Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Pavements

Need 1: New and Reconstructed Pavements

The following boxes are specific product projects that fall under Need 1. To see the detailed product statement, click on the corresponding box.

Coefficient of Thermal Expansion of Concrete
Responsible Agency: FHWA
Funding Required: $0
ETG: Materials
Current Product Phase: Supported
Introduced: 2000
Expected Phase Completion: N/A

Design Pamphlet in Support of the 1993 AASHTO Guide for the Design of Pavement
Responsible Agency: FHWA
Funding Required: $0
ETG: Materials
Current Product Phase: Supported
Introduced: 19972000
Expected Phase Completion: N/A

Factors Affecting Pavement Smoothness
Responsible Agency: FHWA
Funding Required: $0
ETG: Distress Profile
 Current Product Phase: Identify
Introduced: 2003
Expected Phase Completion: N/A

Guidelines for Design Resilient Modulus for Soils
Responsible Agency: FHWA
Funding Required: $4,000
ETG: Materials
 Current Product Phase: Supported
Introduced: 2001
Expected Phase Completion: 12/1/03

LTPPBind version 3.0
Responsible Agency: FHWA
Funding Required: $191,5950
ETG: Materials
Current Product Phase: Development
Introduced: 2002
Expected Phase Completion: 2/1/04

LTPPBind version 2.1
Responsible Agency: FHWA
Funding Required: $0
ETG: Materials
Current Product Phase: Supported
Introduced: 1998
Expected Phase Completion: N/A

PCC Pavement Practice Manual
Responsible Agency: FHWA
Funding Required: $0
ETG: Products Subcommitte
Current Product Phase: Supported
Introduced: 2001
Expected Phase Completion: 6/1/99

Resilient Modulus for Unbound Materials (Protocols)
Responsible Agency: FHWA
Funding Required: $0
ETG: Materials
Current Product Phase: Transferred
Introduced: 19962000
Expected Phase Completion: 2/1/03

Rigid Pavement Design Software
Responsible Agency: FHWA
Funding Required: $0
ETG: Analysis
Current Product Phase: Supported
Introduced: 1997
Expected Phase Completion: 6/1/99

Guidelines for the Selection of Pavement Design Features
Responsible Agency: FHWA
Funding Required: $0
ETG: N/A
 Current Product Phase: Identify
Introduced: 2003
Expected Phase Completion: N/A

 
This page last modified on 06/02/06
 

FHWA
United States Department of Transportation - Federal Highway Administration