-1101-Jul-111mm concurred and added some guidanceNDOR (or LPA) / Must prepare technical and NEPA documentation
Sidney - SunolDR-5351487802-9829-Sep-1130-Sep-111 NDOR (or LPA) / Must prepare technical and NEPA documentation
Ave I, West Overland - 27th, ScottsbluffDR 53514885703-209-Jun-1116-Jun-117mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
10th St Crescent Dr to River Bridge, GeringDR 53514895701-930-Jun-1101-Jul-111mm concurred and added some guidanceNDOR (or LPA) / Must prepare technical and NEPA documentation
10th Street, Crescent Dr to River BridgeSHPO concur request514895701-912/9/201112/9/20110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
10th Street Cresent Drive - River BridgeBio doc version 1514895701-91/4/20121/16/201212approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
10th St Box Butte to Flack Ave, AllianceDR 53514906254-730-Jun-1101-Jul-111mm concurred and added guidanceNDOR (or LPA) / Must prepare technical and NEPA documentation
E Jct US-20 NorthDR 5351506874-1177/12/20128/8/201227approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
SB Valley Pathway NDR-535151279-424/3/20124/26/201223approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Scottsbluff Valley Pathway NorthSHPO concur request5151279-424/25/20124/27/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dunning NortheastSHPO concur req60818913-10322-Feb-1124-Feb-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dunning NortheastSHPO concur request60818913-1032/23/20123/6/201212letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dunning NortheastBio doc version 160818913-1033/21/20124/20/201230 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dunning NortheastScope Change Memo60818913-1035/23/20125/25/20122letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dunning NortheastCat Ex60818913-1036/18/20126/26/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Merna - Broken BowDR 536093823-11728-Sep-1004-Oct-106rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Merna-Broken BowBio doc vers 16093823-11702-Nov-1003-Nov-101letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Merna - Broken BowSHPO concur req6093823-11705-Jan-1107-Jan-112comments sent back to JonNDOR / address FHWA comments and resubmit
Merna - Broken BowSHPO concur req6093823-11710-Jan-1131-Jan-1121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Merna to Broken BowSHPO concur req6093823-11710-Jan-1131-Jan-1121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Merna to Broken BowScope Change Memo6093823-1174/25/20124/26/20121approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Big Blue SpringsSHPO concurrence letter60939302(133)14-Sep-1023-Sep-109to Sue for formatting of letterFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Big Springs-BruleBio doc vers 160939302-13319-Oct-1022-Oct-103letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sargent SouthSHPO concur req609431833-11318-May-1119-May-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Seneca East & WestSHPO Concur6100922-11320-Aug-1027-Aug-107sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Seneca East & WestDR 536100922-11325-Oct-1026-Oct-101rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Seneca East and WestBio Doc vers 16100922-11310/18/201110/28/201110letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Seneca East & WestCE6100922-1131/27/20122/7/201211approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
In Broken BowSHPO concur req6120023-11819-Jan-1131-Jan-1112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Broken BowSHPO concur req6120023-11831-May-1110-Jun-1110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Broken BowBio doc vers 16120023-11818-Aug-1123-Aug-115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In Broken Bow4(f) concur letters6120023-1181/3/20121/13/201210comments emailed back to NDORNDOR / address FHWA comments and resubmit
In Broken Bow4(f) de minimis forms6120023-1181/17/20121/25/20128approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In Broken BowCE6120023-1181/31/20122/8/20128sent comments back to NDORNDOR / address FHWA comments and resubmit
In Broken BowCE - revised6120023-1182/27/20123/5/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Sutherland NorthDR 53612311475-524-Jan-1131-Jan-117sent back with non-concurrence. Recommending EANDOR (or LPA) / Must prepare technical and NEPA documentation
Sargent NorthBio doc vers 1612321833-11504-Oct-1012-Oct-108rb sent eric commentsNDOR / address FHWA comments and resubmit
Sargent NorthDR 53612321833-11508-Oct-1012-Oct-104rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sargent NorthBio doc vers 1 - revised612321833-11515-Oct-1019-Oct-104Eric Zach to revise according to discussion at env coordination meeting today. He is going to add a paragraph discussing the informal coordination between USFWS and a private landowner regarding the movement of fencing prior to construction. Once reviseNDOR / address FHWA comments and resubmit
Sargent NorthBio doc - revised612321833-11522-Oct-1022-Oct-100letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sargent NorthSHPO concur612321833-11509-Nov-1012-Nov-103letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sargent NorthCE612321833-11516-Feb-1122-Feb-116approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Overton SouthwestDR 53612607024-221/18/20121/25/20127approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hershey viaductDR 5361277L56C-10614-Mar-1115-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Buffalo Billreeval for additl easement612835805(5)09-Mar-1011-Mar-102 NDOR / address FHWA comments and resubmit
Anselmo NortheastDR 53613027021-2711/25/201112/1/20116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Anselmo Northeast4(f) concur memo613027021-271/19/20121/31/201212sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Anselmo NortheastSHPO concur request613027021-271/25/20121/31/20126sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Anselmo NortheastBio doc version 1613027021-273/23/20124/23/201231not sure if the person doing the BA visited the site; the doc didn't make a clear case that the stream wasn't suitable for the dace. Requested additl info.NDOR / address FHWA comments and resubmit
Anselmo NortheastBio doc - version 2613027021-276/27/20127/2/20125comments sent back to NDORNDOR / address FHWA comments and resubmit
Anselmo NortheastBio doc - version 2613027021-277/3/20127/12/20129 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Anselmo NortheastSHPO concur req613027021-277/10/20128/8/201229comments sent back to NDORNDOR / address FHWA comments and resubmit
Ansley SoutheastDR 53613037021-2811/25/201112/5/201110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ansley SoutheastSHPO concur request613037021-2812/7/201112/9/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ansley SoutheastBio doc version 1613037021-282/24/20123/8/201213approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
13th Stbio memo613386556(4)10-Feb-1022-Feb-1012 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
North Platte EastBio doc version 261339803-1367/26/20127/26/20120letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
1st - 6th Sts., North PlatteDR 5361359832-1287/30/20128/14/201215approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lewellen SouthBio doc vers 161368261-15818-Oct-1022-Oct-104verbally asked eric to fix the inconsistencies with the Gray Wolf and the Ferret and also add the USFWS range map reference and then resubmit.NDOR / address FHWA comments and resubmit
Lewellen SouthBio doc - revised61368261-15822-Oct-1022-Oct-100letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Platte - MaxwellDR 5361399803-13606-Oct-1012-Oct-106rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Platte East106 Concur Req61399803-1363/29/20124/25/201227sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Platte EastBio doc version 161399803-1367/23/20127/26/20123comment sent to NDORNDOR / address FHWA comments and resubmit
North Platte EastFHWA review req61399803-1387/19/20127/26/20127comments sent back to NDORNDOR / address FHWA comments and resubmit
Paxton EastDR 5361401803-14914-Oct-1117-Oct-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Maxwell SWDR 53614141480-1101-Mar-1102-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Maxwell SouthwestBio doc vers 1614141480-1106-May-1106-May-110letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Maxwell SouthwestSHPO concur req614141480-1118-Jul-1120-Jul-112ltr to SHPO on 7/21/11FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Maxwell SWCategorical Exclusion614141480-1112/21/201112/27/20116approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Bridwood Grade SeparationReevaluation614161390-32/7/20122/15/20128provided comments to NDORNDOR / address FHWA comments and resubmit
Birdwood Grade SeparationRe-evaluation revised614161390-32/24/20123/8/201213comments sent back to NDORNDOR / address FHWA comments and resubmit
Bridwood Grade SeparationRe-eval version 2614161390-36/18/20126/19/20121comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Bridwood Grade SeparationRe-eval version 2614161390-36/21/20126/21/20120approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
OA projectBio doc version 161424804-13606-Aug-1011-Aug-105bio doc approved. Sue sending out agency letters.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bio doc vers 1Gothenburg E and W61425804-13728-Feb-1101-Mar-111document needs to be combined with 804-138 and resubmittedNDOR / address FHWA comments and resubmit
Bio doc vers 1Cozad to Darr61426804-13828-Feb-1101-Mar-111document needs to be combined with 804-137 and resubmittedNDOR / address FHWA comments and resubmit
Hershey EastDR 5361427803-14011/22/201112/5/201113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Paxton EastDR 5361428803-1416/19/20126/27/20128approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ash - Jefferson St, LexingtonNEPA & CE614332832-10206-Apr-1007-Apr-101 NDOR / address FHWA comments and resubmit
Sutherland WestDR 5361442803-14321-Mar-1121-Mar-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sutherland WestSHPO concur request61442803-1435/23/20126/8/201216letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lexington East Viad.DR 53614571705-327-Dec-1005-Jan-119approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ansley EastSHPO concur req61458923-10504-Jan-1107-Jan-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ansley EastDR 5361458923-10511/1/201111/2/20111 NDOR (or LPA) / Must prepare technical and NEPA documentation
Overton EastDR 5361460303-11510-Mar-1110-Mar-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Overton EastSHPO concur req61460303-11523-Sep-1126-Sep-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Overton EastBio doc vers 161460303-11510/21/201110/28/20117letters sent agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Paxton to SutherlandCE61461302-13822-Feb-1017-Mar-1023 NDOR / address FHWA comments and resubmit
Paxton - SutherlandNEPA & CE61461302-13806-Apr-1007-Apr-101 NDOR / address FHWA comments and resubmit
Paxton - SutherlandCE v261461302-13812-Apr-1015-Apr-103 NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Stapleton NorthSHPO concur req61463833-10828-Mar-1131-Mar-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Stapleton NorthDR 5361463833-10830-Mar-1131-Mar-111approved again - to be combined with Stapleton South 83-2(133), 61464NDOR (or LPA) / Must prepare technical and NEPA documentation
Stapleton North & Stapleton SouthCE61463833-1084/4/20124/23/201219"approved
Documents saved to 833-108/env/nepa."NEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Stapleton South106 Consultation Letter61464832-13315-Jul-1026-Jul-1011sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wellfleet NorthDR 5361466832-13412-Apr-1112-Apr-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wellfleet NorthBio doc vers 161466832-13427-Jun-1130-Jun-113mm sent to resource agencies to consult 6/30FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Gothenburg WestDR 5361467302-14012/5/201112/6/20111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Halsey Spur BridgeDR 5361472S86B-1022/2/20122/17/201215approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hyannis NorthSHPO concur req61473613-10929-Mar-1101-Apr-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hyannis NorthBio Doc Vers 161473613-10911/23/201111/28/20115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Arnold WestDR 5361474922-10912/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Arnold WestSHPO concur request61474922-1094/25/20124/27/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Arnold WestSHPO concur req - revised61474922-1095/29/20126/4/20126letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N Jct US-83 WestDR 5361475232-12511/7/201111/14/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Jct. US-83 WestSHPO concur request61475232-12512/13/201112/20/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Jct. US-83 WestBio doc version 161475232-1256/5/20126/12/20127letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Arnold EastDR 5361477923-1065/18/20125/31/201213approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Gothenburg - Custer Co. LineDR 5361479472-1112/29/20123/8/20128approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Mullen east & westDR 536148122-11606-Apr-1112-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Mullen East and West1066148122(116)09-May-1113-May-114letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Mullen East & WestSHPO concur req6148122-1161/18/20121/25/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Oconto - EddyvilleDR 5361482403-1067/30/20128/14/201215approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sargent Safet RoutesDR 536148321-2411/25/201112/5/201110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Platte Canal TrlDR 536148856-3515-Dec-1017-Dec-102approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Platte Canal Trail106 Concur Req6148856-353/28/20124/25/201228sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jackson St ImprovesDR 53614896561-222-Feb-1123-Feb-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Jackson St ImprovementsBio Doc V1614896561-222-Jul-1129-Jul-117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Jackson St, LexingtonSHPO concur req614896561-224-Aug-1106-Sep-1113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jackson Street ImprovementsCat Ex614896561-21/20/20121/25/20125sent comments back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Jackson St Improvements, LexingtonCat Ex614896561-22/9/20122/17/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
South Platte River Bridges North PlatteDR 5361500832-13711/25/201112/1/20116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Cozad South BridgeDR 5361501212-1103/13/20124/5/201223 NDOR (or LPA) / Must prepare technical and NEPA documentation
Cozad South BridgesSection 106 consultation package61501212-1105/2/20125/9/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Platte NorthBio Doc vers 161510832-13819-Jan-1131-Jan-1112letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sutherland SouthBio Doc61511252-10820-Apr-1127-Apr-117letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sutherland SouthScope Change Memo61511252-10827-Jun-1128-Jun-111mm forwarded the re-initiation of consultation material to USFWS and NGPC todayFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Comstock SouthDR 53615131833-11605-Apr-1111-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Comstock SouthSHPO concur req615131833-11601-Aug-1104-Aug-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Comstock SouthBio doc version 1615131833-1163/21/20124/20/201230 NDOR / address FHWA comments and resubmit
Comstock SouthBio doc version 2615131833-1165/2/20125/11/20129letters sent to the agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lexington - OvertonDR 5361531805-7412-Jan-1126-Jan-1114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lexington - OvertonBio doc vers 161531805-7422-Feb-1124-Feb-112letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Lexington, Walnut &17thDR 53615376558-116-Dec-1017-Dec-101approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Lexington ResurfacingSHPO concur615376558-125-Jan-1131-Jan-116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
17th & Walnut, LexingtonBio doc vers 1615376558-122-Mar-1123-Mar-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
North Platte East BridgeDR 5361539804-14211/15/201111/22/20117Sent comment to NDOR to consider combining all of the anti-icing projects into one NEPA effort. Also asked that the proejct description include alternatives for how the system may be installed. NDOR to get back to me with how they would like to proceed.NDOR / address FHWA comments and resubmit
Brownlee Road SouthDR 5361540974-11110-Feb-1116-Feb-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Brownlee Road SouthBio doc vers 161540974-11122-Feb-1124-Feb-112letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Arthur - Grant Co, HyannisDR 5361541613-11003-Feb-1103-Feb-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Arthur-Grant Co LineBio doc vers 161541613-11022-Feb-1124-Feb-112letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Tryon NorthDR 5361542973-10311/18/201111/23/20115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Broken Bow 5th Ave TrailDR 536154821-2708-Apr-1112-Apr-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
6th, Jackson St, 13th St ImprovementsDR 53615546552-130-Jun-1130-Jun-110mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
Maxwell UPRR BridgeDR 5361557302-1418/2/20128/16/201214 NDOR (or LPA) / Must prepare technical and NEPA documentation
Platte River Bridge, South of GothenburgDR 5361558472-1128/2/20128/15/201213approved, added commentsNone
Broken Bow EastDR 536155923-12012/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
In AlmaDR 53704601732-113-Jun-1116-Jun-113mm concurred on CENDOR (or LPA) / Must prepare technical and NEPA documentation
Franklin SouthDR 5370510101-10412/1/201112/6/20115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Oxford South BridgeDR 5370565461-10215-Dec-1023-Dec-108comments sent back to SteveNDOR / address FHWA comments and resubmit
Oxford South BridgeDR 53 - revised70565461-10218-Jan-1115-Feb-1128approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Oxford South BridgeSHPO concur req70565461-10213-Jun-1123-Jun-11106/23 mm sent letter to AB for formatting/mailingFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Oxford South BridgeBio doc vers 170565461-10221-Sep-1126-Sep-115letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Oxford South BridgeCat Ex70565461-1025/7/20125/9/20122comments sent back to NDORNDOR / address FHWA comments and resubmit
Benkelman SouthDR 5370696342-12404-Jan-1121-Jan-1117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Benkelman South SectionSHPO Concur Req 10670696342-12410-Jun-1110-Jun-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Benkelman SouthBio doc vers 170696342-12407-Sep-1115-Sep-118letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Benkelman SouthCE70696342-1241/26/20122/8/201213sent comments back to NDORNDOR / address FHWA comments and resubmit
Benkelman SouthCE 2nd Submittal70696342-1243/28/20124/9/201212comments sent back to NDORNDOR / address FHWA comments and resubmit
Benkelman SouthCat Ex - 3rd version70696342-1244/11/20124/19/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Trenton SoutheastDR 53708117044-271/18/20121/25/20127approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Palisade SoutheastDR 53708627044-2923-Sep-1126-Sep-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hendley East & WestDR 5370871893-1084/10/20124/27/201217approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Hendley East and WestPublic involve inq70871893-1085/29/20126/4/20126sent back comments to NDORNDOR (or LPA) / Must prepare technical and NEPA documentation
Elwood SW, Gosper Co.DR 53708771530-522-Oct-1026-Oct-104rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Elwood SWSHPO concur req708771530-529-Mar-1131-Mar-112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Elwood SouthwestBio Doc V1708771530-506-Jul-1111-Jul-115mm reviewed/approved, AB is mailing today to USFWS/NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Culbertson to McCook106 Consultation Letter7088162-12214-Jul-1026-Jul-1012sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Moorefield E & WDR 5370889232-12114-Mar-1115-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Moorefield East and WestSHPO Concur Req 10670889232-12110-Jun-1110-Jun-110letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Moorefield East and WestSHPO concur req70889232-1217/17/20127/26/20129letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
McCook NorthSHPO concur request709231553-112/30/20111/3/20124comments sent to NDORNDOR / address FHWA comments and resubmit
McCook NorthSHPO concur revised709231553-11/10/20121/17/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
McCook NorthBio doc version 1709231553-13/6/20123/15/20129letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Hildreth SouthBio doc vers 1709521955-219-Oct-1026-Oct-107rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hildreth SouthDR 53709521955-206-Dec-1015-Dec-109approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Minden E and SBio doc vers 17102864-12422-Feb-1124-Feb-112approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Minden East & South106 Concur Req7102864-12426-Apr-1127-Apr-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Stockville SWDR 53710377032-244/12/20124/23/201211 NDOR (or LPA) / Must prepare technical and NEPA documentation
Stockville SouthwestSHPO concur req710377032-244/18/20124/25/20127sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In NaponeeDR 53710431925-306-Dec-1015-Dec-109approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
In NaponeeSHPO concur req710431925-314-Oct-1117-Oct-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In NaponeeBio doc version 1710431925-31/10/20121/16/20126approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
In NaponeeCat Ex710431925-37/9/20127/16/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Holdrege Public Schools Safe Routes to SchoolDR 537107069-2710-Jun-1116-Jun-116concurred on CE and provided some guidance.mmNDOR (or LPA) / Must prepare technical and NEPA documentation
Holdrege Public Schools - InfrastructureBio doc version 17107069-271/23/20121/25/20122approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Holdrege Public School SRTSSHPO concur request7107069-273/7/20123/15/20128letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Holdrege Safe Routes to SchoolSect 4(f) Eval7107069-276/6/20126/14/20128approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Franklin Sterner TrailT&E consult update7107931-214-Dec-1017-Dec-103approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Jct US-34 NorthDR 5371084611-11011-Jul-1112-Jul-111mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
Jct US-34 NorthSHPO concur req71084611-11003-Aug-1104-Aug-111comments sent back to NDORNDOR / address FHWA comments and resubmit
Jct US-34 North SectionSHPO concur req - 2nd71084611-11012-Aug-1117-Aug-115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Curtis EastSHPO concur req71102232-12415-Mar-1116-Mar-111sent comments back to CarinNDOR / address FHWA comments and resubmit
Curtis EastSHPO concur req71102232-12404-Apr-1107-Apr-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Curtis EastSHPO Supplemental71102232-1245/8/20125/9/20121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-6 WestBio doc vers 171105342-12101-Oct-1001-Oct-100letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-6 WestBio doc vers 171105342-12117-Nov-1023-Nov-106letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Farnam WestDR 5371124232-12603-Aug-1105-Aug-112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Farnam WestSHPO concur req71124232-12631-Aug-1106-Sep-116letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wauneta - HamletDR 537112762-13019-May-1127-May-118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wauneta - HamletSHPO concur req7112762-13003-Aug-1104-Aug-111comments sent to NDORNDOR / address FHWA comments and resubmit
Wauneta - HamletSHPO concur req - 27112762-13022-Aug-1106-Sep-1115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Wauneta to HamletCat Ex7112762-1306/26/20126/27/20121approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Jct. N-21 to ElwoodDR 5371131232-12712/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
H Street & Norris Ave, McCookDR 53711356154-125-Aug-1001-Sep-107 NDOR (or LPA) / Must prepare technical and NEPA documentation
H Street Improvements - Norris Ave to Airport RoadBio doc version 1711356154-111/18/201111/25/20117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
H Street Improvements, Norris Ave to Airport RoadSHPO concur request711356154-12/1/20122/3/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
H Street - Norris Ave to Airport Road, McCookCat Ex711356154-14/10/20124/23/201213approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Alma North & SouthDR 53711371831-11525-Oct-1027-Oct-102rb asked steve to resubmit a completed formNDOR (or LPA) / Must prepare technical and NEPA documentation
Alma North and SouthDR53711371831-11527-Oct-1027-Oct-100rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Alma North & SouthSHPO concur711371831-11509-Nov-1012-Nov-103letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Alma North & SouthBio doc vers 1711371831-11505-Jan-1107-Jan-112letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Minden Hike & Bike TrailDR 537113850-3616-Feb-1122-Feb-116approved with comments.NDOR (or LPA) / Must prepare technical and NEPA documentation
Arapahoe SouthSHPO concur req711392831-11421-Sep-1126-Sep-115letter sent to NDORFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct N-46 - HoldregeBio doc vers 17114463-12507-Apr-1108-Apr-111letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Jct. N-46 to HoldregeDR 537114463-12520-Jun-1128-Jun-118approved mmNDOR (or LPA) / Must prepare technical and NEPA documentation
11th Av, HoldregeDR 53711456602-215-Dec-1017-Dec-102approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
11th Ave, HoldregeSHPO concur req711456602-28/2/20128/16/201214 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Stockville SW Road RepairDR 5371147ER 1460-220-Dec-1027-Dec-107local project, but NDOR LPD coordinator signed the form for the local on 12/15/10. NDOR Env approved the form 12/20/11 and emailed to FHWA. FHWA approved 12/27/11NDOR (or LPA) / Must prepare technical and NEPA documentation
Eustis SWDR 5371148ER 1675-316-Feb-1116-Feb-110signed by NDOR 2/14/11, approved by NDOR 2/14/11, sent to FHWA 2/16/11. approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
E 7th/ Seminole, H St - Park Ave, McCookDR 53711516158-130-Jun-1130-Jun-110mm concurred, included commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
18th Ave, Burlington St to West AveDR53711526606-209-May-1113-May-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
18th Ave, Burlington - West Ave, HoldregeSHPO concur req711526606-27/11/20127/24/201213letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ericson EastDR 5380643704-10411/7/201111/14/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ericson EastBio doc version 180643704-1043/21/20124/20/201230 FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ericson East106 Concur Req80643704-1044/2/20124/25/201223sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ericson EastCat Ex80643704-1046/5/20126/11/20126comments sent back to NDORNDOR / address FHWA comments and resubmit
Ericson EastCat Ex - 2nd submittal80643704-1046/27/20126/28/20121approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Niobrara River SouthDR 53806901834-1097/27/20128/14/201218approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Burwell WestDR 5380709964-1011/25/20122/13/201219did not concur with CE recommendation. Made comment for NDOR to proceed with EA.NDOR (or LPA) / Must prepare technical and NEPA documentation
Nenzel WestBio doc vers 180727202-13101-Oct-1012-Oct-1011letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
O'Neill WestDR 53807587045-281/18/20121/25/20127approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ericson SouthDR 53807852325-306-Dec-1015-Dec-109approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Ericson SouthSHPO concur request807852325-312/19/201112/21/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ericson SouthBio doc version 1807852325-33/23/20124/23/201231sent back to amend a cc so loophole goneNone
Ericson SouthBio doc version 2807852325-35/4/20125/11/20127letters sent to the agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Burwell NorthDR-5380798113-1184/2/20124/23/201221approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Valentine EastDR-5380799122-1044/2/20124/6/20124approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Valentine NorthBio doc vers 180800834-11208-Oct-1013-Oct-105sent eric commentsNDOR / address FHWA comments and resubmit
Valentine NorthBio doc80800834-11213-Oct-1027-Oct-1014letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Valentine NorthSHPO concur req80800834-11225-Oct-1027-Oct-102letter to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Valentine NorthScope change memo80800834-11222-Apr-1127-Apr-115comments sent to EricNDOR / address FHWA comments and resubmit
Valentine NorthScope Change Memo V280800834-11227-Apr-1127-Apr-110memo sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Valentine North (scope change)SHPO concur req80800834-11220-May-1127-May-117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Rose - BassettBio doc vers 1808011834-11120-Sep-1029-Sep-109letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Rose NorthBio doc vers 1808021834-11220-Sep-1029-Sep-109letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bristow East and WestDR 5380805124-10707-Jul-1108-Jul-111mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
Rose Mitigation BankMonitoring Report8081075-707-Mar-1121-Mar-1114 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Niobrara Scenic Rvr Corr RoadsSHPO concur req8081716-3613-Jul-1119-Jul-116mm sent back for revision - scope of work in APE of site not clearly definedNDOR / address FHWA comments and resubmit
Niobrara Scenic Rvr RoadsSHPO concur req - 8 ltrs8081716-3611-Aug-1116-Aug-115comments sent back to NDORNDOR / address FHWA comments and resubmit
Niobrara ScenRvr Cor RdsSHPO concur req - revised8081716-3626-Aug-1106-Sep-1111SHPO letter sent today; tribal letters going out tomorrowFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Niobrara, Cherry & Keya Paha CountiesTribal coord request8081716-3612/1/201112/6/20115letters sent to the TribesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Niobrara Scenic River CorridorBio doc version 28081716-365/7/20125/11/20124package sent to NPS, USFWS, and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Merriman WestDR 5380846202-13210/19/201110/28/20119approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Spencer NorthBio doc vers 1808472814-11722-Dec-1027-Dec-105letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Spencer NorthScope Change memo808472814-11707-Apr-1115-Apr-118comments sent back to EricNDOR / address FHWA comments and resubmit
Spencer NorthBio Re-eval memo - vers 2808472814-11721-Apr-1126-Apr-115email sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Chambers EastDR 5380860954-10411/22/201111/28/20116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Chambers EastSHPO concur request80860954-10412/8/201112/9/20111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Chambers EastBio doc version 180860954-1045/31/20126/8/20128letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Chambers EastCat Ex80860954-1047/30/20128/14/201215provided verbal comment to NDOR - need the NDEQ correspondence referneced in the hazmat section attached to the CE.NDOR / address FHWA comments and resubmit
Sheridan & Cherry Line EastDR 5380861202-13609-Dec-1013-Dec-104approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sheridan Co Line EastBio doc vers 180861202-13603-Feb-1103-Feb-110letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sparks WestDR 5380877122-10526-Jul-1129-Jul-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Sparks WestSHPO concur request80877122-10512/6/201112/9/20113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sparks WestBio doc version 180877122-1055/31/20126/8/20128letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Crookston WestDR 5380878202-13306-Oct-1012-Oct-106rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crookston WestBio doc vers 180878202-13304-Feb-1108-Feb-114letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Crookston WestSHPO concur req80878202-13324-Mar-1131-Mar-117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Crookston WestSHPO concur req80878202-13324-Mar-1131-Mar-117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Nenzel - KilgoreDR 5380879202-13411/7/201111/14/20117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wood Lake WestDR-5380880202-1354/2/20124/23/201221comment sent to NDORNDOR / address FHWA comments and resubmit
Wood Lake WestSHPO concur request80880202-1355/4/20125/9/20125letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
S16B North & SouthBio doc vers 180881834-11406-Oct-1013-Oct-107letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
S16B North & SouthBio doc vers 180881834-11406-Oct-1013-Oct-107letters to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Valentine Cowboy Trl Conect Phs 1DR 538088616-3813-Jun-1116-Jun-113mm concurred on CENDOR (or LPA) / Must prepare technical and NEPA documentation
Valentine Cowboy Trl Conect Phs 1DR 538088616-3813-Jun-1116-Jun-113mm concurred on CENDOR (or LPA) / Must prepare technical and NEPA documentation
Valentine Cowboy Trail Connection - Phase 14(f) Exception Req8088616-383/28/20124/25/201228comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
Valentine Cowboy Trail Connection - Phase 1106 Concur Req8088616-383/28/20124/25/201228sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Valentine Cowboy Trail Phase 14(f) exempt request8088616-385/18/20125/31/201213 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
North Loup Rvr NorthBio doc vers 180895834-11529-Dec-1007-Jan-119comments sent to EricNDOR / address FHWA comments and resubmit
North Loup River Northbio doc version 280895834-11507-Jan-1107-Jan-110letter sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup Rvr NorthBio doc vers 180895834-11529-Dec-1007-Jan-119comments sent to EricNDOR / address FHWA comments and resubmit
North Loup River Northbio doc version 280895834-11507-Jan-1107-Jan-110letter sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup Rvr NorthSHPO concur req80895834-11510-Feb-1115-Feb-115reviewed today and ok to send to SHPO. Will go out in mail tomorrow.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup Rvr NorthSHPO concur req80895834-11510-Feb-1115-Feb-115reviewed today and ok to send to SHPO. Will go out in mail tomorrow.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup Rvr NorthBio doc vers 380895834-11521-Mar-1129-Mar-118letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup Rvr NorthBio doc vers 380895834-11521-Mar-1129-Mar-118letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kilgore EastBio doc vers 180896202-13722-Dec-1027-Dec-105letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Kilgore EastBio doc vers 180896202-13722-Dec-1027-Dec-105letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Inman East & WestBio doc vers 180897204-12320-Dec-1027-Dec-107letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Inman East & WestBio doc vers 180897204-12320-Dec-1027-Dec-107letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Brewster - Calamus RiverDR 538089973-10225-Mar-1129-Mar-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Brewster - Calamus RiverDR 538089973-10225-Mar-1129-Mar-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Brewster - Calamus RiverBio doc version 18089973-1026/1/20126/11/201210letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Brewster - Calamus RiverCat Ex8089973-1028/1/20128/13/201212approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Wheeler-Antelope Co. Line WestDR 5380900704-11025-Jul-1129-Jul-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wheeler-Antelope Co. Line WestDR 5380900704-11025-Jul-1129-Jul-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crookston - ValentineDR 5380901202-13809-Mar-1110-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crookston - ValentineDR 5380901202-13809-Mar-1110-Mar-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crookston - ValentineBio Doc80901202-13826-Apr-1127-Apr-111letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Crookston - ValentineBio Doc80901202-13826-Apr-1127-Apr-111letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ewing LinkDR 5380906ER SL45B-10302-Sep-1114-Sep-1112state project - NDOR completed and approved form on 9/1/11. approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ewing LinkDR 5380906ER SL45B-10302-Sep-1114-Sep-1112state project - NDOR completed and approved form on 9/1/11. approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ewing Link, Loup CountySHPO concur req80906ER SL45B-10311-Oct-1112-Oct-111approved and procecssed.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ewing Link, Loup CountySHPO concur req80906ER SL45B-10311-Oct-1112-Oct-111approved and procecssed.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ewing LinkBio doc version 180906SL45B-1033/22/20123/22/20120letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
O'Neill SEDR 5380907ER 204-12402-Sep-1114-Sep-1112state project- NDOR completed and approved their form on 9/1/11. approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
O'Neill SEDR 5380907ER 204-12402-Sep-1114-Sep-1112state project- NDOR completed and approved their form on 9/1/11. approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
O'Neill SoutheastSHPO concur req80907ER 204-12412-Oct-1112-Oct-110approved and processed.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
O'Neill SoutheastSHPO concur req80907ER 204-12412-Oct-1112-Oct-110approved and processed.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
ER - Gracie Creek CulvertDR 5380908ER 964-10302-Sep-1119-Sep-1117state project - NDOR completed the form on 9/1/11 and approved form 9/1/11. received at FHWA 9/2/11.comments sent to NDOR - coord with agencies quicklyNDOR (or LPA) / Must prepare technical and NEPA documentation
ER - Gracie Creek CulvertDR 5380908ER 964-10302-Sep-1119-Sep-1117state project - NDOR completed the form on 9/1/11 and approved form 9/1/11. received at FHWA 9/2/11.comments sent to NDOR - coord with agencies quicklyNDOR (or LPA) / Must prepare technical and NEPA documentation
Burwell NorthwestDR 53 ver 280908ER 964-10307-Oct-1107-Oct-110 re-submittal of Doc occurred at stakeholder meeting today, signed at meeting, proceeding with CENDOR (or LPA) / Must prepare technical and NEPA documentation
Burwell NorthwestSHPO concur req80908ER 964-10307-Oct-1107-Oct-110approvedFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Burwell NorthwestDR 53 ver 280908ER 964-10307-Oct-1107-Oct-110 re-submittal of Doc occurred at stakeholder meeting today, signed at meeting, proceeding with CENDOR (or LPA) / Must prepare technical and NEPA documentation
Burwell NorthwestSHPO concur req80908ER 964-10307-Oct-1107-Oct-110approvedFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
ER - North Loup RiverDR 5380909ER 1833-11702-Sep-1116-Sep-1114State project- NDOR completed and approved doc on 9/1/11 aned emailed to FHWA. ApprovedNDOR (or LPA) / Must prepare technical and NEPA documentation
ER - North Loup RiverDR 5380909ER 1833-11702-Sep-1116-Sep-1114State project- NDOR completed and approved doc on 9/1/11 aned emailed to FHWA. ApprovedNDOR (or LPA) / Must prepare technical and NEPA documentation
North Loup River, TaylorSHPO concur request809091833-11711/18/201111/25/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North Loup TaylorReevaluation Memo809091833-1175/30/20126/5/20126comments sent to NDORNDOR / address FHWA comments and resubmit
North Loup TaylorReeval Memo809091833-1176/12/20126/19/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Thedford - ValentineDR 5380911834-11622-Aug-1106-Sep-1115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Thedford - ValentineDR 5380911834-11622-Aug-1106-Sep-1115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Thedford to ValentineBio doc version 180911834-11612/16/201112/23/20117letters sent to USFWS, NGPC, Valentine National Wildlife RefugeFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
SE Jct US275 Antelope Co LineDR 5380913204-12505-Oct-1106-Oct-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
SE Jct US275 Antelope Co LineDR 5380913204-12505-Oct-1106-Oct-111approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ahntelope County LineBio doc version 180913204-12512/19/201112/23/20114letters sent to the agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ewing East and WestDR 53809142754-10512/21/201112/6/2011-15The email was received on 11/21/11 and filed in project file, but not placed on the task bar until today. approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Ewing East & WestSHPO concur request809142754-1055/21/20126/4/201214letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Loup County Line - BurwellDR 5380915914-10811/18/201111/23/20115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Loup County Line - BurwellBio doc version 180915914-1086/26/20127/2/20126approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Merriman - EliDR 5380916202-14030-Aug-1106-Sep-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Merriman - EliDR 5380916202-14030-Aug-1106-Sep-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Merriman to EliBio doc version one80916202-14012/19/201112/23/20114letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
N Jct. N-70 NorthwestDR 53809172813-11102-Sep-1114-Sep-1112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N Jct. N-70 NorthwestDR 53809172813-11102-Sep-1114-Sep-1112approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
N Jct. N-70 NorthwestBio doc version 1809172813-11112/19/201112/23/20114letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Ewing SouthwestDR 5380921ER 2260-223-Sep-1123-Sep-110Signed by Holt Co 2/17/11. Signed by NDOR 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Ewing SouthwestDR 5380921ER 2260-223-Sep-1123-Sep-110Signed by Holt Co 2/17/11. Signed by NDOR 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Inman NortheastDR 5380922ER 2270-223-Sep-1123-Sep-110Signed by Holt Co 2/17/11. Signed by NDOR 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Inman NortheastDR 5380922ER 2270-223-Sep-1123-Sep-110Signed by Holt Co 2/17/11. Signed by NDOR 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Emmet SouthDR 5380923ER 2105-323-Sep-1123-Sep-110Signed by Holt Co 2/17/11. NDOR signed 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Emmet SouthDR 5380923ER 2105-323-Sep-1123-Sep-110Signed by Holt Co 2/17/11. NDOR signed 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Stuart NortheastDR 5380924ER 2115-423-Sep-1123-Sep-110Holt Co signed 2/18/11, NDOR signed/approved 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Stuart NortheastDR 5380924ER 2115-423-Sep-1123-Sep-110Holt Co signed 2/18/11, NDOR signed/approved 9/22/11 and emailed to FHWA 9/23/11. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Naper SouthDR 5380925ER 2115-523-Sep-1123-Sep-110Signed by Holt Co 2/18/11. Signed by NDOR 9/22/11 and emailed to FHWA 9/23. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Naper SouthDR 5380925ER 2115-523-Sep-1123-Sep-110Signed by Holt Co 2/18/11. Signed by NDOR 9/22/11 and emailed to FHWA 9/23. FHWA concurred to proceed as PCE/CENDOR (or LPA) / Must prepare technical and NEPA documentation
Burwell NW BridgeDR 5380926964(104)5/2/20125/11/20129approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Bison BridgeCat Ex RTP 2011-57/26/20128/9/201214CE approvedNone
Tier 1 - Chicago to Omaha Regional Passenger Rail SystemCooperating Agency request  5/23/20127/18/201256letter mailed out todayNone
D2-D1 Device DeploymentBio doc vers 100649JITSN-20926-Oct-1027-Oct-101rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval
D1/D2 Device DeploySHPO concur req00649JITSN-20902-Dec-1010-Dec-108letter to SHPOFHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
LPA/NDOR Statewide Workforce DevelopmentDR 5300841ASTWD-11312-Jul-1119-Jul-117mm approved dr53NDOR (or LPA) / Must prepare technical and NEPA documentation
Alvo North BridgesDR 5311450A632-11408-Oct-1015-Oct-107rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Alvo North BridgeBio Doc vers 111450A632-11420-Dec-1027-Dec-107approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Alvo North bridgesSHPO concur req11450A632-11415-Mar-1116-Mar-111letter sent to SHPOFHWA sent the material to the resource agency(s) for review/concurrrence, which takes up to 4 weeks. Once all tech reviews and concurrences complete, next step is for NDOR to review/ approve the NEPA doc. If not a PCE, NDOR will submit CE to FHWA
Alvo North bridgesCE11450A632-11419-Aug-1103-Sep-1115approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
14th St Br, Linc; Mahoney Intrch rampsReevaluation12482, 12312809-855, -87228-Apr-1111-May-1113sent comments back to SteveNDOR / address FHWA comments and resubmit
Auburn E & In AuburnDR 5312994, 130621366(119), 1367(123)08-Mar-1108-Mar-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Jct N-64 to Schuyler; Jct Us-34 North; Ewing East & WestCat Ex13019; 71084; 80914152-122; 611-110; 2754-1057/31/20128/15/201215Batched: 152-122; 611-110; 2754-105. mm: had a couple items that had to be addressed, but will be quick fixesNone
Installation of Anti-Icing SystemsDR 5313136; 42661; 61539808-153; 807-160; 804-14212/7/201112/15/20118approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Falls City to US-75; Kansas State Line to AuburnDR 53 - resubmittal13205; 13206731-117; 751-1062/22/20123/5/201212approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Falls City-US75; K-State Line-AuburnBio doc version 113205; 13206731-117; 751-1063/5/20123/8/20123approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-133, N-36, North-Blair SouthSHPO concur request21791- 21791a1333-102; 1333-1034/5/20124/26/201221comments sent back to NDORNDOR / address FHWA comments and resubmit
N-36 North & Blair SouthSHPO concur request - version 221791; 21791A1333-102; 1333-1035/14/20125/25/201211comments sent to NDOR to addressNDOR / address FHWA comments and resubmit
Blair South / N-36 North OmahaNoise Study21791; 21791A1333-102; 1333-1035/23/20126/27/201235approved; minor comments sent as recommendations on future noise studies.this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-133, Jct. N-36 North, Omaha; Blair South4(f) req21791; 21791a1333-102; 1333-1036/29/20127/11/201212approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
N-36 North and Blair SouthCat Ex Reeval21791; 21791A1333-102; 1333-1037/17/20127/24/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Blair SouthBio doc vers 121791A1333-10314-Jan-1131-Jan-1117mm bio approved, based on verification NEPA questions are answeredthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Oreopolis Wetland Mitigation SiteNEPA Det. Form V221849F752-16810-Jun-1010-Jun-100 NDOR (or LPA) / Must prepare technical and NEPA documentation
Oreapolis Wetland Mitigation siteBio doc21849F752-16814-Jun-1022-Jun-108approved rbthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Omaha Riverfront Trail - Phase 4DR 5321973A28-10923-Sep-1126-Sep-113approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Omaha Interstate projectsGrouping for NEPA Analysis22143, etc809-89702-Nov-1018-Nov-1016 NDOR (or LPA) / Must prepare technical and NEPA documentation
Western Douglas Co. Trls; Phase 1 & 2SHPO concur req22227; 22227A28-87; 28-1026/12/20126/14/20122letters sent to SHPO and THPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
WDCT Phase 1; WDCT Phase 2Bio doc version 122227; 22227A28-87; 28-1027/5/20127/12/20127 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
WDCT - Valley to Waterloo, Ph 2DR 5322227A28-10209-Jun-1110-Jun-111approved, to be combined with 28-87NDOR (or LPA) / Must prepare technical and NEPA documentation
Fremont Main St Hist LightingSHPO concur req22272A27-6004-Apr-1107-Apr-113comments sent to NDORNDOR / address FHWA comments and resubmit
Fremont Main St Hist LightingBio doc22272A27-6013-Oct-1114-Oct-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
36th St Roadway Impr Ph 1 & 2DR 5322276 & 222885061-5, 3773-110-Jan-1126-Jan-1116sent comments to AllisonNDOR (or LPA) / Must prepare technical and NEPA documentation
Omaha Cocnrete Repair pkgs.Bio doc vers 122498, etc5001-18, etc04-Aug-1105-Aug-111approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Macy SouthSHPO Concur30848B754-10813-Sep-1023-Sep-1010mm sent email to clarify intent of letter to NDOR 9/13/10NDOR / address FHWA comments and resubmit
Macy SouthTribal Monitoring Agrmt30848B754-10818-Oct-1005-Nov-1018sent back to NDOR for them to sign; asked for a signed version ASAP so we can send to tribeNDOR / address FHWA comments and resubmit
Macy SouthTribal concur30848B754-10808-Nov-1009-Nov-101 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Belden East BridgeDR 5331342A206-10911/9/201111/14/20115sent comment back to NDOR to address.NDOR / address FHWA comments and resubmit
Belden East BridgeSHPO concur request31342A206-1094/6/20124/25/201219sent to SHPO FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In NorfolkFuture bike trail accommodation request memo31416A353-1075/4/20125/8/20124sent back comments to NDORNDOR / address FHWA comments and resubmit
Norfolk Ave, NorfolkDR 5331417A2755-14315-Apr-1121-Apr-116approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
37th to Norfolk Ave, NorfolkSHPO concur req31417A2755-14301-Aug-1104-Aug-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Norfolk SE, In Norfolk Norfolk NEBio doc version 131442, 31416A, 31416B353-105, 353-107, 353-10810/24/201110/28/20114approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Norfolk SE, In Norfolk, Norfolk NECE31442, 31416A, 31416B353-105; 353-107; 353-10811/21/201111/28/20117approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Newman Grove N BridgesDR 5331490a453-10905-Nov-1012-Nov-107rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Newman Grove North BridgesBio Doc31490A453-10908-Nov-1012-Nov-104rb approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Newman Grove NorthSHPO concur req31490a453-10915-Nov-1015-Nov-100letter mailed to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Newman Grove N brdgs4(f) temp occpcy ltr review31490A453-10910-Feb-1116-Feb-116letter ok to go to Citythis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Hwy N-45, Newman Grove N brdges4(f) concur letter31490A453-10910-Mar-1110-Mar-110approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Tilden South; In Tilden & Battle Creek NorthSHPO concur req - version 231808; 31897453-107; 453-1107/31/20128/16/201216letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Tilden South; In Tilden & BattleCreek NorthSHPO concur req31808; 31897453-107; 453-1107/17/20127/26/20129comments sent back to NDORNDOR / address FHWA comments and resubmit
Juct N-52, W and EDR 5331833A915-12404-Apr-1111-Apr-117approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Wayne South & Wayne South BridgeBio doc version 131886, 31893154-117, 154-1181/13/20121/17/20124approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Wayne South and BridgeDR 5331886, 318933189154-117, -11809-Nov-1012-Nov-103rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Fordyce E & W; Crofton EastSHPO concur req - revised31912; 32061126-116; 125-1156/7/20126/8/20121letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Columbus ViaductsSHPO concur request31924, etc6061-8, etc30-Nov-1002-Dec-102FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWAFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Columbus viaductsHazMat Memo31924, etc6065-5, etc08-Dec-1009-Dec-101comments sent to allison. Once comments are addressed the letters can go out - we don't need to see it again before the letters go out.NDOR / address FHWA comments and resubmit
Columbus ViaductsDraft EA31924, etc6065-5, etc06-Dec-1010-Dec-104comments sent to AllisonNDOR / address FHWA comments and resubmit
Norfolk SouthBio doc vers 131941A813-13902-Feb-1102-Feb-110letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dakota Ave resurv; Regency PrkwyBio doc vers 132081 and A5305-10, -1103-Mar-1108-Mar-115approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
Dakota Ave projectsDR 5332081, 32081A5305-10 and -1121-Oct-1021-Oct-100rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Dakote Ave 29th to Regency Parkway to I-129SHPO concur req32081/32081A5305-10, -1104-Apr-1107-Apr-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Dakota Ave, 29th to Regency Prkwy to I-129SHPO concur request32081; 32081A5305-10; 5305-116/8/20126/14/20126comments sent back to NDORNDOR / assist locals in addressing FHWA comments; then NDOR reviews and approves locals re-submittal; then NDOR re-submit to FHWA
US-30 Drain Impr, GIDR 5340352A304-15806-May-1111-May-115approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
US-30 Drainage ImprovementsBio doc version 140352A304-15812/7/201112/14/20117approvedthis tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
US-30 Drainage ImprovementsSHPO concur request40352A304-1582/7/20122/14/20127letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
US-30 Drainage Improvements, Grand IslandCat Ex40352A304-1585/8/20125/25/201217sent comments back to NDORNDOR / address FHWA comments and resubmit
US-30 Drainage ImprovementsCat Ex - revised40352A304-1586/28/20127/2/20124approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Wood River W viaductSHPO concur req42-32112-11422-Feb-1125-Feb-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Glenvil Spur & East Jct US-281 EastBio doc vers 142421, 42590S18E-106 & 744-11012/6/201112/14/20118letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Alexandria South BridgesSHPO concur request42474 & 42533531-103 & 531-1045/21/20126/14/201224comments sent to NDORNDOR / address FHWA comments and resubmit
Alexandria SouthSHPO concur req42474, etc531-103, -10428-Jan-1131-Jan-113letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Alexandria S and Alex S BridgesSHPO concur req42533, 42474531-103 & -10412-Nov-1015-Nov-103letter mailed to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Alexandria South & South BridgesPurpose & Need for comments42533; 42474531-103; 531-1043/6/20124/20/201245 NDOR (or LPA) / Must prepare technical and NEPA documentation
E Jct US-281 East - Glenvil SpurCat Ex42590, 42421744-110, S18E-1062/7/20122/15/20128provided comments to NDOR.NDOR / address FHWA comments and resubmit
E Jct US-281 East; Glenvil Spurdraft CE42590; 42421744-110; S18E-1062/21/20123/5/201213revised changes look ok. NDOR to resubmit document with changes and signatures.NDOR / address FHWA comments and resubmit
E. Jct. US-281 East; Glenvil SpurCat Ex42590; 42421744-110; S18E-1063/7/20123/15/20128approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Platte River BR E of GI; N Loup W Brdge; Kearney S Platte Rvr BR; Rockville S BrdgeDR 5342607; 42715; 42719; 42725345-118; 224-111; 442-109; 682-1048/6/20128/16/201210approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Bio doc vers 1Wood Rvr - GI; Platte - Phillips42667; 42668806-109, -11028-Feb-1102-Mar-112letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Pioneer Spirit Trail Ph IIISHPO concur req42688, 42688A1-50, 1-5113-Oct-1114-Oct-111letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Pioneer Spirit TrailSHPO concur request42688, 42688A1-50, 1-5111/18/201111/25/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Pioneer Spirit Trail Phase III4(f)42688, 42688A1-50; 1-5112/7/201112/15/20118document wasn't submitted (only the transittal sheet was.NDOR / address FHWA comments and resubmit
Pioneer Spirit TrailCat Ex42688a1-507/19/20127/26/20127approvedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Alexandria S and Alex S BridgesDR 53 - revised442533, 42474531-103 & -10412-Nov-1012-Nov-100rb approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Dix South & East; Kimball to DixSHPO concur req51233; 51395301-134; 301-1276/25/20126/27/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Bayard & South; Sioux/Box Butte Co Line to N-2DR-53 approvals51292, 51373261-160; 714-1196/1/20126/12/201211projects are not to be combined. NDOR resubmitting DR53 as seperate projects.NDOR / address FHWA comments and resubmit
D-5 I-80 Bridge repairsDR 5351431A801-18218-May-1127-May-119sent comments back to SaraNDOR / address FHWA comments and resubmit
District 5 - I-80 Bridge RepairBio doc version 151431A801-18212/13/201112/20/20117letters sent to agencies.FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
District 5 - I-80 Bridge Repair Part 2Bio doc version 251431A801-1821/4/20121/9/20125letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Potter-Brownson CrossoversSHPO concur request51451, 51451A801-178; 801-18412/8/201112/9/20111comments sent back to NDORNDOR / address FHWA comments and resubmit
Potter - Brownson, Potter Brownson crossoversSHPO concur request - revised51451, 51451A801-178, 701-18412/19/201112/21/20112letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Potter - Brownson, Potter - Brownson CrossoversBio doc version 151451, 51451A801-178, 801-18412/27/20111/3/20127discussed comments with NDORNDOR / address FHWA comments and resubmit
Potter - Brownson & Potter - Brownson CrossoversBio doc version 251451, 51451A801-178, 801-1841/3/20121/3/20120letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Sunol-Chappell; Sunol-Chappell CrossoversSHPO concur req51459; 51459A802-97; 802-996/5/20126/8/20123letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Cottonwood Crk N of Crawford; Crawford - SD lineDR 5351499; 51505714-120; 714-1217/11/20127/13/20122approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Crawford Creek N of Crawford; Crawford - SD LineSHPO concur - version 251499; 51505714-120; 714-1217/27/20128/17/201221reviewed this morning. should go out to SHPO tomorrow (8/17).FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Cottonwood Creek N of Crawford; Crawford - SD LineSHPO concur req51499; 51505714-120; 714-1217/18/20127/26/20128comments sent to NDORNDOR / address FHWA comments and resubmit
Big Springs SW and Colorado Line NESHPO concur request61279, 612801382-107, 1382-10811/18/201111/25/20117letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Big Springs SW; Colorado Line NEDR 5361279, 801382-107, -10806-Oct-1106-Oct-110approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Gothenburg E & W, Cozad - DarrBio doc vers 1 revised61425, 61426804-137 & -13816-Mar-1116-Mar-110letters sent to agenciesFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
North PlatteBio Doc61449 & 61449A832-139 & 832-14030-Sep-1130-Sep-110 this tech doc approved. Once NDOR completes all tech reviews, NDOR reviews/ approves NEPA. If not a programmatic CE, NDOR will then submit NEPA to FHWA for review/approval.
S Platte Rvr N & In North PlatteDR 5361449 and -A832-139, -14006-Jun-1110-Jun-114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Stapleton North & Stapleton SouthBio doc version 161463, 61464833-108, 832-13312/6/201112/14/20118letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
O'Neill WestSHPO concur req7045-287045-287/10/20127/16/20126"letter sent to SHPO
"FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Campbell WestCE70476a4-4(103)17-Feb-1022-Feb-105signedNEPA document approved, NDOR to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Stamford WestDR 5370589A892-10911/21/201111/25/20114approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Stamford WestBio doc version 170589a892-1094/20/20124/23/20123asked NDOR to amend the BA to match the PA requirements; no need to submit to FHWA or resource agencies if following the PANDOR (or LPA) / Must prepare technical and NEPA documentation
Bloomington to FranklinDR 5370592A1364-1113/29/20124/20/201222DR53 sent back with questions that will hopefully clarify the anticipated impactsNDOR / address FHWA comments and resubmit
Bloomington-FranklinDR-53 resubmittal70592A1364-1114/26/20125/8/201212approved with commentsNDOR (or LPA) / Must prepare technical and NEPA documentation
Bloomington to FranklinArechaeological testing plan - version 270592A1364-1118/1/20128/16/201215letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Bloomington to FranklinArcheological testing plan70592a1364-1117/12/20127/25/201213comments sent back to NDORNDOR / address FHWA comments and resubmit
Danbury West; Danbury - Lebanon; Lebanon - Jct N-47DR 5370727, 70890, 71099892-108; -110; -1121/31/20122/13/201213approvedNDOR (or LPA) / Must prepare technical and NEPA documentation
Danbury West; Danbury-Lebanon; Lebanon-Jct N-47SHPO concur req - version 270727; 70890; 71099892-108; 892-110; 892-1125/11/20125/25/201214letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Danbury West;Danbury-Lebanon;Lebanon-Jct N-47SHPO concur request70727;70890;71099892-108; 892-110; 892-1124/18/20124/27/20129sent comments back to NDORNDOR / address FHWA comments and resubmit
Moorefield E & W; Curtis EastBio doc - version 170889; 71102232-121; 232-1246/27/20127/2/20125letters sent to USFWS and NGPCFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
In Bassett and NorthDR 5380684A74-11413-Jun-1116-Jun-113mm concurred on CENDOR (or LPA) / Must prepare technical and NEPA documentation
In Bassett & NorthSHPO concur req80684A74-11402-Sep-1107-Sep-115letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Temporary Emergency Repair ProjectsDR 5380909TER 1833-117T12/20/201112/22/20112 None
ER 2010 Relief ProjectsDR 53 -batched multiple projectsERER01-Jul-1108-Jul-117mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
ER 2010 Relief ProjectsDR 53 -batched multiple projectsERER01-Jul-1108-Jul-117mm concurredNDOR (or LPA) / Must prepare technical and NEPA documentation
ER 2010 Relief ProjectsSHPO Concur Req - batched multiple projectsERER07-Jul-1111-Jul-114this is a batch Section 106 consultation with SHPO for all the 2010 temp repair work completed. Batched at FHWA's request for expediency. mm reviewed 7/8, gave to front office to format for submittal. SHPO concurrence received in AugustFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
ER 2010 Relief ProjectsSHPO Concur Req - batched multiple projectsERER07-Jul-1111-Jul-114this is a batch Section 106 consultation with SHPO for all the 2010 temp repair work completed. Batched at FHWA's request for expediency. mm reviewed 7/8, gave to front office to format for submittal. SHPO concurrence received in AugustFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
2010 ER Temp RepairsBio doc - batched multiple projectsERER 201007-Oct-1107-Oct-110FHWA reviewed document and sent comments back to NDOR. NDOR didn't sign the document, changed the determinations agreed to by consulting parties without explanation, and needs to address previous resource agency commentsNDOR / address FHWA comments and resubmit
2010 ER Temp RepairsBio doc - batched multiple projectsERER 201007-Oct-1107-Oct-110FHWA reviewed document and sent comments back to NDOR. NDOR didn't sign the document, changed the determinations agreed to by consulting parties without explanation, and needs to address previous resource agency commentsNDOR / address FHWA comments and resubmit
ER 2010 Temp repairsbatched bio doc for all 2010 temp repairs, ver 2ERER201011-Oct-1111-Oct-110FHWA pulled up bio doc at Matrix meeting, helped NDOR to amend, with USFWS and NGPC. Then FHWA printed it off and all parties signed. Agency concurrence by sig. MM told NDOR to send the paragraph NEPA memo ASAP to complete processawaiting submittal of NEPA memo from NDOR ( a quick paragraph summary of their "unusual circumstance" review)
ER 2010 Temp repairsbatched bio doc for all 2010 temp repairs, ver 2ERER201011-Oct-1111-Oct-110FHWA pulled up bio doc at Matrix meeting, helped NDOR to amend, with USFWS and NGPC. Then FHWA printed it off and all parties signed. Agency concurrence by sig. MM told NDOR to send the paragraph NEPA memo ASAP to complete processawaiting submittal of NEPA memo from NDOR ( a quick paragraph summary of their "unusual circumstance" review)
Wolff Trail Renovation, LincolnCERTPRTP2010-00706-Dec-1016-Dec-1010approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Oak Park TrailCERTPRTP2010-00306-Dec-1016-Dec-1010approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Wolff Trail Renovation, LincolnCERTPRTP2010-00706-Dec-1016-Dec-1010approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Oak Park TrailCERTPRTP2010-00306-Dec-1016-Dec-1010approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Bison Bridge ReplacementSHPO MOA CommentsRTPRTP2011-00515-Feb-1128-Feb-1113sent comments to Michelle Stryker for revising.NGPC / address FHWA comments and resubmit
Bison Bridge ReplacementSHPO MOA CommentsRTPRTP2011-00515-Feb-1128-Feb-1113sent comments to Michelle Stryker for revising.NGPC / address FHWA comments and resubmit
S Park Trl, Schuyler, Cole Prk Trl, AuroraState T&E reviewRTPRTP2010-002, 00628-Feb-1107-Mar-117approvedFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
S Park Trl, Schuyler, Cole Prk Trl, AuroraState T&E reviewRTPRTP2010-002, 00628-Feb-1107-Mar-117approvedFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NGPC review/ approve the NEPA document. 2) NGPC submit NEPA to FHWA
Deshler Park TrailNEPA ComplianceRTPRTP2011-00326-Apr-1112-May-1116provided comment to MichelleNGPC / address FHWA comments and resubmit
Deshler Park TrailNEPA ComplianceRTPRTP2011-00326-Apr-1112-May-1116provided comment to MichelleNGPC / address FHWA comments and resubmit
Cowboy Trail - RTPNEPA compl docsRTPRTP2011-406-Jun-1110-Jun-114approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Cowboy Trail - RTPNEPA compl docsRTPRTP2011-406-Jun-1110-Jun-114approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Motocross Track, LincolnArcheological ReportRTPRTP2009-00625-Jul-1109-Aug-1115mm reviewed report 7/25 and feels it is adequate. Mm needs to write the summary and recommendation into a letter to SHPO stillFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Motocross Track, LincolnArcheological ReportRTPRTP2009-00625-Jul-1109-Aug-1115mm reviewed report 7/25 and feels it is adequate. Mm needs to write the summary and recommendation into a letter to SHPO stillFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
Streeter Park Trl, AuroraNEPA complianceRTPRTP2010-00416-Aug-1107-Sep-1122approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Streeter Park Trl, AuroraNEPA complianceRTPRTP2010-00416-Aug-1107-Sep-1122approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Hebron Rock Island TrailNEPA complianceRTPRTP2010-00519-Sep-1120-Sep-111approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
Hebron Rock Island TrailNEPA complianceRTPRTP2010-00519-Sep-1120-Sep-111approvedNEPA document approved, NGPC to evaluate any project scope/condition changes through development and construction to determine if a re-evaluation is required
RTP Motocross parking lot reportSect 106 final reportRTPRTP2009-00605-Oct-1112-Oct-117mm, sent back to NGPC - signature missing from doc. Once corrected, will send to SHPO for concurrenceNGPC / address FHWA comments and resubmit
RTP Motocross parking lot reportSect 106 final reportRTPRTP2009-00605-Oct-1112-Oct-117mm, sent back to NGPC - signature missing from doc. Once corrected, will send to SHPO for concurrenceNGPC / address FHWA comments and resubmit
RTP Motocross parking lot reportSect 106 final report2RTPRTP2009-00614-Oct-1117-Oct-113mm, sent back to NGPC - signature missing from doc. Once corrected, will send to SHPO for concurrenceNGPC / address FHWA comments and resubmit
Bison Bridge ReplacementNGP Bridge Recordation Plan RTP2011-00512/1/201112/13/201112letter with enclosures to go to SHPO 12/13/11FHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
ER 2008-2010 Perm Repair ProjectsSHPO concur request  1/23/20121/25/20122letter sent to SHPOFHWA sent material to resource agency(s) for consultation, which takes up to 4 weeks. Once all tech reviews complete, then: 1) NDOR review/ approve the NEPA document. 2) If not a PCE, NDOR submit NEPA to FHWA
AVERAGE FHWA TURNAROUND 6.59 Calendar days

 

* Note: DR 53 is a simple one page yes/no checklist, serving as an early concurrence point for determining if an action will likely be a CE, EA, or EIS. The DR 53 also serves as an early communication tool between FHWA, NDOR, and the project proponent. This is not a NEPA document, but is the "kickoff point" for the environmental review.

** Note: a 0 (zero) value in the Response Time column indicates a document received and responded to in the same day

*** To determine the next step for a project, read the info in this column for the last submittal received related to the project

 

Contacts

Melissa Maiefski, Program Delivery Team Leader
(402) 742-8473