Stewardship and Oversight Agreement
Previous | Table of Contents | Next
Appendix B – New Mexico Division FMIS Checklist
Fed-Aid Project#: |
|
Control Number: |
|
Reviewed by: |
|
Date: |
|
Paperwork Needed:
- Right-of-way Certification
- Cleared Certification ( )
- Conditional Certification with approved stipulations( )
- Railroad Certification
- a. Cleared Certification( )
- Conditional Certification with approved stipulations( )
- Environmental Certification
- Environmental Commitments( )
- Utility Certification
- Cleared Certification( )
- Conditional Certification with approved stipulations ( )
- ITS Checklist ( )
- Fed Form ( )
- Project Estimate ( )
In FMIS
- Oversight Code matches most recent PMTM( )
- Check the type of funds used, the % of federal share
and ensures it matches the type of work and project limits ( )
- Project is on the current and approved STIP and the funds match
and project limits are correct ( )
For State Administered:
- NMDOT provided PS&E Checklist( )
For Federal Oversight:
- FHWA PS&E Checklist ( )
- Value Engineering Study on projects >$25 Mil ( )
- Life Cycle Cost Analysis (Pavements) for project >$25 Mil( )